Exhibit_A_-_CDRLs.pdf

PDF 182 KB Posted

Attached to
Battle Command Training Capability - Equipment Support (BCTC-ES) Competition
Solicitation number
W900KK-17-R-0013
Issued by

About this file

Exhibit A - CDRLs

View the file

Other files

File Type Posted
Offeror_Questions_and__Government_Answers_for_Amend_0002.pdf PDF
Attachment_8_Performance_Work_Statement_(Amend_0002).docx DOCX document
W900KK-17-R-0013_Amend_0002.pdf PDF
W900KK-17-R-0013_Conformed_Copy_through_Amend_0002.pdf PDF
Attachment_4_-_Scenario_Cost-Price_Workbook_(Amend_002).xlsx XLSX spreadsheet
Attachment_2_-_Cost-Price_Workbook_(Amend_0002).xlsx XLSX spreadsheet
Attachment_9_-_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM_(Amend_0002).docx DOCX document
Attachment_10_-_Draft_Authorization_to_use_FSS_and_Army_CHESS_(Amend_0002).doc DOC document
Attachment_9_-_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM.docx DOCX document
W900KK-17-R-0013_Amendment_0001.pdf PDF
Attachment_2_-_Cost-Price_Workbook.xlsx XLSX spreadsheet
Attachment_4_-_Scenario_Cost-Price_Workbook.xlsx XLSX spreadsheet
Attachment_1_-_BCTC-ES_FFE_Packages_S_M_L_MTC.xlsx XLSX spreadsheet
Attachment_5_-_Data_Item_Transmittal_Form.doc DOC document
Attachment_8_Performance_Work_Statement.pdf PDF
Attachment_6_-_Question_Comment_Form.xlsx XLSX spreadsheet
W900KK-17-R-0013_Released_4_April_2017.pdf PDF
Attachment_3_-_Fixed_Fully_Burdened_Labor_Rate_Buildup.xls XLS spreadsheet
Attachment_7_Security_Form_DD254.pdf PDF
W900KK17R0013DRFPQuestions.xlsx XLSX spreadsheet
Official_Draft_Solicitation_W900KK-17-R-0013_BCTC-ES_121316.docx DOCX document
Attachment_4_-_Scenario_Cost-Price_Workbook.xlsx XLSX spreadsheet
Attachment_2_-_Cost-Price_Workbook.xlsx XLSX spreadsheet
Attachment_3_-_Fixed_Fully_Burdened_Labor_Rate_Buildup.xls XLS spreadsheet
Attachment_1_-_BCTC-ES_FFE_Packages_S,_M,_L_MTC.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6. REQUIRING OFFICE

PWS Para. 5.1.1

5. CONTRACT REFERENCE

DI-MGMT-81861

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

23-MAR-2017

H. DATEG. PREPARED BY

Dunn, Jimmy

1. BLOCK 9: DISTRIBUTION STATEMENT A - APPROVED FOR PUBLIC

RELEASE; DISTRIBUTION IS UNLIMITED.

2. BLOCK 12 & 13: THE INITIAL SUBMISSION IS DUE NO LATER THAN

(NLT) 10 WORKING DAYS AFTER THE END OF THE SECOMND MONTH AFTER

CONTRACT AWARD. SUBSEQUENT SUBMISSIONS ARE DUE MONTHLY NLT 10

WORKING DAYS AFTER THE END OF THE MONTH.

3. THE CONTRACTOR SHALL STRUCTURE MONTHLY SCHEDULE REPORTS BY

TASK ORDER BUT PROVIDE THEM IN ONE CDRL SUBMISSION AT THE IDIQ LEVEL.

4. COST DATA IS NOT REQUIRED AS PART OF THE IPMR SUBMISSION. THE

IPMR INCLUDE THE FOLLOWING FORMATS:

A) FORMAT 1 WORK BREAKDOWN STRUCTURE SHOWING SCEDULE PERFORMANCE DATA

B) FORMAT 2 SCHEDULE PERFORMANCE DATA BY THE CONTRACTOR'S

ORGANIZATIONAL STRUCTURE

C) FORMAT 5 NARRATIVE REPORT TO PROVIDE ANALYSIS

D) THE CONTRACTORS INTEGRATED MASTER SCHEDULE

5. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL

TO THE COR IN MICROSOFT PROJECT 2013 ON REMOVABLE MEDIA.

6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IS ACCEPTABLE.

9. THE SCHEDULE RISK ASSESSMENT (SRA) REFERENCED IN THE DID WILL

BE DELIVERED ON A QUARTERLY BASIS.

16. REMARKS

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

PWS Para. 5.1.2

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

11. AS OF DATE

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

23-MAR-2017

H. DATEG. PREPARED BY

Dunn, Jimmy

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 9: DISTRIBUTION STATEMENT A - APPROVED FOR PUBLIC

RELEASE; DISTRIBUTION IS UNLIMITED.

2. BLOCK 12: SHALL BE DUE 10 DAYS AFTER CLOSE OF THE SECOND

CALENDAR MONTH AFTER AWARDING THE CONTRACT.

3. BLOCK 13: SHALL BE DUE 10TH DAY OF EACH MONTH AND CONTINUE

MONTHLY THROUGH LIFE OF THE CONTRACT.

4. THE CONTRACTOR SHALL STRUCTURE MONTHLY REPORTS BY DELIVERY

ORDER BUT PROVIDE THEM IN ONE CDRL SUBMISSION AT THE IDIQ LEVEL.

5. BLOCK 14: * REPRODUCIBLE SHALL BE DELIVERED THE COR IN

MICROSOFT WORD 2013. GRAPHIC PACKAGES USED TO CREATE FIGURES,

TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.

6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IS ACCEPTABLE.

9. REVISED ON 18 JULY 2013.

16. REMARKS

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SFAE-STRI-ITE-CSS

PWS Para 5.2.5.1

5. CONTRACT REFERENCE

DI-MGMT-81804A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

IUID ReportSee Block 16

2. TITLE OF THE DATA ITEM

C001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTC

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

See Block 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

30-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

29-MAR-2017

H. DATEG. PREPARED BY

Riley, Ellison

Block 2: Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

1. Block 8: Government Approval will be required prior to completion of the delivery order.

2. Block 9: Distribution Statement D - Distribution authorized to the Department of Defense and U.S. DOD contractors only. Other requests for this document shall be referred to PEO STRI.

3. Block 12: First submission shall be due 90 days prior to first delivery of equipment to site.

4. Block 10, 13: Final document shall be submitted NLT 30 days prior to delivery of equipment to site. Document shall be revised on a per-site basis and resubmitted in the same manner prior to subsequent site deliveries.

5. Block 14: All data deliveries shall be submitted via email to the Logistics Manager and PD in the approved electronic format (.xlsx)

6. The government will have 10 working days from submission for format review and acceptance or rejection of each submission.

7. The contractor shall have 5 working days to incorporate government comments and resubmit. The contractor shall submit a final version with all changes incorporated NLT 5 working days after equipment delivery.

16. REMARKS 101SFAE-STRI-ITE-CS

101 15. TOTAL

18.ESTIMATED

TOTAL PRICE

PWS 5.2.1

5. CONTRACT REFERENCE

DI-SESS-81759A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

LPD SummariesLOGISTICS PRODUCT DATA SUMMARIES

2. TITLE OF THE DATA ITEM

C002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

See Block 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

30-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

29-MAR-2017

H. DATEG. PREPARED BY

Riley, Ellison

1. Block 8: Government Approval will be required prior to completion of the delivery order.

2. Block 9:DISTRIBUTION D - DISTRIBUTION AUTHORIZED TO DEPARTMENT

OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS.OTHER REQUESTS FOR

THIS DOCUMENT SHALL BE REFERRED TO PEO STRI, ATTN: PM CON SIM,

12350 RESEARCH PARKWAY, ORLANDO FL, 32826.

3. Block 12: First submission shall be due 90 days prior to first delivery of equipment to site.

4. Block 10, 13: Document shall be revised on a per-site basis and resubmitted 90 days prior to any change in delivered hardware part numbers.

5. BLOCK 14: ** REPRODUCIBLE SHALL BE DELIVERED TO THE LOGISTICS

MANAGER AND APM, [Ellis H. Riley, ellison.h.riley2.civ@mail.mil;JIMMY DUNN,james.f.dunn30.civ@mail.mil ] VIA ELECTRONIC MAIL SENT TO THEIR

RESPECTIVE EMAIL ADDRESSES] IN MICROSOFT EXCEL 2013. GRAPHIC

PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE

COMPATIBLE WITH MICROSOFT OFFICE 2013.

6. For initial submission, the government will have 30 days from submission for review and acceptance or rejection. For subsequent submissions,the government will have 15 days from submission for review and acceptance or rejection of each submission.

7. For initial submission, the contractor shall have 15 days to incorporate government comments. For subsequent submission, the contractor shall have 5 days to incorporate government comments.

8. Please see Annex to Exhibit A (attached file) for additional guidance on fields & sectioning.

9. Use GEIA-STD-0007-B as Guidance

16. REMARKS 11W900KK-17-R-0013

101 15. TOTAL

18.ESTIMATED

TOTAL PRICE

PWS para 5.2.5.3

5. CONTRACT REFERENCE

DI-TMSS-80527C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

C003

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER TMSS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

See Block 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

30-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

29-MAR-2017

H. DATEG. PREPARED BY

Riley, Ellison

Block 2: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED

SUPPLEMENTAL DATA

1. Block 8: Government Approval will be required prior to completion of the delivery order.

2. Block 9: Distribution Statement D - Distribution authorized to the Department of Defense and U.S. DOD contractors only. Other requests for this document shall be referred to PEO STRI.

3. Block 12: First submission shall be due 90 days prior to first delivery of equipment to site.

4. Block 10, 13: Document shall be revised on a per-site basis and resubmitted 90 days prior to any change in delivered hardware part numbers.

5. Block 14: All data deliveries shall be submitted via email to the Logistics Manager and PD in Microsoft Word 2013 format (.docx)

6. For initial submission, the government will have 30 days from submission for review and acceptance or rejection. For subsequent submissions,the government will have 15 days from submission for review and acceptance or rejection of each submission.

7. For initial submission, the contractor shall have 15 days to incorporate government comments. For subsequent submission, the contractor shall have 5 days to incorporate government comments.

8. Block 4: The contractor shall use Data Item Description (DID) DI-TMSS-80527C Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data and MIL-PRF 32216A as a guide in the development of information for presentation to the Government. The COTS operator's and maintenance manuals delivered shall be written in English.

Supplemental data shall be provideed as necessary to meet the requirement s specified in MIL-PRF-32216A. MIL-PRF 32216A will be used as evaluation document for all COTS manuals.

The basic manual shall be in the contractor's format. Supplemental data shall be in the format specified in MIL- PRF- 32216A.

16. REMARKS 101SFAE-STRI-ITE-CS

101 15. TOTAL

18.ESTIMATED

TOTAL PRICE

PWS para 5.2.1

5. CONTRACT REFERENCE

DI-SESS-81758A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

LOGISTICS PRODUCT DATALOGISTICS PRODUCT DATA

2. TITLE OF THE DATA ITEM

C004

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

See Block 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

30-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

29-MAR-2017

H. DATEG. PREPARED BY

Riley, Ellison

1. Block 8: Government Approval will be required prior to completion of the delivery order.

2. Block 9: Distribution Statement D - Distribution authorized to the Department of Defense and U.S. DOD contractors only. Other requests for this document shall be referred to PEO STRI.

3. Block 12: First submission shall be due 90 days prior to first delivery of equipment to site.

4. Block 10, 13: Final document shall be submitted NLT 30 days prior to delivery of equipment to site. Document shall be revised on a per-site basis and resubmitted in the same manner prior to subsequent site deliveries.

5. Block 14: All data deliveries shall be submitted via email to the Logistics Manager and PD in the approved electronic format (.xlsx)

6. For initial submission, the government will have 30 days from submission for review and acceptance or rejection. For subsequent submissions,the government will have 15 days from submission for review and acceptance or rejection of each submission.

7. For initial submission, the contractor shall have 15 days to incorporate government comments. For subsequent submission, the contractor shall have 5 days to incorporate government comments.

8. Please see Annex to Exhibit A (attached file) for additional guidance on fields & sectioning.

9. Using GEIA-STD-0007-B as Guidance

16. REMARKS 101SFAE-STRI-ITE-CS

101 15. TOTAL

18.ESTIMATED

TOTAL PRICE

PWS Para 5.2.5.6, 5.2.7.1, 5.2.8

5. CONTRACT REFERENCE

DI-FACR-80966

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Trainer Facilities ReportTrainer Facilities Report (TFR)

2. TITLE OF THE DATA ITEM

C005

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0013

E. CONTRACT/PR NO.

BCTC-ES

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER FACRC

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

See Block 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

30-MAR-2017

J. DATE

Priebe, Timothy

I. APPROVED BY

29-MAR-2017

H. DATEG. PREPARED BY

Riley, Ellison

1. Block 8: Government Approval will be required prior to completion of the delivery order.

2. Block 9: Distribution Statement D - Distribution authorized to the Department of Defense and U.S. DOD contractors only (technical data that advance current technology or describe new technology in an area of potentially significant military application). Other requests for this document shall be referred to PEO STRI.

3. Block 12: Initial submission shall be 90 days prior to fielding to each site

4. Block 10, 13: Subsequent submissions shall be provided with each new fielding to site

5. Block 14: All data deliveries shall be submitted via email to the Government project director and logistician in the approved electronic format (.docx)

6. The government will have 30 days for review and acceptance or rejection of each submission.

7. The contractor shall have 15 days to incorporate government comments.

8.The following sections of the attached DID are not applicable:

Section 10.2.2.4.1 - Civil and Site Plan Section 10.2.2.4.2.c (2) Raised Flooring Section 10.2.2.4.3 Structural Section 10.2.2.4.4 Mechanical, parts b, c, and e Section 10.2.2.4.5 Electrical, sections b, d, e, and g Section 10.2.2.5.3 Security Section 10.2.2.7 Government Responsibilities

Section 10.2.2.6 Device Contractor Responsibilities the contractor shall not list any support criteria for facility design and/or construction. The contractor shall list any responsibilities with regard to the installation of the trainer.

16. REMARKS 101SFAE-STRI-ITE-CS

101 15. TOTAL

18.ESTIMATED

TOTAL PRICE

File details come from the government source that posted it. Updated .