DATA ITEM DESCRIPTION
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
A003, Task Implementation Plan (TIP)
2. IDENTIFICATION NUMBER
3. DESCRIPTION/PURPOSE
To provide a written description of how the contractor intends to accomplish an assigned tasking and what resources are required.
4. APPROVAL DATE (YYMMDD)
120821
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
USAOTC G4
6a. DTIC APPLICABLE
6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
This Task implementation Plan (TIP) is the contractor’s plan for executing tasks described in the Task Authorization Request (TAR), along with an estimate of the resources (e.g., labor, government furnished property, funding) required to accomplish the work. Before the contractor can provide services under a TAR, the Contracting Officer must approve the associated TIP.
8. APPROVAL LIMITATION
N/A 9a. APPLICABLE FORMS
N/A 9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 The contractor shall provide one of the following TIP formats: an oral TIP or an abbreviated TIP. The oral TIP review is generally the preferred method for the larger, more complex TIPs, because it combines streamlined procedures with thorough coverage of essential tasks and resources during a government/contractor meeting held to resolve issue and provide immediate approval.
10.2 The TIP shall be submitted to the Government as one document, identified by the TAR number and title. The contractor shall also identify the POC or TSC Lead responsible for accomplishing the task, with telephone number.
a. Oral TIPs shall be submitted to the COR as read-ahead packet consisting of a cover letter, management presentation (e.g., Power Point Slides) and costing attachments, to be followed up with an oral presentation.
b. An Abbreviated TIP does not include briefing slides: it consists of a formal letter explaining the contractor’s approach and the TIP cost. This format is generally preferred for the smaller, less complicated tests.
c. Ordinarily there is no government/contractor meeting schedule for an abbreviated TIP: it is provided to the test directorate for a written response (recommendation of approval and comments, if applicable). However, the test officer or contracting officer may request an oral presentation for an abbreviated TIP, if they feel that government/contractor discussion is needed. All TIP formats shall provide the information listed in paragraph 10.3 and 10.4 below.
10.3 How to accomplish the requirement.
a. Describe the proposed methodology, procedures and plans to accomplish the requirement.
b. List the milestone and delivery schedule.
c. List potential problems and recommended solutions.
d. List actions or situations requiring Government action.
e. List exceptions to the Government requirement.
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited.
| DATA ITEM DESCRIPTION |
| Form Approved |
OMB NO. 0704-0188
A003, Task Implementation Plan (TIP) Continued
f. Address the following when applicable:
(1) Property administration.
(2) Safety and security (including computer viruses) measures.
(3) Maintenance of GFP and post test repair of equipment and instrumentation to operational status.
(4) Communications capabilities and procedures.
(5) Data collection and data management.
(6) Physical and COMSEC security measures.
(7) Instrumentation development.
(8) Logistics and instrumentation support
10.4 Estimate of Required Resources.
a. Labor Requirement and Costs Shows the labor requirements by job position and man hours to the nearest man-hour, the hourly burdened rate and the total cost of each position. Provide subtotals for man-hour and costs.
(1) Direct Labor.
(2) Overtime.
(3) Premium overtime
b. Non-Labor Requirements and Costs. Show all requirements, their costs and subtotals for the following:
(1) Travel.
(2) Commercial supplies, materials and shipping.
(3) Subcontracts. List all subcontracting efforts and suggested sources of supply.
(4) GSA, MILSTRIP, GBL, and POL supplies and materials.
(5) DOL maintenance.
(6) Insurance, fees and other cost factors as required.
c. ITR items will be broken into two sections: Government purchased and TSC purchased
d. Required resources currently not available, including estimated costs.
e. Total costs
| DATA ITEM DESCRIPTION |
| Form Approved |
OMB NO. 0704-0188
DD Form 1664, APR 89 Previous editions are obsolete DD Form 1664, APR 89 Previous editions are obsolete