Attachment 1 - 6_TE 01-06 _20231117.pdf

PDF 3 MB Posted

Attached to
Preventive Maintenance & Repair of Heating and Ventilation System in Yongsan Cluster
Solicitation number
W90VN824R0035
Issued by

About this file

This document contains technical exhibits and attachments related to a solicitation for Preventive Maintenance & Repair of Heating and Ventilation System in the Yongsan Cluster in Korea. The attachments provide detailed information on the heating and heat pump systems, equipment lists, maintenance tasks and cycles, and lists of minor parts required for the work. The solicitation is for the Department of the Army Materiel Command Army Contracting Command and requires providing preventive maintenance and emergency repair services for the heating and ventilation systems in 73 buildings across the Yongsan Cluster. The solicitation number is W90VN824R0035.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit (TE)

TE-01 Attachment 01 Heating_Sys_&_Svc_Areas (SF) TE-02 Attachment 02 Heatpump_Sys_&_Svc_Areas (SF) TE-03 Attachment 03 List of Heating Equip TE-04 Attachment 04 List of Heat Pump Equip TE-05 Attachment 05 Minor_Parts_Less_Than_$250 TE-06 Attachment 06 PM Tasks & Cycles TE-07 ELINX004 Installation & Removal Service Items TE-08 ELINX005 Replacement/Repair Parts TE-09 Historical Data of On-call Service List TE-10 Inspection Checklist for AST & Dike TE-11 Specific Tasks TE-12 Deliverables TE-13 Contractor Qualification

TE-01 Heating_Sys_&_Svc_Areas (SF)

No. Loca-tion

Installed Main Equipment & Systems Service Areas (Bldg No.) Space Heating Domestic Hot Wa-ter Type of Fuel Fuel Tank Bldg No Floor Area

(SqFt) 1 Yongsan 1178 WAF Diesel AST-1178 1178 4,608

2 Yongsan 1188 WAF Diesel AST-1188 1188 2,096

3 Yongsan 1315 WAF Diesel AST-1315 1315, 1316 3,036

4 Yongsan 1330 SHB Diesel AST-1330 1330, 1327 10,404

5 Yongsan 1333 DHWB HWST Diesel AST-1368

AST- 1333 4,107

6 Yongsan 1344 SHBSTM DHWB HWST Diesel AST-1344 1344 8,050

7 Yongsan 1347 WAF DHWB HWST Diesel AST-1347 1347 3,538

8 Yongsan 1348 WAF(2) Diesel AST-1347 1348 3,815

9 Yongsan 1351 WAF Diesel AST-1351 1351 4,377

10 Yongsan 1363 WAF DHWB HWST Diesel AST-1363 1363 2,148

11 Yongsan 1368 WAF Diesel AST-1368 1368 1,480

12 Yongsan 1382 SHB Diesel AST-1383 1382 11,382

13 Yongsan 1383 SHB HWST Diesel AST-1383 1383, 1375, 2,476

14 Yongsan 1384 SHB DHWB HWST Diesel AST-1384 1384, 1349 1,883

15 Yongsan 1391 WAF(2) DHWB HWST Diesel AST-1368 1391 5,285

16 Yongsan 1394 SHB AHU Diesel AST-1394 1394 1,575

17 Yongsan 1396 SHB Diesel AST-1363 1396 3,734

18 Yongsan 1397 SHB Diesel AST-1397 1397 3,672

19 Yongsan 1533 HWB DHWB HWST NAG 1533, 1527 42,922

20 Yongsan 1577 WAF Diesel AST-1577 1577 1,800

21 Yongsan 1601 WAF DHWB HWST Diesel AST-1669 1601 7,055

22 Yongsan 1694 WAF Diesel AST-1694 1694 3,220

23 Yongsan 2075 WAF Diesel AST-2075 2075 3,808

24 Yongsan 2077 WAF Diesel AST-2075 2077 2,866

25 Yongsan 2078 WAF Diesel AST-2075 2078 647

26 Yongsan 2079 WAF Diesel ? 2209 14,364

27 Yongsan 2308 SHB DHWB HWST Diesel AST-2308 2308 24,106

28 Yongsan 2320 WAF Diesel AST-2320 2320 27,300

29 Yongsan 2661 DHWB HWST(3) Diesel AST-2661 2661, 2660, 41,839

30 Yongsan 2670 WAF Diesel AST-2640 2670 4,800

31 Yongsan 2680 DHWB HWST Diesel AST-2680 2680 13,109

32 Yongsan 2681 SHB Diesel AST-2681 2681, (2680) 192

33 Yongsan 4017 WAF Diesel AST-4043 4017 2290

34 Yongsan 4101 WAF Diesel AST-4101 4101 3,064

35 Yongsan 4203 SHB DHWB HWST Diesel AST-4203 4203 11,911

36 Yongsan 4208 WAF(2) NAG 4208 7,602

37 Yongsan 4220 WAF DHWB HWST Diesel AST-4220 4220 4,091

38 Yongsan 4275 DHWB Diesel 4275 17,669

39 Yongsan 4309 SHB Diesel AST-4309 4309 1,248

40 Yongsan 4401 WAF(4) Diesel AST-4401 4401 4,320

41 Yongsan 4437 SHB DHWB HWST Diesel AST-4437 4437 4,231

42 Yongsan 4457 WAF DHWB Diesel AST-4458 4457 1,113

43 Yongsan 4461 WAF Diesel AST-4458 4461 1,158

44 Yongsan 4479 WAF Diesel AST-4479 4479 800

45 Yongsan 4493 WAF DHWB Diesel UST-4493 4493 1,228

46 Yongsan 4723 SHB Diesel AST-4723 4723 634

47 Yongsan 4817 WAF Diesel AST-4817 4817 3,876

48 Yongsan 5277 WAF Diesel AST-5277 5277 2,361

49 Yongsan 5278 DHWB HWST Diesel AST-5278 5278 593

50 Yongsan 5380 SHB DHWB HWST Diesel AST-5380 5380 9,439

51 Yongsan 5382 SHB Diesel AST-5380 5382 2,392

52 Yongsan 5395 WAF Diesel AST-5395 5395 579

ATTACHMENT 1

53 Yongsan 5460 WAF Diesel AST-5460 5460 800

54 Yongsan 5495 SHB(2) Diesel AST-5495 5495 22,269

55 Yongsan 5497 SHB DHWB HWST NAG 5497 13,392

56 Yongsan 5701 WAF(3) NAG 5701 7,296

57 Yongsan 5713 WAF(3) NAG 5713 5,757

58 Yongsan 5714 WAF(3) NAG 5714 6,965

59 Yongsan 5717 WAF NAG 5717 1,170

60 Yongsan 5720 WAF NAG 5720 2,904

61 Yongsan 5725 WAF NAG 5725 3,276

62 Yongsan 5735 SHB NAG 5735 25,794

63 Yongsan 7003 SHB DHWB HWST Diesel NAG AST-7003 7003 54,577

64 Yongsan 8102 DHWB HWST NAG 8102 14,336

65 Yongsan 8103 DHWB HWST Diesel AST-8103 8103 14,336

66 Yongsan 8104 DHWB HWST Diesel AST-8104 8104 14,336

67 CP Morse 13 WAF Diesel AST-13 13 960

68 CP Morse 19 SHB DHWB HWST Diesel AST-19 19 1,872

69 CP Morse 27 WAF Diesel AST-27 27 1,680

70 CP Morse 42 SHB DHWB HWST Diesel AST-42 42 1,731

71 CP

Tango* 3008 SHB(2) Diesel UST-3008 3108 42,375

72 CP

Tango* 3109 Diesel UST-3109 3109 4,728

73 CP

Tango* 3201 DHWB(2) HWST Diesel UST-3201 3201 34,658

TOTAL SERVICE AREA (SF): 621,505

*Note: Normally all heating systems located in CP Tango are operated and maintained by DPW, but six (6) boilers once a year

The contractor shall provide inspection and PM for the above (6) boilers once a year, also provide emergency repair as requested by DPW(RP).

TE-02 Heatpump Sys_&_Svc_Areas (SF)

# Location Bldg Bldg No. Area SF 1 Yongsan 2372 Geothermal Heatpump

Unit (34) Heat Exchanger

(4) Electricity 2372, 2370, 2374 30,665

2 Yongsan 2308 Cooling Tower

Heatpump Unit (11)

Scroll Chiller

& AHU(4)

Cooling Tower &Air Cooled Type

Electricity 2308 24,106

3 Yongsan 4499 Geothermal Heatpump Unit

Electricity 4499 1,272

56,043

Type

ATTACHMENT 2

Heat Pump Systems and Service Areas (SF)

TOTAL SERVICE AREA (SF) :

TE-03 List of Heating Equip

LN EQUIPMENT/SYSTEM TYPE QTY UNIT

1 Warm Air Furnace(WAF) Oil-Fired 37 EA

2 Warm Air Furnace(WAF) Gas-Fired 17 EA

3 Space Heating Boiler (SHB) Oil-Fired 27 EA

4 Space Heating Boiler (SHB) Gas-Fired 2 EA

5 Expansion Tank 20 EA

6 Heat Exchanger - EA

7 Air Handling Unit(AHU) 1 EA

8 Convertor 57 EA

9 Radiator 82 EA

11 Fan Coil Unit(FCU) 89 EA

12 Unit Heater - EA

13 Domestic Hot Water Boiler(HWB) Oil-Fired 29 EA

14 Domestic Hot Water Boiler(HWB) Gas-Fired 4 EA

15 Hot Water Storage Tank 29 EA

16 Fuel Storage Tank Aboveground 59 EA

17 Fuel Storage Tank Underground - EA

18 Mechanical Rm Within Building 55 EA

19 Mechanical Rm Separate Building 4 EA

Summary of Heating Equipment and Systems

ATTACHMENT 3

No Location Bldg. Capacity Unit MFR Model Install Date

1 YSN 1178 WAF 500,000 BTU JACKSON SDF-50-OFU 5/23/2016

2 YSN 1188 WAF 283,000 BTU ADAMS AACOV 700 1/16/2013

3 YSN 1347 WAF 214,650 BTU DORNBACK ACOV 350

4 YSN 1348 WAF A 101,400 BTU ALDRICH AUFD 120 35 9/10/2007

5 YSN 1348 WAF B 101,400 BTU ALDRICH AUFD 120 35

6 YSN 1351 WAF 174,600 BTU DORNBACK ACOV 230

7 YSN 1363 WAF 142,000 BTU DORNBACK ACOV 175 4/17/2007

8 YSN 1368 WAF 200,000 BTU DORNBACK ACOV 230B 5 6/2/2014

9 YSN 1391 WAF A 500,000 BTU JACKSON SDF 50 OFU

10 YSN 1391 WAF B 101,400 BTU ALDRICH AUFO 120

11 YSN 1577 WAF 283,500 BTU DORNBACK ACOV 350 12/11/2007

12 YSN 1601 WAF 750,000 BTU JACKSON SDF 75-02FCU 8/26/2013

13 YSN 1694 WAF 525,000 BTU WARNING ELEC

14 YSN 2075 WAF 280,000 BTU A/D AACOV 700 6/5/2012

15 YSN 2077 WAF 142,000 BTU DORNBACK ACOV 175

16 YSN 2078 WAF 101,400 BTU ADAMS AUFO 120 10/13/2010

17 YSN 2079 WAF 112,000 BTU RHEEM ROBB 112A

18 YSN 2320 WAF 200,000 BTU DORNBACK ACOV 230B 5 7/1/2014

19 YSN 2670 WAF 142,000 BTU DORNBACK ACOV 175

20 YSN 4017 WAF 142,000 BTU DORNBACK ACOV 175

21 YSN 4101 WAF 200,000 BTU DORNBACK ACOV 230B 5 4/26/2010

22 YSN 4220 WAF 280,000 BTU ADAMS ACOV 350B 5/6/2010

23 YSN 4259 WAF E 120,000 BTU ADAMS AUFO 120

24 YSN 4401 WAF A 120,000 BTU DORNBACK UP0123BA

25 YSN 4401 WAF B 120,000 BTU DORNBACK UP0120BA

26 YSN 4401 WAF C 125,000 BTU CARRIER 58BLA 155 20

27 YSN 4401 WAF D 85,000 BTU CARRIER M588LA105 12

28 YSN 4457 WAF 101,400 BTU DORNBACK AUPO 120

29 YSN 4461 WAF 174,000 BTU DORNBACK ACOV 230

30 YSN 4479 WAF 92,000 BTU DORNBACK ACOV 120X

31 YSN 4493 WAF 174,000 BTU DORNBACK ACOV 230

32 YSN 4817 WAF 283,500 BTU DORNBACK ACOV 350

33 YSN 5277 WAF 79,000 BTU DORNBACK UFO 105

34 YSN 5395 WAF 187,000 BTU DORNBACK MUWBER35B 11/4/2014

35 YSN 5460 WAF 100,000 BTU CLARE O18 F 11/6/2007

36 CP MORSE 13 WAF 101,400 BTU DORNBACK AUFO 120 9/9/2008

37 CP MORSE 27 WAF 350,000 BTU ADAMS AACOV 350 10/10/2007

YSN 35 EA

CP MORSE 2 EA

Total 37 EA

Type

WARM AIR FURNACE (WAF), OIL-FIRED

ATTACHMENT 3-1

1 YSN 4208 WAF(G) A 75,000 BTU DORNBACK HDN75 3.5

2 YSN 4208 WAF(G) B 172,500 BTU DORNBACK CDS 230IP

3 YSN 4259 WAF(G) A 172,500 BTU DORNBACK CDHS230IP

4 YSN 4259 WAF(G) B 172,500 BTU DORNBACK CDHS-230IP

5 YSN 4259 WAF(G) C 172,500 BTU DORNBACK CDHS230IP

6 YSN 4259 WAF(G) D 172,500 BTU DORNBACK CDHS230IP

7 YSN 5701 WAF(G) A 350,000 BTU DORNBACK ACOV350 6/30/2013

8 YSN 5701 WAF(G) B 350,000 BTU DORNBACK ACOV350 6/30/2013

9 YSN 5701 WAF(G) C 350,000 BTU DORNBACK ACOV350

10 YSN 5713 WAF(G) A 350,000 BTU DORNBACK ACOV 350 6/30/2013

11 YSN 5713 WAF(G) B 350,000 BTU DORNBACK ACOV 350 6/30/2013

12 YSN 5713 WAF(G) C 500,000 BTU DORNBACK ACOV500 6/30/2013

13 YSN 5714 WAF(G) A 350,000 BTU DORNBACK ACOV350 6/30/2013

14 YSN 5714 WAF(G) B 350,000 BTU DORNBACK ACOV350 6/30/2013

15 YSN 5717 WAF(G) 101,400 BTU DORNBACK UFO 120BA

16 YSN 5720 WAF(G) 350,000 BTU DORNBACK ACOV350 6/30/2013

17 YSN 5725 WAF(G) 230,000 BTU DORNBACK ACOV230 6/30/2013

YSN 17 EA

CP MORSE 0 EA

Total 17 EA

WARM AIR FURNACE (WAF), GAS-FIRED

Type

ATTACHMENT 3-2

1 YSN 1315 SHB 112,000 BTU ALDRICH WHO 13G

2 YSN 1330 SHB 380 GPH ALDRICH K360W

3 YSN 1365 SHB 1,500 GPH ALDRICH WHO 150G

4 YSN 1382 SHB 200,000 KCAL KYUNG DONG 2035RDS

5 YSN 1383 SHB 645 GPH ALDRICH WHO 64G 1/18/2011

6 YSN 1384 SHB 135 GPH ALDRICH WHO 135G

7 YSN 1394 SHB 156,000 BTU BURNHAM RAS 135 LU TB

8 YSN 1396 SHB 135 GPH ALDRICH L12W

9 YSN 1397 SHB 645 GPH ALDRICH WHO 64G

10 YSN 2308 SHB 507,000 BTU BURNHAM

11 YSN 2681 SHB 1,500 GPH ALDRICH WHO 150G 12/14/2012

12 YSN 4203 SHB 1,500 GPH ALDRICH WHO 150G

13 YSN 4309 SHB 152,000 BTU ALDRICH BOCK51PGNTA

14 YSN 4437 SHB 560 GPH ALDRICH WHO 56G

15 YSN 4723 SHB 157,000 BTU ALDRICH D17W

16 YSN 5380 SHB 1,500 GPH ALDRICH WHO 150G

17 YSN 5382 SHB 380 GPH ALDRICH WHO 38G

18 YSN 5495 SHB A 623,000 BTU BOCK 541 E

19 YSN 5495 SHB B 645 GPH ALDRICH WHO 64G

20 CP MORSE 19 SHB 350,000 BTU BURNHAM FD100BVLL K

21 CP MORSE 42 SHB 350,000 BTU BURNHAM FD100BVLL K

22 CP TANGO 3008 SHB 856,000 BTU BURNHAM FD240BVLL-K 2005

23 CP TANGO 3008 SHB 856,000 BTU BURNHAM FD240BVLL-K 2005

24 CP TANGO 3109 SHB 600,000 KCAL DAEYEOL ASV 6009 2010

25 CP TANGO 3109 SHB 600,000 KCAL DAEYEOL ASV 6009 2010

YSN 19 EA

CP MORSE 2 EA

CP TANGO 4 EA

Total 25 EA

SPACE HEATING BOILER (SHB), OIL-FIRED

Type

ATTACHMENT 3-3

No Location Bldg. Capacity Unit MFR Model Install Date

1 YSN 5497 SHB(G) 563,000 BTU ALDRICH 730W

2 YSN 5735 SHB(G) 748 MBH BURNHAM FD240BULL-K 6/30/2013

YSN 2 EA

Total 2 EA

SPACE HEATING BOILER (SHB), GAS-FIRED

Type

ATTACHMENT 3-4

No Location Bldg. Capacity Unit

1 YSN 1315 5 Gal 2 YSN 1330 30 Gal 3 YSN 1344 15 Gal 4 YSN 1365 50 Gal 5 YSN 1382 20 Gal 6 YSN 1384 15 Gal 7 YSN 1394 20 Gal 8 YSN 1396 30 Gal 9 YSN 2307 60 Gal 10 YSN 2308 30 Gal 11 YSN 2681 60 Gal 12 YSN 4203 50 Gal 13 YSN 4723 25 Gal 14 YSN 5380 30 Gal 15 YSN 5382 20 Gal 16 YSN 5495 20 Gal 17 YSN 5497 40 Gal 18 YSN 7003 82 Gal 19 CP MORSE 19 20 Gal 20 CP MORSE 42 50 Gal

YSN 18 EA

CP MORSE 2 EA

Total 20 EA

EXPANSION TANK

ATTACHMENT 3-5

No Location Bldg. MFR Model Install Date

1 YSN 1394 AHU CARRIER 39EH08

YSN 1 EA

Grand Total 1 EA

AIR-HANDLING UNIT (AHU)

Type

ATTACHMENT 3-6

No Location Bldg. Convertor Radiator FCU Unit Heater

1 YSN 1344 2 12

2 YSN 1384 5

3 YSN 1396 4

4 YSN 4203 8 39

5 YSN 4280 3 8

6 YSN 4723 5 1

7 YSN 5380 11 2 2

8 YSN 5382 4 4

9 YSN 5495 2

10 YSN 5497 8 3

11 YSN 5735 23 67

12 CP MORSE 19 8

13 CP MORSE 42 7

Convertor Radiator FCU UnitHeater

YSN 57 82 74 0 EA

CP MORSE 57 82 15 0 EA

Total 114 164 89 0 EA

CONVECTOR, RADIATOR, FAN COIL UNIT (FCU), Unit Heater

ATTACHMENT 3-7

1 YSN 1333 HWB 640 GPH ALDRICH WHO 64G 2/11/2014

2 YSN 1344 HWB 380 GPH ALDRICH WHO 38G 2/13/2013

3 YSN 1347 HWB 560 GPH ALDRICH WHO 56G 4/6/2016

4 YSN 1363 HWB 645 GPH ALDRICH WHO 64G 1/14/2013

5 YSN 1365 HWB 100,000 KCAL KYUNG DONG KOV V011AK 1/5/2007

6 YSN 1384 HWB 230 GPH ALDRICH WHO 23G 4/2/2008

7 YSN 1391 HWB 640 GPH ALDRICH WHO 64G 1/9/2014

8 YSN 1601 HWB 645 GPH ALDRICH WHO 64G 3/27/2007

9 YSN 2308 HWB 50,000 KCAL KYUNG DONG 535RTG 12/14/2011

10 YSN 2661 HWB 400,000 KCAL KYUNG DONG KDD V041AK

11 YSN 2680 HWB 160,000 KCAL KYUNG DONG KDV V017AK 5/21/2007

12 YSN 4203 HWB 160,000 KCAL KYUNG DONG KDV V1017K 1/18/2008

13 YSN 4220 HWB 560 GPH ALDRICH WHO 56G 10/22/2013

14 YSN 4275 HWB 155,000 BTU BOCK 120E

15 YSN 4437 HWB 560 GPH ALDRICH WHO 56G

16 YSN 4457 HWB 235 GPH ALDRICH WHO 23G 4/10/2014

17 YSN 4493 HWB 135 GPH ALDRICH WHO 13G 3/12/2015

18 YSN 5278 HWB 100,000 KCAL KYUNG DONG KDV V001K 12/21/2007

19 YSN 5380 HWB 50,000 KCAL KYUNG DONG 535RTG

20 YSN 7003 HWB A 380 GPH ALDRICH WHO 38G 3/12/2013

21 YSN 8103 HWB 380 GPH ALDRICH WHO 38G 6/27/2013

22 YSN 8104 HWB 380 GPH ALDRICH WHO 38G 6/8/2016

23 CP MORSE 19 HWB 199,000 BTU BOCK 72E

24 CP MORSE 42 HWB 162,000 BTU BOCK 51E

25 CP TANGO 3201 HWB 586,000 BTU BURNHAM 4FW63A450GDP 6/26/1905

26 CP TANGO 3201 HWB 586,000 BTU BURNHAM 4FW63A450GDP 6/26/1905

YSN 22 EA

CP MORSE 2 EA

CP TANGO 2 EA

Total 26 EA

DOMESTIC HOT WATER (DHW), OIL-FIRED

Type

ATTACHMENT 3-8

No Location Bldg. Capacity Unit MFR Model Install Date

1 YSN 1533 HWB(G) 600 GPH BOOSTER NBG 90A

2 YSN 4259 HWB(G) 135 GPH ALDRICH WHO 13G 1/19/2014

3 YSN 5497 HWB(G) 135 GPH ALDRICH WHO 13G 6/5/2014

4 YSN 8102 HWB(G) A 470 GPH ALDRICH WHO 47G 3/25/2014

YSN 4 EA

Total 4 EA

DOMESTIC HOT WATER (DHW), GAS-FIRED

TYPE

ATTACHMENT 3-9

No Location Bldg. Capacity Unit Qty

1 YSN 1333 800 Gal 1 2 YSN 1344 1000 Gal 1 3 YSN 1347 600 Gal 1 4 YSN 1363 1000 Gal 1 5 YSN 1365 600 Gal 1 6 YSN 1384 600 Gal 1 7 YSN 1391 600 Gal 1 8 YSN 1601 500 Gal 1 9 YSN 2308 300 Gal 1 10 YSN 2661 600 Gal 3 11 YSN 2680 500 Gal 1 12 YSN 4203 200 Gal 1 13 YSN 4220 500 Gal 1 14 YSN 4437 300 Gal 1 15 YSN 5278 300 Gal 1 16 YSN 5380 300 Gal 1 17 YSN 7003 600 Gal 1 18 YSN 7003 600 Gal 1 19 YSN 8102 800 Gal 1 20 YSN 8103 600 Gal 1 21 YSN 8104 800 Gal 1 22 CP MORSE 19 150 Gal 1 23 CP MORSE 42 150 Gal 1

YSN 23 EA

CP MORSE 2 EA

Total 25 EA

TOTAL

HOT WATER STORAGE TANK

ATTACHMENT 3-10

No Location BLDG. Fuel Type Capacity AFFECTED BUILDING NUMBER 1 YSN 1178 Diesel Aboveground 500 GAL B-1178 2 YSN 1188 Diesel Aboveground 300 GAL B-1188 3 YSN 1315 Diesel Aboveground 550 GAL B-1315 4 YSN 1330 Diesel Aboveground 1,200 GAL B-1330 5 YSN 1344 Diesel Aboveground 3,000 GAL B-1344 6 YSN 1347 Diesel Aboveground 600 GAL B-1347, 1348 7 YSN 1351 Diesel Aboveground 600 GAL B-1351-1351 8 YSN 1363 Diesel Aboveground 2000 GAL B-1333,1363,1396 9 YSN 1365 Diesel Aboveground 600 GAL B-1365-1365 10 YSN 1368 Diesel Aboveground 1,000 GAL B-1391, 1333 (WAF), 136833 (WAF), 1368 11 YSN 1383 Diesel Aboveground 1,000 GAL B-1383, 1382 12 YSN 1384 Diesel Aboveground 600 GAL B-1384-1384 13 YSN 1391 Diesel Aboveground 1,000 GAL B-1368,1391 14 YSN 1394 Diesel Aboveground 600 GAL B-1394-1394 15 YSN 1397 Diesel Aboveground 600 GAL B-1397-1397 16 YSN 1563 Diesel Aboveground 600 GAL B-1560-1560 17 YSN 1577 Diesel Aboveground 600 GAL B-1577-1577 18 YSN 1669 Diesel Aboveground 5,000 GAL B-1601, 1602, 1619,1621, 1623, 1627, 1668, 1669 19 YSN 1694 Diesel Aboveground 600 GAL B-1694 20 YSN 2075 Diesel Aboveground 600 GAL B-2075,2077, 2078, 2079 21 YSN 2308 Diesel Aboveground 300 GAL B-2308 22 YSN 2320 Diesel Aboveground 600 GAL B-2320 23 YSN 2550 Diesel Aboveground 300 GAL B-2550 24 YSN 2640 Diesel Aboveground 1,200 GAL B-2640, 2668, 2670 25 YSN 2661 Diesel Aboveground 1,200 GAL B-2661 26 YSN 2680 Diesel Aboveground 600 GAL B-2680 27 YSN 2681 Diesel Aboveground 1,000 GAL B-2681 28 YSN 4034 Diesel Aboveground 1,500 GAL B-4034,4035, 4313, 4358 29 YSN 4043 Diesel Aboveground 600 GAL B-4017, 4042, 4043 30 YSN 4101 Diesel Aboveground 300 GAL B-4101 31 YSN 4203 Diesel Aboveground 2,500 GAL B-4203 32 YSN 4220 Diesel Aboveground 2,500 GAL B-4220, 4253, 4254, 4257, 4260 33 YSN 4259 Diesel Aboveground 600 GAL B-4259: WAF(E) only 34 YSN 4275 Diesel Aboveground 5,000 GAL B-4280: SHB(A), HWB 35 YSN 4401 Diesel Aboveground 1,000 GAL B-4401 36 YSN 4437 Diesel Aboveground 600 GAL B-4437 37 YSN 4458 Diesel Aboveground 600 GAL B-4456, 445 B-4456, 4457, 4458, 4460, 4461 38 YSN 4479 Diesel Aboveground 550 GAL B-4479 39 YSN 4493 Diesel Aboveground 1000 GAL B-4489,4493,4485 40 YSN 4506 Diesel Aboveground 2,500 GAL B-4506, 4502, 4503, 4159, 4158, 4156, 4162, 4160, 4151, 4472, 4474, 4486, 4487 B-4506, 4502, 4503, 4159, 4158, 4156, 41 YSN 4723 Diesel Aboveground 300 GAL B-4723 42 YSN 4817 Diesel Aboveground 600 GAL B-4817 43 YSN 5277 Diesel Aboveground 1,000 GAL B-5277 44 YSN 5278 Diesel Aboveground 600 GAL B-5278 45 YSN 5380 Diesel Aboveground 1,200 GAL B-5380, 5382 46 YSN 5395 Diesel Aboveground 300 GAL B-5395 47 YSN 5460 Diesel Aboveground 300 GAL B-5460 48 YSN 5495A Diesel Aboveground 600 GAL B-5495, SHB(A) 49 YSN 5495B Diesel Aboveground 300 GAL B-5495, SHB(B) 50 YSN 7003 Diesel Aboveground 3,000 GAL B-7003 51 YSN 8103 Diesel Aboveground 500 GAL B-8103 52 YSN 8104 Diesel Aboveground 500 GAL B-8104 53 CP Morse 13 Diesel Aboveground 300 GAL B-13 54 CP Morse 19 Diesel Aboveground 1,000 GAL B-19 55 CP Morse 27 Diesel Aboveground 300 GAL B-27 56 CP Morse 42 Diesel Aboveground 600 GAL B-42

YSN 52 EA

0 EA

CP Morse 4 EA

0 EA

TOTAL 56 EA

ATTACHMENT 3-11

FUEL OIL STORAGE TANK

Aboveground Underground

Aboveground

Aboveground Underground

No Location Bldg.

1 YSN 1178

2 YSN 1188

3 YSN 1315

4 YSN 1333

5 YSN 1344

6 YSN 1347

7 YSN 1348

8 YSN 1351

9 YSN 1363

10 YSN 1368

11 YSN 1382

12 YSN 1384

13 YSN 1391

14 YSN 1394

15 YSN 1396

16 YSN 1397

17 YSN 1577

18 YSN 1601

19 YSN 1694

20 YSN 2075

21 YSN 2077

22 YSN 2078

23 YSN 2079

24 YSN 2307

25 YSN 2308

26 YSN 2320

27 YSN 2670

28 YSN 4017

29 YSN 4101

30 YSN 4203

31 YSN 4208

32 YSN 4220

33 YSN 4259

34 YSN 4280

35 YSN 4401

36 YSN 4437

37 YSN 4457

38 YSN 4461

39 YSN 4479

40 YSN 4493

41 YSN 4723

42 YSN 4817

43 YSN 5701

44 YSN 5713

45 YSN 5714

46 YSN 5717

47 YSN 5720

48 YSN 5725

49 YSN 5735

50 YSN 7003

51 YSN 8102

52 CP Morse 13

53 CP Morse 19

54 CP Morse 27

55 CP Morse 42

Subtotal Yongsan 51 EA

CP MORSE 4 EA

Total: 55 EA

MECHANICAL ROOMS (WITHIN BUILDING)

ATTACHMENT 3-12

No Location Bldg.

1 YSN 1330

2 YSN 1365

3 YSN 1383

4 YSN 2661

5 YSN 2681

Yongsan 4 EA

Total 4 EA

MECHANICAL ROOMS (SEPARATE BUILDING)

ATTACHMENT 3-13

TE-04 List of Heat Pump Equip

Bldg. System Equipment Model Mfg Q'ty Specification

Remark Capacity Power

Consumption

Geothermal

Type

Heat Pump

GEHB060 TRANE 8 Heating :73.8 MBTUH Cooling :57.9 MBTUH

4.84KW

GEHB048 TRANE 6 Heating :57 MBTUH Cooling :47.3 MBTUH

4.27KW

GEHB042 TRANE 5

Heating :48.5 MBTUH Cooling :39.5 MBTUH 3.46KW

GEHB030 TRANE 1 Heating :33.5 MBTUH Cooling :28.1 MBTUH

2.33KW

GEHB024 TRANE 2

Heating :31.0 MBTUH Cooling :25.2 MBTUH 2.18KW

GEHB018 TRANE 1 Heating :22.1 MBTUH Cooling :18.6 MBTUH

1.54KW

GEHB015 TRANE 3 Heating :17.5 MBTUH Cooling :13.8 MBTUH 1.09KW

GEHB009 TRANE 2 Heating : 11.1 MBTUH Cooling : 8.9 MBTUH

0.72KW

WPWD072 TRANE 1 Heating :96.9 MBTUH Cooling :58.2 MBTUH

4.34KW

WPWD060 TRANE 1

Heating :80.4 MBTUH Cooling :52.5 MBTUH 3.93KW

Heat Pump (Water to Water Heat Pump) WPWD042 TRANE 1 Heating :55.9 MBTUH

Cooling :35.7 MBTUH

2.06KW

WPWD036 TRANE 1

Heating :46.9 MBTUH Cooling :30.5 MBTUH 1.72KW

WPWD024 TRANE 2 Heating :34.3 MBTUH Cooling :20.6 MBTUH

1.79KW Hot Water

HX

(Air to Air Heat Exchanger)

HRP‐S700‐W700 Dooil Engineering 2

HRP‐S600‐W700 Dooil Engineering 2

Circulation Pump

LPBO‐125/114 GRUNDFOS 2 5.6HP (220V/60Hz/3Ph) for geo‐thermal

TP50‐160/2 GRUNDFOS 2 1.5HP (220V/60Hz/3Ph) for condensing water on 1F

TP65‐190/4 GRUNDFOS 2 4HP (220V/60Hz/3Ph) for condensing water on 2F

Circulation Pump TP32‐40/4 GRUNDFOS 1 1/3HP (220V/60Hz/3Ph) for WP(Hot Water)

TP32‐160/2 GRUNDFOS 4 3/4HP (220V/60Hz/3Ph) for HX

Fan

BSQ‐180‐15 MARATHON 1 1.5HP (220V/60Hz/3Ph)

BSQ‐180‐7 MARATHON 4 4/3HP (220V/60Hz/3Ph)

BSQ‐180‐10 MARATHON 3 1HP (220V/60Hz/3Ph)

ATTACHMENT 4

Bldg. System Equipment Model Mfg Q'ty Specification

Remark Capacity Power

Consumption

Baseboard Heater

E2907‐040C TPI

CORPORATION

4 1 kW

E2906‐040C TPI

CORPORATION

3 0.5 kW

Expansion Tank

D80 BELL&COSSETT 1

Maximum Working Pressure : 85 for HP piping loof

D20 BELL&COSSETT 4

Maximum Working

Pressure : 85 for HX

Heating Water Coil 4 serviced with HX

Cooling Tower Type

Heat Pump

GEHB024 TRANE 6

Heating :31.0 MBTUH Cooling :25.2 MBTUH 2.18KW

GEHB018 TRANE 1 Heating :22.1 MBTUH Cooling :18.6 MBTUH

1.54KW

Heat Pump (Water to Water Heat Pump) EXWA24041 TRANE 4 Heating :302.4 MBTUH

Cooling :191.4 MBTUH

Scroll Chiller CGWF0404 TRANE 1 40 TON

AHU

MCCB040UA0AO

UA

TRANE 1

Fan Motor M2513T BALDOR 1 15HP (460V/3Ph/60Hz)

Fan Motor ADSMITH ADSMITH 1 7.5 HP (460V/3Ph/60Hz)

Fin Tube Radiator 2 3Row, 11'‐6"

2 3Row, 10'‐6" VAV Unit 95

Expansion Tank 4 Working Pressure : 862 ㎪ Tank Volume : 19 ℓ

Coolingtower VF1096510 BALTIMORE 1 Cooling capacity : 671kW

Pump

M3313T BALDOR 2 10HP (460V/3Ph/60Hz)

M3211T BALDOR 2 3HP (460V/3Ph/60Hz) M3157T BALDOR 2 2HP (460V/3Ph/60Hz) M99084 MARATHON 1 2HP (460V/3Ph/60Hz)

P6CKB‐2742 EMERSON 1 1HP (460V/3Ph/60Hz)

S55CXJFM4927 EMERSON 2 0.5HP (115V/1Ph/60Hz)

Cooled Air Type

AHU DACD-3034 DATA-AIRE 1 496.3 MBTUH NOC Room

AHU DAAD-3034 DATA-AIRE 2 397.9 MBTUH NOC Room

Heat Pump GSUJ060 TRANE 1 Heating :73.5 MBTUH

Cooling :63.2 MBTUH

Circulation Pump LPK4B GRUNDFOS 1

1/4 HP

(220volt/60HZ/1Ph)

TE-05 M inor_Parts_Less_Than_$250

L/N ITEM DESCRIPTION PART NUMBER ANNUAL QTY UNIT

1 Air filter 16"x20"x1" 600 EA

2 Air filter 16"x25"x1" 600 EA

3 Air filter 20"x20"x1" 600 EA

4 Air Filter 20"x25"x1" 600 EA

5 Air Filter 700*750*20 120 EA

6 Air Filter 500*760*20 30 EA

7 Air Filter 620*500*20 40 EA

8 Air Filter 520*740*25 20 EA

9 Air Filter 470*640*25 20 EA

10 Air Filter 410*640*25 25 EA

11 Air Filter 370*510*25 35 EA

12 Anti-Freezer T675A 3 EA

13 Aquastat L6006A 16 EA

14 Aquastat A4081A 9 EA

15 Ball valve 15mm 59 EA

16 Ball valve 32mm 25 EA

17 Ball valve 25mm 27 EA

18 Ball valve 40mm 16 EA

19 Ball valve 50mm 24 EA

20 Ball valve 20mm 24 EA

21 Bearing RA012RRTCOL 2 EA

22 Bearing KHR209-27 20 EA

23 Bearing 6203 20 EA

24 Bearing 6205 20 EA

25 Bearing 6202 20 EA

26 Bearing 6201 20 EA

27 Burner Motor 1/4HP 3450RPM 10 EA

28 Burner Motor 1/8HP 3450RPM 8 EA

29 Burner motor 1/7HP 3450RPM 10 EA

30 Burner Motor 1/3HP 3450RPM 5 EA

31 Burner Motor 1/5HP 3450RPM 4 EA

32 Bushing 50 * 40mm 17 EA

ATTACHMENT 5

33 Bushing 50 * 20mm 5 EA

34 Bushing 32 * 15mm 12 EA

35 Bushing 80 * 50mm 10 EA

36 Bushing 32 * 20mm 5 EA

37 Bushing 25 * 15mm 5 EA

38 Bushing 50 * 32mm 13 EA

39 Bushing 40 * 32mm 17 EA

40 Bushing 65 * 50mm 5 EA

41 Bushing, Pipe Galv, 3/4"x1/2" 7 EA

42 Bushing, Pipe 1"x 3/4" 5 EA

43 Bushing, Pipe 1-1/2"x1" 3 EA

44 Cap 32mm 15 EA

45 Cap Galv, 1" 4 EA

46 Cap 15mm 7 EA

47 Cap 40mm 3 EA

48 Cap Galv, 3/4" 2 EA

49 Cap 50mm 5 EA

50 Circulation Cuppling USA1 1070 10 EA

51 Circulation Pump 400 W 51 EA

52 Circulation Pump 600 W 10 EA

53 Circulation Pump Condenser 400 W 4 EA

54 Copper Adapter C xM Type, 50mm 19 EA

55 Copper Adapter C xM Type, 32mm 15 EA

56 Copper Adapter C xM Type, 25mm 6 EA

57 Copper Adapter C xM Type, 15mm 29 EA

58 Copper Adapter C xM Type, 20mm 14 EA

59 Copper Adapter C xM Type, 40mm 7 EA

60 Copper Bushing 11/2*11/4 9 EA

61 Copper check valve 10k 40mm 5 EA

62 Copper check valve 10k 15mm 11 EA

63 Copper check valve 10k 20mm 1 EA

64 Copper check valve 10k 25mm 4 EA

65 Copper check valve 10k 50mm 4 EA

66 Copper check valve 10k 32mm 3 EA

67 Copper Elbow 32mm 66 EA

68 Copper Elbow 20mm 68 EA

69 Copper Elbow 40mm 56 EA

70 Copper Elbow 25mm 11 EA

71 Copper Elbow 50mm 32 EA

72 Copper Elbow 15mm 58 EA

73 Copper gate valve 10k 25mm 8 EA

74 Copper gate valve 10k 50mm 2 EA

75 Copper gate valve 10k 40mm 13 EA

76 Copper gate valve 10k 32mm 5 EA

77 Copper gate valve 10k 15mm 9 EA

78 Copper Nipple 1/16*50 61 EA

79 Copper Nipple 1/8*1/16 30 EA

80 Copper Nipple 3/8*3/8 50 EA

81 Copper Pipe 40mm*6M 2 BON

82 Copper Pipe 32mm*6M 3 BON

83 Copper Pipe 25mm*6M 3 BON

84 Copper Pipe 50mm*6M 3 BON

85 Copper Reducer 32*20mm 11 EA

86 Copper Reducer 32*15mm 7 EA

87 Copper Socket 50mm 24 EA

88 Copper Socket 40mm 24 EA

89 Copper Socket 32mm 18 EA

90 Copper Socket 20mm 10 EA

91 Copper Socket 15mm 2 EA

92 Copper Tee 25mm 28 EA

93 Copper Tee 32mm 30 EA

94 Copper Tee 40mm 12 EA

95 Copper Tee 20mm 17 EA

96 Copper Tee 50mm 15 EA

97 Copper Tee 15mm 7 EA

98 Copper Tube 3/8" 8 M

99 Copper Tube 3/8" 22 M

100 Copper Union C xM Type, 40mm 73 EA

101 Copper Union C xM Type, 50mm 41 EA

102 Copper Union C xM Type, 32mm 72 EA

103 Copper Union C xM Type, 15mm 29 EA

104 Copper Union C xM Type, 20mm 43 EA

105 Copper Union C xM Type, 25mm 57 EA

106 Cork Valve Set Glass set 2 EA

107 Cotton Work Glove 419 EA

108 Coupling Spring 7 EA

109 Coupling 6" 2 EA

110 Elbow 50mm 27 EA

111 Elbow 20mm 91 EA

112 Elbow 15mm 38 EA

113 Elbow 25mm 36 EA

114 Elbow 40mm 30 EA

115 Electrical Tape 66 EA

116 Electrical Wire 1.5mm * 1C * 300M 13 EA

117 Electrical Wire 1.25mm * 2C * 200M 3 EA

118 Electrical Wire 0.75mm * 2C * 200M 1 EA

119 Electrical Wire 1.5mm * 2C * 200M 2 EA

120 Ethy propylene diene monomer 25mm*13T 35 EA

121 Ethy propylene diene monomer 32mm*13T 6 EA

122 Ethy propylene diene monomer Tape 1 EA

123 Fan Belt B-64 15 EA

124 Fan Belt B-51 15 EA

125 Fan Belt B-35 15 EA

126 Fan Belt B-38 15 EA

127 Fan Belt B-44 15 EA

128 Fan Belt B-62 15 EA

129 Fan Belt B-48 15 EA

130 Fan Belt A-50 15 EA

131 Fan Belt B-47 15 EA

132 Fan Belt B-46 15 EA

133 Fan Belt B-65 15 EA

134 Fan Belt A-48 15 EA

135 Fan Belt B-45 15 EA

136 Fan Belt B-61 15 EA

137 Fan Belt A-45 15 EA

138 Fan Belt B-42 15 EA

139 Fan Belt B-37 15 EA

140 Fan Belt A-47 15 EA

141 Fan Belt B-39 15 EA

142 Fan Belt B-49 15 EA

143 Fan Belt B-63 15 EA

144 Fan Belt B-36 15 EA

145 Fan Belt B-40 15 EA

146 Fan Belt A-49 15 EA

147 Fan Belt B-41 15 EA

148 Fan Belt B-43 15 EA

149 Fan Belt B-50 15 EA

150 Fan Belt A-44 15 EA

151 Fan Belt A-46 15 EA

152 Fan Limit Switch 13 cm long 10 EA

153 Fan Limit Switch 29 cm long 15 EA

154 Foil Tape 97 EA

155 Fuel pump A2VA7116 20 EA

156 Fuel pump B2VA8216 10 EA

157 Fuel pump B2YA8916 3 EA

158 Fuel pump HA2BB 3 EA

159 Fuel pump J3BB1W 2 EA

160 Fuel pump A2YB7917 1 EA

161 Garbage Bag 100ℓ 645 EA

162 Gas Ignitor 41-40V 5 EA

163 Glass Wool 24K*50T*10M 5 EA

164 Grease Alvania RL 10kg 1 EA

165 Half Coated Glove 1000 EA

166 Hook Nut 3/8" 7 EA

167 Hook Nut 3/16" 8 EA

168 Hook Nut 1/4" 6 EA

169 Hot water/Hydraulic Pressure 4 EA

170 Hour Meter 220V49557 2 EA

171 Ignitor Q347A 2 EA

172 Insulation 15mm * 25T 51 EA

173 Insulation 32mm * 25T 28 EA

174 Insulation 40mm * 25T 49 EA

175 Insulation 20mm * 25T 55 EA

176 Insulation 25mm * 25T 11 EA

177 Insulation 50mm * 25T 30 EA

178 Insulation Tape red 267 EA

179 Insulation Tape yellow 238 EA

180 Insulation Tape white 238 EA

181 Insulation Tape blue 208 EA

182 Magnet sensor CTR01146 1 EA

183 Magnet sensor CPT00904 2 EA

184 Magnetic Contactor 2P110V5HP 3 EA

185 Mechanical Seal B2-32Ø 22 EA

186 Mechanical Seal B2-30Ø 20 EA

187 Mechanical Seal B2-16Ø 18 EA

188 Mechanical Seal B2-15Ø 11 EA

189 Mechanical Seal B2-14Ø 5 EA

190 Mechanical Seal B2-10Ø 10 EA

191 Metal Sheet 4 * 8 * 0.45T 81 EA

192 Multi-joint 25mm 6 EA

193 Multi-joint 15mm 12 EA

194 Multi-joint 32mm 3 EA

195 Multi-joint 20mm 1 EA

196 Multi-joint 40mm 3 EA

197 Multi-joint 50mm 16 EA

198 Nipple 50mm * 1" 43 EA

199 Nipple 40mm * 4" 26 EA

200 Nipple 40mm * 1" 32 EA

201 Nipple 20mm * 2" 68 EA

202 Nipple 32mm * 5" 20 EA

203 Nipple 40mm * 6" 10 EA

204 Nipple 25mm * 6" 26 EA

205 Nipple 20mm * 4" 5 EA

206 Nipple 15mm * 5" 12 EA

207 Nipple 20mm * 1" 53 EA

208 Nipple 15mm * 6" 45 EA

209 Nozzle Tip 1.00/70˚, 80˚ 12 EA

210 Nozzle Tip 4.00/60˚, 70˚, 80˚ 5 EA

211 Nozzle Tip 1.75/70˚, 80˚ 6 EA

212 Nozzle Tip 5.50/45˚, 60˚, 70˚, 80˚ 6 EA

213 Nozzle Tip 2.00/70˚, 80˚ 9 EA

214 Nozzle Tip 6.50/45˚, 60˚, 70˚, 80˚ 5 EA

215 Nozzle Tip 1.50/70˚, 80˚ 8 EA

216 Nozzle Tip 0.75/70˚, 80˚ 3 EA

217 Nozzle Tip 5.00/45˚, 60˚, 70˚, 80˚ 3 EA

218 Nozzle Tip 1.25/70˚, 80˚ 5 EA

219 Nozzle Tip 4.50/60˚70˚, 80˚ 10 EA

220 Nozzle Tip 1.35/70˚, 80˚ 5 EA

221 Nozzle Tip 2.50/70˚, 80˚ 5 EA

222 Nozzle Tip 6.00/45˚, 60˚, 70˚, 80˚ 3 EA

223 Nozzle Tip 3.50/60˚, 70˚, 80˚ 3 EA

224 Nozzle Tip 3.00/70˚, 80˚ 3 EA

225 Oil Pressure Gage 300PSI 44 EA

226 Oil Strainer 3/8" 24 EA

227 Photo cell 45CM-1000 3 EA

228 Photo cell C554A1463 30 EA

229 Pipe 50mm 28 BON

230 Pipe 25mm 20 BON

231 Pipe 40mm 18 BON

232 Pipe 20mm 18 BON

233 Pipe 32mm 19 BON

234 Pipe 15mm 11 BON

235 Plug, Pipe, Galv 1-1/2" 15 EA

236 Plug, Pipe, Galv 3/4" 32 EA

237 Plug, Pipe, Galv 1/2"DIA 10 EA

238 Plug, Pipe, Galv 1" 2 EA

239 Plug, Pipe, Galv 1-1/4" 5 EA

240 Pressure Gauge 300 PSI 15 EA

241 PVC Elbow 50mm 64 EA

242 PVC Pipe, Fuel Line 50mm 50 BON

243 PVC Socket 50mm 30 EA

244 Reducer 40 * 20mm 24 EA

245 Reducer 32 * 15mm 23 EA

246 Reducer 1-1/2"x1-1/4" 10 EA

247 Reducer 25 * 15mm 6 EA

248 Reducer 20 * 15mm 1 EA

249 Reducer 40 * 15mm 9 EA

250 Reducer, Pipe 2"x3/4" 24 EA

251 Reducer, Pipe 2"x1.5" 18 EA

252 Reducer, Pipe 1-1/4"x1" 4 EA

253 Reducing Valve 6KJP2 5 EA

254 Reducing Valve 25mm 5 EA

255 Refrigerant R-22(13.5kg) 5 EA

256 Relay 15sec 60 EA

257 Relay 30sec 10 EA

258 Relay 45sec 10 EA

259 Safety Valve 150 psi Size: 3/4" 21 EA

260 Safety Valve 125 psi Size: 3/4" 13 EA

261 Safety Valve 75 psi Size: 3/4" 4 EA

262 Safety Valve 60 psi Size: 3/4" 3 EA

263 Safety Valve 30 psi Size: 3/4" 10 EA

264 Socket 20mm 131 EA

265 Socket 15mm 113 EA

266 Socket 40mm 28 EA

267 Socket 25mm 46 EA

268 Socket 32mm 23 EA

269 Socket 50mm 38 EA

270 Solenoid Valve HPS-2250 21 EA

271 Solvent 18 L/Can 21 EA

272 Starting Condensor 30㎌ 2 EA

273 Starting Condensor 5㎌ 2 EA

274 Starting Condensor 7.5㎌ 2 EA

275 Starting Condensor 15㎌ 2 EA

276 Starting Condensor 10㎌ 1 EA

277 Steam Trap 3/4" 2 EA

278 Tee, Pipe 1", Galv 14 EA

279 Tee, Pipe 2", Galv 9 EA

280 Tee, Pipe 1/2" Galv 14 EA

281 Tee, Pipe 3/4", Galv, 17 EA

282 Teflon Tape 300 EA

283 Thermometer L type 11 EA

284 Thermostat T651A2028 5 EA

285 Thermostat T-8600 3 EA

286 Thermostat sensor SEN01521 6 EA

287 Thermostat sensor RLY01709 1 EA

288 Thermostat sensor COL05901 2 EA

289 Transformer 10,000v 32 EA

290 Union, Pipe 40mm 30 EA

291 Union, Pipe 32mm 13 EA

292 Union, Pipe 25mm 31 EA

293 Union, Pipe 15mm 8 EA

294 Union, Pipe 20mm 2 EA

295 Wire Connector 7 BOX

296 Wire Flexible 20mm * 30M 2 EA

297 Wire Flexible Connector 20mm 70 EA

TE-06 PM Tasks & Cycles Warm Air Furnaces (WAFs) Maintenance Task and Cycle

Equipment Type Warm Air Furnace, Gas-Fired Job Plan Title Annual (or more) Reference Means/O&M Manual

Step # Task 1 Check with operating personnel or area personnel for deficiencies.

2 Inspect, clean & adjust control valves & thermo-sensing bulbs.

3 Inspect fuel system for leaks; report all leaks promptly to COR.

4 Check for proper operation of burner primary controls, check & adjust thermostat.

5 Replace air filters at least once a month for heating season 6 Check blower & motor for vibration & noise, lubricate bearings and all moving parts 7 Check belts for wear & tension, tighten or replace.

8 Check electrical wiring to burner controls & blower.

9 Inspect & clean firebox & combustion chamber.

10 Clean blower.

11 Check condition of flue pipe, damper & stack.

12 Check furnace operation through complete cycle.

13 Check furnace combustion w/calibrated analyzer.

14 Clean area around furnace.

15 Check electrodes & hot surface igniters.

16 Check fan & limit control adjustment & operation; adjust as necessary.

17 Inspect, clean & test inducer motor; oil as required.

18 Inspect, clean & test positive & negative pressure switch; repair or replace as necessary.

19 Inspect, clean & test pilot assembly; repair or replace as necessary.

20 Inspect & clean burners.

21 Check manifold pressure& appliance input; adjust as required.

22 Check static air; adjust as required.

23 Check room thermostat is properly communicated with furnace and is programmed w/proper settings for energy saving; replace battery as necessary.

24 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

25 Fill out maintenance checklist & report deficiencies.

Note: 1. The frequency for the above STEPs might be increased, IAW the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

2. PM plan to be used for both forced draft & atmospheric burner assemblies, use the steps as applicable to the equipment being serviced.

ATTACHMENT 6

Equipment Type Warm Air Furnace, Oil-Fired Job Plan Title Annual (or more) Reference Means/O&M Manual

Step # Task 1 Check with operating personnel or area personnel for deficiencies.

2 Inspect, clean & adjust electrodes & nozzles; replace nozzles as necessary.

3 Inspect fuel system for leaks; report all leaks promptly to COR.

4 Change fuel filter & fuel strainer elements.

5 Check for proper operation of burner primary controls, check & adjust thermostat.

6 Replace air filters at least once a month for heating season.

7 Check blower & fan motor for vibration & noise; repair or replace as necessary.

clean fan motor & blower, lubricate bearings and all moving parts 8 Check belts for wear & tension, tighten or replace.

9 Check electrical wiring to burner controls & blower.

10 Inspect & clean firebox & flue piping; repair or replace as necessary, reseal smoke pipe as required.

11 Check condition of flue pipe, damper & stack; repair or replace as necessary.

12 Check fan & fan limit controls for proper operation; repair or replace as necessary.

13 Check furnace operation through complete cycle.

14 Check furnace combustion w/calibrated analyzer.

15 Clean area around furnace.

16 Check room thermostat is properly communicated with furnace and is programmed w/proper settings; replace battery as necessary.

17 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

18 Fill out maintenance checklist & report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

Hot Water Boiler Maintenance Task & Cycles

Equipment Type Hot Water Boiler (Space Heating & Domestic HW) Job Plan Title Monthly Reference Means/ASME-CSD-1-1998

Step # Task 1 Make visual inspection of the igniter.

2 Check both pilot & main flame signal strength.

3 Check flame failure detection system. Close manual fuel supply pilot

& main; check safety shutdown timing and log.

4 Check firing rate control and verify factory settings 5 Open limit switch and make aural and visual check of the pilot and/or main fuel valves; check valve position indicators 6 Check condition of flue pipe, damper & exhaust stack.

7 Check operation & condition of safety pressure relief valve.

8 Test low draft, fan, air pressure & damper position interlocks.

9 Check low fire start interlock.

10 Test high & low oil pressure & temperature interlocks.

11 Test high & low gas pressure & temperature interlocks.

12 Test operation of low water fuel cut-off devices.

13 Check hot water pressure gauges.

14 Inspect and clean or replace water column sight glass.

15 Check operation of mercury control switches (i.e., hot water temp limit atomizing or combustion air proving, etc.)

16 Check fuel lines & connections for damage.

17 Perform visual opacity checks IAW unmanned boiler SOP.

18 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

19 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Job Plan Title Quarterly Reference Means/ASME-CSD-1-1998

Step # Task 1 Make visual inspection of the igniter.

2 Check both pilot & main flame signal strength.

3 Check flame failure detection system. Close manual fuel supply pilot

& main; check safety shutdown timing and log.

4 Check firing rate control and verify factory settings 5 Open limit switch and make aural and visual check of the pilot and/or main fuel valves; check valve position indicators 6 Make visual inspection of the flue, vent, stack or outlet dampers linkage for proper operation.

7 Check for proper operational response of burner to thermostat controls.

8 Check & lubricate burner & blower motors.

7 Test low draft, fan, air pressure & damper position interlocks.

8 Check low fire start interlock.

9 Test high & low oil pressure & temperature interlocks.

10 Test high & low gas pressure & temperature interlocks.

11 Test operation of low water fuel cut-off devices.

12 Perform visual opacity checks IAW unmanned boiler SOP.

13 Check flame failure detection system components, such as vacuum tubes, amplifier, and relays.

14 Check piping and wiring of all interlocks and shutoff valves.

15 Inspect burner components IAW manufacturer’s instructions.

16 Check fuel lines & connections for damage.

17 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

18 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Job Plan Title Annual Reference Means/ASME-CSD-1-1998

Step # Task 1 Check combustion chamber for air & gas leaks.

2 Make visual inspection of the igniter.

3 Check both pilot & main flame signal strength.

4 Check flame failure detection system. Close manual fuel supply pilot

& main; check safety shutdown timing and log.

5 Conduct pilot turndown test IAW manufacturer’s instructions.

6 Replace vacuum tubes, scanners, or flame rods IAW manufacturer’s instructions.

7 Test for hot refractory hold in.

8 Check firing rate control and verify factory settings.

9 Conduct a combustion test of the firing rate control; verify factory settings.

10 Open limit switch and make aural and visual check of the pilot and/or main fuel valves; check valve position indicators 11 For pilot and/or main fuel valves Check all coils & diaphragms; test all other operating parts of all safety shutoff & control valves.

12 Test fuel valve interlock switch IAW manufacturer’s instructions.

13 Perform leakage test on pilot & main gas and/or fuel valves IAW manufacturer’s instructions.

14 Make visual inspection of the flue, vent, stack or outlet dampers linkage for proper operation.

15 Test low draft, fan, air pressure & damper position interlocks.

16 Test purge switch IAW manufacturer’s instructions.

17 Check low fire start interlock.

18 Test low fire start interlock IAW manufacturer’s instructions.

19 Test air/steam interlock IAW manufacturer’s instructions.

20 Test burner position interlock IAW manufacturer’s instructions.

21 Check dual fuel change over control.

22 Test high & low oil pressure & temperature interlocks.

23 Test high & low gas pressure & temperature interlocks.

24 Test operation of low water fuel cut-off devices.

25 Recondition or replace low water fuel cut-off device.

26 Test high limit & operating temperature or steam pressure controls.

27 Test safety/safety relief valves IAW ASME boiler & pressure vessel code, sections VI and VII.

28 Check flame failure detection system components, such as vacuum tubes, amplifier, and relays.

29 Check piping and wiring of all interlocks and shutoff valves.

30 Inspect burner components IAW manufacturer’s instructions.

31 Clean gas train drip leg & oil system atomizers & strainers; vacuum boiler.

32 Wash and layup boiler.

33 Check and adjust boiler water chemicals 34 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

35 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Steam Boilers Maintenance Task & Cycles

Equipment Type Steam Boiler Job Plan Title Weekly Reference Means/ASME-CSD-1-1998

Step # Task 1 Make visual inspection of the igniter.

2 Check both pilot & main flame signal strength.

3 Check flame failure detection system. Close manual fuel supply pilot

& main; check safety shutdown timing and log.

4 Check firing rate control and verify factory settings 5 Open limit switch and make aural and visual check of the pilot and/or main fuel valves; check valve position indicators 6 Test operation of low water fuel cut-off devices.

7 Perform visual opacity checks IAW unmanned boiler SOP.

8 Perform water chemistry analysis IAW unmanned boiler SOP.

9 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

10 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

Equipment Type Steam Boiler Job Plan Title Monthly Reference Means/ASME-CSD-1-1998

Step # Task 1 Perform all weekly maintenance procedures.

2 Make visual inspection of the flue, vent, stack or outlet dampers linkage for proper operation.

3 Test low draft, fan, air pressure & damper position interlocks.

4 Check low fire start interlock.

5 Test high & low oil pressure & temperature interlocks.

6 Test high & low gas pressure & temperature interlocks.

7 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

8 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Equipment Type Steam Boiler Job Plan Title Quarterly Reference Means/ASME-CSD-1-1998

Step # Task 1 Perform all weekly and monthly maintenance procedures.

2 Check flame failure detection system components, such as vacuum tubes, amplifier, and relays.

3 Check piping and wiring of all interlocks and shutoff valves.

4 Inspect burner components IAW manufacturer’s instructions.

5 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

6 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

Equipment Type BOILER STEAM Job Plan Title Annual Reference Means/ASME-CSD-1-1998

Step # Task 1 Perform all weekly, monthly & quarterly maintenance procedures.

2 Conduct pilot turndown test IAW manufacturer’s instructions.

3 Replace vacuum tubes, scanners, or flame rods IAW manufacturer’s instructions.

4 Test for hot refractory hold in.

5 Conduct a combustion test of the firing rate control; verify factory settings.

6 Check all coils & diaphragms; test all other operating parts of all safety shutoff & control valves.

7 Test fuel valve interlock switch IAW manufacturer’s instructions.

8 Perform leakage test on pilot & main gas and/or fuel valves IAW manufacturer’s instructions.

9 Test purge switch IAW manufacturer’s instructions.

10 Test low fire start interlock IAW manufacturer’s instructions.

11 Test air/steam interlock IAW manufacturer’s instructions.

12 Test burner position interlock IAW manufacturer’s instructions.

13 Check dual fuel change over control.

14 Recondition or replace low water fuel cut-off device.

15 Test high limit & operating temperature or steam pressure controls.

16 Test safety/safety relief valves IAW ASME boiler & pressure vessel code, sections VI and VII.

17 Inspect & clean burner components IAW manufacturer’s instructions.

18 Clean gas train drip leg & oil system atomizers & strainers; vacuum boiler.

19 Wash and layup boiler.

20 Power Vac boiler 21 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

22 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Hydronic Heating System Mechanical Room Maintenance Task & Cycles

Equipment Type Hydronic Heating System (water) Mechanical Room Maint.

Job Plan Title Annual Reference

Step # Task 1 Check with operating or area personnel for deficiencies.

2 Heating System Hot Water Converter

A) Check temperature gauges for proper operating temperatures;

repair or replace as necessary.

B) Check hot water modulating valve for proper operation;

repair or replace as necessary.

C) Inspect heat exchanger and adjacent piping for torn or deteriorated insulation: repair or replace as necessary.

3 Recirculation pumps A) Check for proper operation of pump.

B) Check for leaks on suction & discharge piping, seals, packing glands, etc.

Check pump & motor operation for excessive vibration, noise, & overheating;

make minor adjustments or replace pump as necessary.

C) Check alignment of pump & motor; adjust or replace as necessary.

D) Lubricate pump & motor.

4 Automatic Control Valves (Average of 3) A) Lubricate valve actuator stem & valve stem, where possible.

B) Check valve for proper operation.

C) Check packing glands for leakage; adjust as required.

D) Check pneumatic operator & tubing for leaks.

5 Motor Operated Valves.

A) Lubricate valve actuator stem & valve stem, where possible.

B) Check motor and valve for proper operation, including limit switch; adjust as required.

C) Check packing gland for leaks; adjust as required.

D) Check electrical wiring, connections & contacts; tighten as necessary.

E) Inspect & lubricate motor gearbox as required.

6 Hot Water System Valves (Average of 5) A) Lubricate valve stem; open & close valve to check operation.

B) Check packing glands for leaks; tighten packing & flange bolts as required.

7 Strainers A) Remove & clean strainer element.

B) Inspect for leaks; tighten as necessary

8 Clean mechanical room.

9 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

10 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy, Equipment Type Hydronic Heating System (steam) Mechanical Room Maint.

Job Plan Title Annual Reference

Step # Task 1 Check with operating or area personnel for deficiencies.

2 Heating System Steam Convertor

A) Check temperature gauges for proper operating temperatures;

repair or replace as necessary.

B) Check steam modulating valve & steam condensate trap for proper operation: repair or replace as necessary.

C) Inspect heat exchanger and adjacent piping for torn or deteriorated insulation: repair or replace as necessary.

3 Condensate Pump(s) A) Check for proper operation of pump.

B) Check for leaks on suction & discharge piping, seals, packing glands, etc.; make minor adjustments or replace pump as necessary.

C) Check alignment of pump and motor; adjust as necessary.

D) Lubricate pump and motor.

E) Clean exterior of pump & motor.

4 Recirculation pumps A) Check for proper operation of pump.

B) Check for leaks on suction & discharge piping, seals, packing glands, etc. Check pump & motor operation for excessive vibration, noise & overheating; make minor adjustments or replace pump as necessary.

C) Check alignment of pump, motor & check condition of coupling guard; adjust or replace as necessary.

D) Lubricate pump & motor.

5 Steam Regulating Valves A) Inspect valve for leaks; repair as necessary.

B) Manually operate to check operation; adjust as necessary.

C) Check pressure for proper opening & closing action.

6 Automatic Control Valves A) Lubricate valve actuator stem & valve stem, where possible.

B) Check valve for proper operation.

C) Check packing glands for leakage; adjust as required.

D) Check pneumatic operator & tubing for leaks.

7 Motor Operated Valves (Average of 2) A) Lubricate valve actuator stem & valve stem, where possible.

B) Check motor and valve for proper operation, including limit switch; adjust as required.

C) Check packing gland for leaks; adjust as required.

D) Check electrical wiring, connections & contacts; tighten as necessary.

E) Inspect & lubricate motor gearbox as required.

8 Steam System Valves (Average of 15) A) Lubricate valve stem; open & close valve to check operation.

B) Check packing glands for leaks; tighten packing & flange bolts as required.

9 Strainers A) Remove & clean strainer element.

B) Inspect for leaks; tighten as necessary

10 Expansion Tank A) Check sight glass for defects; replace as necessary.

B) Check overall condition of tank; repair as necessary.

C) Check gage stop valves for operation & defects; repair or replace as necessary.

D) Check for leaks on piping to the system; repair or replace as necessary.

11 Condensate Tanks

A) Check for holes.

B) Check for leaking tank C )Check for rusted areas, clean and touch up paint D) Check sight glass for damage, leaks; repair or replace as necessary.

E) Check all tank valves for damage, leaks; repair or replace as necessary.

F) Check tank level switch for leaks, bare wires & proper operation; adjust as necessary.

12 Steam Traps (Average of 15)

a) Check for proper operation of the trap by:

1) Visually looking for excessive steam venting.

2) Check condensate temperature at condensate tank

3) Mechanically or electrically check the cycling of the trap

13 Clean mechanical room.

14 Perform any tasks other than the above STEPs, as required by the applicable policy, regulation, technical manual, and manufacturer specification/recommendation.

15 Fill out maintenance checklist and report deficiencies.

Note: The frequency for the above STEPs might be increased, IAW the applicable policy,

File details come from the government source that posted it. Updated .