Exhibit A ACT_CDRLS_29SEP2021.rtf

RTF text file 2 MB Posted

Attached to
ACT W900KK-21-R-0049
Solicitation number
W900KK21R0049
Issued by

Text of this file

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.2.8, 3.8.3.1.1.3

5. CONTRACT REFERENCE

DI-MISC-81419

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

PERSONNEL REPORT

2. TITLE OF THE DATA ITEM

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-22-C-XXXX

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_0.png file_1.wmf

TDP

C. CATEGORY

TM

OTHER

MISC

file_2.png file_3.wmf file_4.png file_5.wmf

A

B. EXHIBIT

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

MNTHLY

10. FREQUENCY

Repro Reg Final

Draft

b. COPIES

a. ADDRESSEE

14.

DISTRIBUTION

J. DATE

I. APPROVED BY

H. DATE

G. PREPARED BY

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall document the manning and staffing levels.

3. BLK 4: The following paragraphs/sections/terminology are not applicable:

Providing names as part of paragraph 10.2.3 is not required.

4. BLK 11/12: 1ST submission shall be due 30 days after contract award.

5. BLK I3: Submission/postings shall continue through life of the contract.

6. Final submission/postings shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service/contract.

7. BLK 14: Submission shall be in Microsoft Office products and submitted/posted to the MIS. Email notification of the posting shall be required.

8. CDRL due dates occurring on weekends or Government holidays shall be due the following business day.

16. REMARKS

15. TOTAL

file_6.png file_7.wmf

18.

ESTIMATED TOTAL PRICE

17. PRICE GROUP

Page 1 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.3.1

5. CONTRACT REFERENCE

DI-ADMN-81249B

4. AUTHORITY

CONFERENCE AGENDA

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_8.png file_9.wmf

TM

OTHER

ADMN

file_10.png file_11.wmf file_12.png file_13.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

ASREQ

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. BLK 11/12/13: Submission shall be due two (2) weeks prior to each scheduled conference, as required through the end of the contract.

3. BLK 14: Submission shall be in Microsoft Office products and submitted/posted to the MIS. Email notification of posting is required.

4. The Government shall have five (5) days for review and acceptance/rejection of each submission.

5. The contractor shall incorporate Government comments for distribution on the day of the conference.

6. CDRL due dates occurring on weekends or Government holidays shall be due the following business day.

15. TOTAL

file_14.png file_15.wmf

Page 2 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.3.1

5. CONTRACT REFERENCE

DI-ADMN-81250B

4. AUTHORITY

Conference Minutes

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_16.png file_17.wmf

TM

OTHER

ADMN

file_18.png file_19.wmf file_20.png file_21.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format at is acceptable.

2. BLK 11/ 12 / 13 : Submission shall be due seven (7) days after each scheduled conference, as required through the end of the contract

3. BLK 14: Submiss ion shall be in Microsoft Office and submitted /posted to the MIS. Email notification of the posting is required.

4. The Government shall have 10 days for review and acceptance/rejection of each submission.

5. The contractor shall incorporate Government comments within five (5) days and re-submit.

6. Acceptance of any minutes which include information regarding changes in the contract requirements (including Standards, Statement of Works, and Specifications, etc.) does not constitute Government approval of those changes.

7. CDRL due dates occurring on weekends or Government holidays shall be due the following business day.

15. TOTAL

file_22.png file_23.wmf

Page 3 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.4.3

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Transition Plan

Scientific and Technical Reports

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_24.png file_25.wmf

TM

OTHER

MISC

file_26.png file_27.wmf file_28.png file_29.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall document the plan for transitioning the LCCS contract requirement from the incumbent and include all aspects of the transition, such as PMO, MIS etc.

3. BLK 4: The following paragraphs/sections/terminology are not applicable;

paragraphs 10.2

4. BLK 11 / 12: 1ST submission shall be due at the start of the Phase-In-Period/Mobilization period and be a copy of the plan delivered with the Government accepted proposal and contain any changes/ updates since contract award.

5. BLK 13: Subsequent submissions/revisions due as additional information and lessons learned are gathered during the Phase- In-Period/Mobilization. Final submission due 30 days after completion of the Phase-In-Period/ Mobilization period documenting all lessons learned.

6. BLK 14: Submission shall be in Microsoft Office products and submitted/posted to the MIS. Email notification of the posting shall be required.

7. The Government shall have 15 days for review and acceptance/rejection of each submission.

8. The contractor shall incorporate Government comments within 10 days and re-submit.

9. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_30.png file_31.wmf

Page 4 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.8.1.1.2

5. CONTRACT REFERENCE

DI-ILSS-80872

4. AUTHORITY

Training Materials

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_32.png file_33.wmf

TM

OTHER

ILSS

file_34.png file_35.wmf file_36.png file_37.wmf

A. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

ONE/R

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. BLK 4: Shall be used as guidance in the development of the instructional/training materials on the use of the Management Information System. The following paragraph s/sections/terminology arc not applicable:

a. Reference to 'The training materials should be for students... a basic knowledge of hand tools" ( Paragraph I0.1)

b. Paragraph 10.2.1.2, 10.2.1.4, 10.2.1.5, 10.2.1.6, and 10.2.1.7

3. . BLK 11 /12: Submission shall be due 30 days after the completion of the Phase-In-Period.

4. BLK 13: Subsequent submission/updates shall be due within 30 days of requisite change to the MIS and shall continue through life of the contract.

5. Submission shall be a multi-media "take home" training package that can be loaded/run on any Windows Personnel Computer.

6. Final submission/posting shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service/contract.

7. BLK 14: Submission shall be posted to the Management Information System (MIS) for download and review. Email notification of posting is required.

8. The Government will have 30 days for review and acceptance/reject ion of each submission/posting. The Government will respond only as necessary.

9. The contractor shall have 10 days to incorporate or respond to Government comments and repost.

10. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_38.png file_39.wmf

Page 5 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.8.3.1.1.1

5. CONTRACT REFERENCE

DI-MISC-81392

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Monthly Status Report

See Block 16

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_40.png file_41.wmf

TM

OTHER

MISC

file_42.png file_43.wmf file_44.png file_45.wmf

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

Block 2: Contractor Operation and Maintenance of Simulators/Equipment Management Sta

1. Contractor format is acceptable.

2. The Monthly Status Report shall document and summarize operation, maintenance, and utilization management information for compliance reporting.

3. BLK 4: The following paragraphs /sections/terminology are not applicable:

a. Any reference to " Fire Fighter Training Devices" and "FFTD" shall be interpreted as "training device"

b. Paragraph I0. 2.3.5.15

4. BLK 11 / 12 : Submission shall be due 30 days after the start of the Phase-In-Period/Mobilization.

5. BLK 13: Submission/ updates shall continue monthly through life of the contract.

6. Each submission/ posting shall be provided to the applicable device TOR for review/comment three (3) working days after the end of the monthly reporting period and posted to the MIS two (2) working days after TOR review/comment.

7. Final submission/posting shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service /contract.

8. BLK 14: Submission shall be in Microsoft Office products and posted to the MIS. Email notification of the posting is required.

9. The Government will have 10 days for review and acceptance/rejection of each submission/posting. The Government will respond only as necessary.

10 . The contractor shall have 5 days to incorporate or respond to Government comments.

11. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_46.png file_47.wmf

Page 6 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.9.2.4.2.1.2

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

TDSP Recommendations

Scientific and Technical Reports

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_48.png file_49.wmf

TM

OTHER

MISC

file_50.png file_51.wmf file_52.png file_53.wmf

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall consist of recommendations for changes to the existing TADSS baselines (TDSP, MSP, etc).

3. TDSP Verification comments shall include applicable " redlines" with the following:

a. Publication #

b. List of Discrepancies

e. Verification Method

d. Suggested corrections

e. Page #/Drawing # verified

f. Paragraph #/Sheet # verified

4. BLK 11/12: Submission shall be due As Required (ASREQ) after the completion of the Phase-In-Period/Mobilization.

5. BLK 13: Subsequent submission shall be ASREQ and continue through the life of the contract.

6. Final submission shall be due on the last working day of the contract.

7. BLK 14: Submission shall be submitted/posted to the MIS. Email notification of the posting is required.

8. The Government will have 10 days for review and acceptance/rejection of each submission/ posting. The Government will respond only as necessary.

9. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_54.png file_55.wmf

Page 7 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.9.4.1

5. CONTRACT REFERENCE

DI-MGMT-80259

4. AUTHORITY

Physical Inventories Report

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_56.png file_57.wmf

TM

OTHER

MGMT

file_58.png file_59.wmf file_60.png file_61.wmf

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format acceptable.

2. Submission shall establish the baseline inventory of the Government Furnished Property (GFP) and the contractor furnished inventories to establish the consolidated inventory baseline.

3. BLK 11/12: 1ST Submission shall be in Microsoft Office products and be due at the completion of the Phase-In/Mobilization Period.

4. BLK 13 : Subsequent submissions/revisions due within 30 days of change to the baseline inventory and continue through the life of the contract. Final submission/posting shall be due on the last working day of the contract.

5. BLK 14 : Submission shall be posted to the MIS. Email notification of the posting is required.

6. Submission shall be used for the conduct and documenting of the annual inventories.

7. The Government shall have 10 days for review and acceptance/rejection of each submission. The Government will respond only if necessary.

8. The contractor shall incorporate Government comments within 10 days and re-submit.

9. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_62.png file_63.wmf

Page 8 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.8.3.1.1.2, 3.9.5.5

5. CONTRACT REFERENCE

DI-MISC-81107A

4. AUTHORITY

Inventory/Utilization Data Report

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_64.png file_65.wmf

TM

OTHER

MISC

file_66.png file_67.wmf file_68.png file_69.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall use the baseline inventory established via the "Physical Inventory Report" and document the fluctuations/changes of the inventory due to consumption, maintenance, replacement. re-order etc to create a rolling/real-time inventory.

3. BLK 11/ 12: 1ST Submission shall be in Microsoft Office products and be due monthly starting at the completion of the Phase-In-Period/Mobilization.

4. BLK 13: Subsequent submissions/revisions due daily and continue through the life of the contract. Final submission/posting shall be due on the last working day of the contract.

5. BLK 14 : Submission shall be posted to the MIS.

6. The Government shall have 10 days for review and acceptance/ rejection of each submission.

7. The contractor shall incorporate Government comments within 10 days and re-submit.

8. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_70.png file_71.wmf

Page 9 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.2

5. CONTRACT REFERENCE

DI-ILSS-80191D

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Readiness Report

Contractor Device Performance Report

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_72.png file_73.wmf

TM

OTHER

ILSS

file_74.png file_75.wmf file_76.png file_77.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. The Readiness Report shall list the status/condition of each device, trainer, and system supported for compliance reporting.

3. BLK 4: The following paragraphs/sections/terminology are not applicable:

a. Paragraph 10.2.2

4. BLK 11 /12: Submission shall be due 30 days after the completion of the Phase-In-Period/Mobilization.

5. BLK 13 : Submission/postings shall continue through life of the contract.

6. Final submission/posting shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service/contract.

7. BLK 14: Submission shall be in Microsoft Office products and posted to the MIS. Email notification of the posting is required.

8. The Government will have 10 days for review and acceptance/rejection of each submission/posting. The Government will respond only as necessary.

9. The contractor shall have 5 days to incorporate or respond to Government comments.

10. Annex to Exhibit 010 applies.

11. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_78.png file_79.wmf

Page 10 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.5

5. CONTRACT REFERENCE

DI-SESS-81315B

4. AUTHORITY

See Block 16

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_80.png file_81.wmf

TM

OTHER

SESS

file_82.png file_83.wmf file_84.png file_85.wmf

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

Block 2: FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FRACAR)

1. Contractor format is acceptable.

2. Submission shall provide status of downtime and/or trend in failures in the maintenance area.

3. BLK 11/12: Submission shall be due seven (7) days after the occurrence of the downtime and/or trends in failures are suspected.

4. BLK 13: Submission shall be in Microsoft Office products ASREQ.

5. BLK 14: Submission shall be submitted/ posted to the MIS.

6. The Government shall have 10 days for review and acceptance/rejection of each submission.

7. The contractor shall have 5 days to respond to Government comments and repost.

8. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_86.png file_87.wmf

Page 11 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.10.1

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

PMCS

Scientific and Technical Reports

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_88.png file_89.wmf

TM

OTHER

MISC

file_90.png file_91.wmf file_92.png file_93.wmf

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

ANNLY

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall provide a schedule for preventive maintenance.

3. BLK 11 /12: 1ST submission shall be due 60 days after the Phase-In-Period/Mobilization period.

4. BLK 13: Subsequent submissions/revisions due 30 days prior to each option year.

5. BLK 14: Submission shall be in Microsoft Office products and submitted/posted to the MIS. Email notification of the posting shall be required.

6. The Government shall have 30 days for review and acceptance/rejection of each submission.

7. The contractor shall incorporate Government comments within 10 days and re-submit.

8. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_94.png file_95.wmf

Page 12 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.10.2

5. CONTRACT REFERENCE

DI-MISC-81392

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Corrective Maintenance

See Block 16

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_96.png file_97.wmf

TM

OTHER

MISC

file_98.png file_99.wmf file_100.png file_101.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

Block 2: Contractor Operation and Maintenance of Simulators/Equipment Management Sta

1. Contractor format is acceptable.

2. Corrective Maintenance shall document and summarize the corrective maintenance operation management information for compliance reporting.

3. BLK 4: The following paragraphs/sections/terminology are not applicable:

a. Any reference to 'Fire Fighter Training Devices" and " FFTD" shall be interpreted as "training device"

b. Paragraph 10.2.3.5.15

4. BLK 11 / 12: Submission shall be due 30 days after the start of the Phase-In-Period/Mobilization.

5. BLK 13: Submission/updates shall continue monthly through life of the contract.

6. Each submission/posting shall be provided to the applicable device TOR for review/comment three (3) working days after the end of the monthly reporting period and posted to the MIS two (2) working days after TOR review/comment.

7. Final submission/posting shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service/contract.

8. BLK 14: Submission shall be in Microsoft Office products and posted to the MIS. Email notification of the posting is required.

9. The Government will have 10 days for review and acceptance/rejection of each submission/posting. The Government will respond only as necessary.

10. The contractor shall have 5 days to incorporate or respond to Government comments.

11. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_102.png file_103.wmf

Page 13 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.12

5. CONTRACT REFERENCE

DI-CMAN-80639C

4. AUTHORITY

Engineering Change Proposal (ECP)

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_104.png file_105.wmf

TM

OTHER

CMAN

file_106.png file_107.wmf file_108.png file_109.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. The ECP shall document recommended configuration changes to the TADSS and associated MSP.

3. BLK 13: Submission shall be in Microsoft Office products ASREQ and continue throughout the life of the contract

4. BLK 14: Submission shall resubmitted/posted to the MIS. Email notification of posting is required.

5. The Government will have 10 days for review and acceptance/rejection of each submission/posting. The Government will respond only as necessary.

6. The contractor shall have 5 days to incorporate or respond to Government comments.

7. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_110.png file_111.wmf

Page 14 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.13.1

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Contract Modification Request (CMR)

Scientific and Technical Reports

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_112.png file_113.wmf

TM

OTHER

MISC

file_114.png file_115.wmf file_116.png file_117.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall provide a report of Contract Modification Request Requirements.

3. BLK 13 : Submission shall be in Microsoft Office products ASREQ and continue through the life of the contract.

4. BLK 14: Submission shall be submitted/posted to the MIS. Email notification of posting is required .

5. The Government shall have 30 days for review and acceptance/rejection of each submission.

6. The contractor shall incorporate Government comments within 10 days and re-submit.

7. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_118.png file_119.wmf

Page 15 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.10.14

5. CONTRACT REFERENCE

DI-QCIC-81379

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

See Block 16

Quality System Plan

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_120.png file_121.wmf

TM

OTHER

QCIC

file_122.png file_123.wmf file_124.png file_125.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

Block 3: Quality Assurance Surveillance Plan (QASP)

1. Contractor format is acceptable.

2. BLK 11/12: 1ST submission shall be due 30 days after contract award.

3. BLK 13: Subsequent/update submissions shall be due 30 days after each option exercise as changes occur and continue through out the life of the contract. Final submission shall be due on the last working day of the contract.

4. BLK 14: Submission shall be in Microsoft Office products and posted to the MIS. Email notification of the posting is required.

5. The Government shall have 30 days for review and acceptance/rejection of each submission.

6. The contractor shall incorporate Government comments within 15 days and re-submit.

7. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_126.png file_127.wmf

Page 16 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.13.2

5. CONTRACT REFERENCE

DI-SAFT-81563

4. AUTHORITY

Accident/Incident Report

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_128.png file_129.wmf

TM

OTHER

SAFT

file_130.png file_131.wmf file_132.png file_133.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. BLK 11/12/13: Submission shall be due within 24 hours of any accident/incident, as required, and continue through out the contract.

3. BLK 14: Submission shall be in Microsoft Office products and submitted/posted to the MIS. Email notification of the posting is required.

Final submission/posting shall be due on the last working day of the Life Cycle Contractor Support (LCCS) service/contract.

4. The Government shall have 5 days for review and acceptance/rejection of each submission.

5. The contractor shall incorporate Government comments within 5 days and re-submit.

6. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_134.png file_135.wmf

Page 17 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.13.4

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY

(Data Acquisition Document No.)

3. SUBTITLE

Material Safety Data Sheets (MSDS)

Scientific and Technical Reports

2. TITLE OF THE DATA ITEM

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_136.png file_137.wmf

TM

OTHER

MISC

file_138.png file_139.wmf file_140.png file_141.wmf

A. CONTRACT LINE ITEM NO.

LOT 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. BLK 11/12: Submission shall be due at the completion of the Phase-In Period/Mobilization.

2. Submission shall be the MSDS to support the operation and maintenance of the TADSS.

3. BLK 13: Subsequent submissions due as new/additional hazardous materials are added to the support inventory.

4. BLK 14: Submission shall be in Microsoft Office products and located on site, as appropriate, with a duplicate submission posted to the MIS. Email notification of the posting is required. Email notification of the posting is required.

5. The Government shall have 15 days for review and acceptance/rejection of each submission.

6. The contractor shall incorporate Government comments within 15 days and re-submit.

7. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_142.png file_143.wmf

Page 18 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

SFAE-STRI-TSO

6. REQUIRING OFFICE

PWS PARA 3.6

5. CONTRACT REFERENCE

DI-FNCL-80912A

4. AUTHORITY

Performance and Cost Report

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

file_144.png file_145.wmf

TM

OTHER

FNCL

file_146.png file_147.wmf file_148.png file_149.wmf

A. CONTRACT LINE ITEM NO.

LOT 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

B 9.

DIST STATEMENT REQUIRED

13.

DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLK 16

SEE BLK 16

12.

DATE OF FIRST SUBMISSION

Johnson, Brittney

Block D: Artillery and Chemical TADSS (ACT)

1. Contractor format is acceptable.

2. Submission shall document status of all obligated funds associated with the contract to include payments, cancellations and invoices against each contract line item number (CLIN).

3. BLK 4: The following paragraphs/sections/terminology are not applicable:

a. Paragraph 10.2.3.

4. BLK 11/12: Submission shall be due 30 days after the completion of the Phase-In-Period/ Mobilization.

5. BLK 13: Submission/ postings shall continue through life of the contract.

6. Final submission/posting shall be due on the last working day of the Life Cycle Con tractor Support ( LCCS) service/contract.

7. BLK 14: Submission shall be in Microsoft Office products and submitted/ posted to the MIS. Email notification of the posting shall be required.

8. CDRL due dates occurring on weekends or Government holidays shall be due

15. TOTAL

file_150.png file_151.wmf

Page 19 of 19 Pages

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001

Other files

File Type Posted
ACT W900KK-21-R-0049 Amendment 02.pdf PDF
Att 11 7ATC_ETSD_CFFT_Sustainment_Requirement_MFR_072821.pdf PDF
Att 1 ACT_PWS_2022_Recompete_04_Oct_21.docx DOCX document
Att 11 JMRC_AGOS CFFT Sustainment MFR_072221.pdf PDF
Att. 3 Pricing Workbook 09282021.xlsx XLSX spreadsheet
Att 12 DoD OCONUS Tuition Rates.pdf PDF
Att 13 ACT_RFP_Q_A_ 10_07_21.xlsx XLSX spreadsheet
ACT RFP W900KK-21-R-0049 Amendment 01.pdf PDF
ACT PWS App A_092421.xlsx XLSX spreadsheet
Att 10 ACT_CDRLS_29SEP2021.rtf RTF text file
Att. 7 Locations and Wage Determinations 09232021.docx DOCX document
ACT DD 254 Continuation Page.DOCX DOCX document
Exhibit A ACT CDRL List_26Feb2021.pdf PDF
Supplemental Info ACT_Program_TSS_ENTERPRISE_TADSS_INDEX_CATALOG.pdf PDF
ACT Insturctions for CUI 102320.doc DOC document
Att. 5 Sample Consent Letter.docx DOCX document
Att. 3 Pricing Workbook 08232021.xlsx XLSX spreadsheet
Att. 6 Solicitation Questions_Clarification Form.docx DOCX document
ACT Combined Corrective Maint_Jul_20-Jun_21.pdf PDF
ACT_DRAFTRFP_Q_A_ 9_1_2021.xlsx XLSX spreadsheet
Att. 10 ACT Recompete CDRL List_073021.pdf PDF
Att. 9 Sample DOL Wage Determination Price Adj Request Information.docx DOCX document
Att. 1. ACT_PWS_2022_Recompete_2SEP2021_Final.docx DOCX document
ACT PWS App A_9SEP2021_Final.xlsx XLSX spreadsheet
PWS App. D Data Item Description DID Ref_071521.docx DOCX document
PWS App. E GFP ADDENDUM 07222021.docx DOCX document
Att. 8 Sample DOL Wage Determination Price Adjustment Workbook.xlsx XLSX spreadsheet
Supplemental Info ACT TADSS_082621.xlsx XLSX spreadsheet
Supplemental Info Fort Sill Government Provided Space.pptx PPTX presentation
Att. 2 ACT DD254 17 Mar 2021.pdf PDF
Att. 4 Past Performance Questionnaire.docx DOCX document
Supplemental Info ACT Program Training Device count by serial number 20210816.xlsx XLSX spreadsheet
PWS App. B ACT System Overview_2_17_21.pptx PPTX presentation
Att. 7 Locations and Wage Determinations 08022021.docx DOCX document
PWS App. C ACT Government Furnished Property Master 042221.xlsx XLSX spreadsheet
ACT W900KK-21-R-0049.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .