This statement of work outlines environmental remediation services required at the Fort Glenn Formerly Used Defense Site on Umnak Island, Alaska. The U.S. Army Corps of Engineers seeks a contractor to conduct a limited containerized hazardous, toxic, and radioactive waste removal action for projects involving transformers and miscellaneous abandoned machinery. Services include inspection and documentation of drums, tanks, transformers and equipment; soil sampling and analysis; and archaeological monitoring and reporting. Work must be completed by May 2021 and is subject to the 2017 USACE Alaska District Manual for Electronic Deliverables. The contractor must provide onsite medical and quality assurance personnel throughout field activities.

W911KB19R0007 - AMENDMENT 0004

View the file

Other files

File Type Posted
A.7.23_19R0007_AMENDMENT_0003_Issued_02MAY19_SB_ERS.pdf PDF
A.7.23_19R0007_AMENDMENT_0002_Issued_29APR2019_SB_ERS.pdf PDF
A.7.23_AMENDMENT_0001_SB_ERS_W911KB19R0007.pdf PDF
17_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
18_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
16_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
15_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
6_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
9_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
12_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
8_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
10_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
14_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
7_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
13_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
11_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
2_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
5_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
4_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
3_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
1_W911KB19R0007-Attachment_L-6_PWS_GFI_GFM.pdf PDF
A.7.23_19R0007_Issued_02APR2019_SB_ERS.pdf PDF
L-1_Resume_of_Offeror's_Environmental_Experience.doc DOC document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SB ERS MATOC SOLICITATION, $140M

The purpose of this Amendment is to incorporate the final bidder inquiry responses and incorporate any changes included on the Summary of Changes. All other items remain unchanged.

POC for this Amendment is Clara Sullivan, clara.d.sullivan@usace.army.mil.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0007

X 9B. DATED (SEE ITEM 11)

02-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-May-2019

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB19R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following SECTION B TABLE 4 has been modified to add the word “Profit”:

These are Firm-Fixed Price (FFP) Ceiling Fully Burdened Hourly Rates. The contractor may propose lower rates for any task order, but shall not exceed these rates in task order proposals. AMENDMENT 0003…Provide labor rate calculation chart from Section J in support of listed rates… AMENDMENT 0003 *The offeror shall completely fill out all tables in Section B for the prime offeror and any key subcontractor firm(s).

TABLE 4

Key Personnel Basic Hourly Rate Option #1 (1YR) Contract Year 4

Program Manager $ Project Manager(s) $ Program Chemist $ Health & Safety Manager $ Contractor Quality Control (CQC) Systems Manager $ Environmental Engineer(s) $ Environmental Scientist(s) $ Site Superintendent $

Escalation Factor Over Previous Year Rates NA

G&A

OVERHEAD

PROFIT

Non-Key Personnel Basic Hourly Rate Option #1 (1YR) Contract Year 4

Site Safety and Health Officer $ Project Chemist $ Sampling Technician $

Escalation Factor Over Previous Year Rates

G&A

OVERHEAD

PROFIT

Each Contract Year equates to one (1) calendar year from the date of contract (or option) award.

Per Diem shall be in accordance with the Joint Travel Regulations.

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates from the option year.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text: INCORPORATED BY AMENDMENT 0004

Bid Inquiry Contractor Report All Inquiries (150 INQUIRIES TOTAL)

-AMENDMENT 0004 INCLUDES ONLY MAY 2019 ANSWERED INQUIRIES

INCORPORATED IN AMENDMENT0003 & AMENDMENT 0004-

Project: Solicitation - W911KB19R0007 Review: W911KB19R0007 SB ERS $140M Information for this report is procurement sensitive.

7928392 Contracting Section H 1.0 Minimum

Insurance Required

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that when required, qualified subcontractors and vendors can indemnify CAPE and the government and provide the following insurance: (d) Aircraft Public and Passenger Liability Insurance, and (e) Vessel Collision Liability and Protection and Indemnity Liability Insurance. Those types of insurance require firms to have licensed pilots, for example, so cannot typically be obtained by environmental contractors.

On: Apr 05 2019.

Government Response. . The FAR Clause 52.228-5 applies to this solicitation, as well as the items stated in SECTION H, Paraqraph 1.1. The reference to FAR

28.307 is deleted in AMENDMENT 0003 (it is not applicable). Please note that the Government does not have purview over subcontractors or other vendors. The prime is responsible for what is required in the solicitation and any resultant contract. On:

May 02 2019

Current Request Status: Request Closed

7928410 Contracting Section L Attachment L-8

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

If the Offeror is a joint venture, should the answers to questions 4 through 8, and copies of financial statements and credit reports be provided for the individual firms?

On: Apr 05 2019.

Government Response. . Yes. Copies of financial statements and credit reports shall be provided for the individual firms of a JV, as well as, the JV firm. On: May 01 2019

7931357 Environmental Attachment L-6 PWS for

Sample CPFF-CF Task Order Project

Will the government require the contractor to provide a dedicated medical infirmary on site attended by a full-time Emergency Medical Technician (EMT III) during field operations?

On: Apr 08 2019.

Government Response. . Yes, the Government requires the contractor to provide a dedicated medical infirmary on site attended by a full-time Emergency Medical Technician (EMT III) during field operations. On: May 01 2019

7931359 Contracting Section B Labor Rates

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section B indicates that we are to use a Labor Rate Calculation Chart from Section J in support of listed rates. With regard to the Labor Rate Calculation Chart:

(1) Is the intent to show how each contractor's loaded rate is built (i.e., how indirect rate structure is applied to the unloaded hourly rate) for each listed key and non-key labor classification? This seems to align with the direction given in 5.3 of Section L.

(2) A Labor Rate Calculation Chart was not provided with the RFP. Can the contractor develop their own Labor Rate Calculation Chart that shows hour our indirect rate structure is applied to each key and non-key position, especially since each firms OH rate structure is different?

On: Apr 08 2019.

Government Response. . What will be required for labor rate other than cost or pricing data information (including any referenced Section J Labor Chart) will be clarified and issued with Amendment 0003. This is a firm-fixed price services solicitation that will be review key personnel labor rates, G&A, OH, and Escalation Rates. On: May 01 2019

7932942 General Tab 5.1(c)

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Regarding paragraph 5.1(c): "Offerors shall submit plans in accordance with FAR Clause 52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL EMPLOYEES for professional employee categories as defined within Clause." Please clarify the requirements for this submittal. Does the government require a compensation plan detailing all professional staff and their salaries?

On: Apr 09 2019.

Government Response. . The FAR Clause 52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL EMPLOYEES is not applicable to this solicitation and will be deleted via forthcoming AMENDMENT 0003. On: May 01

7933027 General Attachment L-6 PWS: Section

4.6.1

Sample Project PWS Project 16 - Please clarify if only transformers require removal and disposal, or if other items listed in Table 5 (e.g. poles, stumps, guy lines, etc.) also require removal and disposal.

On: Apr 09 2019.

Government Response. . Only transformers require removal and disposal On:

May 01 2019

7934983 Environmental Proposal Submission

Requirements

On page 341 of the RFP, it states that 3.2.1, Tab 2.1 Volume 1, Factor 2, Management Plan should be no longer than 3 double-sided pages. Is that the only section that is to be double-sided, or will other sections of the proposal need to be double-sided? If so, which other sections should be double-sided?

On: Apr 10 2019.

Government Response. . Any page can be double-sided. On: Apr 30 2019

Government Response. . The text below appends or clarifies ALL previous replies.

All pages should be double-sided in accordance with FAR CLAUSE 52.204-4. On:

May 06 2019

7934996 Environmental

Requirements and PWS

Please clarify the information in Attachment L-6, Section 4.6.2: The first paragraph states:

"Twenty pieces of equipment were identified in the Site Reconnaissance Report. The contractor shall remove fluids from each piece of machinery, including any batteries." The second paragraph states: "The work under this task includes removal, packaging, transportation, and disposal of fluids and batteries from machinery or equipment listed and described in Attachment 2 (2018 SR Table 7), and all related work, up to a total of 25 pieces of machinery." The end of the second paragraph states: "Contractor shall assume removal, sampling, and disposal of up to 25 pieces of abandoned machinery." Will the Contractor be required to only remove the fluids and batteries for up to 25 pieces of equipment or does the scope of work require the Contractor to remove the fluids, batteries, and equipment?

On: Apr 10 2019.

Government Response. . The Contractor is required to only remove the fluids and batteries for up to 25 pieces of equipment. On: May 01 2019

THE ABOVE ANSWER IS REVISED TO COINCIDE WITH RESPONSE TO

SIMILAR QUESTION AND UPDATED SAMPLE FFP PERFORMANCE

WORK STATEMENT (PWS) – AMENDMENT 0004… The Contractor is required to only remove the fluids and batteries for up to 20 pieces of equipment…AMENDMENT 0004.

7939565 Contracting 1 1 1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Under section 4.6.1 of the SOW Limited Con/HTRW Removal Action, can you confirm the intent of 128 ISM samples, which could equate to up to 128 individual decision units and associated QA/QC samples, vs. discrete sampling on Transformers (Project 16)?

On: Apr 15 2019.

Government Response. . The intent is to sample under each identified transformer location as well as at the base of each identified pole from Table 5. Sampling should be in accordance with TSCA Code of Federal Regulations (CFR) 761 subpart O grid sampling requirements. On: May 02 2019

7939586 Contracting 1 1 1

Under section 4.6.1 of the SOW Limited Con/HTRW Removal Action, can you confirm the intent of 128 ISM samples, which could equate to up to 128 individual decision units and associated QA/QC samples, vs. PCB sampling in accordance with TSCA Code of Federal Regulations (CFR) 761 subpart O grid sampling requirements and or discrete sampling on Transformers (Project 16)?

On: Apr 15 2019.

Government Response. . The intent is to sample under each identified transformer location as well as at the base of each identified pole from Table 5. Sampling should be in accordance with TSCA Code of Federal Regulations (CFR) 761 subpart O grid sampling requirements. On: May 02 2019

7939812 General

Tab 3.0 FACTOR 3 – Technical Approach to

Sample FFP Task Order Project:

Comment Classification: UNCLASSIFIED (U)

Tab 3.0 FACTOR 3 – Technical Approach to Sample FFP Task Order Project: Per the RFP and Amendment 1, the page limits for sub-tabs 3.1 through 3.6 is noted as 2 pages or less for each sub-tab. Would the government consider combining the page limit for these sub-tabs to be 12 pages as a whole for Factor 3 instead of breaking it up by sub-tab?

Government Response. . The text will be revised to: "Limit the information in this factor to 12 pages or less (to include an additional 11x17 page for schedule."

On: May 01 2019

7940397 Environmental Attachment L-6 PWS for

Sample CPFF-CF Task Order Project, Delivery Date

Amendment 1 changed the delivery date for the sample project to end on 31 December 2020;

however, the date for reporting documents was not changed, so field work will still need to occur in the winter. Should 30 April 2020 be the date by which all planning documents are to be finalized and submitted instead of reporting documents?

Government Response. . The scope will be corrected to show a delivery date of 31 May 2021. The Final reporting documents will be required by 30 April 2021. On:

7941358 General Attachment 2

(2018 SR Table 7)

In Attachment 2 (2018 SR Table 7) the first item listed (EQ14-2017) is described as a "Bucyrus Erie cable tool drill rig on tracks" located in the Ashishik Subarea. There was no photo provided for this piece of equipment. Will the contractor be required to remove and dispose fluids and batteries from this piece of equipment and collect an ISM sample from underneath it?

On: Apr 16 2019.

Government Response. . No photo is available. Yes, the contractor is required to remove and dispose fluids and batteries from this piece of equipment and collect an ISM sample from underneath it. On: May 01 2019

7943706 Contracting Amendment 1 pg 4-6 Section B Labor Rates

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The instructions require rates and we're assuming documentation for how rates are calculated for the prime and major subs/teaming partners. May subcontractors/teaming partners submit their base rates and markups, escalation, rate build-up calculations, and any financial information (other than the fully loaded rates) directly to USACE? This financial information is proprietary and companies are not comfortable sharing it with other companies/competitors.

On: Apr 17 2019.

Government Response. . No, information from any subcontractors shall not come separate to the Government. The prime offeror is responsible for any information required in their proposal to include any key personnel or key subcontractor labor rate information. Clarification on the G&A and OH Rate, and fully burdened key personnel labor rate will be provided in Amendment 0003. On: May 01 2019

7948564 Contracting Para 5.3, Tab 3, Volume 2 pg 69

Response to 7943718 & Section L

We question USACE's response to question 7943718 which indicated that Amendment 1 deleted the requirement for supporting information for the Section B rates:

1. Basis for the direct labor rates

2. DCAA audit

3. Weighing factors if weighted rates are used

4. Rate build-up calculations

5. Basis for proposed escalation and copies of escalation forecasts

Amendment 1, Section L, paragraph 5.3, Tab 3 Volume 2 (pg 69) states that the financial information identified above is required from the offeror. Since the USACE requires labor rates from the prime offeror AND Key Subcontractors, please confirm:

1) that KEY SUBCONTRACTORS are ONLY required to provide their labor rates and are NOT required to provide their indirect rates and show how they build their labor rates.

2) that financial back-up is NOT required to support the rates submitted by the KEY

SUBCONTRACTORS.

On: Apr 20 2019.

clarified and issued with Amendment 0003. This is a firm-fixed price services

Rates. On: May 01 2019

7950258 Contracting RFP, Amend

Page 68 of 79 Section 5.3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph on "FFP Ceiling Burdened Hourly Rates" tables closes by stating in part: "The offeror shall provide the rate build up calculations in Excel format showing application of all indirect rates required to obtain the fully burdened rate...". For subcontractor rate build up, our Key Subcontractor(s) would like to submit rate build-up calculations (printed copy and Excel format on CD) directly to the Contracting Officer since this information is company confidential. Please confirm this is acceptable.

On: Apr 22 2019.

clarified and issued with Amendment 0003. This is a firm-fixed price services

Rates. NO subcontractor rate build up or any other Key Subcontractor(s) information will be submitted separate from a prime offeror's proposal to the Government. The prime offeror has full responsibility for a complete and responsive proposal. On: May 01 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7951085 General Section L, 3.2.3 Tab 2.3, Vol. 1, Factor 2 -

Key Personnel

Please confirm for this proposal: Can the Site Superintendent also serve as the CQC Systems Manager and HSM, or does the CQC Systems Manager have to be a stand-alone position? In the past, these positions could be dual-hatted.

On: Apr 22 2019.

Government Response. . Please refer to the Section C, Paragraph 8.1, "One (1) person may perform the duties of more than one (1) role if the person has the expertise and experience for both positions, based on the specific requirements of the TO; HOWEVER, UNLESS APPROVED by the COR for a specific Task Order (TO), the Site Superintendent and the CQC Manager may NOT be the same person.

7953085 Contracting Amendment 1 pg 4-6 Section B Labor Rates/Tab 3

Vol 2

Please confirm the requirements of Vol 2, Tab 3. Is USACE's requirement that the offeror submit one version of the tables in Section B with fully burdened hourly rates that are binding on the prime and all key subcontractors OR is USACE's requirement that the offeror submit separate versions of tables in Section B with fully burdened hourly rates for the prime and separate fully burdened hourly rates for EACH key subcontractor.

On: Apr 23 2019.

Government Response. . The Government requirement will be that the offeror submit separate versions of SECTION B TABLES with fully burdened hourly rates for the prime and separate fully burdened hourly rates for EACH key subcontractor.

7955173 Contracting Section L 3.0 Volume 1 –

Technical Capability

Section L defines Key Subcontractor as "subcontractor member of a teaming agreement with the offeror or subcontractor for a proposed subcontract that will be equal to 20% or more of the prime contract." We have a teaming agreement with another small business that is providing an important role on the contract and is providing a key personnel resume, but is not expected to perform 20% or more of the prime contract value. Would the government consider amending the definition to include "or is expected to perform important/critical aspects of work"?

On: Apr 24 2019.

Government Response. . The requirement to include information about Key Subcontractors does not preclude having a teaming member with less than 20% participation. On: May 01 2019

7955232 Contracting

Section L Tab 3.6 – Performance Based

Milestones and Time Schedule

Currently, one of the two pages for this tab can be on 11x17 inch paper. We plan to include the Time Schedule on 11x17; however, with the 10 point font requirement, this is not allowing a lot of detail to be provided. For example, we are not going to be able to show all the draft versions or various reviews of all the documents. Would the government consider increasing the page limitation for this tab to 3 pages, with two pages allowed on 11x17 paper?

On: Apr 24 2019.

Government Response. . Section L Tab 3.6 –Performance Based Milestones and Time Schedule - The Government will increase the page limitation for this tab to 3 pages, with two pages allowed on 11x17 paper. On: May 01 2019

7964286 Contracting Response to

Question 7931343

Amendment 2

Question 7931343 states "The sample project requires completion in 8 months with much of the field work during the winter season. Based upon this period of performance, please confirm the expectation that the contractor will be performing field work during the winter season where challenges and risks to working outside the construction season will significantly drive up costs."

The USACE RESPONSE is "The sample project schedule will be revised".

There were no revisions to the Sample Project Schedule in Amendment 2.

On: Apr 29 2019.

Government Response. . Amendment 3 will clarify. On: May 01 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7965129 General Volume 1, Factor 3, Sample

Task Order

The solicitation states "Limit the information in each sub-tab to two (2) pages or less." This amounts to a total of 10 pages for this section. Would the USACE please consider changing the page limitation to be 10–12 pages total for the entire section instead of limiting the pages for each subtab? Some subtabs require significantly more room for a sufficient response than other subtabs in this section.

On: Apr 30 2019.

Government Response. . The page limitation has been changed to 12 pages total for all of Factor 3 (and this includes an additional 11x17 page for schedule). On:

7966810 Contracting ProjNet Question 931349

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The recent ProjNet response No. 931349 says that page count was clarified in Amendment 1, however, Amendment 1, Section L, Section 2.0, sub paragraph 2.1.1(ii) says: "The Government will not evaluate any material exceeding the page limitations stated in the RFP.

Pages will be counted as follows: one side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages." These statements contradict each other. Please clarify how pages will be counted and what the page limits are for each tab and sub-tab.

On: May 01 2019.

Government Response. . One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. This answers corrects, supersedes and replaces any other explanation provided to previous inquiries. On: May 01 2019

7966888 Contracting ProjNet Question 7943150

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

ProjNet Question 7943150 includes this statement: "There is a two page requirement but these pages can be double sided which makes four pages available" which is counter to the original Section L instructions that state "Pages will be counted as follows: one side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages." We have worked for weeks to provide required information and meet the requirements of the RFP and Amendment 1. We respectfully request the government confirm that each printed sheet of paper counts as one page and confirm the page limits as stated in the RFP and Amendment 1.

Government Response. . Yes, one side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. This supersedes prior responses. On: May 01 2019

7967029 Contracting Page Limitations

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Your responses to the page limitation questions are very confusing. Please confirm that when the RFP says:

- Two 8.5x11 pages per project for the Project Experience forms, this really means a total of four 8.5x11 pages (2 pages double sided = 4 pages).

- 20 pages total for Volume 1, Factor 1, this really means 40 pages total (20 pages double-sided = 40 pages)

- Resumes for Key Personnel are limited to two 8.5x11 pages per person, this really means a total of four 8.5x11 pages per person (2 pages double sided = 4 pages)

- Each tab in Factor 3, Technical Approach to Sample FFP Task Order, is limited to two pages, this really means four pages (2 pages double sided = 4 pages)

- Attachment L-1 is one 11x17 page, it really means two 11x17 pages ( 1 page double sided = 2 pages). Please note, it is very hard to read double-sided 11x17 pages and would recommend USACE change the page limitation to 2-single sided pages.

the back and front of one sheet of paper will be counted as two pages. This supersedes prior responses. On: May 01 2019

7967376 Contracting ProjNet No. 7932965 and

7943150

Questions 7932965 and 7943150 ask for the page count for Tab 3.1 to be generalized to 10 pages total vs. 5 pages for each sub-tab. The provided answers do not address this question, but instead indicate that the page count is 10 double-sided pages, effectively doubling the page count. This runs counter to Amendment 1, Section L, Section 2.0, sub paragraph 2.1.1(ii):

"The Government will not evaluate any material exceeding the page limitations stated in the RFP. Pages will be counted as follows: one side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages."

Please respond as to whether the page limit for Tab 3.1 can be set at 10 pages total, divided as needed among the subtabs, and according to the page-count instructions as previously provided in the RFP and Amendment 1; that is, one printed sheet equals one page.

Government Response. . SECTION L, Tab 3.1 - One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Amendment 3 will clarify the total page count of 12 (includes extra page for schedule). On: May 01 2019

7967424 Contracting Answer to Question 7941968

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In reference to Q&A #7941968, we have personnel who are ADEC Qualified Samplers, who exceed the required years of experience, and have performed environmental work on ADEC, EPA, and USACE projects as Environmental Scientists, ADEC Qualified Samplers/ADEQ Qualified Environmental Professionals. Will the Government please consider personnel for the role of Environmental Scientist who possess degrees in sciences beyond the majors listed?

Government Response. . The solicitation does not require degrees in a specific major. On: May 01 2019

7967426 Contracting Answer to Question 7928023

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

As a follow up to Q&A #7928023, will a contractor that submits two credit references be in compliance with Section M, 5.1(b)?

Government Response. . Two credit references may be in compliance with Section M, Paragraph 5.1, TAB 4.0 VOLUME 2, (b). On: May 01 2019

7967444 Contracting Answer to Question 7955135

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In reference to the Government's response to Q&A #7955135, please clarify the purpose of Tab 3.1. Since Tabs 3.2 through 3.6 are called subtabs of Tab 3.1, why are they numbered at the same level as Tab 3.1? On page 62 of Amendment 0001, note that Tab 3.1 seems out of place since it will have no content – unlike comparable Tabs 1.1 and 2.1. Should Tabs 3.2 through 3.6 be renumbered as Tabs 3.1 through 3.5 to accurately reflect the five (not six) sections of content that are expected behind Tab 3.0?

Government Response. . Follow the solicitation as stated in Section L. Tab Dividers/Section Tab Pages do not get counted in page limitations. On: May 01

7967497 Environmental Answer to Question 7933029

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In relation to Q&A #7933029, the Government response indicates the contractor should "Assume that only transformers require removal for the Sample FFP Project." This response suggests that contractors should no longer assume that collected waste fluids and batteries from the on-site heavy equipment should not be transported and disposed off-island. Please clarify.

Government Response. . The response stating that only transformer are required to be removed, applies to the transformer removal task only. Waste fluids and batteries are to be collected, transported and disposed off island in accordance with attachment L-6. On: May 01 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7968432 Contracting Answer to Questions 7966888 and 7967029

As follow-up to Q&A #7966888 and 7967029, would the government reconsider the answer to question #7955136, and change the page limitation for Attachment L-2 Project Experience Form to 3 pages each?

Government Response. . Offerors are requested to keep the PROJECT DESCRIPTION to a succinct document with sufficient detail to be evaluated. These Attachment L-2 forms (2 Pages) are the narrative of the Attachment L-1. These are requested as sufficient for the Source Selection Evaluation Board (SSEB) to evaluate experience of offerors. Offerors do not need to provide extension narratives and limiting the experience narrative to two pages remains unchanged. On: May 02

7971778 General

4.0 Volume 1 - Factor 4 - Past

Performance Confidence Assessment

Regarding the Government's response to questions 7945750, 7945751, and 7945752 - the Government's response does not answer the questions that were posed.

Please review the RPF language in that section. The language used in the RFP identifies when a company responding to this RFP who was once a subcontractor to another firm. The use of Prime and Subcontractor and following the government's language is important here.

The Government is fundamentally asking that a firm (who is an offeror to this RFP but was once a subcontractor for project work that they are seeking to be evaluated on) bypass the Prime contractor (who has purview of that actual scope and performance of that scope) and seek an evaluation of their performance from a 3rd party.

How can/does this process ensure the integrity of those evaluations? Can the Government rely upon this data, from a 3rd party?

On: May 03 2019.

Government Response. . The Government does not have concern with the integrity of the FACTOR 4 - Past Performance (SECTION L) or FACTOR 4 Evaluation (as stated under SECTION M). Each prime offeror is responsible to ensure that SECTION L & SECTION M are reviewed and that FACTOR 4 Past Performance is provided for the projects in an offer under FACTOR 1. Each prime contractor proposal will be evaluated on its own merits. However, the SECTION L, Paragraph 4.0, VOLUME 1 - FACTOR 4 language will be reviewed and any amendment included in forthcoming AMENDMENT 0004. On: May 07 2019

7975459 Environmental

The labor rate table in schedule B, added as part of amendment 3, presents a challenge for offerors proposing as an unpopulated Joint Venture (JV) in which each of the partners has its own set of indirect rates. Would the Government consider allowing the table to be completed with a single set of fully burdened basic hourly rates for the JV and with information on the G&A and overhead provided in two separate sealed envelopes to be included with the proposal submission?

On: May 06 2019.

Government Response. . For the required submittals for SECTION B, Key Personnel Labor Rates for the Prime and Proposed Subcontractors (for Key Personnel), the Government will allow the table to be completed with a single set of fully burdened basic hourly rates for the JV and with information on the G&A and overhead provided in two separate sealed envelopes to be included with the proposal submission. And for any other subcontractor rate tables - they can be included in separate sealed envelope if necessary - but they must be in the offeror proposal submission per RFP and not sent to Government any other method or separate from prime offeror's proposal package. On: May 07 2019

7975461 Environmental

Is profit to be included in the each of the fully burdened basic hourly rates?

Government Response. . Refer to SECTION L, Tab 3.0 – VOLUME 2 – SF33 RFP Section B Key Personnel Labor Rates – (No Page Limitations). G&A, Overhead, and Profit are just Percentage on SECTION B Tables. Refer to Section L for fully burdened labor rates "excluding profit" and ensure proposal complies. On:

May 07 2019

7975999 General amendment pdf

It is our understanding that we have (17) 8.5"x 11" pages for Tabs 3.1-3.6 in Volume 1, Factor 3, with (2) 11"x 17" for schedule (see page count breakdown attached). Can the Government clarify how many pages total are allowed for each major tab for Volume 1, Factor 3 Technical Approach to Sample FFP Task Order?

(Attachment: Sample_Task_Page_Count.pdf) On: May 06 2019.

the front and back of one sheet of paper will be counted as two (2) pages. UP TO four (4) 8.5x11 pages are permissible for EACH FACTOR 3 SUB-TAB. No more than four (4) 8.5x11 pages per FACTOR 3 sub-tabs will be reviewed, except for FACTOR 3, SUB-TAB 3.6, where it is permissible to submit up to two (2) 11x17 pages if needed. No more than two (2) 11x17 pages for FACTOR 3 SUB-TAB 3.6 will be reviewed. The Sample total provided with this inquiry missed the "up to four

(4) 8.5x11 pages for EACH SUB-TAB under FACTOR 3." No total required as these are "UP TO" and "NO MORE THAN" qualified page limitations - not some exact total required to be met. On: May 06 2019

7976003 General amendment

What is the maximum number of pages allowed for Volume 1, Factor 1, Tab 1.2 – Project Experience Forms, is it 20 pages total or 40 pages total?

Government Response. . Based on previously answered bidder inquiries regarding double-sided pages, Amendment 3 did expand the number of pages for Factor 1 from 2 to 4 pages per project. AMENDMENT 0003...limited to two (2) DOUBLE-SIDED 8.5" x 11" pages for a total of NO MORE THAN FOUR (4) PAGES per project for this Factor. Use the format provided in Section L, Attachment L-2...AMENDMENT 0003 However, this is a MAXIMUM Page Count and project descriptions should be a succinct document with sufficient detail to be evaluated in accordance with Section M. On: May 07 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7976005 General amendment

Our interpretation of the page count for Volume 1, Factor 1, Tab 1.2 – Project Experience Forms is now 4 pages per project, which equals 40 pages. As the requirements up until the amendment released May 2nd only allowed for 20 pages (2 pages for each project experience description for Volume 1, Factor 1), many offerors have been working hard to cut projects based on the original requirements. Is it the Government's intention to allow 40 pages so close to the submission date?

Government Response. . Yes. The "UP TO FOUR (4) PAGES" for Volume 1, Factor 1, Tab 1.2 – Project Experience Forms is a MAXIMUM page count. Project descriptions should be a succinct document with sufficient detail to be evaluated in accordance with Section M. On: May 07 2019

7976006 General amendment

The response to question 7968432 states that offerors are requested to keep project descriptions to a succinct document with sufficient detail to be evaluated. This was not changed in Amendment 0003. Is it still applicable?

Government Response. . Yes. Based on previously answered bidder inquiries regarding double-sided pages, Amendment 3 did expand the number of pages for Factor 1 from 2 to 4 pages per project. However, this is a maximum page count and project descriptions should be a succinct document with sufficient detail to be evaluated in accordance with Section M. On: May 07 2019

7976016 General amendment page 2, 4 and 5 of 103 pdf

FFP Ceiling Fully Burdened Hourly Rate Tables 1, 7, and

Historically profit for a given task order under the ERS Contract has been applied to labor, subcontracts and ODCs (exclusive of travel costs) and established at award under a FFP task order.

Amendment 0003 changed the "FFP Ceiling Fully Burdened Hourly Rate" Tables 1 and 7 to include G&A, Overhead, and Profit for Key and Non-Key Personnel. Table 4 was modified to include G&A, Overhead and Profit for Non-Key Personnel however, "Profit" was not included on Table 4 for Key Personnel. Does the government wish to establish ceiling profit rates for task orders under the new contract? If so, why was "Profit" excluded from Key Personnel on Table 4?

Government Response. . Refer to SECTION L, Tab 3.0 – VOLUME 2 – SF33 RFP Section B Key Personnel Labor Rates – (No Page Limitations). G&A, Overhead, and Profit are just Percentage on SECTION B Tables. Refer to Section L for fully burdened labor rates "excluding profit" and ensure proposal complies.

Section B Table 4 will be corrected in forthcoming Amendment 0004 to add the word "Profit" to the Table 4. It was missed on Amendment 0003. On: May 07 2019

7976032 General

What is the maximum number of 8.5X11 and 11x17 pages each allowed for Volume 1, Factor 3 – Technical Approach to Sample FFP Task Order?

Government Response. . PER AMENDMENT 0003..."Limit the information in each sub-tab to two (2) double-sided pages or less (which means no more than four (4) pages total per each sub-tab (excluding the 11x17 extra page permitted for Schedule under Sub-Tab 3.6...AMENDMENT 0003. No total required as the "UP TO" and "NO MORE THAN" are page limitation qualifiers and it is not required that each offeror submit the "up to" but they can submit less than. NO MORE THAN four (4) pages (that's two (2) double-sided pages) will be evaluated however. On: May 07 2019

7976050 General

Our interpretation of the page count for Volume 1, Factor 3 – Technical Approach to Sample FFP Task Order is 4 pages per tab for Tabs 3.2, 3.3, 3.4, and 3.5 and one 8.5x11 page combined with two 11x17 pages for Tab 3.6. It is also our interpretation that no pages are allowed for Tab 3.1. Please confirm. It is very important all responders understand the requirements the same.

Government Response. . PER AMENDMENT 0003..."Limit the information in each sub-tab to two (2) double-sided pages or less (which means no more than four (4) pages total per each sub-tab (excluding the 11x17 extra page permitted for Schedule under Sub-Tab 3.6...AMENDMENT 0003. No total required as the "UP TO" and "NO MORE THAN" are page limitation qualifiers and it is not required that each offeror submit the "up to" but they can submit less than. NO MORE THAN four (4) pages (that's two (2) double-sided pages) will be evaluated however. On: May 07 2019

7976326 Environmental Answer to Question 7939565

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In response to Q&A 7939565 on May 2, 2019, the Government Response directed the contractors to sample in accordance with TSCA Code of Federal Regulations (CFR) 761 subpart O grid sampling requirements. This sampling guidance is only applicable to verify completion of a cleanup. Information presented in the PWS did not indicate that a cleanup has been conducted. Under the sample project scenario should contractors assume that cleanup has been completed at all transformer locations or should the ADEC approved ISM methodology originally described in the PWS be applied?

Government Response. . Text of the Sample Project remains as presented in Amendment 0003. Contractor shall collect one sample for PCBs under each transformer and at the base of each pole for a total of 128 samples in accordance with TSCA Code of Federal Regulations (CFR) 761 subpart O grid sampling requirements. Required QA/QC samples shall also be collected. On: May 07 2019

7977134 Contracting

Section L 5.3 Tab 3.0 –

VOLUME 2 – SF33 RFP

Section B Key Personnel

Labor Rates

Amendment 3 page 55 of 57 Section 5.3 Tab 3.0 – VOLUME 2 – SF33 RFP Section B Key Personnel Labor Rates, second sentence still reads "The rates that the offeror proposes shall show the base rate and all mark ups (including percentages) to come to the fully burdened labor rates (excluding profit) for firm-fixed price (FFP) for each year of the contract." Sections B and J, and Q&A provided in Amendment 3 removed the requirement for rate buildups and calculations and the unburdened base rates. Please verify the above requirement for base rates and all mark ups to come to the fully burdened labor rate is no longer required.

On: May 07 2019.

Government Response. . Refer to "SECTION L, Tab 3.0 – VOLUME 2 – SF33 RFP Section B Key Personnel Labor Rates – (No Page Limitations)." G&A, Overhead, and Profit are just Percentage on SECTION B Tables. Refer to Section L for fully burdened labor rates "excluding profit" and ensure proposal complies.

Section B Table 4 will be corrected in forthcoming Amendment 0004 to add the word "Profit" to the Table 4. It was missed on Amendment 0003. Please remember that AMENDMENT 0001, 0002 and 0003 have all been issued and changed RFP accordingly. "SECTION L, Tab 3.0 – VOLUME 2 – SF33 RFP Section B Key Personnel Labor Rates" did not change. On: May 07 2019

7977987 General

VOLUME 1,

SECTION 3.1

1 1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

VOLUME 1, TAB 3.1: Appears to call for pricing, however pricing is not allowed in Volume

1. Confirm Tab 3.1 is a roll-up for Tabs 3.2 through 3.6, and nothing is required under Tab 3.1 alone.

On: May 07 2019.

Government Response. . VOLUME 1, TAB 3.1 is an general direction paragraph for the FACTOR 3 VOLUME 1 and its Sub-Tabs 3.2 thru 3.6. It does NOT request PRICING. Please refer to RFP where pricing for the Volume 1 FACTOR 3 is required under VOLUME 2 - FACTOR 5. Nothing is required under VOLUME 1, FACTOR 3, Tab 3.1 alone. On: May 07 2019

Report Complete

(End of Summary of Changes)

Statement of Work Limited CON/HTRW Removal Action

Fort Glenn Formerly Used Defense Site (F10AK0289) Umnak Island, Alaska

6 May 2019

1.0 GENERAL

1.1 Description of Work

This work consists of a limited Containerized Hazardous Toxic and Radioactive Waste (CON/HTRW) removal action to be conducted at the Fort Glenn Formerly Used Defense Site (FUDS) located on Umnak Island, Alaska. This work is managed by the U.S. Army Corps of Engineers (USACE) Alaska District under the FUDS Program. The FUDS Property Number is

F10AK0289.

This contract includes work under the following CON/HTRW projects under F10AK0013.

Project 16 (Transformers)

Project 17 (Miscellaneous Abandoned Machinery)

1.2 Task Order Objectives

The objectives of this work are as follows.

Conduct a limited CON/HTRW removal action for Projects 16 and 17, to consist of CON/HTRW item/debris removal.

Objectives of each FUDS Project are described in the 2015 INPR Revision included in Government Furnished Information (GFI).

Archeological/cultural features have been identified at and near the work sites associated with this contract. Consequently, work shall minimize impacts to these sensitive areas, and shall include detailed monitoring of activities to identify and document contractor impacts. See Section titled KEY INFORMATION AND REQUIREMENTS for additional information on this issue.

1.3 Delivery Date

The delivery date for this contract ends on 31 May 2021. The contractor shall have all reporting documents finalized and submitted to the government by 30 April 2021. The contractor shall assume Notice To Proceed (NTP) will be provided by the government no later than 30 September 2019.

1.4 Right of Entry

Right‐of‐Entry (ROE) for all onsite work to be conducted under this contract will be provided to the contractor at NTP.

1.5 SOW Organization

The table below describes the general organization of this Statement of Work (SOW).

Section Section Title

1.0 GENERAL

2.0 BACKGROUND

3.0 KEY INFORMATION AND REQUIREMENTS

4.0 TASKS

5.0 TECHNICAL REQUIREMENTS

6.0 ADMINISTRATIVE REQUIREMENTS

7.0 AUTHORITY AND POINTS OF CONTACT

8.0 GOVERNMENT‐FURNISHED INFORMATION

9.0 QUALITY MANAGEMENT PLAN

1.6 Applicable Regulations

The work under this contract shall be conducted under applicable requirements of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). Additionally, work shall adhere to the substantive requirements of Alaska Department of Environmental Conservation (ADEC) Alaska Administrative Code, Title 18, Chapter 75 (18 AAC 75) as current ARARs for CON/HTRW work.

The contractor shall perform the work in accordance with all applicable and current regulations and guidance. The contractor is responsible for identifying all applicable and most current federal, state and local regulations that will affect this contract. The contractor shall apply the appropriate procedures and protocols and identify which laws and regulations are applicable.

Nothing in this task order shall exempt the contractor from Federal, State, or local laws or regulations unless a specific exemption has been acquired.

2.0 BACKGROUND

2.1 Site Location, Description, and History

Fort Glenn is located on Umnak Island, approximately 850 miles southwest of Anchorage, Alaska, in the Aleutian Island Chain of the Pacific Ocean. The Fort Glenn property is in the Aleutians West Census Area approximately 70 miles southwest of Dutch Harbor, Alaska. The property is located in the vicinity of Latitude 53° 22' 46" North, 167° 56' 38" West. It is within Alaska's At Large Congressional District, U.S. Environmental Protection Agency (USEPA) Region 10, and zip code 99692. In 1985, Cape Field at Fort Glenn (i.e., Main Airfield) was designated as a National Historic Landmark (U.S. Department of Interior, National Park Service, 1986).

Fort Glenn encompasses more than 100,000 acres and was established as an air base on the northeast coast of Umnak Island during World War II (WWII). The property consists of a main cantonment area and two satellite airfields. In 1942, building began on Umnak with the construction of a 5,000‐foot‐long by 100‐foot‐wide airfield near Otter Point (Main Airfield, Figure 1). The Main Airfield was composed of approximately 80,000 perforated steel mats placed directly on the tundra. A layer of volcanic cinder was placed over the steel matting to increase the structural stability of the runways. Two satellite fields were subsequently constructed on Umnak Island, one to the north near Cape Tanak (Northern Airfield, also known as Berry Fields) and one to the southwest between Kettle Cape and Black Rock (Pacifier Airfield, Figure 1). Each satellite field consisted of up to three approximately 5,000‐ to 7,000‐ft runways.

The northern field near Cape Tanak was later extended to 7,500 ft in length (USACE, 2017c).

The property was excessed between 1952 and 1955 to the U.S. Department of Interior (DOI), Bureau of Land Management (BLM) and subsequently transferred to numerous owners, both public and private in the 1960s. Post‐WWII in the late‐1950s, Reeve Aleutian Airways was granted the right to use, operate, and maintain the Main Airfield until sometime before 2000, when Reeve ceased operations. In 1966, BLM conveyed the Northern Airfield (1,780 acres) and Main Airfield (7,550 acres), and granted a 200‐ft right‐of‐way along the road between these two airfields to the State of Alaska. As part of the 1966 deed, several buildings were conveyed to the State of Alaska as well, including H‐16 hangar, P‐18 power house, BLH‐17 boiler house, MAS‐2 frame house, D and HSP‐38 dispensary, and W‐21 warehouse.

Current property owners include: ADOT&PF, Tanadgusix Corporation (TDX) (surface), St. George Tanaq Corporation (surface), U.S. Fish and Wildlife Service (surface), Aleut Corporation (subsurface), and BLM (subsurface). Bering Pacific Ranches Ltd. (BPR) of Priddis, Alberta, Canada, leases the property and operates a certified organic cattle and reindeer ranching operation with headquarters at Pustoi Bay. BPR’s operations began in 1993, but ranching on Umnak Island is known to date back to the early 19th century when Russian settlers first brought over cattle.

2.2 Previous Investigations

Multiple visits and investigations have been conducted on the Fort Glenn property by government employees and contractors. The project areas within Fort Glenn are referred to by different names within each report summarized below. For this report, there are three primary areas of interest, as shown on Figure 1 and designated as follows:

Main Airfield, which includes the primary cantonment;

Northern Airfield located to the north of the primary cantonment at the northern extent of the FUDS; and

Pacifier Airfield located to the southwest of the primary cantonment near the southern extent of the Fort Glenn FUDS.

Past work relevant to this project is described below.

Inventory Report, Defense Environmental Restoration Account, Umnak Island, Alaska (Woodward‐Clyde Consultants, 1985)

In 1985, a debris inventory was conducted at each of the four main areas:

Fort Glenn main base, also referred to as the Main Airfield;

Northern Satellite Airstrip, also referred to as the Northern Airfield;

Southwest Satellite Airstrip, also referred to as the Pacifier Airfield; and

Nikolski.

This report details a site inspection and inventory at abandoned military installations located on Umnak Island. The work was conducted using a helicopter and ground surveillance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .