B.08.03 W911KB20R0006-0003 Amendment.pdf

PDF 364 KB Posted

Attached to
OPTIMIZED REMEDIATION CONTRACT, JOINT BASE ELMENDORF-RICHARDSON, ALASKA
Solicitation number
W911KB20R0006
Issued by

View the file

Other files

File Type Posted
B.08.03 W911KB20R0006-0004 DBA Wage Rate Update.pdf PDF
DBA Wage Rates for Amendment 0004.pdf PDF
B.08.03 Amendment 0003 KTR Questions and Answers 1 May 2020.pdf PDF
Final DP098 DNAPL Evaluation Report April-2018-with App B.PDF PDF
JBER ORC_FY20_Enclosure 2 - GFI List_20200424.xlsx XLSX spreadsheet
Amendment 0002 - DOD Safe Instructions.docx DOCX document
W911KB20R0006-0002 SF30 and Conformed Copy.pdf PDF
F22SVE_AAR Final.pdf PDF
SD15_Final_Report.pdf PDF
Amendment 0002 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Attachment B-1 CLIN-Sub-CLIN Structure_rev1_20200414.xlsx XLSX spreadsheet
Amendment 0001 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Schedule B JBER ORC.xlsx XLSX spreadsheet
Amendment 0001 - Enclosure 2A - GFI AR Spreadsheet.xlsx XLSX spreadsheet
Amendment 0001 - JBER ORC_FY20_Enclosure 2 - GFI List_20200415.xlsx XLSX spreadsheet
W911KB20R0006-0001 SF30 and Conformed Copy.pdf PDF
Amendment 0001 - L-3 ORC PMP Guidance v1.0_20191115_final.pdf PDF
B.08.02 Attachment L-2 Labor Category Qualifications 4 March 20.pdf PDF
B.08.02 Attachment C-8 Optimization Benefit Template_190520_MD_190710.pdf PDF
B.08.02 Attachment B-1 CLIN-Sub-CLIN Structure.xlsx XLSX spreadsheet
B.07.01 ORC Virtual Site Visit Draft Final 25 Feb 20.pptx PPTX presentation
B.08.02 Attachment C-2 ORC PMP Guidance v1.0_20191115.pdf PDF
B.08.02 Attachment C-1 PWS Enclosure 1_Acronyms and Definitions.pdf PDF
B.08.02 Attachment J-1 JBER ORC_FY20_Enclosure 2 - GFI List_201911213.pdf PDF
B.08.02 Attachment C-5 Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
B.08.02 GFP List.pdf PDF
B.08.02 Attachment J-2 QASP_ORC.pdf PDF
B.08.02 Attachment C-6 Field Sampling Protocol PFOA-PFOS-PFBS Guidance__June 2019.pdf PDF
B.08.02 Attachment C-7 nterim Guidance 1-4 Dioxane, Environmental Restoration Program.pdf PDF
B.08.02 Attachment C-4 AFGM2019-32-01,AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
B.08.02 W911KB20R0006.pdf PDF
B.08.02 Attachment C-3 Draft CPSMR template- 25Aug2019.pdf PDF
B.08.02 Attachment L-1 Past Performance Quality Questionaire.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide Contractor Questions and the Government answ ers. No other changes are being made as a result of this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB20R0006

X 9B. DATED (SEE ITEM 11)

21-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-May-2020

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB20R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .