Attachment_7_Preaward_Survey_of_Accounting_System.doc

DOC document 97 KB Posted

Attached to
Intelligence & Electronic Warfare Tactical Proficiency Trainer (IEWTPT) Draft Solicitation Update
Solicitation number
W900KK-16-R-0006
Issued by

About this file

IEWTPT Preaward Survey of Prospective Contractor Accounting System (Unchanged)

View the file

Other files

File Type Posted
Attachment_5_Evaluated_Price.xlsx XLSX spreadsheet
Attachment_8_Performance_Risk_Questoinnaire.doc DOC document
Exhibits_A-C.pdf PDF
IEWTPT_Responses_10FEB16.pdf PDF
W900KK-16-R-0005_Draft_Solicitation_10FEB16.doc DOC document
Attachment_3_SSS_Distro_Agreement.docx DOCX document
Attachment_6_Cost_Adequacy.xlsx XLSX spreadsheet
IEWTPT_PSC_13JAN16.pdf PDF
IEWTPT_PSC_Attendees_13JAN16.pdf PDF
Attachment_12_DD254.pdf PDF
Attachment_9_Govt_WBS.docx DOCX document
Attachment_11_QASP.docx DOCX document
Attachment_4_Question_and_Comment_Form.docx DOCX document
Attachment_1_SOW_03FEB16.docx DOCX document
Attachment_10_Data_Item_Form.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7: Preaward Survey of Prospective Contractor Accounting System Checklist, Intelligence and Electronic Warfare Tactical Proficiency Trainer –

W900KK-16-R-0005

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item.

Name of Offeror:

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) Do you currently have existing contracts with the U.S. Government?

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is “N/A”, please provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

File details come from the government source that posted it. Updated .