RFPExhibitsA-C_CDRLs_050913.pdf

PDF 467 KB Posted

Attached to
Engagement Skills Trainer II (EST II)
Solicitation number
W900KK13R0007
Issued by

About this file

RFPExhibitsA-C_CDRLs_050913

View the file

Other files

File Type Posted
RFPAttach14_QAs_060713_EST_II.xlsx XLSX spreadsheet
RFP_(Conformed_Copy-Amend1)_EST_II_060713.doc DOC document
RFPAttach2B_Ballistic_Data_Collection_052113.xlsx XLSX spreadsheet
RFPAttach11_PricingSpreadsheet_052413.xlsx XLSX spreadsheet
RFP_Amend_0001_EST_II_060713.doc DOC document
RFPAttach2A_ESTII_Demo_Plan_052313.pdf PDF
RFPAttach12_CurrentFieldedLocations_060313.xlsx XLSX spreadsheet
RFPAttach10A_DO1_ESTII_Edited_053113.docx DOCX document
RFPExhibitsA-C_CDRLs_Exhibit-C-Annex_TechPubs_MIL-STD-40051-2.doc DOC document
RFPAttach4A_GFEtoAwardee_050813.pdf PDF
RFPAttach9_PerfRiskContractMatrix_050813.xls XLS spreadsheet
RFPAttach10B_DO1_CDRLs_050913.pdf PDF
RFP_EST_II_051013.doc DOC document
RFPAttach6_RFP-Comment-Form_050813.doc DOC document
RFPAttach4B_GFI-Partial-ARDEC-BallisticsTableM16A4_050813.pdf PDF
RFPExhibitsA-C_CDRLs_Exhibit-A-Annex_LogProdData.docx DOCX document
RFPAttach7_Cross_Reference_Matrix_050813.docx DOCX document
RFPEditsSummarySince041513.docx DOCX document
RFPAttach2A_DemoPlan_050913.pdf PDF
RFPExhibitsA-C_CDRLs_Exhibit-B-Annex_ProdDwgAssocLists.doc DOC document
RFPAttach8_PerfRiskAssessmentSurvey_050813.doc DOC document
RFPAttach10A_DO1_ESTII_Edited_050913.docx DOCX document
RFPAttach3_iWatchArmyBrochure_050813.pdf PDF
RFPAttach5_GFI-Dist-Agreement_050813.doc DOC document
RFPAttach1_SRD_050813.pdf PDF
RFPAttach11_PricingSpreadsheet_050813.xlsx XLSX spreadsheet
RFPAttach2B_BallisticDataCollection_050813.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

W900KK-13-R-0007

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Work Breakdown Structure

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81334D

5. CONTRACT REFERENCE

PWS Paragraph 3.1.1

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SHALL BE DUE 30 WORKING DAYS AFTER CONTRACT AWARD FOR THE

SYSTEMS.

4. BLOCK 13: SHALL BE DUE 30 WORKING DAYS AFTER EXERCISING AN APPLICABLE

CONTRACT DELIVERY ORDER.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-PMCATT-GC 0 1 1

SFAE-STRI-KOV 0 1 1

15. TOTAL 0 2 2

G. PREPARED BY

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

17. PRICE

GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A003

2. TITLE OF DATA ITEM

Integrated Program Management Report (IPMR)

DI-MGMT-81861

5. CONTRACT REFERENCE

PWS Paragraph 3.1.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

MNTHLY

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SHALL BE DUE 30 WORKING DAYS AFTER CONTRACT AWARD FOR THE

OPERATIONAL SYSTEMS. BASELINE UPDATES SHALL BE DUE 30 WORKING DAYS AFTER

EXERCISING APPLICABLE CONTRACT DELIVERY ORDERS.

4. FORMAT 1-4 ARE NOT REQUIRED; FORMAT 5, PARAGRAPH 3.6.7, FORMAT 6, PARAGRAPH

3.7 ARE REQUIRED; FORMAT 6, SHALL USE MICROSOFT PROJECT AND SHALL INCLUDE ALL

SUBCONTRACTOR SCHEDULES SUMMARIZED IN THE MAIN REPORT.

5. BLOCK 13: STATUS UPDATES SHALL BE DUE MONTHLY THROUGH THE LIFE OF THE

CONTRACT.

6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A005

2. TITLE OF DATA ITEM

Contract Invoicing and Payment Report

DI-MGMT-81651

5. CONTRACT REFERENCE

PWS Paragraph 3.1.4

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

QRTLY

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 90 WORKING DAYS AFTER CONTRACT

AWARD

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL CONTINUE QUARTERLY THROUGH THE

COMPLETION OF THE CONTRACT.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. CONTRACTOR FORMAT IS ACCEPTABLE.

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER CMAN

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A007

2. TITLE OF DATA ITEM

Request for Deviation (RFD)

DI-CMAN-80640C

5. CONTRACT REFERENCE

PWS Paragraph 3.1.5.6

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 20 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE AS REQUIRED.

4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC AND SFAE-STRI-PS-E-V VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE

SFAE-STRI-PMCATT-GC 0 1 0

SFAE-STRI-PS-E-V 0 1 0

SFAE-STRI-KOV 0 0 1

15. TOTAL 0 2 1

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00A

2. TITLE OF DATA ITEM

Contract Summary Report

DI-ADMN-80447A

5. CONTRACT REFERENCE

PWS Paragraph 3.1.9

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SHALL BE DUE 1 YEAR PRIOR TO CONTRACT END PERIOD OF PERFORMANCE.

4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 1 0

SFAE-STRI-KOV 0 1 0

15. TOTAL 0 2 0

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER IPSC

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00D

2. TITLE OF DATA ITEM

Interface Design Description (IDD)

DI-IPSC-81436A

5. CONTRACT REFERENCE

PWS Paragraph 3.2.1.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 30 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 20

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 90 WORKING DAYS AFTER CDR.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE 30 WORKING DAYS AFTER SYSTEM

VERIFICATION TEST AND BASELINE UPDATES SHALL BE DUE 90 WORKING DAYS AFTER

EXERCISING APPLICABLE DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 1 1

SFAE-STRI-PS-E-V 0 0 1

15. TOTAL 0 2 3

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER IPSC

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00E

2. TITLE OF DATA ITEM

Software Design Description (SDD)

DI-IPSC-81435A

5. CONTRACT REFERENCE

PWS Paragraph 3.2.3.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 30 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 20

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 14 WORKING DAYS PRIOR TO PDR.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALLBE DUE 30 WORKING DAYS AFTER CDR AND

AFTER COMPLETION OF THE CONTRACT. BASELINE UPDATES SHALL BE DUE 90 WORKING

DAYS AFTER EXERCISING OF APPLICABLE DELIVERY ORDER.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 1 1

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER IPSC

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00F

2. TITLE OF DATA ITEM

Database Design Description (DBDD)

DI-IPSC-81437A

5. CONTRACT REFERENCE

PWS Paragraph 3.2.3.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SHALL BE DUE 14 WORKING DAYS PRIOR TO PDR.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE 30 WORKING DAYS AFTER CDR AND

AFTER BASELINE UPDATES SHALL BE DUE 90 WORKING DAYS AFTER EXERCISING

APPLICABLE DELIVERY ORDER.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 1 0

SFAE-STRI-KOV 0 1 0

15. TOTAL 0 3 0

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER IPSC

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00G

2. TITLE OF DATA ITEM

Software Version Description (SVD)

DI-IPSC-81442A

5. CONTRACT REFERENCE

PWS Paragraph 3.2.3.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 20 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 14 WORKING DAYS PRIOR TO CDR. SVD

AND SPS SHALL BE DELIVERED TOGETHER AT INTIAL AND SUBSEQUENT SUBMISSIONS.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS REQUIRED THROUGH THE

COMPLETION OF THE CONTRACT AND BASELINE UPDATES SHALL BE DUE 90 WORKING DAYS

AFTER EXERCISING APPLICABLE DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 1 1

Gary Stevenson

H. DATE

29-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER SAFT

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00H

2. TITLE OF DATA ITEM

Safety Assessment Report (SAR)

DI-SAFT-80102B

5. CONTRACT REFERENCE

PWS Paragraph 3.2.5.1.1

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 7

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 WORKING DAYS AFTER THE INITIAL

TECHNICAL INTERCHANGE MEETING.

4. BLOCK 13: SUBMISSION SHALL BE DUE 5 WORKING DAYS AFTER TEST READINESS REVIEW

AND BASELINE UPDATES SHALL BE DUE AFTER EXERCISING APPLICABLE DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-KOV 0 0 1

SFAE-STRI-PS-E-V 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER NDTI

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00I

2. TITLE OF DATA ITEM

Test Procedure

3. SUBTITLE

Functional

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

PWS Paragraph 3.4

6. REQUIRING OFFICE

SFAE-STRI-PS-E-V

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 5

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SUBMISSION SHALL BE DUE 10 WORKING DAYS PRIOR TO THE TEST READINESS

REVIEW FOR THE GIVEN TEST EVENT.

4. BLOCK 13: SUBSEQUENT TEST PROCEDURES SUBMISSIONS SHALL BE DUE AS REQUIRED

FOR THE VERIFICATION OF TEST DISCREPANCIES CLOSURE.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007.

6. CONTRACTOR FORMAT IS ACCEPTABLE.

NOTE: CDRL/DID APPLIES TO ALL TEST SUB-PARAGRAPHS.

SFAE-STRI-KOV 0 0 1

SFAE-STRI-PMCATT-GC 0 0 1

SFAE0STRI-PS-E-V 0 0 1

15. TOTAL 0 0 3

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER MISC

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00J

2. TITLE OF DATA ITEM

Test Problem Report

DI-MISC-81622

5. CONTRACT REFERENCE

PWS Paragraph 3.4.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft Reg Repro

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 7

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 10 WORKING DAYS AFTER THE GIVEN TEST

EVENT.

4. BLOCK 13: SUBSEQUENT REPORT SUBMISSIONS SHALL BE DUE AS REQUIRED FOR THE

VERIFICATION OF TEST DISCREPANCIES CLOSURE.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-PMCATT-GC 0 0 1

15. TOTAL 0 1 3

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00L

2. TITLE OF DATA ITEM

Unique Identification (IUID) Marking and Verification Report

3. SUBTITLE

Item Unique Identification (IUID)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81858

5. CONTRACT REFERENCE

PWS Paragraph 3.5.5

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 7

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE AS REQUIRED THROUGH THE COMPLETION

OF THE CONTRACT

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS REQUIRED THROUGH THE

COMPLETION OF THE CONTRACT.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-PMCATT-GC 0 0 1

SFAE-STRI-PS-Q 0 0 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER FACR

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

A00M

2. TITLE OF DATA ITEM

Trainer Facilities Report (TFR)

DI-FACR-80966

5. CONTRACT REFERENCE

PWS Paragraph 3.7.1

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

A

10. FREQUENCY

2TIME/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

1. BLOCK 8: THE GOVERNMENT WILL HAVE 14 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: SUBMISSION SHALL BE DUE 14 WORKING DAYS AFTER TO SITE SURVEY.

4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

5. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-PS-E-V 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

B

C. CATEGORY

TDP X TM OTHER

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

B004

2. TITLE OF DATA ITEM

Software Product Specification (SPS)

DI-IPSC-81441A

5. CONTRACT REFERENCE

PWS Paragraph 3.2.3.2

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

b.COPIES

a. ADDRESSEE

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 30 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 20

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 14 WORKING DAYS PRIOR TO CDR. SPS AND

SVD SHALL BE DELIVERED TOGETHER AT INITIAL AND SUBSEQUENT SUBMISSIONS. SOURCE

FILES SHALL BE DUE 10 WORKING DAYS PRIOR TO THE COLD START TEST EVENT.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS AS REQUIRED THROUGH THE COMPLETION OF THE

CONTRACT AND BASELINE UPDATES SHALL BE DUE 90 WORKING DAYS AFTER EXERCISING

APPLICABLE DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PMCATT-GC 0 0 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP X TM OTHER

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

B005

2. TITLE OF DATA ITEM

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED

DI-SESS-81003D

5. CONTRACT REFERENCE

PWS Paragraph 3.2.7

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 30 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 20

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: DRAFT SUBMISSION DUE 10 WOKRING DAYS PRIOR TO PDR, SUBMISSION SHALL

BE DUE 10 WORKING DAYS PRIOR TO CDR.

4. BLOCK 13: REVISIONS SHALL BE DUE 90 WORKING DAYS AFTER EXERCISING APPLICABLE

DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

SFAE-STRI-PS-Q 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP X TM OTHER

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

B006

2. TITLE OF DATA ITEM

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

DI-SESS-81000D

5. CONTRACT REFERENCE

PWS Paragraph 3.2.7

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 8: THE GOVERNMENT WILL HAVE 30 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR ADMINISTRATIVE OR

OPERATIONAL USE, EFFECTIVE 19 JUNE 12. OTHER REQUESTS SHALL BE REFERRED TO U.S.

ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

3. BLOCK 12: DRAFT SUBMISSION SHALL BE DUE 10 WORKING DAYS PRIOR TO CDR.

4. BLOCK 13: REVISIONS AS REQUIRED BASED ON APPROVED CHANGES OR REVISIONS SHALL

BE DUE 90 WORKING DAYS AFTER EXERCISING APPLICABLE DELIVERY ORDERS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

6. FORMAT SHALL BE IAW ANNEX TO EXHIBIT B, TDP OPTION SELECTION WORKSHEET,

PRODUCT DRAWINGS AND ASSOCIATED LISTS. TAILORING WILL BE APPROVED DURING PDR

AND PDD. DELIVERABLES VIA CD-ROM IAW BLOCK 14.

SFAE-STRI-PS-E-V 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C

C. CATEGORY

TDP TM OTHER ALSS

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

C001

2. TITLE OF DATA ITEM

Logistics Management Information Data Product(s)

DI-ALSS-81529

5. CONTRACT REFERENCE

PWS Paragraph 3.5.3

6. REQUIRING OFFICE

SFAE-STRI-PMCATT-GC

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 4: DATA PRODUCTS ARE REQUIRED FOR DEVELOPMENT OF MAINTENANCE PLANS,

PROCEDURES, AND MANUALS. THE CONTRACTOR SHALL PREPARE SUPPORTABILITY

SUMMARIES USING THE DATA DICTIONARY AND DATA PRODUCTS OUTLINED IN MIL-PRF-

49506 AND THE TAILORED WORKSHEETS FOR DATA PRODUCTS PROVIDED AS AN ANNEX TO

THIS CDRL. (ANNEX TO EXHIBIT A)

2. BLOCK 8: BLOCK 8: THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10

WORKING DAYS TO INCORPORATE GOVERNMENT COMMENTS.

3. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

4. BLOCK 12: INITIAL SUBMISSION SHALL BE 120 WORKING DAYS AFTER CONTRACT AWARD

OR EXERCISE OF ANY APPLICABLE OPTIONS . LMI DATA PRODUCTS ARE REQUIRED TO

DEVELOP THE LMI SUPPORTABILITY SUMMARIES. DATA PRODUCT INFORMATION SHALL BE

DELIVERED AS REQUIRED OR REQUESTED BY THE GOVERNMENT FOR EVALUATION AT ALL

PROGRAM REVIEWS AND ANY SUPPORTABILITY IPT WHEN REQUESTED.

5. BLOCK 13: LMI DATA PRODUCTS AND THE ASSOCIATED SUPPORTABILITY SUMMARIES

SHALL BE UPDATED AS REQUIRED FOR THE DURATION OF THE CONTRACT. FINAL

SUBMISSION SHALL BE 45 WORKING DAYS BEFORE TRANSITION TO THIRD PARTY SUPPORT

BEGINS.

6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND S

SFAE-STRI-PMCATT-GC 0 0 1

SFAE-STRI-PS-Q 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY

TDP TM OTHER ALSS

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

16. REMARKS (Continued)

FAE-STRI-PMCATT-GC VIA CD-ROM COMPATIBLE WITH MICROSOFT OFFICE 2007

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM OTHER ALSS

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

C002

2. TITLE OF DATA ITEM

Logistics Management Information (LMI) Summaries

DI-ALSS-81530

5. CONTRACT REFERENCE

PWS Paragraph 3.5.3

6. REQUIRING OFFICE

SFAE-STRI-PS-Q

7. DD 250 REQ

DD

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

D b.COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 4: DATA PRODUCTS ARE REQUIRED FOR DEVELOPMENT OF MAINTENANCE PLANS,

PROCEDURES, AND MANUALS. THE CONTRACTOR SHALL PREPARE SUPPORTABILITY

SUMMARIES USING THE DATA DICTIONARY AND DATA PRODUCTS OUTLINED IN MIL-PRF-

49506 AND THE TAILORED WORKSHEETS FOR DATA PRODUCTS PROVIDED AS AN ANNEX TO

THIS CDRL. (ANNEX TO EXHIBIT A) AS A MINIMUM, THE FOLLOWING SUMMARIES ARE

REQUIRED.

A. SUPPLY SUPPORT

B. POST PRODUCTION SUPPORT

2. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS

3. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR PROVIDING EST II

ADMINISTRATIVE OR OPERATIONAL USE SUPPORT, EFFECTIVE 19 JUNE 12. OTHER REQUESTS

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-PMCATT-GC.

4. BLOCK 12: SHALL BE DUE 120 WORKING DAYS AFTER CONTRACT AWARD OR EXERCISE OF

ANY APPLICABLE OPTIONS. LMI SUPPORTABILITY SUMMARIES SHALL BE DELIVERED AS

REQUIRED OR REQUESTED BY THE GOVERNMENT FOR EVALUATION AT ALL PROGRAM

REVIEWS AND ANY SUPPORTABILITY IPT WHEN REQUESTED.

5. BLOCK 13: SUPPORTABILITY SUMMARIES SHALL BE UPDATED AS REQUIRED FOR THE

DURATION OF THE CONTRACT. FINAL SUBMISSION SHALL BE 45 WORKING DAYS BEFORE

TRANSITION TO THIRD PARTY SUPPORT BEGINS.

6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED TO SFAE-STRI-KOV AND SFAE-STRI-

PMCATT-GC VIA CD-ROM COMPATIBLE WITH

SFAE-STRI-KOV 0 0 1

SFAE-STRI-PS-Q 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY

TDP TM OTHER ALSS

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

16. REMARKS (Continued)

MICROSOFT OFFICE 2007

7. CONTRACTOR FORMAT IS ACCEPTABLE.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate(07040188).

Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

C. CATEGORY

TDP TM X OTHER TMSS

D. SYSTEM/ITEM

Engagement Skills Trainer II

E. CONTRACT/PR NO.

C005

2. TITLE OF DATA ITEM

COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-TMSS-80527C PWS Paragraph 3.5.4.3 SFAE-STRI-PS-Q

7. DD 250 REQ

LT

9. DIST

STATEMENT

REQUIRED

A

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

SEE BLK 16 14. DISTRIBUTION

a. ADDRESSEE b.COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. BLOCK 9: DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION

IS UNLIMITED.

2. BLOCK 12: ONE SET OF COTS MANUALS SHALL BE OVER-PACKED WITH EACH TRAINER.

SFAE-STRI-PS-Q 0 1 1

Gary Stevenson

H. DATE

30-APR-2013

I. APPROVED BY

Alberto Garcia

J. DATE

08-MAY-

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .