IEWTPT Government WBS (Unchanged)

View the file

Other files for this federal contract opportunity

Other files attached to Intelligence & Electronic Warfare Tactical Proficiency Trainer (IEWTPT) Draft Solicitation Update, newest first.
File Type Posted
Attachment_11_QASP.docx DOCX document
Attachment_10_Data_Item_Form.doc DOC document
Attachment_4_Question_and_Comment_Form.docx DOCX document
Attachment_1_SOW_03FEB16.docx DOCX document
Attachment_7_Preaward_Survey_of_Accounting_System.doc DOC document
IEWTPT_Responses_10FEB16.pdf PDF
Exhibits_A-C.pdf PDF
Attachment_3_SSS_Distro_Agreement.docx DOCX document
IEWTPT_PSC_13JAN16.pdf PDF
Attachment_12_DD254.pdf PDF
Attachment_5_Evaluated_Price.xlsx XLSX spreadsheet
Attachment_8_Performance_Risk_Questoinnaire.doc DOC document
W900KK-16-R-0005_Draft_Solicitation_10FEB16.doc DOC document
Attachment_6_Cost_Adequacy.xlsx XLSX spreadsheet
IEWTPT_PSC_Attendees_13JAN16.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS

Element
Definition
1
IEWTPT
1.1
Program Management
Consist of the business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives. These activities include Financial Management; Subcontractor Management; Risk Management; and Configuration Management.
1.1.1
Financial Management
Consist of all efforts required to establish and maintain a cost control system designed to monitor cost and schedule performance, direct budget allocations, provide for resource management and measure progress of individual tasks. This effort includes Earned Value Management (EVM), cost collection and reporting as well as support of any Government cost audits.
1.1.2
Subcontractor Management
Consist of all activities associated with the award and management of related subcontracts.
1.1.3
Risk Management
Consist of all efforts required to identify, analyze, assess, mitigate, monitor, control, prioritize and coordinate the minimization or elimination of risk driven, negative impacts to program execution or to maximize the realization of opportunities.
1.1.4
Configuration Management
Consist of all activities associated with the establishment, monitoring and administration of change control procedures for established baselines, including collection, processing, distribution, and tracking of modification request forms, establishment and administration of change control boards, and formal audits to compare product to documentation. The effort includes Configuration Management of hardware, software, facilities, data, interfaces, tools, and documentation.
1.2
Systems Engineering
Consist of all activities associated with requirements definition, system development, and test and evaluation conducted to transform an operational need or specification into a set of implemented system requirements that demonstrate that the developed system will meet specifications.
1.2.1
System Design
Consist of all activities associated with the process of defining the elements of a system such as the architecture, modules and components, and the different interfaces of those components to satisfy specified needs and requirements.
1.2.2
Software (SW) Engineering
Consist of all activities associated with defining software requirements and developing the system software and firmware following disciplined, enforceable, and auditable standards and internally documented organizational software development practices.
1.2.3
Hardware (HW) Engineering
Consist of all activities associated with defining software requirements and developing the system software and firmware following disciplined, enforceable, and auditable standards and internally documented organizational software development practices.
1.2.4
Cybersecurity
Consist of all efforts associated with defining and implementing cybersecurity compliance measures in all phases of system development, deployment, and maintenance activities. Cybersecurity is considered a requirement for all system components of IEWTPT and include all activities required for system Certification & Accreditation (C&A).
1.3
Logistics
Consist of all efforts associated with conducting engineering analyses to establish quantitative and qualitative supportability design guidelines, conduct trade studies, evaluate design and support alternatives, and defining system supportability design features consistent with optimizing system readiness and availability.
1.3.1
Training Products
Consist of all efforts associated with designing, developing, and delivering training support packages.
1.3.2
Technical Support
Consist of all efforts associated with providing on-site technical support to assist on-site support contractor personnel with site dependent, one-of-a-kind issues and/ or tailored needs in the operation of IEWTPT during training exercise events.
1.4
Integration & Test
Consist of all efforts associated with system integration and testing activities.
1.4.1
Integration Events
Consist of all efforts associated with supporting participation in Integration Events for testing specific system enhancements, or integration of system capabilities within existing federations (e.g. LVC-IA, JLCCTC, etc.) and/or point-to-point with complementary systems (e.g. DCGS-A).
1.4.2
Fieldings
Consist of all efforts associated with conducting site surveys, safety analysis, and providing equipment and ancillary equipment required to connect to on-site facilities, interfacing systems, networks, and power.