RFP Questions Page 1
| Solicitation # | Solicitation Name | Contracting Office POC |
| W900KK-17-R-0013 | PEO STRI BCTC-ES | Corretta Benton - Contract Specialist |
corretta.m.benton.civ@mail.mil and Robert Minjack - Procuring Contracting Officer (PCO) robert.m.minjack.civ@mail.mil
| Question | ||||||||
| # | Solicitation Document | |||||||
| (ex: SOW, RFP, Cost Model, Attachment A, etc.) | Section | |||||||
| # | Section | |||||||
| Title | Page Number | Referenced Content | Question or Comment | Response | Document Changes | |||
| 1 | PWS | 1.6.11 | Key personnel | 8 | Are all key personnel required to be located in Orlando or may the contractor have one, the Interior designer, remotely located? | Key personnel are not required to be located in Orlando. They should be available by phone, email or in person during the PEO STRI core hours, 0900-1500 ET. | PWS Update 1.6.11 | |
| 2 | PWS | 5.2.3 | Delivery of COTS Products | 20 | Do the current contractors provide delivery and set up (for example - furniture) as part of the materials cost? | Yes, the current contractor's approach is to utilize subcontractors or vendors to deliver and set up the furniture, fixtures and equipment (FFE) when installation services are required. In some instances, the requirement is to procure and drop ship the FFE to the site. The requirement to drop ship or provide installation services will be further defined in each Task Order. Contractors can develop their own approach to meet the requirement. | None | |
| 3 | PWS | 5.2.5.6 | Site Survey | 23 | Will the Government provide Architectural and Engineering (electronic - CAD) drawings include building plans (with electrical) prior to the Site Survey? | The A&E drawings will be provided prior to the Red Zone meetings for new Military Construction, Army projects to facilitate preparation of the proposed FFE solution. For Legacy Site refresh surveys, the availability of CAD drawings will be dependent on whether or not the installation Directorate of Public Works can make them available. The legacy site survey will provide the contractor an opportunity to take measurements, prepare drawings or schematics and note available infrastructure to assist with the preparation of the proposed solution. | PWS Update 5.2.5.6, 5.2.8 | |
| 4 | PWS | 5.2.7.3 | COTS Products and FFE Installation | 25 | ~For all network drops, are extensions only from inside the room using existing wall or floor jacks (i.e.. not run back to TR)? |
~For electrical work, must the contractor be licensed and insured?
~Will all electrical work be from within the room and require no additional circuits run out of room to the panel?
~Will all circuits be in place and no sub panels be included in the scope?
~Will designs for DPW be required and require signature of a licensed Master Electrician? Network drops are only used from within the inside of the room using a provided zone box -Electrical work requires contractor to be licensed and insured -All Electrical work/circuits will be in place and no subpanels will be required as part of the scope
| -DPW has their own electricians contractors and the design will be part of their scope of work, our contractor's scope will be to connect at room level. | None | ||||||||
| 5 | PWS | 5.2.8 | Legacy and Site Refresh | 26 | Comment: Products that will hit their End of Life (EOL) within 12 months, may not have the ability to have the 5 year support as stipulated in the Draft RFP. | The original equipment manufacturer (OEM) typically includes the end-of-support date with the EOL or end-of-sale (EOS) announcement. The OEM normally announces the EOL/EOS 1-2 years prior to the planned date. The contractor should propose a replacement product from the DISA Approved Product List when it is determined five (5) years of support will not be available from the OEM. | None | ||
| 6 | PWS | 5.3 | Radio Wire Integration System Support | 27 | Under the current contract, is the OEM support to include help desk, procured as part of the materials purchase? | Yes, it is procured as a purchase order with the OEM, however the current contractor has established a subcontractor relationship based on the effort including labor. | None | ||
| 7 | PWS | Technical Exhibit 1 | Performance Requirements Summary | 30 | Is the Acceptable Level of Performance actually 5%? | ||||
| Does this mean offerors must meet objectives 5% of the time? Is it the Government's intent to state the objective as 95%? | The 5% depicts the Acceptable level not being met. | ||||||||
| Yes the Government's intent is to state the objective as 95%. | Update PRS Table | ||||||||
| 8 | PWS | Addendum 2 | Mission Training Size by location | 38 | Once an MTC layout is approved will future MTC layouts of equal size category require the same equipment listing and configuration with only limited deviations? | MTC's are categorize by Small, Medium and Large. For the most part the requirement by size transfers to other MTC's with similar size on new MCS projects, at times there may be adjustment to the requirement based on customers preference but these are typically a minor deviation. on Legacy sites there is a lage variance between similar size MTC's which will be determined during the site survey. | None | ||
| 9 | PWS | Addendum 4 | Annual COTS Software License Renewals | 43 | Should the support agreement be between 1 Oct 16 to 30 Sept 17? Please clarify. | The support agreement should read 1 Oct 17-30 Sep 18. The Addendum will be updated prior to release of the RFP. | Update PWS Addendum #4 | ||
| 10 | Draft RFP | Section L | Section 2, Subfactor B | 104 | Does the Cost proposal for the sample scenario get included in the 30 page technical proposal page count or should it be a new tab on the Cost-Price Workbook? | The cost price workbook for the sample task should be included in the Cost and Price Volume as a new tab. No Cost/Price information should be included in the Technical proposal. | Update Section L | ||
| 11 | Draft RFP | L | Instructions to Offerors | 101 | Section 2 Paragraph b | ||||
| "A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a font size no less than 12-point " | Will the Government consider allowing 9 point Ariel Narrow font for Illustrations/Graphics? | Illustrations and table may use a font size no less than 9 point Arial or Times New roman | Update Section L | ||||||
| 12 | Draft RFP | L | Instructions to Offerors | 101 & 103 | Section 2 Paragraph b states the following: "A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required." |
Whereas Section 3 Paragraph a states: "MS Word (doc) files shall use the following page setup parameters:…..
Font – Arial, 12 point" Please clarify which fonts offerors must use. 12-point minimum font size applies. Arial or Times New Roman fonts are acceptable. Update Section L
&"Arial,Bold"W900KK-17-R-0013 Questions and Comments for Draft BCTC-ES Solicitation
&P of &N
RFP Questions Page 2
| Solicitation # | Solicitation Name | Contracting Office POC |
| W900KK-17-R-0013 | PEO STRI BCTC-ES | Corretta Benton - Contract Specialist |
corretta.m.benton.civ@mail.mil and Robert Minjack - Procuring Contracting Officer (PCO) robert.m.minjack.civ@mail.mil
| Question | |||||
| # | Solicitation Document | ||||
| (ex: SOW, RFP, Cost Model, Attachment A, etc.) | Section | ||||
| # | Section | ||||
| Title | Page Number | Referenced Content | Question or Comment | Response | Document Changes |
| 13 | Draft RFP | M | Evaluation Factors for Award | 120 | Section M states the award will be made based on the best overall value of the proposal and the relative order of importance is as follows: The Program Management/Technical Factor is significantly more important than the Past Performance Factor and the Past Performance Factor is more important than the Cost/Price Factor. NOTE: ALL EVALUATION FACTORS OTHER THAN COST OR PRICE, WHEN COMBINED, ARE SIGNIFICANTLY MORE IMPORTANT THAN COST OR PRICE. | |
| Section C PWS defines the tasks and activities required to provide Program Management (PM), engineering support services, logistics, procurement of Commercial-Off-The-Shelf (COTS) Information Technology (IT) hardware and software, furniture, audiovisual and video teleconference equipment and installation services in support of the Battle Command Training Capability-Equipment Support (BCTC-ES) mission to provide training enablers for Mission Training Complex (MTC) locations and new MTC Military Construction, Army (MCA) projects. | Issue One – Objective Evaluation Criteria Relating to Overall Best Value The Specifications of the PWS and the evaluation/award criteria clearly are looking for best value solution; however, there are not clearly defined metrics or parameters to differentiate best value objectively. The BCTC-ES requirements require a mature small business with robust enterprise resources, existing management tools, and skilled program management professionals (PMP), to manage multiple and simultaneous complex program tasks and deployments, to CONUS and OCONUS sites. Without measurable criteria the government may risk awarding a less capable company based on generally capricious award criteria that will ultimately yield a Low Price Technically Acceptable (LPTA) solution and execution. | The Government intends to utilize the Best Value Subjective Tradeoff Process utilizing the factors and subfactors identified in the solicitation. In Section M, the Offerors are cautioned that while the Government will not evaluate every PWS requirement for the purposes of the source selection evaluation, the awardee Contractor will be required to comply with all the PWS requirements during task performance. The BCTC-ES contractor has a requirement to purchase COTS IT hardware and software through the US Army Computer Hardware Enterprise Software and Solutions (CHESS) program. | ||||
| 14 | Draft RFP | B | Supplies or Services and Prices | 2 | Section B indicates the following contract types: |
CLIN 0001 Program Management FFP CLIN 0002 RWIS Help Desk & IA Support FFP CLIN 0003 Video Telecon Help Desk Support FFP CLIN 0004 Annual COTS SW License Renewal FFP CLIN 0005 MTC Site Survey Mission FFP CLIN 0006 Travel for MTC Site Survey Cost CLIN 0007 MTC Installation Services FFP CLIN 0008 MTC Equipment FFP CLIN 0009 Travel for MTC Install Service Cost CLIN 0010 Over and Above FFP
CLIN 0011 CMRA FFP
Option CLINs prescribed with the same contract types as base award CLINs b.) PWS 5.1.1 Integrated Master Schedule including (DI-MGMT-81861) Integrated Program Management Report (IPMR) c.) PWS 5.1.2 Program Management Review … The PMR shall provide a program overview (cost, schedule, and performance) … (DI-MGMT-80227) Contractor’s Progress Status Management Report (CPSMR) d.) PWS 5.1.5 Integrated Product Team … Each IPT shall be empowered to make critical life cycle decision recommendations regarding each product or process within their assigned areas in compliance with their defined charter authority. Each IPT shall prepare a conference agenda, maintain minutes and make them available to the Government upon request.
e.) PWS 5.2.1 COTS Product Procurement … As authorized by the Government, the Contractor shall procure COTS Products. The Contractor shall pre-coordinate any material purchasing activities with the Government Integrated Product Team … The Contractor shall provide a recommended buy list to the Government of COTS Products that meet the specifications/requirements as provided by the Government for each COTS Products procurement and deployment … Following Government approval, the Contractor shall procure all required items on the approved buy list and deploy to each site IAW Government approved schedule f.) PWS 5.2.3 Delivery of COTS Products … The Contractor shall plan and execute a series of IPR a minimum of 90 days prior to each delivery to coordinate with the Government, including BCTC-ES site receiving the delivery, to establish and manage site deployment plans … The Contractor shall install and configure COTS hardware and software at the fielding sites IAW Government approved site specific system layout diagram with site personnel present … The Contractor shall use the established baseline of equipment suite to support MCA and legacy sites. The RMF baseline includes the following as defined by the Government:
Edge Routers Firewalls Layer 3 Core Switch and or Internal Router Intrusion Detection System (IDS)/ Intrusion Prevention System (IPS) Network Monitoring System (NMS) The RMF and FFE requirements will be identified during the execution of the MCA Red Zone meeting and/or legacy site survey.
g.) PWS 5.2.4 Hardware and Software Integration … The Contractor shall be responsible for testing connectivity from the patch panel to final outlet.
h.) PWS 5.2.6.5 Timing of Training Delivery … The Contractor shall conduct training at the completion of the installation of all equipment, exceptions can be made based on prior Government approval.
i.) PWS 5.2.7 Military Construction Army Support … The Contractor shall utilize the Government provided information from the Architectural and Engineering (AE) drawings for an MTC MCA project to design the FFE and COTS Product solution. The COTS Products and FFE solution shall be presented during the Red Zone meeting, normally conducted six months prior to the MTC MCA project completion date.
| j.) PWS 5.2.12 End to End Integration … For site refresh equipment, the Contractor shall ensure that there is proper integration and functionality with legacy and new equipment installations. This work may be requested in conjunction with the FFE fielding or during updates to an MTC as part of the planned refresh cycle or IAW the requirements of the task order. | Issue Two – Contract Type - The US Government is stipulating FFP contract type for all CLINs except travel related CLINs. Our analysis indicates that each of the PWS call-outs above is more properly suited for cost reimbursable contract types. Each of the examples given above relays multiple potential issues with regard to FFP contract type. We will highlight three issues below that clearly present generally untenable risk to the contractor in a fixed price setting which would ultimately result in increased cost to the US Government through the incorporation of risk mitigation costs into the current CLIN contract type in the best value approach. | ||||||||
| First, the contractor is not fully in control of the schedule, resources required (e.g. US Government personnel available for installation support, training, etc.), or technical baseline (which according to the PWS must be agreed upon by an IPT of various BCTC-ES stakeholders). Second, the contractor is not fully aware at Task Order solicitation regarding the validity or comprehensive nature of provided AE drawings and specifications and third the contractor is unable to forecast hardware and software revisions and/or End of Life, End of Service impacts from multiple OEMs across multiple configurations at each of 34 separate sites. | The schedule risk associated with each fielding event will be mitigated utilizing a Material Fielding Agreement between PEO STRI and the gaining organization. The planning process will initiate with the execution of site survey prior to each fielding event to identify the requirement and establish a timeline for execution based on procurement lead times and availability of the gaining organization's resources. Continuous dialog will be maintained with the site through a series of in process reviews leading up to the fielding. The technical baseline will be idenitfied by the Government. The IPT role is to monitor the status of information technology hardware and software on the DoD Unified Capabilities Approved Product List (UC APL), recommend changes based on UC APL status, industry standards and original equipment manufacturers (OEM) end-of-sale, end-of-life and end-of-support annuncements. The requirement for each fielding event will be identified by the Government following the site survey in a subsequent Task Order RFP with each resultant fielding event on a separately priced Task Order. The Government still believes FFP is appropriate. Previous fielding events have been executed utilizing FFP. | ||||||||
| 15 | Issue Three - NAICS code and Size Standare | L | Instructions to Offerors | 98 | Section L indicates The BCTC-ES requirement will be pursued as a Total Small Business Set-aside to be competed among companies qualifying as small businesses under NAICS 541519, (Computer Management Services), with a size standard of 500 employees. | Section L indicates The BCTC-ES requirement will be pursued as a Total Small Business Set-aside to be competed among companies qualifying as small businesses under NAICS 541519, (Computer Management Services), with a size standard of 500 employees. | NAICS code 541519 does not appear in the Draft RFP for solicitation W900KK-17-R-0013. The NAICS code for this effort is 541513 (Computer Facilities Management Services) and the size standard is $27.5M as stated on page 98 of the draft solicitation. | None | |
| 16 | Draft RFP | Has a contractor performed similar work to this for the Government in the past? If available, please provide the incumbent contract number. If you are unable to provide a contract number, is it safe to assume this is a new requirement for the Government? | The BCTC-ES effort was previously performed under the Constructive Training Systems (CTS) contract W900KK-10-D-0002 by a large business. Based on market research, the decision was made to separate the CTS effort into three distinct requirements: BCTC-ES (W900KK-17-R-0013), Common Battle Command Equipment Support (W900KK-16-R-0042) and the Joint Land Component Constructive Training Capabilty fielding, help desk and information assurance and vulnerability assessment patch mangement (W900KK-13-D-0002). |