Draft PRS
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9113M-15-R-0007 Attachment: 003
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED - SMDC #6139, 11OCT2016
Performance Requirement Summary (PRS) - DRAFT
Reagan Test Site (RTS) Engineering and Technical Services (RETS)
Performance Objective
Performance Standard Acceptable Quality Level
Method of
Surveillance
Performance Evaluation Ratings
1. Technical/Quality
a. RTS Test Mission Services (TMS) and Instrumentation Modifications
b. RTS Standard Technical Services
(STS)
c. Transition
Contract requirements met for RTS TMS services and instrumentation modifications (PWS paragraph 3.1 and all sub-paragraphs excluding subparagraphs 3.1.1.1.7 (Range Safety Planning), 3.1.1.5.5 (Range Safety System Operations).
Contract requirements met for RTS STS services (PWS paragraph 3.2 and all sub-paragraphs excluding RTS range safety (subparagraph 3.2.4.5), security management (subparagraph 3.2.4.8), and government property management (subparagraph 3.2.4.11)
Transition Phase-in and Phase- Out conducted IAW Government approved Transition Phase-In and Phase Out plans.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor are satisfactory.
Maintain satisfactory quality performance with effective and efficient cost controls.
100% inspection of deliverable data and reports.
Combination of
Periodic and
Random inspection of rendered services.
Review of feedback surveys from test mission customers.
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions are only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely
W9113M-15-R-0007 Attachment: 003 manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions were ineffective.
2. Cost Control
a. Test Mission Services - Customer Mission Estimating and Billing Accuracy
b. Standard Technical Services Cost Control
Overall contract
Actual mission support costs for all activities for each RTS test mission program are billed IAW
FAR Part 31 and cost reporting is delivered to the government for the actual mission support costs IAW CDRL requirements.
STS Contract labor mix is controlled in efficient and effective manner; travel, material, and ODCs effectively controlled. Effective and efficient cost controls with high quality performance maintained.
Maintain effective and efficient cost controls with quality performance.
Actual costs are within
10% of final estimated costs
Actual labor resource mix is maintained within
10% of awarded contract resource mix.
Travel, material, and
ODCs effectively monitored and controlled.
reports.
Combination of
Periodic and
Random inspection of rendered services.
Review of feedback surveys from test mission customers.
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions are only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which
W9113M-15-R-0007 Attachment: 003
3. Schedule/ Timeliness
Overall Contact: Contract deliverables are delivered on time. Contractor adapts to schedule changes during execution of TMS and STS requirements.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor are satisfactory.
reports.
Combination of
Periodic and
Random inspection of rendered services.
Review of feedback surveys from test mission customers.
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element
W9113M-15-R-0007 Attachment: 003
4. Management or Business Relations
a. Contract Execution
b. Coordination and Flexibility
c. Management of Key Personnel
Contractor meets all contract requirements under the PWS
4.6. Contractor integrates and
coordinates all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements;
assigns responsibility for missions/actions required by contract; communicates appropriate information to affected program elements in a timely manner.
Contractor is timely, accurate, and complete in identification of problems, required corrective actions, and proposal submittals resulting in effective business relations and customer satisfaction.
Qualified key personnel are maintained and/or hired in a timely manner and IAW key personnel requirements identified in the PWS (paragraph 4.3).
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions reports.
Combination of periodic and random inspection of rendered services.
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element
W9113M-15-R-0007 Attachment: 003
5. Subcontracting/ Small Business
Overall Contract: Contractor’s award and management of subcontracts is timely, and contractor meets small/small disadvantage and women-owned business participation goals.
Performance demonstrates a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period.
Contractor complies with FAR 52.219-8, Utilization of Small Business Concerns.
Contractor meets any other small business participation requirements included in the contract/order.
Contractor fulfills the requirements of the subcontracting plan included in the contract/order.
Contactor completes and submits Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.
contractor subcontracting / small business plan and execution reports
Performance exceeded all statutory goals or goals as negotiated. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business (SDVOSB). Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.
VERY GOOD
Performance met all of the statutory goals or goals as negotiated. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.
SATISFACTORY
Performance demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period.
Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract/order. Fulfilled the requirements of the subcontracting plan included in the contract/order.
Completed and submitted Individual Subcontract
W9113M-15-R-0007 Attachment: 003
Reports and/or Summary Subcontract Reports in an accurate and timely manner.
MARGINAL
Performance is deficient in meeting key subcontracting plan elements. Deficient in complying with FAR 52.219-8, Utilization of Small Business Concerns, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do so. Required a corrective action plan.
UNSATISFACTORY
Performance is noncompliant with FAR 52.219-8 and 52.219-9, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner.
Showed little interest in bringing performance to a satisfactory level or is generally uncooperative.
Required a corrective action plan.
6. Regulatory Compliance
a. Security Management
b. Industrial Safety
Security Management is provided for RTS operations IAW PWS sections 3.2.4.8, and 5.1.
Industrial Safety for RTS Operations is provided IAW PWS section 5.2.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions reports.
Combination of periodic and random inspection of rendered services.
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
W9113M-15-R-0007 Attachment: 003
c. Information Assurance
Information Assurance is provided for RTS operations IAW PWS section 3.2.3
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element
7. Other
a. Property and Data Accountability
b. RTS Mission and RF Safety
Maintain Government furnished property (GFP, GFE, GFI, etc.), contractor acquired property (CAP) and data accountability IAW PWS sections 3.2.4.11
RTS Mission Safety, RF safety is provided IAW PWS sections
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions reports.
Combination of periodic and random inspection of rendered services.
Property Inventories and Data Files
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
W9113M-15-R-0007 Attachment: 003
3.1.1.1.7 (Range Safety Planning), 3.1.1.5.5 (Range Safety System Operations), and
3.2.4.5 (RTS Range RF safety).
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element