Attach 16_Compare Doc.pdf
PDF 2 MB Posted
- Attached to
- National Cyber Range Complex Event Planning, Operations and Support Federal contract opportunity
- Solicitation number
- W900KK-20-R-0011
About this file
This document provides an overview of a solicitation for the National Cyber Range Complex Event Planning, Operations and Support requirement. The solicitation seeks proposals to provide event planning, operations, and support services for the National Cyber Range Complex. Key dates include a pre-proposal conference on March 16-17, proposal submissions due by April 6, and contract award by December 17. Offerors must complete a distribution agreement and submit required forms to receive export-controlled and controlled unclassified information attachments to the solicitation. The selected contractor will be responsible for planning, configuring, and executing cyber range events; providing personnel with required skills and experience; and managing the range infrastructure, software, and traffic generation tools. The period of performance is one base year with option years.
View the file
Other files for this federal contract opportunity
Show all 50
National Cyber Range Complex Event Planning, Operations and Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unclassified // For Official Use Only Attachment 16 Solicitation #: W900KK-20-R-0011 Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
National Cyber Range Complex
Sample NCRC Range Event Schedule
Version 1.0
January 21, 2020
DISTRIBUTION STATEMENT F
DISTRIBUTION ONLY AS DIRECTED BY THE DIRECTOR, NATIONAL CYBER RANGE COMPLEX (NCRC). REQUESTS FOR
THIS DOCUMENT MUST BE SUBMITTED TO THE OFFICE OF THE DIRECTOR, NATIONAL CYBER RANGE COMPLEX
(NCRC).
EXPORT CONTROLLED
THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP 2401
ET SEQ.) AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1. Introduction The intent of this document is to provide potential EPOS Offerors with an overview of a representative sample notional NCRC event schedule that can be used as a backdrop for estimating the numbers of personnel, types of skills, job families and levels of effort (LOE) required to successfully execute events on the NCRC.
The document presents a notional but representative sample schedule of one (1) year of events covering the expected base year of EPOS execution. The events used to develop this sample notional schedule are representative of past NCRC events in terms of number or events, types of events and concurrency of events.
1.1 Document Organization
The document is divided into the following sections:
Section 1 provides basic introductory material Section 2 presents the sample notional NCRC event schedule Section 3 provides a more detailed description of each event to include an overview of the event, a description of the composition of the event environment and additional detailed information about the specific software that will be used for the event.
Note – This schedule and the events are representative of past NCRC events; however, the events described in the schedule are fictitious. Given the fictitious nature of the events included in this sample schedule, the Government will not comment on or provide any additional information about the specific lists of components, capabilities, hardware and software provided herein.
1.2 Characterization of Test and Training Events
The following sections provide a generalized characterization of NCRC events. Each event includes planning, design/configuration, and execution and activities. The post-execution sets of activities. do not significantly vary based on event size.
1.2.1 Small Cyber Security Test Event
Planning: Localized evaluation of a somewhat simplistic software/application. Minimal timeframe (1 month) required to work with the User to understand requirements and requirements are straightforward. May be the first in a series of events with the first instance focused on a relatively simple aspect in order to establish a baseline.
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Design/Configuration: Minimal development. Minimal setup of the range infrastructure. Limited variation platform configurations.
Execution: Straightforward plan for Cyber Security Evaluation Team (CSET) assessment.
CSET assessment may be conducted within a week but could take two weeks. CSET focused on gaining an initial understanding of security posture.
1.2.2 Medium Cyber Security Test Event
Planning: System may include several components and/or Hardware in the Loop (HWIL). Several planning sessions (1-2 months) required to understand the system under test. May be a follow-on event to a successive series where the assessment is graduating in complexity.
Design/Configuration: Limited development. Limited coordination required with User SMEs to assist with integration and setup. Straightforward range infrastructure setup.
Execution: CSET assessment conducted over a two-week timeframe. CSET may need to meet with system SMEs to better understand how to structure the test. If this is a follow-on to a prior event, the CSET may include focus on evaluating improvement of security posture from the prior test.
1.2.3 Large Cyber Security Test Event
Planning: Complex system of systems and/or integration of Hardware-in-the-Loop (HWIL). A few months of planning sessions (2-3) required to understand the systems under test. Possibly requiring an offsite Technical Exchange Meeting (TEM) with Subject Matter Experts (SMEs) and mission operators. Complex system of systems and/or integration of HWIL. May be follow-on of prior events with increasing complexity to address system of systems perspective
Design/Configuration: Complex setup of range infrastructure which could include reverse engineering required by range engineers to effectively accommodate virtual and physical aspects. Setup can include multiple variations of platform configurations and instrumentation requirements. Review of technical documentation. Coordination with SMEs required to support installation and configuration of complex mission software/components.
Execution: CSET assessment conducted over a two to three-week timeframe. CSET plan is detailed and worked in conjunction with SMEs.
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1.2.4 Small Cyber Security Training Event
Planning: Simplistic environment buildout leveraging re-use from other baseline environments: red, gray, blue; simple traffic generation and web content. Minimal timeframe required to work with the User to understand environment details. May be focused on individual team certification and training.
Design/Configuration: Straightforward environment setup, leveraging prior capabilities previously developed. No new development or limited development of capabilities.
Execution: Straightforward event execution timeframe, on-line for a week or two.
Limited engagement by engineering team required while the event is executing.
1.2.5 Medium Cyber Security Training Event
Planning: Moderately complicated environment. Several detailed meetings with the User to identify requirements, understand Master Scenario Event Lists (MSELs), and the scenario. Discussion to understand customization needed to support training objectives and scenario development. May be focused on multiple team training and readiness.
Design/Configuration: Robust red, blue and gray space with realistic internet services and customized traffic generation to enable a representative target environment. High fidelity, realistic, and dynamic content. Combination of re-use of existing capabilities and new development. Integration of User tools. Can include Hardware in the loop.
Execution: Support for event environment reconnaissance activities established on the range, pre-event execution and support during event execution based on dynamic requirements that may evolve during the course of the exercise. Event execution can be between one to two weeks.
1.2.6 Large Cyber Security Training Event
Planning: Highly fidelity, realistic, complex training environment. Detailed meetings and official planning conferences to coordinate requirements for the training audience.
May involve collaboration with other range providers to identify integration / touch points. Most often focused on support to large COCOM training exercises. Can include multi-national partners.
Design/Configuration: High-fidelity, operationally realistic environments that mimic real-world behavior and performance. Large environment with significant number of diverse enclaves. Representative military and critical infrastructure target sets, representative ISPs, simulated satellite links, integration of wireless assets, integration of multiple hardware in the loop devices/components. Significant development of new
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
and/or tailored capabilities. Integration of User VMs and tools. Development of threat scenarios. Multi-level workflows representative of real-world performance.
Execution: Environment ready approximately a month in advance of event execution to support user account management, reconnaissance, and other preparations. Event Execution for about two weeks. On-site support at primary exercise location to assist Users. Assess opportunity to address ad-hoc, dynamic, on-demand requirements as they emerge. Support for a significant number of multiple participants remotely connected.
1.3 General Notes and Information
The time allocated each activity in the event descriptions, e.g. range configuration, network familiarization, reconnaissance (RECCE), event execution and post-event activities includes the time necessary to produce the related event products. Post-Event analysis time is intended to cover the development and delivery of all associated post-event CDRLs.
The SW listed with each event description is the “core” event environment SW that is deployed by the NCRC automated tool suite. It does not include the additional SW that would be required to provide event specific capabilities like website content, content management systems, video and audio streaming, collaboration, functional databases, interactive websites, etc.
Assume that 85% of the software listed for each event will be installed using the NCRC Automated Tool Suite. The other 15% will have to be installed manually. Unless otherwise noted, the hardware and software that is listed with each event description can be assumed to be part of the NCRC inventory; therefore, proposals do not need to include costs for that HW/SW.
1.4 Extending the Schedule
The sample schedule currently contains one (1) year worth of events for the expected EPOS Base Year. For evaluation purposes, the sample schedule for Option Year 1 will be the same events as the Base Year with each event being run twice and spread across the entire 12 months.
2. Sample NCRC EPOS Base Year Notional Event Schedule Legend
Bold Range Prep Bold (Underline) Execution week
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Regular (Not Bold) Post-Event Week Italics Faraday Cage Required
In the notional range schedule below, each event is numbered and indicated by a separate color. Weeks including federal holidays are indicated with a red fill.
This notional schedule is for FY21 with an assumption of contract award by the beginning of FY21. No events are indicated on the schedule for the first 90 days (October through December) . During this 90-day period, contractors will be ramping up, receiving NCRC EPOS initial training and meeting other personnel training and security requirements in the contract/task order in preparation to commence work. Events are shown on the schedule to start in JanuaryMonth 4 of the base year and run through SeptemberMonth 12.
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
5-Oct 12-Oct 19-Oct 26-Oct
2-Nov 9-Nov 16-Nov 23-Nov 30-Nov
Te st be ds
Te st be ds
Events November
Unclassified // For Official Use Only
Unclassified // For Official Use Only
EPOS Base Year (FY21) Range Schedule (Notional For Planning Purposes Only)
Events October
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
7-Dec 14-Dec 21-Dec 28-Dec
4-Jan 11-Jan 18-Jan 25-Jan
1 Test 21-1 Test 21-1 Test 21-1 Test 21-1
2 Training 21-1 Training 21-1 Training 21-1 Training 21-1
3 Test 21-2.1
Te st be ds
Te st be ds
EPOS Base Year (FY21) Range Schedule (Notional For Planning Purposes Only)
Unclassified // For Official Use Only
Events January
Events December
Range Shutdown
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1-Feb 8-Feb 15-Feb 22-Feb
1 Test 21-1 Test 21-1 Test 21-3 Test 21-3
2 Training 21-1 Training 21-1 Training 21-1 Test 21-4
3 Test 21-2.1 Test 21 -2.1 Test 21-2.1 Test 21-2.1
1-Mar 8-Mar 15-Mar 22-Mar 29-Mar
1 Test 21-3 Test 21-3 Test 21-3 Test 21-5 Test 21-5
2 Test 21-4 Test 21-4 Test 21-4 Test 21-4 Test 21-4
3 Test 21-2.1 Training 21-2 Training 21-2 Training 21-2 Training 21-2
Te st be ds
Te st be ds
Unclassified // For Official Use Only
Unclassified // For Official Use Only
EPOS Base Year (FY21) Range Schedule (Notional For Planning Purposes Only)
Events February
Events March
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
5-Apr 12-Apr 19-Apr 26-Apr
1 Test 21-5 Test 21-5 Test 21-5 Test 21-5
2 Test 21-6 Test 21-6 Test 21-6 Test 21-6
3 Training 21-2 Training 21-2 Training 21-2 Training 21-2
3-May 10-May 17-May 24-May 31-May
1 Test 21-7 Test 21-7 Test 21-7 Test 21-7 Test 21-7
2 Test 21-6 Test 21-6 Training 21-3 Training 21-3 Training 21-3
3 Training 21-2 Test 21-8 Test 21-8 Test 21-8 Test 21-8
Te st be ds
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year (FY21) Range Schedule (Notional For Planning Purposes Only)
Events
April
Events May
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
7-Jun 14-Jun 21-Jun 29-Jun
1 Test 21-7 Test 21-11 Test 21-11 Test 21-11
2 Training 21-3 Training 21-3 Training 21-3 Test 21-2.2
3 Test 21-8 Test 21-8 Test 21-10 Test 21-10
4 Test 21-9 Test 21-9 Test 21-9 Test 21-9
5-Jul 12-Jul 19-Jul 26-Jul
1 Test 21-11 Test 21-11 Test 21-11 Test 21-12
2 Test 21-2.2 Test 21-2.2 Test 21-2.2 Test 21-2.2
3 Test 21-10 Test 21-10 Test 21-10 Test 21-10
4 Test 21-9 Test 21-9 Training 21-4 Training 21-4
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year (FY21) Range Schedule (Notional For Planning Purposes Only)
Unclassified // For Official Use Only
Events July
Te st be ds
Events June
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
2-Aug 9-Aug 16-Aug 23-Aug 30-Aug
1 Test 21-12 Test 21-12 Test 21-12 Test 21-12 Test 21-12
2 Test 21-2.2 Training 21-5 Training 21-5 Training 21-5 Training 21-5
3 Training 21-4 Training 21-4 Training 21-4 Test 21-2.3 Test 21-2.3
4 Test 21-13 Test 21-13 Test 21-13 Test 21-13 Test 21-13
6-Sep 13-Sep 20-Sep 27-Sep
1 Test 21-2.3 Test 21-2.3 Test 21-2.3 Test 21-2.3
2 Training 21-5 Training21 -5 Training 21-5 Training 21-5
3 Test 21-13
Events August
Events September
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year (FY21) Range Schedule Te st be ds
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Week 1 Week 2 Week 3 Week 4
Week 1 Week 2 Week 3 Week 4
1 Test 21-1 Test 21-1 Test 21-1 Test 21-1
2 Training 21-1 Training 21-1 Training 21-1 Training 21-1
3 Test 21-2.1
Events Month 4
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year Range Schedule (Notional For Planning Purposes Only)
Events Month 3
Te st be ds
Range Maintenance Shutdown
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 Test 21-1 Test 21-1 Test 21-3 Test 21-3
2 Training 21-1 Training 21-1 Training 21-1 Test 21-4
3 Test 21-2.1 Test 21 -2.1 Test 21-2.1 Test 21-2.1
Week 1 Week 2 Week 3 Week 4 Week 5
1 Test 21-3 Test 21-3 Test 21-3 Test 21-5 Test 21-5
2 Test 21-4 Test 21-4 Test 21-4 Test 21-4 Test 21-4
3 Test 21-2.1 Training 21-2 Training 21-2 Training 21-2 Training 21-2
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year Range Schedule (Notional For Planning Purposes Only)
Events Month 5
Te st be ds
Events Month 6
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 Test 21-5 Test 21-5 Test 21-5 Test 21-5
2 Test 21-6 Test 21-6 Test 21-6 Test 21-6
3 Training 21-2 Training 21-2 Training 21-2 Training 21-2
Week 1 Week 2 Week 3 Week 4 Week 5
1 Test 21-7 Test 21-7 Test 21-7 Test 21-7 Test 21-7
2 Test 21-6 Test 21-6 Training 21-3 Training 21-3 Training 21-3
3 Training 21-2 Test 21-8 Test 21-8 Test 21-8 Test 21-8
Unclassified // For Official Use Only
Te st be ds
Events Month 8
Te st be ds
Unclassified // For Official Use Only
EPOS Base Year Range Schedule (Notional For Planning Purposes Only)
Events Month 7
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 Test 21-7 Test 21-11 Test 21-11 Test 21-11
2 Training 21-3 Training 21-3 Training 21-3 Test 21-2.2
3 Test 21-8 Test 21-8 Test 21-10 Test 21-10
4 Test 21-9 Test 21-9 Test 21-9 Test 21-9
Week 1 Week 2 Week 3 Week 4
1 Test 21-11 Test 21-11 Test 21-11 Test 21-12
2 Test 21-2.2 Test 21-2.2 Test 21-2.2 Test 21-2.2
3 Test 21-10 Test 21-10 Test 21-10 Test 21-10
4 Test 21-9 Test 21-9 Training 21-4 Training 21-4
Events Month 10
Te st be ds
Unclassified // For Official Use Only
Unclassified // For Official Use Only
EPOS Base Year Range Schedule (Notional For Planning Purposes Only)
Events Month 9
Te st be ds
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Rev Date: 7 Feb27 Mar 2020
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
3. Sample Event Descriptions
Test Event 21-1
Description: Test Event 21-1 is a medium sized test event that involves a cybersecurity assessment of a new version of an already fielded Service capability. The goal is to increase the user’s understanding of impacts of new products on the cybersecurity posture and operational employment of the new capability version. The event will include a cooperative vulnerability assessment and traditional penetration testing activities.
• The event environment will consist of a single enclave and VLAN with AD, DNS, SQL, Exchange and SharePoint instances along with the User provided SUT (system under test) SW
The event environment will have 7 ESXi hypervisors and 19 VMs. This event will not require any traffic generation.
External Connections: N/A
Event Classification: Secret
Faraday Cage: N/A
User Participation: User personnel will be on site during event execution.
CSET Participation: Required
Event Timeline: Test Event 21-1 will include 4 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution and 1 week of post-event activities.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
Software Application Name
# of Nodes
Containing or Running the
SW
# of Types of Nodes
1 1 CentOS 5.3 x64
19 17 Meinberg NTP Client
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
18 16 SSL Certs
11 11 Windows 2008 R2 SP1
4 4 Windows 2012 R2 Server x64
3 1 Windows 7 Enterprise SP1 x64
1 1 Yum Repo 36 32 wget for Windows 1 1 SUT (User Provided SW)
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Training Event 21-1
Description: Training Event 21-1 will be a “Capture the Flag” style of training event where Cyber Protection Teams (CPTs) are able to hone their skills and TTPs in both competitive and non-competitive conditions. This event will have a naval flavor for which the NCRC will provide an event environment replicating 3 different kinds of ships each with 3 different “flags” that teams must find in order to disable each ship. Each participating team will be given access to an identical environment for a set time period during which they must capture as many ‘flags’ as possible.
The event environment will consist of a simplified Internet enclave with minimal services including a single Root DNS server and NTP services. A set of Blue enclaves will be provided for each type of ship that sit behind a DMZ as well as a small DODIN enclave with common network infrastructure services.
Traffic generation (TG) will be provided via Mantra and include web and E-mail.
The event environment will have 2 ESXi hypervisors, 250 VMs and 200 nodes set up for Traffic Generation using Mantra.
External Connections: Joint Information Operations Range (JIOR) connections to multiple locations.
User Participation: User personnel will not be on site during event
CSET Participation: N/A
Event Timeline: Training Event 21-1 will include 2 months of planning, 4 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 2 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
180 22
Adobe Acrobat Reader 9.3
5 5 Microsoft DNS Server
Surrogate Software
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
3 3 Apache 2.2.15 HTTP Server
Linux
Microsoft Exchange Server
2010 SP2 Enterprise
4 4
Apt Repo
Microsoft Windows Internet
Information Server 2000 1 1 Bind 9.8.1 for Linux 8 8 MySQL 5.1 32 32 CentOS (multiple versions) 1 1 NTP Server 4 4 DHCP Server 180 22 Office 2010 4 4 Firewall 13 13 PHP 5.4 188 23 Pidgin 1 1 Elastic Search 28 14 SSH Server 188 23 Firefox 35.0.1 2 2 Samba
5 5 Domain Controller Surrogate
Software
Ubuntu 12.04 x64 16 2 Kali 2017.1 18 18 VyOS 1.1.6 x64
1 1
Kibana
4 1 Windows 2008 Enterprise SP1 x64 1 1 Logstash 17 17 Windows 2008 R2 SP1
1 1 MS SQL Server 2012 Enterprise
SP1 x64
Windows 7 Professional SP1 x64 237 72 Mantra 32 32 Yum Repo 62 55 Meinberg NTP Client 3 3 ejabberd XMPP Server
2 2 Microsoft .NET Framework 3.5
SP1
402 80 wget for Windows
Microsoft DHCP Server
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-2.1
Description: Test Event 21-2.1 is the first in a series of large-scale test events that will independently test and evaluate commercial Industrial Control System (ICS) technologies and products and how they might be applied and integrated in analogous DoD systems. The event will include a cooperative vulnerability assessment and traditional penetration testing activities.
The event environment will consist of a small Internet enclave and an internal enclave behind a DMZ with sub-enclaves for 2 control enclaves and a building enclave that acts as the SUT. The User will provide the commercial products that are to be tested and the vendors will provide technical assistance as needed for their products.
The event environment will have no hypervisors and 54 nodes set up for Traffic Generation using Mantra.
Event Timeline: Test Event 21-2.1 will include 5 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 4 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
50 3
2 2
Surrogate
Adobe Flash Player 11.5
2010 SP2 Enterprise
1 1
Microsoft Office 2007
Professional SP2 2 2 Apt Repo 1 1 PHP Default for Linux
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1 Firewall 15 15 SSH Server 2 2 Windows Fileshare 1 1 Syslog Client 1 1 Elastic Search 1 1 Syslog Server 2 2 Domain Controller Surrogate 2 2 Ubuntu 12.04 x64 7 7 Kali 2.0 x64 5 5 Vyatta 6.6 x64 7 7 Kali Linux Full 1 1 Windows 2000 Server SP4 x86
Windows 2003 Enterprise SP2 x86 1 1 Logstash 8 8 Windows 2008 R2 SP1
1 1
Windows 2012 R2 Server x64 72 25 Mantra 54 7 Windows 7 Enterprise SP1 x64
Meinberg NTP Client
Windows XP Professional SP2 x64
2 2
130 36
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-3
Description: Test Event 21-3 is a complex large-scale event with a primary goal of assessing the security posture of a specific portion of a small sized Unmanned Ground Vehicle (UGV) that provides land-based tactical reconnaissance, surveillance, and target acquisition (RSTA) data collection. The NCRC will be deploying a detailed representation of the C2 portion of the UGV’s supporting real-world networking infrastructure using information and VMs supplied by the User. The OGV will be operated and stimulated from within the NCRC faraday cage.
Both the UGV and associated C2 applications will be provided by the User.
The event environment will consist of the UGV, UGV C2 application enclave, RF communications and stimulation HW/SW, the UGV C2 application as well as supporting SW and instrumentation. This event will include traditional penetration testing activities using User supplied tools and data to be performed by NCRC personnel working with User SMEs.
The event environment will have 2 ESXi hypervisors and 35 VMs with no Traffic Generation.
Event Classification: TS/SCI
Faraday Cage: Required
Event Timeline: Test Event 21-3 will include 6 weeks of planning, 2 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 4 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
34 5
Information Server 2000 34 5 Adobe Flash Player 11.5 1 1 MySQL 5.1 1 1 Bind 9.8.1 for Linux 2 2 PHP 5.4 1 1 CentOS 6.5 x64 2 2 SSH Server
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
6 6 Firewall 34 5 SSL Certs 34 5 Firefox 35.0.1 3 3 VyOS 1.1.6 x64
4 4
11 11
Vyatta 6.6 x64 57 28 Mantra 8 8 Windows 2008 R2 SP1
62 33
Windows 2012 R2 Server
Update x64
1 1 x64
4 4
Yum Repo
94 36
Microsoft Office 2007 Professional Edition w/SP2 Bundled
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-4
Description: Test Event 21-4 is the latest medium sized event in a series of events that the NCRC has hosted for a Program Office responsible for developing autonomous vehicle wireless control systems for use in non-deployed garrison environments. This event will continue the work done during previous events to refine the baseline configurations of User provided GOTS security applications prior to them being deployed.
Specifically, this event will focus on non-RF portions of the system and assess and conduct a performance and security capabilities analysis of one component of a larger system.
The event environment will consist of a small Internet enclave and an internal enclave behind a DMZ with a sub-enclave to host the
SUT.
The event environment will have 2 ESXi hypervisors and 25 nodes for Traffic Generation using Mantra.
Event Timeline: Test Event 21-4 will include 3 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 2 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
Logstash 12 3 Apt Repo 35 26 Mantra 2 2 CentOS 7.0 x64 1 1 Meinberg NTP Client 1 1 Chrome 43.0.2357.65 1 1 PHP Default for Linux 4 4 Firewall 35 26 SSH Server
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1 Elastic Search 12 11 Ubuntu 12.04 x64 10 1 FTP Server 9 9 VyOS 1.1.6 x64
3 3
Firefox 35.0.1 x64 13 4 Gnome Desktop 1 1 Wireshark 2.0.3 for Windows 10 10 Kali 2.0 x64 2 2 Yum Repo 1 1 Kibana 22 22 wget for Windows
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-5
Description: Test Event 21-5 will be the latest in a series of events that the NCRC has hosted for a Program Office responsible for developing enterprise security solutions for use in deployed environments. This event will continue the work done during previous events to refine the baseline configurations of User provided commercial security applications prior to them being deployed. Specifically, this event will assess and conduct a performance and security capabilities analysis of one component of a larger system.
The event environment will consist of a simplified Internet enclave with minimal services including a single Root DNS server and NTP services, one at the Brigade Combat Team (BCT) level enclave that sits behind a DMZ as well as a small DODIN enclave with common services.
Traffic generation (TG) will be provided via Mantra and include web and E-mail.
The event environment will have 4 ESXi hypervisors, 65 VMs and 40 nodes set up for Traffic Generation using Mantra.
Event Timeline: Training Event 21-5 will include 5 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 5 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
1 1 AVG Free 42 42 Mantra 1 1 Adobe Acrobat Reader 9.3 33 33 Meinberg NTP Client
1 1 Adobe Flash Player 10.2
Windows
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1
Information Server 2000 2 2 Bind 9.8.1 for Linux 2 2 NTP Server 3 3 CentOS 5.9 x64 6 6 Office 2010 1 1 DHCP Server 1 1 PHP 5.4 2 2 Firewall 6 6 Pidgin 2 2 Network Address Translation 1 1 Putty 0.63 1 1 Windows Fileshare 7 7 RedHat 5.4 x64 1 1 Dovecot 33 33 SSH Server 1 1 Elastic Search 1 1 Ubuntu 12.04 x64 6 6 F Virtual Window Manager 14 14 Vyatta 6.6 x64 18 18 Fedora 16 x86 64 1 1 Webmin 1.760 2 2 GNUPlot 10 10 Windows 2008 R2 SP1
15 15
Gnome Desktop
8 8 x64
InspIRCd
Windows XP Operating System w/SP3
2 2
28 28
7 7 KDE Desktop 3 3 ejabberd XMPP Server 1 1 Kibana 1 1 vsftpd 2.2.2 1 1 Logstash 38 38 wget for Windows
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Training Event 21-2
Description: Training Event 21-2 is a large-scale bi-lateral training event intended to foster collaboration while conducting force-on-force exercise training with significant OPFOR play from robust Red enclaves. It will involve three defensive teams, two different offensive teams and a white cell. For this event, the NCRC has been asked to create an event environment that accurately represents the user’s requirements.
The even must include a robust Gray environment with realistic internet-level services and elements and real-world threat-representative Blue and Red environments. OPFOR will require robust and detailed Red enclaves to operate from. The event environment for Training Event 21-2 consists of several enclaves as follows:
Backbone Internet Services to include operational instances of all 13 Root DNS servers, domain registration services, NTP and various repos and capabilities, e.g. OS and Yum
The environment will have 3 Regional Internet Grey, 4 Blue and 5 Red enclaves all with sub-enclaves that include different combinations and varieties of Windows and Linux client & server OS and SP configurations, DNS, AD, IIS, Apache, Exchange/Outlook, FTP, SQL databases, live websites, file and video streaming services, etc. Include user provided Hardware-in-the-loop (HWIL) capabilities. Physical routers and firewalls configured IAW “best practices” were added to increase realism and meet specific user requirements.
The user will provide several images that will have to be imported and configured by the NCRC team after which multiple instances will have to be deployed into the event environment. The User has requested specific versions and configurations of some OSs and applications in order to introduce a controlled and known set of vulnerabilities into the exercise.
Traffic generation (TG) will be provided via Mantra and include web, E-mail, fileshare (SMB), and database manipulation modules.
The event environment will have 58 ESXi hypervisors, 985 VMs and 625 nodes set up for Traffic Generation using Mantra
External Connections: JIOR and Joint Mission Environment Test Capability (JMETC) Multiple Independent Levels of Security (MILS) Network (JMN) connections to multiple user locations
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Event Timeline: Training Event 21-2 will include 2 months of planning that includes an Initial Planning Conference (IPC), Mid-Planning Conference (MPC) and Final Planning Conference (FPC) of 1-2 days per conference, 4 weeks of range configuration, 2 weeks of event participant network familiarization, 1 week of RECCE, 1 week of event execution and 1 week of post-event activities.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
80 6
Adobe Acrobat 11.0
17 17
2013 SP1 Enterprise
329 67
English Windows Software
142 34
Professional Edition w/SP2 Bundled
129 13 Adobe Flash Player 10.2
Windows Software
55 55
Information Server 2000 80 6 Adobe Shockwave Player 12.2 89 89 MySQL 5.6
59 59
6 2
Office 2003 123 84 Apt Repo 20 2 Office 2010 20 20 Bind 9.8.1 for Linux 253 43 Office 2013 51 51 CentOS (multiple versions) 145 145 PHP 5.4 150 30 Chrome 43.0.2357.65 19 19 Firewall 1 1 Putty 0.63 3 3 Network Address Translation 514 336 SSH Server 12 12 Windows Fileshare 548 208 SSL Certs 2 2 Domain Registrar Client 1 1 Samba 5 5 Elastic Search 16 16 Security Onion 14.04 x64 1 1 FTP Server 80 6 Silverlight 5.0 422 82 Firefox 35.0.1 2 2 Squid 184 85 Firefox Default for Linux 1 1 SquirrelMail
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
201 92 Gnome Desktop 2 2 Syslog Server
36 36
7 2
Thunderbird 38.0.1 2 2 Secondary Domain Controller 123 84 Ubuntu (multiple versions)
20 2 Internet Explorer
8.0.6001.18702
Unreal IRCd 80 6 Java SE 8 Update 60 JRE 112 112 VyOS 1.1.6 x64 122 47 Kali 2.0 x64 174 36 Windows 10 Professional SP0
129 50
Kali Linux Full
45 45
54 54
Update x64 5 5 Logstash 166 40 Windows 3.1 Installer
1002 544
Mantra
87 11 x64 1003 545 Meinberg NTP Client 1 1 Windows 8.1 Professional x64
20 2
41 5 Windows XP Operating System with SP3
18 18 Microsoft .NET Framework
4.5.2
121 31 x64
38 38
Wireshark Surrogate Software
36 36
75 75
19 19 Microsoft Exchange Server
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-6
Description: Test Event 21-6 is a very complex large-scale event with a primary goal of assessing the security posture of a specific portion of the User’s network infrastructure. The NCRC will be deploying a very detailed representation of a portion of the User’s real-world networking infrastructure using information and VMs supplied by the User. This event will include traditional penetration testing activities using User supplied tools and data to be performed by NCRC personnel working with User SMEs.
The event environment will consist of a simplified Internet enclave with minimal services including a single Root DNS server and NTP services. There will be a small NIPR representation including HBSS with 2 levels of DMZs that lead to the User provided VMs which are the SUT.
The event environment will have 1 ESXi hypervisor, 65 VMs and 40 nodes set up for Traffic Generation using Mantra.
Event Timeline: Test Event 21-6 will include 6 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 5 weeks of post-event analysis.
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
Information Server 2000 34 5 Adobe Flash Player 11.5 1 1 MySQL 5.1 1 1 Bind 9.8.1 for Linux 2 2 PHP 5.4 1 1 CentOS 6.5 x64 2 2 SSH Server 6 6 Firewall 34 5 SSL Certs
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
34 5 Firefox 35.0.1 3 3 VyOS 1.1.6 x64
4 4
Vyatta 6.6 x64 57 28 Mantra 8 8 Windows 2008 R2 SP1
62 33
Update x64
1 1 x64
4 4
94 36
Microsoft Office 2007
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-7
Description: The primary focus of this complex large-scale test event will be to identify any potential cybersecurity impacts associated integrating a specialized RF sensor into an existing C2 application that had been tested in a previous event. The specialized RF sensor will be operated and stimulated from within the NCRC faraday cage. Both the sensor and C2 application will be provided by the User. This event will include traditional penetration testing activities using User supplied tools and data to be performed by NCRC personnel working with User SMEs.
The event environment will consist of the RF sensor, RF communications and stimulation HW/SW, the sensor C2 application as well as supporting SW and instrumentation. There is no Traffic Generation requirement for this event.
The event environment will have 4 ESXi hypervisors and 10 VMs.
Faraday Cage: Required
Event Timeline: Training Event 21-7 will include 5 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
SSH Server 1 1 Apt Repo 1 1 Ubuntu 12.04 x64 1 1 Elastic Search 1 1 VSFTPD 3.0.2 35 35 Gnome Desktop 1 1 Windows 2008 R2 SP1 35 35 KDE Desktop 35 35 Yum Repo
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1 Kibana 2 2 wget for Windows
Linux 1 1 Mantra 1 1 Apt Repo 37 37 Meinberg NTP Client 1 1 Elastic Search 1 1 PHP Default for Linux 35 35 Gnome Desktop 35 35 RedHat 6.5 x64 2 35 KDE Desktop
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-8
Description: Test Event 21-8 is the latest small-sized event in a series of events that the NCRC has hosted for a Program Office responsible for developing enterprise security solutions for the deployed ground environment. This event will continue the work done during previous events to refine security setting of a solution set prior to be it being formally tested in a Service live-fire event. The PMO intends to provide generated by this event to the Service Operational Test Agency (OTA) as part of the formal testing process.
The event environment will consist of a simplified Internet enclave with minimal services including a single Root DNS server and NTP services, two Blue enclaves, one at the Battalion level and one at the Brigade Combat Team (BCT) level that sit behind a DMZ as well as a small DODIN enclave with common services.
Traffic generation (TG) will be provided via Mantra and include web and email.
The event environment will have 1 ESXi hypervisor, 100 VMs and 75 nodes set up for Traffic Generation using Mantra.
Event Timeline: Test Event 21-8 will include 2 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
90 11
2010 SP2 Enterprise
2 2
Information Server 2000 2 2 Apt Repo 4 4 MySQL 5.1
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
15 15 CentOS (multiple versions) 1 1 NTP Server 2 2 DHCP Server 75 10 Office 2010 2 2 Firewall 13 13 PHP 5.4 1 1 Elastic Search 100 14 Firefox 35.0.1 4 4 Ubuntu 12.04 x64
3 3
10 10
VyOS 1.1.6 x64
8 1
Kali 2017.1
2 1 x64
1 1
Windows 2008 R2 SP1
100 35
75 15 x64 50 50 Meinberg NTP Client 10 10 Yum Repo
1 1 ejabberd XMPP Server
DHCP Server Surrogate
100 100
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Training Event 21-3
Description: Training Event 21-3 will be the second is a series of “Capture the Flag” style training events where Cyber Protection Teams (CPTs) are able to hone their skills and TTPs in both competitive and non-competitive conditions. This event will have an Army flavor for which the NCRC will provide an event environment replicating 3 different levels of tactical enclaves, i.e. Battalion, Brigade Combat Team (BCT) and Corps, each with 3 different “flags” that teams must find in order to render the unit not mission capable. Each participating team will be given access to an identical environment for a set time period during which they must capture as many ‘flags’ as possible.
The event environment will consist of a simplified Internet enclave with minimal services including a single Root DNS server and NTP services. A set of Blue enclaves will be provided for each type of tactical enclave that sit behind a DMZ as well as a small DoDIN enclave with common services.
Traffic generation (TG) will be provided via Mantra and include web and email.
The event environment will have 2 ESXi hypervisors, 250 VMs and 200 nodes set up for Traffic Generation using Mantra.
External Connections: JIOR and JMN connections to multiple locations.
Event Timeline: Training Event 21-3 will include 6 weeks of planning, 2 weeks of range configuration, 2 weeks of event execution, 1 week of
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
Surrogate Software
3 3
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Information Server 2000 1 1 Bind 9.8.1 for Linux 8 8 MySQL 5.1 32 32 CentOS (multiple versions) 1 1 NTP Server 4 4 DHCP Server 180 22 Office 2010 4 4 Firewall 13 13 PHP 5.4 1 1 Elastic Search 188 23 Pidgin 188 23 Firefox 35.0.1 28 14 SSH Server
5 5
Samba 16 2 Kali 2017.1 4 4 Ubuntu 12.04 x64 1 1 Kibana 18 18 VyOS 1.1.6 x64
4 1 x64
1 1
237 72 x64 62 55 Meinberg NTP Client 32 32 Yum Repo
2 2
DHCP Server Surrogate
402 80
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-9
Description: Test Event 21-9 is the initial small-sized event the NCRC will host for a Program Office responsible for developing methodologies and solutions for assessing the security posture of contractors supporting development of security solutions that are intended for deployment within DoD garrison environments. The intent is to develop solutions and methodologies that can be rapidly applied to improve the overall cybersecurity posture of the DIB. The event will include a cooperative vulnerability assessment and traditional penetration testing activities.
The event environment will consist of a small Internet enclave and an internal enclave behind a DMZ with sub-enclaves for 2 generalized garrison enclaves and a single building enclave to house the SUT. The User will provide the SUT solutions that are to be tested as well as SME support as needed.
The event environment will have3 ESXi hypervisors and 50 nodes set up for Traffic Generation using Mantra.
Event Classification: Unclassified
Event Timeline: Test Event 21-9 will include 3 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
2010 SP2 Enterprise
1 1
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1 Firewall 15 15 SSH Server 2 2 Windows Fileshare 1 1 Syslog Client 1 1 Elastic Search 1 1 Syslog Server 2 2 Domain Controller Surrogate 2 2 Ubuntu 12.04 x64 7 7 Kali 2.0 x64 5 5 Vyatta 6.6 x64 x86 1 1 Logstash 8 8 Windows 2008 R2 SP1
1 1 x64
2 2
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-10
Description: Test Event 21-10 will evaluate the effectiveness and suitability of a User developed and supplied capability prior to it being deployed in support of real-world operations. The capability must be tested within the context of the Government user requirements in a realistic environment. This event will include traditional penetration testing activities using User supplied tools and data to be performed by NCRC personnel working with User SMEs. The four components of the environment will be:
A robust Internet Backbone enclave to include operational instances of all 13 Root DNS servers, domain registration services and NTP, 30 distinct Grey enclaves with regional distinctions that host numerous and different configurations of functional Content Management System (CMS) sites along with numerous non-CMS functional websites
A Capability Enclave used to host the User provided SUT A dedicated Traffic Generation enclave using Mantra for web (HTTP and HTTPS) traffic that interacts with the CMS and other web services in the internet enclave.
The event environment will have 15 ESXi hypervisors, 750 VMs and 1 node set up to support Mantra Traffic Generation
Event Timeline: Test Event 21-10 will include 4 weeks of planning, 3 weeks of range configuration, 2 weeks of event execution, 1 week of
Software Overview # of Nodes
Containing or Running the
SW
# of Types of Nodes
Running the
SW
# of Types of Nodes
102 102
270 270
SSH Server 26 26 Apt Repo 21 21 Ubuntu 14.04 x86
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
1 1 Bind 9.8.1 for Linux 3 3 VyOS 1.1.6 x64 112 93 CentOS 7.0 x64 27 27 Vyatta 6.6 x64 5 5 Debian 7.8 x64 8 8 Website Module Drupal 1 1 Elastic Search 7 7 Website Module MyBB 64 7 Firefox 35.0.1 8 8 Website Module Phpbb 24 24 Gnome Desktop 9 9 Website Module SMF 1 1 Kibana 10 10 Website Module WordPress 1 1 Logstash 9 9 Website Module vBulletin
198 141
20 1 x64 51 51 MySQL Default 20 1 Windows 8.1 x64
36 36
112 93
167 167 PHP Default for Linux 80 4 wget for Windows
Rev Date: 7 Feb27 Mar 2020
Unclassified // For Official Use Only
Use or disclosure of information contained on this page is subject to the restrictions on the title page of this document.
Test Event 21-11
Description: Test Event 21-11 will be a large-scale test event focused on evaluating the suitability and usability of a newly developed capability for supporting data collection and analysis during testing and training events. The SUT is very complex and will require significant effort to instantiate on the range. The event environment for this test will be highly instrumented with non-interfering sensors and have significant data collection requirements. The SUT will be hosted by the NCRC and will be largely virtualized with a small number of physical hosts being required. The event environment will consist of the following enclaves:
• A small Internet backbone with an operational instance of a Root DNS server and an NTP service
• A number of Blue, Red and Grey enclaves with sub-enclaves that include different combinations and varieties of Windows and
Linux client & server OS and SP configurations as well as Exchange/Outlook E-mail, File Sharing, Chat, websites, in-game Voice Over Internet Protocol (VOIP) telephony services will be provided using Cisco routing hardware
The event environment will have 10 ESXi hypervisors, 682 VMs and 344 nodes set up for Traffic Generation using Mantra.
Event Timeline: Test Event 21-11 will include 6 weeks of planning that includes 2 technical exchanges of 2-3 days each with the User, includes 3 weeks of range configuration, 2 weeks of event execution, 1 week of post-event activities and 6 weeks of post-event analysis.
Software Overview # of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .