A21_Solicitation_W900KK19R0080_Exhibit_A_CDRLs.pdf

PDF 706 KB Posted

Attached to
Construction Equipment Virtual Trainers (CEVT)
Solicitation number
W900KK-19-R-0080
Issued by

About this file

This synopsis announces a forthcoming solicitation for the Construction Equipment Virtual Trainer (CEVT) program. The U.S. Army's Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), through its Product Manager for Training Devices (PM TRADE), intends to issue solicitation number W900KK-19-R-0080 on or around November 1, 2018 to procure virtual simulators for five types of construction equipment: motor grader, scraper, dozer, wheel loader, and excavator. The contract will have a single awardee and utilize an indefinite-delivery/indefinite-quantity (IDIQ) structure with a five-year ordering period and estimated $27 million ceiling. The North American Industry Classification System (NAICS) code is 333318 and Product Service Code (PSC) is 6910. Questions should be directed to the named Contract Specialist, and the synopsis provides points of contact for program and contracting information.

The attached documents include a statement of work, system requirements document, and contract line item structure for reference related to this forthcoming solicitation for virtual construction equipment simulators by the U.S. Army.

CEVT Exhibit A CDRLs

View the file

Other files

File Type Posted
A21.3_Solicitation_W900KK19R0080_Amd_02_2019FEB07.docx DOCX document
A21.3_Solicitation_W900KK19R0080_Att_0008_CEVT_Question_and_Comment_Matrix.xlsx XLSX spreadsheet
A21.3_Solicitation_W900KK19R0080_Conformed_through_Amd_02_2019FEB07.docx DOCX document
A21.2_Solicitation_W900KK19R0080_Att_0001_CEVT_SOW_2019FEB01.pdf PDF
A21.2_Solicitation_W900KK19R0080_Conformed_through_Amd_01_2019FEB01.docx DOCX document
A21.2_Solicitation_W900KK19R0080_Att_0008_CEVT_Question_and_Comment_Matrix.xlsx XLSX spreadsheet
A21.2_Solicitation_W900KK19R0080_Att_0002_CEVT_SRD_2019FEB01.pdf PDF
A21.2_Solicitation_W900KK19R0080_Att_0006_CEVT_Pricing_Workbook.xlsx XLSX spreadsheet
A21.2_Solicitation_W900KK19R0080_Amd_01_2019FEB01.docx DOCX document
A21.2_Solicitation_W900KK19R0080_Att_0007_CEVT_SOW_DO_0001_2019FEB01.pdf PDF
CRM_052-12N10C05.pdf PDF
CRM_052-12N10D01_v2.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0006_CEVT_Pricing_Workbook.xlsx XLSX spreadsheet
CRM_052-12N10C02.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0003_Contractor_Security_Vetting_v4_011419.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0001_CEVT_SOW_Base_16JAN2019.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0008_CEVT_Question_and_Comment_Matrix.xlsx XLSX spreadsheet
A21_Solicitation_W900KK19R0080_Att_0004_Security_Executive_Agent_Directive_4.pdf PDF
W900KK19R0080_Document_Links.docx DOCX document
CRM_052-12N10C04.pdf PDF
CRM_052-12N10C03.pdf PDF
A21_Solicitation_W900KK19R0080_20190117.docx DOCX document
A21_Solicitation_W900KK19R0080_Att_0005_Past_Performance_Evaluation_Questionnaire.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0007_CEVT_SOW_DO_0001_16JAN2019.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0002_CEVT_SRD_16JAN2019.pdf PDF
CEVT_DRAFT_RFP_Responses_10JAN2019.pdf PDF
Collateral_Item_13_Security_Guidance.docx DOCX document
CEVT_Pre_Solicitation_Conference_Attendance_20181219.pdf PDF
FOUO_Attachment_ver_01.doc DOC document
A23_Pre_Proposal_Conference_Slides_CEVT_19DEC2018_v2.pdf PDF
CEVT_Pre_Solicitation_Con_Slides_19DEC2018.pdf PDF
A21_Solicitation_W900KK19R0080_DRAFT.docx DOCX document
A21_Solicitation_W900KK19R0080_Att_0001_CEVT_SOW_Base_1OCT2018.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0002_CEVT_SRD_4SEP2018_DRAFT.pdf PDF
A21_Solicitation_W900KK19R0080_Att_0005_Past_Performance_Evaluation_Questionnaire.doc DOC document
A21_Solicitation_W900KK19R0080_Att_0006_CEVT_Pricing_Workbook.xlsx XLSX spreadsheet
A21_Solicitation_W900KK19R0080_Att_0004_CEVT_Data_Requirements_Document.rtf RTF text file
A21_Solicitation_W900KK19R0080_Att_0007_CEVT_SOW_DO_0001_1OCT2018.pdf PDF
A11_Synopsis_DRAFT_CEVT_SRD.pdf PDF
A11_Synopsis_DRAFT_CEVT_CLIN_Structure_IDIQ.xlsx XLSX spreadsheet
A11_Synopsis_DRAFT_CEVT_SOW.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-TRADE-VTS

6. REQUIRING OFFICE

SOW SECTION 3.1

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: SHALL BE DUE TWENTY (20) WORKING DAYS AFTER THE POST

AWARD CONFERENCE MEETING.

3. BLOCK 13: SHALL BE DUE MONTHLY AFTER THE FIRST SUBMISSION AND

SHALL CONTINUE THROUGH THE LIFE OF THE CONTRACT

4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A001,

1 OCT 2017).

FOR ANY DATA SUBMISSION WITH ANY FILE

SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO

THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE

SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013

FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE

FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN

THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD

CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF THE SUBMISSION.

6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS

7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW SECTION 3.1.1

5. CONTRACT REFERENCE

DI-MGMT-81861A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

INTEGRATED MASTER SCHEDULEIntegrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: SHALL BE DUE 20 DAYS AFTER POST AWARD CONFERENCE MEETING.

3. BLOCK 13: SHALL BE DUE MONTHLY AFTER THE FIRST SUBMISSION

AND SHALL CONTINUE THROUGH THE LIFE OF THE CONTRACT

4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,

A002, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE

GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE

EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED

VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT PROJECT 2013 FORMAT. EMAIL

IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS.

7. REFER TO PARAGRAH 6 OF DI-MGMT-81861A FOR FORMAT.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.1.3.7.1

5. CONTRACT REFERENCE

DI-SESS-81022D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

Block 2: Configuration Audit Summary Report and Certification

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: THE DATE OF FIRST SUBMISSION SHALL BE TEN (10)

WORKING DAYS AFTER COMPLETION OF THE PHYSICAL CONFIGURATION AUDIT.

3. BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE DUE AS REQUIRED

THROUGH LIFE OF THE CONTRACT.

4. BLOCK 14: : DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A003,

1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER

THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA

AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR

CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW

AND ACCEPTANCE OR REJECTION OF THE SUBMISSION.

6. THE CONTRACTOR SHALL HAVE TEN (10) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS

7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

8. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED PRIOR TO TESTING.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.1.3.10

5. CONTRACT REFERENCE

DI-SESS-80639D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Engineering Change Proposal (ECP)

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: : LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL

CASE INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCKS 12 AND 13: SHALL BE SUBMITTED WHEN A CHANGE IS

PROPOSED TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.

3. BLOCK 14: : DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A004,

1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER

THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA

AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR

CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

4. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS UPON RECEIPT TO

REVIEW AND GIVE ACCEPTANCE/REJECTION OF EACH SUBMISSION.

5. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS

6. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

7. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED PRIOR TO ANY CHANGES

TO THE BASELINE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.1.3.10.2

5. CONTRACT REFERENCE

DI-SESS-80640D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Request for Variance (RFV)

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 8: : CONTRACTOR SHALL REQUEST AND OBTAIN GOVERNMENT'S

WRITTEN APPROVAL TO CONTINUE

2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE IMMEDIATELY BEFORE CHANGE OF WORK IS EXECUTED.

4. BLOCK 13: SHALL BE DUE WHEN SUBSEQUENT DEVIATIONS ARE REQUIRED.

5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,

A005, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE

GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE

EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED

VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

6. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.1.2

5. CONTRACT REFERENCE

DI-ADMN-81505

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Report, Record of Meeting/Minutes

2. TITLE OF THE DATA ITEM

A006

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-GCTT.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS AFTER THE MEETING/REVIEW.

3. BLOCK 13: REVISIONS AS REQUIRED THRU THE LIFE OF CONTRACT.

4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514

A007, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE

SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO

THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE

SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013

FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE

FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN

THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD

CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.1.1

5. CONTRACT REFERENCE

DI-MGMT-82133

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A007

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE 3 FEBRUARY 2017. OTHER REQUESTS FOR THIS DOCUMENT

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

2. BLOCK 12: INITIAL REPORT DUE 20 WORKING DAYS PRIOR TO SYSTEM

REQUIREMENTS REVIEW.

3. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

4. BLOCK 14: THE RTVM REPORTS SHALL HAVE A COVER LETTER AND SHALL

BE DELIVERED IN BOTH MS EXCEL 2013 FORMAT AND RATIONAL DYNAMIC

OBJECT ORIENTED REQUIREMENTS SYSTEM (DOORS) IMPORTABLE FORMAT.

A FINAL REPRODUCIBLE COPY SHALL BE DELIVERED ON CD/DVD.

ADDRESSEES WITHIN THE PROGRAM AND ACC SHALL BE IDENTIFIED AT

POST AWARD CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND

ACCEPTANCE/REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE

GOVERNMENT COMMENTS INTO EACH SUBMISSION.

7. ALL DID CONTENT MUST BE ADDRESSED.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.2.2

5. CONTRACT REFERENCE

DI-IPSC-81442A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Software Version Description (SVD)

2. TITLE OF THE DATA ITEM

A008

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER IPSCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

2TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

24-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

19-SEP-2018

H. DATEG. PREPARED BY

Le, Kien

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: SHALL BE DUE AT TEST READINESS REVIEW (TRR) PRIOR

TO GOVERNMENT IN-PLANT ACCEPTANCE TESTING. GOVERNMENT WILL HAVE

FIVE (5) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF

THIS SUBMISSION. ACCEPTANCE SETS THE SOFTWARE BASELINE TO BE

TESTED.

3. GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO THE START OF

GOVERNMENT IN-PLANT ACCEPTANCE TESTING.

4. BLOCK 13: SHALL BE DUE TEN (10) WORKING DAYS AFTER COMPLETION

OF GOVERNMENT IN-PLANT ACCEPTANCE TESTING. GOVERNMENT WILL HAVE

TEN (10) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF

THIS SUBMISSION.

5. GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO SHIPMENT.

6. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A010,

1 OCT 2016) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER

THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA

AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

7. CONTRACTOR SHALL HAVE FIFTEEN (15) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS INTO THE FINAL SUBMISSION.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.5.2

5. CONTRACT REFERENCE

DI-SAFT-80102C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SAFETY ASSESSMENT REPORT

2. TITLE OF THE DATA ITEM

A009

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO ANY TESTING.

2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: INITIAL SUBMISSION IS THIRTY (30) DAYS AFTER THE

CRITICAL DESIGN REVIEW (CDR).

4. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.

5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,

A011, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE

GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE

EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED

VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

6. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE 7 WORKING DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IN ACCORDANCE TO DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.2.3

5. CONTRACT REFERENCE

DI-AVCS-80700A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

COMPUTER SOFTWARE PRODUCT END ITEMS

2. TITLE OF THE DATA ITEM

A010

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER AVCSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BYH. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. ONE COPY OF SOFTWARE RECOVERY MEDIA IS REQUIRED PER FIELDING

FOR EACH VARIANT AND IOS.

2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS BEFORE FIELDING.

4. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

5. BLOCK 14: SHALL BE DELIVERABLE CD/DVD TO CEVT APM, CEVT LE, AND

PdM FIELD OPS.

6. THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW

AND ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE TEN (10) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IN ACCORDANCE WITH DID IS ACCEPTABLE.

9. BLOCK 8: GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO FIELDING.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.4

5. CONTRACT REFERENCE

DI-NDTI-80603A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

IPAT/OSATTest Procedure

2. TITLE OF THE DATA ITEM

A011

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: IN PLANT ACCEPTANCE TEST PROCEDURE INITIAL

SUBMISSION SHALL BE DUE 20 WORKING DAYS PRIOR TO THE TEST READINESS REVIEW.

ON-SITE ACCEPTANCE TEST PROCEDURE, WHICH IS A SMALLER SUBSET OF

IPAT PROCEDURE, INITIAL SUBMISSION SHALL BE DUE 5 WORKING DAYS

AFTER THE COMPLETION OF THE IPAT.

3. BLOCK 13: IPAT FINAL TEST PROCEDURE SUBMISSION SHALL BE DUE

10 WORKING DAYS PRIOR TO IPAT.

OSAT FINAL TEST PROCEDURE, WHICH IS A SMALLER SUBSET OF IPAT

PROCEDURE, SUBMISSION SHALL BE DUE 10 WORKING DAYS PRIOR TO THE FIRST OSAT.

4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A013,

1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER

THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA

AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR

CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

5. GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMATING ACCORDANCE WITH DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.1.2

5. CONTRACT REFERENCE

DI-ADMN-81373

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

PRESENTATION MATERIAL

2. TITLE OF THE DATA ITEM

A012

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

04-OCT-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

04-OCT-2018

H. DATEG. PREPARED BY

Meister, Jeffery

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

2. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS BEFORE EACH MEETING/REVIEW.

3. BLOCK 13: REVISIONS AS REQUIRED THRU THE LIFE OF CONTRACT.

4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514

A014, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE

SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO

THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE

SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)

OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013

FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE

FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN

THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD

CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.

5. THE GOVERNMENT WILL HAVE THREE (3) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALL HAVE TWO (2) WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.6

5. CONTRACT REFERENCE

DI-SESS-81000E

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Product Drawings/Models and Associated Lists

2. TITLE OF THE DATA ITEM

B001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0036

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

X TM OTHERB

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

2TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

18-SEP-2018

J. DATE

Meister, Jeffery

I. APPROVED BY

24-MAY-2018

H. DATEG. PREPARED BY

Lee, Paul

Block D: Construction Equipment Virtual Trainers (CEVT)

1. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED FOR EACH SUBMISSION

PRIOR TO REVIEW/MILESTONE EXIT.

2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE

INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT

GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING

DISTRIBUTION STATEMENT:

DISTRIBUTION D:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.

DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.

THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT

TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT

LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN

ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: FIRST SUBMISSION SHALL BE DUE THIRTY (30) WORKING

DAYS AFTER CDR.

4. BLOCK 13: FINAL SUBMISSION THIRTY (30) DAYS PRIOR TO DELIVERY

DATE OF FIRST PRODUCTION UNIT. REVISIONS AS REQUIRED THROUGH

THE LIFE OF THE CONTRACT.

5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE

EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA

ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, B003,

1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER

THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA

AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR

CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN

THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT

ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM

AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH

ELECTRONIC AND PHYSICAL ADDRESSES.

6. REFER TO THE TECHNICAL DATA PACKAGE (TDP) OPTION SELECTION

WORKSHEET FOR FURTHER REQUIREMENTS (ANNEX TO EXHIBIT B)

7. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW SECTION 3.2.5.3.1 and 3.4

5. CONTRACT REFERENCE

DI-NDTI-80809B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Test/Inspection…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .