Exhibits_A-C.pdf
PDF 4 MB Posted
- Attached to
- Intelligence & Electronic Warfare Tactical Proficiency Trainer (IEWTPT) Draft Solicitation Update Federal contract opportunity
- Solicitation number
- W900KK-16-R-0006
About this file
IEWTPT Exhibits A-C (Unchanged)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_11_QASP.docx | DOCX document | |
| Attachment_10_Data_Item_Form.doc | DOC document | |
| Attachment_4_Question_and_Comment_Form.docx | DOCX document | |
| Attachment_1_SOW_03FEB16.docx | DOCX document | |
| Attachment_9_Govt_WBS.docx | DOCX document | |
| W900KK-16-R-0005_Draft_Solicitation_10FEB16.doc | DOC document | |
| Attachment_6_Cost_Adequacy.xlsx | XLSX spreadsheet | |
| IEWTPT_PSC_Attendees_13JAN16.pdf | ||
| Attachment_7_Preaward_Survey_of_Accounting_System.doc | DOC document | |
| IEWTPT_Responses_10FEB16.pdf | ||
| Attachment_3_SSS_Distro_Agreement.docx | DOCX document | |
| IEWTPT_PSC_13JAN16.pdf | ||
| Attachment_12_DD254.pdf | ||
| Attachment_5_Evaluated_Price.xlsx | XLSX spreadsheet | |
| Attachment_8_Performance_Risk_Questoinnaire.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-ITTS-STS
6. REQUIRING OFFICE
3.2.3.2
5. CONTRACT REFERENCE
DI-IPSC-81433A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Software Requirements Specification (SRS)
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
09-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
2. BLOCK 9: FURTHER DISSEMINATION ONLY AS DIRECTED BY PEO STRI,
SFAE-STRI-ITTS-STS OR HIGHER DOD AUTHORITY.
3. BLOCK 12: SHALL BE DUE AS REQUIRED BY TDO.
4. BLOCK 13: REVISIONS AS REQUIRED BY TDO.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
6. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
3.2.5.1
5. CONTRACT REFERENCE
DI-IPSC-81431A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
System/Subsystem Specification (SSS)
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND US DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 01 JAN 10.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT START OR WHEN
REQUESTED BY THE GOVERNMENT.
3. BLOCK 13: REVISIONS AS NEEDED THROUGHOUT CONTRACT PERIOD OF PERFORMANCE.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.3.3
5. CONTRACT REFERENCE
DI-IPSC-81441A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Software Product Specification (SPS)
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
X TM OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 4: EXCLUDE DATA ITEM DESCRIPTION PARAGRAPHS: 5.4; 6.c
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED IN ORDER TO
SUCCESSFULLY COMPLETE THE GOVERNMENT ACCEPTANCE TEST.
3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND US DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 01 JAN 10.
4. BLOCK 12: SHALL BE DUE UPON INITIATION OF GOVERNMENT
ACCEPTANCE TEST OR WHEN REQUESTED BY THE GOVERNMENT.
5. BLOCK 13: REVISIONS SHALL INCLUDE CHANGES THROUGHOUT
GOVERNMENT ACCEPTANCE TEST. REVISIONS AS NEEDED THROUGHOUT
CONTRACT PERIOD OF PERFROMANCE.
6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
7. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.3.3
5. CONTRACT REFERENCE
DI-IPSC-81435A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Software Design Description (SDD)
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
F
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
09-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
3. BLOCK 12: SHALL BE DUE AS REQUIRED BY TDO.
4. BLOCK 13: REVISIONS AS REQUIRED BY TDO.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
6. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
7. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.7.1
5. CONTRACT REFERENCE
DI-SAFT-80102C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SAFETY ASSESSMENT REPORT
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND US DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 01 JAN 10.
2. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO TEST READINESS REVIEW
OR WHEN REQUESTED BY THE GOVERNMENT.
3. BLOCK 13: REVISIONS AS NEEDED THROUGHOUT PERIOD OF
PERFORMANCE FOR THE CONTRACT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.2
5. CONTRACT REFERENCE
DI-IPSC-81430A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Operational Concept Description (OCD)
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
F
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
2. BLOCK 9: FURTHER DISSEMINATION ONLY AS DIRECTED BY PEO STRI,
SFAE-STRI-ITTS-STS, OR HIGHER DOD AUTHORITY.
3. BLOCK 12: SHALL BE DUE AS REQUIRED BY TDO.
4. BLOCK 13: REVISIONS AS REQUIRED BY TDO.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
6. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
7. THE GOVERNMENT SHALL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE
OR REJECTION OF SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1.10.5
5. CONTRACT REFERENCE
DI-MISC-80508B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SECURITY ACCREDITATION PACKAGETechnical Report - Study/Services
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SECURITY
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
F
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
2. BLOCK 3: SUBTITLE: SECURITY ACCREDITATION PACKAGE FOR UPPER
AND LOWER ENCLAVES AND ALL SITES.
3. CERTIFICATE OF NETWORTHINESS (CoN) PACKAGE AND AUTHORITY TO OPERATE (ATO)
4. BLOCK 12: SHALL BE UPDATED FOR EVERY SOFTWARE BASELINE AND
DUE 30 DAYS AFTER PEO STRI NOTIFIES THE CONTRACTOR.
5. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT,
AND AS DIRECTED BY TDO.
6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
7. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
8. COMPLETE ACCREDITATION PACKAGES FOR ALL IEWTPT SYSTEMS.
9. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
10. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
11. FORMAT WILL BE IN ACCORDANCE WITH ALL APPLICABLE DOD, ARMY,
AND DIRECTOR OF INTELLIGENCE DIRECTIVES.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.1
5. CONTRACT REFERENCE
DI-IPSC-81432A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
System/Subsystem Design Description (SSDD)
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 9: FURTHER DISSEMINATION ONLY AS DIRECTED BY PEO STRI,
SFAE-STRI-ITTS-STS, OR HIGHER DOD AUTHORITY.
2. BLOCK 12/13: SHALL BE DUE QUARTERLY, NO LATER THAN 15 DAYS
FOLLOWING THE CONTRACTOR'S ACCOUNTING PERIOD CUTOFF DATE
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
4. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT CONTRACTOR FACILITY.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
8. THE SSDD WILL ALSO INCORPORATE THE IDD.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.3.3
5. CONTRACT REFERENCE
DI-IPSC-81442A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Version Description DocumentSoftware Version Description (SVD)
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND US DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 01 JAN 10. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI, SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS PRIOR TO COMPLETION OF EVERY
SOFTWARE RELEASE TO THE FIELDING SITES. OR WHEN REQUESTED BY THE GOVERNMENT.
3. BLOCK 13: REVISIONS AS NEEDED THROUGHOUT CONTRACT PERIOD OF PERFORMANCE.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
5. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. THE CONTRACTOR SHALL PROVIDE DATA MANAGEMENT PRODUCTS
ASSOCIATED WITH FIELDING
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.3.3
5. CONTRACT REFERENCE
DI-IPSC-81436A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Interface Design Description (IDD)
2. TITLE OF THE DATA ITEM
A00A
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
F
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
2. BLOCK 9: FURTHER DISSEMINATION ONLY AS DIRECTED BY PEO STRI,
SFAE-STRI-ITTS-STS, OR HIGHER DOD AUTHORITY.
3. BLOCK 12: SHALL BE DUE AS REQUIRED BY TDO.
4. BLOCK 13: REVISIONS AS REQUIRED BY TDO.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
6. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
7. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.2.3.3
5. CONTRACT REFERENCE
DI-MCCR-80700
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Source Code, Software and Associated DocumComputer Software Product End Items
2. TITLE OF THE DATA ITEM
A00B
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MCCR
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 12: SOURCE CODE, MODIFIED SOFTWARE, AND EXECUTIBLE FILES
SHALL BE DUE WITHIN 30 DAYS AFTER THE COMPLETION OF GAT. FINAL
SUBMISSION SHALL BE DUE 60 DAYS PRIOR TO CONTRACT END OR WHEN
REQUESTED BY THE GOVERNMENT.
2. BLOCK 13: REVISIONS AS NEEDED FOR EACH SOFTWARE VERSION
THROUGHOUT THE PERIOD OF PERFORMANCE OF THE CONTRACT.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
4. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1.9
5. CONTRACT REFERENCE
DI-MGMT-81808
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contractors Risk Management Plan
2. TITLE OF THE DATA ITEM
B001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. Block 4: Contractor format is acceptable. Information will be presented as part of the Program Management Review (PMR).
2. Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to US Government Agencies and their contractors due to critical technology as of December 2011. Other request for this document shall be referred to the controlling DOD office.
3. Block 12: The deliverable shall be due as part of the First PMR.
4. Block 13: As requested by Program Director.
5. Block 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. The Government will have 15 business days to review the deliverable. The Contractor shall have 5 business days to incorporate Government comments.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1.4
5. CONTRACT REFERENCE
DI-MGMT-81861A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Earned Value ReportIntegrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
B002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
B
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES
ONLY; PROPRIETARY INFORMATION, EFFECTIVE 01 JAN 10. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI,
SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
3. BLOCK 13: SHALL BE DUE ON THE 15TH DAY OF EACH MONTH AFTER
FIRST SUBMISSION AND CONTINUE AS NEEDED THROUGHOUT CONTRACT
PERIOD OF PERFORMANCE.
4. BLOCK 12/13: SUBMISSION SHALL BE DELIVERED CONCURRENTLY WITH
THE INTEGRATED MASTER SCHEDULE AND CONTRACTOR'S PROGRESS,
STATUS AND MANAGEMENT REPORT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
B003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
B
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
09-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES
ONLY; PROPRIETARY INFORMATION, EFFECTIVE 01 JAN 10. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI,
SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
3. BLOCK 13: SHALL BE DUE ON THE 15TH DAY OF EACH MONTH AFTER
FIRST SUBMISSION AND CONTINUE AS NEEDED THROUGHOUT CONTRACT
PERIOD OF PERFORMANCE.
4. BLOCK 12/13: SUBMISSION SHALL BE DELIVERED CONCURRENTLY WITH
THE INTEGRATED MASTER SCHEDULE AND CONTRACTOR PERFORMANCE REPORT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1.3
5. CONTRACT REFERENCE
DI-MGMT-81468
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Funds Status Report (CFSR)
2. TITLE OF THE DATA ITEM
B004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
B
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES
ONLY; PROPRIETARY INFORMATION, EFFECTIVE 01 JAN 10. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI,
SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
3. BLOCK 13: SHALL BE DUE ON THE LAST DAY OF EACH MONTH AFTER
FIRST SUBMISSION AND CONTINUE AS NEEDED THROUGHOUT CONTRACT
PERIOD OF PERFORMANCE.
4. BLOCK 12/13: SHALL BE SUBMITTED CONCURRENTLY WITH CONTRACT
INVOICING AND PAYMENT REPORT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1.2
5. CONTRACT REFERENCE
DI-MGMT-81650
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Integrated Master Plan (IMP)Integrated Master Schedule (IMS)
2. TITLE OF THE DATA ITEM
B005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
F
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK A: AS DIRECTED BY TECHNICAL DIRECTION ORDER (TDO).
2. BLOCK 8: THE GOVERNMENT SHALL REVIEW THE PRELIMINARY
(BASELINE) SCHEDULE DIAGRAM AND ACCEPT OR REJECT SUBMISSION
WITHIN 15 DAYS OF RECEIPT. IF THE GOVERNMENT REJECTS THE
SUBMISSION, PROGRESS ON THE PROGRAM SHALL CONTINUE WHILE MAKING
THE NECESSARY REVISIONS. FOLLOWING GOVERNMENT APPROVAL OF THE
PRELIMINARY DRAFT, ONLY REBASELINED SCHEDULE SUBMISSIONS WILL
BE SUBJECT TO GOVERNMENT APPROVAL. SUBMITTALS WILL BE
EVALUATED FOR APPROVAL ON THE BASIS OF TECHNICAL CONTENT AND FORMAT.
3. BLOCK 9: FURTHER DISSEMINATION ONLY AS DIRECTED BY PEO STRI,
SFAE-STRI-ITTS-STS, OR HIGHER DOD AUTHORITY.
4. BLOCK 12: SHALL BE DUE 15 WORKING DAYS FOLLOWING THE
CONTRACTOR'S ACCOUNTING PERIOD CUTOFF DATE.
5. BLOCK 13: SHALL CONTINUE MONTHLY THROUGH LIFE OF THE
CONTRACT. REVISIONS ARE DUE 15 DAYS AFTER RECEIPT OF REJECTION
NOTIFICATION FROM THE GOVERNMENT.
6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC
FORMAT VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON
THE CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2010.
7. ANY CLASSIFIED DATA/DOCUMENTS SHALL BE TREATED AS AN ANNEX TO
THE CDRL ITEM. CLASSIFIED ANNEXES SHALL BE STORED AT
CONTRACTOR FACILITY AND/OR DELIVERED PER TDO AND/OR DELIVERY
REQUIREMENTS AS REQUIRED.
8. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
9. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
10. CONTRACTOR FORMAT IS ACCEPTABLE AS OUTLINED IN DI-MGMT-81650.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.1
5. CONTRACT REFERENCE
DI-MGMT-81334D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Work Breakdown Structure
2. TITLE OF THE DATA ITEM
B006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H. DATEG. PREPARED BY
Lozito, Frank
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND US DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 01 JAN 10. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI, SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE AT POST AWARD CONFERENCE. OR WHEN
REQUESTED BY THE GOVERNMENT.
3. BLOCK 13: SHALL BE DUE AS NEEDED THROUGHOUT CONTRACT PERIOD OF
PERFORMANCE.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
6. REQUIRING OFFICE5. CONTRACT REFERENCE
DI-MGMT-81740A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
B007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: Software Resources Data Reporting: Final Developer Report and Data Dictionary
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES
ONLY; PROPRIETARY INFORMATION, EFFECTIVE 01 JAN 10. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI,
SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
3. BLOCK 13: SHALL BE DUE ON THE 15TH DAY OF EACH MONTH AFTER
FIRST SUBMISSION AND CONTINUE AS NEEDED THROUGHOUT CONTRACT
PERIOD OF PERFORMANCE.
4. BLOCK 12/13: SUBMISSION SHALL BE DELIVERED CONCURRENTLY WITH
THE INTEGRATED MASTER SCHEDULE AND CONTRACTOR PERFORMANCE REPORT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SFAE-STRI-PMITTS
DI-MGMT-81739B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
B008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: Software Resources Data Reporting: Initial Developer Report and Data Dictionary
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES
ONLY; PROPRIETARY INFORMATION, EFFECTIVE 01 JAN 10. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO US ARMY PEO STRI,
SFAE-STRI-ITTS-STS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
3. BLOCK 13: SHALL BE DUE ON THE 15TH DAY OF EACH MONTH AFTER
FIRST SUBMISSION AND CONTINUE AS NEEDED THROUGHOUT CONTRACT
PERIOD OF PERFORMANCE.
4. BLOCK 12/13: SUBMISSION SHALL BE DELIVERED CONCURRENTLY WITH
THE INTEGRATED MASTER SCHEDULE AND CONTRACTOR PERFORMANCE REPORT.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED IN ELECTRONIC FORMAT
VIA ELECTRONIC MAIL SOFTWARE TO THE RECIPIENTS LISTED ON THE
CDRL DISTRIBUTION MATRIX AND SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2010.
6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
3.5
5. CONTRACT REFERENCE
DI-FACR-80966
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Trainer Facilities Report (TFR)
2. TITLE OF THE DATA ITEM
C001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-16-R-0005
E. CONTRACT/PR NO.
IEWTPT Recompete
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER FACR
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
04-MAR-2015
H.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .