This synopsis announces a forthcoming solicitation for the Construction Equipment Virtual Trainer (CEVT) program. The U.S. Army's Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), through its Product Manager for Training Devices (PM TRADE), intends to issue solicitation number W900KK-19-R-0080 on or around November 1, 2018 to procure virtual simulators for five types of construction equipment: motor grader, scraper, dozer, wheel loader, and excavator. The contract will have a single awardee and utilize an indefinite-delivery/indefinite-quantity (IDIQ) structure with a five-year ordering period and estimated $27 million ceiling. The North American Industry Classification System (NAICS) code is 333318 and Product Service Code (PSC) is 6910. Questions should be directed to the named Contract Specialist, and the synopsis provides points of contact for program and contracting information.
The attached documents include a statement of work, system requirements document, and contract line item structure for reference related to this forthcoming solicitation for virtual construction equipment simulators by the U.S. Army.
CEVT Exhibit A CDRLs
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-TRADE-VTS
6. REQUIRING OFFICE
SOW SECTION 3.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: SHALL BE DUE TWENTY (20) WORKING DAYS AFTER THE POST
AWARD CONFERENCE MEETING.
3. BLOCK 13: SHALL BE DUE MONTHLY AFTER THE FIRST SUBMISSION AND
SHALL CONTINUE THROUGH THE LIFE OF THE CONTRACT
4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A001,
1 OCT 2017).
FOR ANY DATA SUBMISSION WITH ANY FILE
SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO
THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE
SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013
FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE
FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN
THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD
CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS
7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
SOW SECTION 3.1.1
5. CONTRACT REFERENCE
DI-MGMT-81861A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
INTEGRATED MASTER SCHEDULEIntegrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: SHALL BE DUE 20 DAYS AFTER POST AWARD CONFERENCE MEETING.
3. BLOCK 13: SHALL BE DUE MONTHLY AFTER THE FIRST SUBMISSION
AND SHALL CONTINUE THROUGH THE LIFE OF THE CONTRACT
4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,
A002, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE
GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE
EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED
VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT PROJECT 2013 FORMAT. EMAIL
IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS.
7. REFER TO PARAGRAH 6 OF DI-MGMT-81861A FOR FORMAT.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.1.3.7.1
5. CONTRACT REFERENCE
DI-SESS-81022D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESS
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
Block 2: Configuration Audit Summary Report and Certification
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: THE DATE OF FIRST SUBMISSION SHALL BE TEN (10)
WORKING DAYS AFTER COMPLETION OF THE PHYSICAL CONFIGURATION AUDIT.
3. BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE DUE AS REQUIRED
THROUGH LIFE OF THE CONTRACT.
4. BLOCK 14: : DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A003,
1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER
THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA
AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR
CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW
AND ACCEPTANCE OR REJECTION OF THE SUBMISSION.
6. THE CONTRACTOR SHALL HAVE TEN (10) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS
7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
8. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED PRIOR TO TESTING.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.1.3.10
5. CONTRACT REFERENCE
DI-SESS-80639D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Engineering Change Proposal (ECP)
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESS
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: : LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL
CASE INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCKS 12 AND 13: SHALL BE SUBMITTED WHEN A CHANGE IS
PROPOSED TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.
3. BLOCK 14: : DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A004,
1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER
THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA
AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR
CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
4. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS UPON RECEIPT TO
REVIEW AND GIVE ACCEPTANCE/REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS
6. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
7. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED PRIOR TO ANY CHANGES
TO THE BASELINE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.1.3.10.2
5. CONTRACT REFERENCE
DI-SESS-80640D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Request for Variance (RFV)
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESS
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 8: : CONTRACTOR SHALL REQUEST AND OBTAIN GOVERNMENT'S
WRITTEN APPROVAL TO CONTINUE
2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE IMMEDIATELY BEFORE CHANGE OF WORK IS EXECUTED.
4. BLOCK 13: SHALL BE DUE WHEN SUBSEQUENT DEVIATIONS ARE REQUIRED.
5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,
A005, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE
GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE
EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED
VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
6. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.1.2
5. CONTRACT REFERENCE
DI-ADMN-81505
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Report, Record of Meeting/Minutes
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-GCTT.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS AFTER THE MEETING/REVIEW.
3. BLOCK 13: REVISIONS AS REQUIRED THRU THE LIFE OF CONTRACT.
4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514
A007, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE
SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO
THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE
SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013
FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE
FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN
THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD
CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.1.1
5. CONTRACT REFERENCE
DI-MGMT-82133
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE 3 FEBRUARY 2017. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
2. BLOCK 12: INITIAL REPORT DUE 20 WORKING DAYS PRIOR TO SYSTEM
REQUIREMENTS REVIEW.
3. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.
4. BLOCK 14: THE RTVM REPORTS SHALL HAVE A COVER LETTER AND SHALL
BE DELIVERED IN BOTH MS EXCEL 2013 FORMAT AND RATIONAL DYNAMIC
OBJECT ORIENTED REQUIREMENTS SYSTEM (DOORS) IMPORTABLE FORMAT.
A FINAL REPRODUCIBLE COPY SHALL BE DELIVERED ON CD/DVD.
ADDRESSEES WITHIN THE PROGRAM AND ACC SHALL BE IDENTIFIED AT
POST AWARD CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS INTO EACH SUBMISSION.
7. ALL DID CONTENT MUST BE ADDRESSED.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.2.2
5. CONTRACT REFERENCE
DI-IPSC-81442A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Software Version Description (SVD)
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
24-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
19-SEP-2018
H. DATEG. PREPARED BY
Le, Kien
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: SHALL BE DUE AT TEST READINESS REVIEW (TRR) PRIOR
TO GOVERNMENT IN-PLANT ACCEPTANCE TESTING. GOVERNMENT WILL HAVE
FIVE (5) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF
THIS SUBMISSION. ACCEPTANCE SETS THE SOFTWARE BASELINE TO BE
TESTED.
3. GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO THE START OF
GOVERNMENT IN-PLANT ACCEPTANCE TESTING.
4. BLOCK 13: SHALL BE DUE TEN (10) WORKING DAYS AFTER COMPLETION
OF GOVERNMENT IN-PLANT ACCEPTANCE TESTING. GOVERNMENT WILL HAVE
TEN (10) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF
THIS SUBMISSION.
5. GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO SHIPMENT.
6. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A010,
1 OCT 2016) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER
THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA
AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
7. CONTRACTOR SHALL HAVE FIFTEEN (15) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS INTO THE FINAL SUBMISSION.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.5.2
5. CONTRACT REFERENCE
DI-SAFT-80102C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SAFETY ASSESSMENT REPORT
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO ANY TESTING.
2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: INITIAL SUBMISSION IS THIRTY (30) DAYS AFTER THE
CRITICAL DESIGN REVIEW (CDR).
4. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514,
A011, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE
GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE
EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED
VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
6. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 7 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IN ACCORDANCE TO DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.2.3
5. CONTRACT REFERENCE
DI-AVCS-80700A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
COMPUTER SOFTWARE PRODUCT END ITEMS
2. TITLE OF THE DATA ITEM
A010
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER AVCSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BYH. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. ONE COPY OF SOFTWARE RECOVERY MEDIA IS REQUIRED PER FIELDING
FOR EACH VARIANT AND IOS.
2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS BEFORE FIELDING.
4. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.
5. BLOCK 14: SHALL BE DELIVERABLE CD/DVD TO CEVT APM, CEVT LE, AND
PdM FIELD OPS.
6. THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW
AND ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE TEN (10) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IN ACCORDANCE WITH DID IS ACCEPTABLE.
9. BLOCK 8: GOVERNMENT ACCEPTANCE IS REQUIRED PRIOR TO FIELDING.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.4
5. CONTRACT REFERENCE
DI-NDTI-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
IPAT/OSATTest Procedure
2. TITLE OF THE DATA ITEM
A011
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: IN PLANT ACCEPTANCE TEST PROCEDURE INITIAL
SUBMISSION SHALL BE DUE 20 WORKING DAYS PRIOR TO THE TEST READINESS REVIEW.
ON-SITE ACCEPTANCE TEST PROCEDURE, WHICH IS A SMALLER SUBSET OF
IPAT PROCEDURE, INITIAL SUBMISSION SHALL BE DUE 5 WORKING DAYS
AFTER THE COMPLETION OF THE IPAT.
3. BLOCK 13: IPAT FINAL TEST PROCEDURE SUBMISSION SHALL BE DUE
10 WORKING DAYS PRIOR TO IPAT.
OSAT FINAL TEST PROCEDURE, WHICH IS A SMALLER SUBSET OF IPAT
PROCEDURE, SUBMISSION SHALL BE DUE 10 WORKING DAYS PRIOR TO THE FIRST OSAT.
4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, A013,
1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER
THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA
AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR
CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
5. GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMATING ACCORDANCE WITH DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.1.2
5. CONTRACT REFERENCE
DI-ADMN-81373
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
PRESENTATION MATERIAL
2. TITLE OF THE DATA ITEM
A012
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
04-OCT-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
04-OCT-2018
H. DATEG. PREPARED BY
Meister, Jeffery
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: SHALL BE DUE FIVE (5) WORKING DAYS BEFORE EACH MEETING/REVIEW.
3. BLOCK 13: REVISIONS AS REQUIRED THRU THE LIFE OF CONTRACT.
4. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514
A014, 1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE
SIZE GREATER THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO
THE EMAIL IS GREATER THAN 10 MB, DATA SUBMISSION SHALL BE
SUBMITTED VIA AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX)
OR CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013
FORMAT. EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE
FILES ARE NOT ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN
THE PROGRAM AND ACC SHALL BE IDENTIFIED AT POST AWARD
CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE THREE (3) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE TWO (2) WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IN ACCORDANCE WITH ABOVE DID IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.6
5. CONTRACT REFERENCE
DI-SESS-81000E
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Product Drawings/Models and Associated Lists
2. TITLE OF THE DATA ITEM
B001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-18-R-0036
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHERB
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
18-SEP-2018
J. DATE
Meister, Jeffery
I. APPROVED BY
24-MAY-2018
H. DATEG. PREPARED BY
Lee, Paul
Block D: Construction Equipment Virtual Trainers (CEVT)
1. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED FOR EACH SUBMISSION
PRIOR TO REVIEW/MILESTONE EXIT.
2. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 28 SEP 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-TRADE-VTS.
THE FOLLOWING EXPORT CONTROL WARNING SHALL BE PLACED ON DOCUMENT
TITLE PAGE AND DISK LABEL (WHERE APPLICABLE):
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,
U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: FIRST SUBMISSION SHALL BE DUE THIRTY (30) WORKING
DAYS AFTER CDR.
4. BLOCK 13: FINAL SUBMISSION THIRTY (30) DAYS PRIOR TO DELIVERY
DATE OF FIRST PRODUCTION UNIT. REVISIONS AS REQUIRED THROUGH
THE LIFE OF THE CONTRACT.
5. BLOCK 14: DATA SUBMISSION SHALL BE VIA ELECTRONIC MAIL. THE
EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL DATA
ITEM NUMBER, AND REPORTING PERIOD (EXAMPLE: W900KK-17-C-0514, B003,
1 OCT 2017) . FOR ANY DATA SUBMISSION WITH ANY FILE SIZE GREATER
THAN 10 MB, OR IF THE COMBINED SIZE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, DATA SUBMISSION SHALL BE SUBMITTED VIA
AMRDEC SAFE (HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/WELCOME.ASPX) OR
CD/DVD AND SHALL BE IN MICROSOFT OFFICE 2013 FORMAT. EMAIL IN
THE FORM OF COMPRESSED OR ZIP FILES OR EXECUTE FILES ARE NOT
ACCEPTED BY PEO STRI FIREWALL. ADDRESSEES WITHIN THE PROGRAM
AND ACC SHALL BE IDENTIFIED AT POST AWARD CONFERENCE ALONG WITH
ELECTRONIC AND PHYSICAL ADDRESSES.
6. REFER TO THE TECHNICAL DATA PACKAGE (TDP) OPTION SELECTION
WORKSHEET FOR FURTHER REQUIREMENTS (ANNEX TO EXHIBIT B)
7. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW SECTION 3.2.5.3.1 and 3.4
5. CONTRACT REFERENCE
DI-NDTI-80809B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Test/Inspection…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .