W58RGZ-19-R-0198.pdf

PDF 199 KB Posted

Attached to
Solicitation for Main Rotor Blade Federal contract opportunity
Solicitation number
W58RGZ-19-R-0198
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This solicitation requests proposals for the overhaul of main rotor blades. The contractor shall provide all labor, facilities, parts, materials, equipment, tools and data to overhaul main rotor blades with input NSNs 1615-01-074-5150 and 1615-01-106-1903 and output NSN 1615-01-106-1903. The estimated quantity range is 500 to 3,964 units over five years. The contract will be a firm fixed price indefinite delivery indefinite quantity contract. Required delivery is FOB origin. Approved sources for this critical safety item are limited to Sikorsky Aircraft Corporation, International Aviation Composites, and Israel Aerospace Industries - Bedek Accessories. Proposals are due on May 6, 2019.

Solicitation W58RGZ-19-R-0198

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation for Main Rotor Blade, newest first.
File Type Posted
Amendment 0006 - Solicitation W58RGZ-19-R-0198.pdf PDF
Amendment 0005 - Solicitation W58RGZ-19-R-0198.pdf PDF
W58RGZ19R0198-0004.pdf PDF
Second_Questions_and_Answers_-_Solicitation_W58RGZ-19-R-0198.pdf PDF
W58RGZ-19-R-0198,_Amendment_0003.pdf PDF
Questions_and_Answers_-_Solicitation_W58RGZ-19-R-0198.pdf PDF
W58RGZ-19-R-0198_Amendment_0002.pdf PDF
Attachment_0002_-_Document_Summary_List.pdf PDF
Attachment_0008_-_DD_Form_1348-1A_Sample.pdf PDF
Exhibit_E_-_CDRL_A005_-_CDM_Report.pdf PDF
Exhibit_D_-_CDRL_A004_-_Technical_Report_-_DD_1348-1A.PDF PDF
Attachment_0005_-_Template_for_Depot_MR.XLSX XLSX spreadsheet
Attachment_0001_-_MO_Packaging_Requirements.pdf PDF
Attachment_0011_-_TDPL.PDF PDF
Exhibit_B_-_CDRL_A002_-_Report_of_Item_and_Packaging_Discrepancy.pdf PDF
Attachment_0007_-_Form_1379.pdf PDF
Attachment_0004_-_ROD_Guidance.docx DOCX document
Exhibit_F_-_CDRL_A006_-_Quality_Deficiency_Report.pdf PDF
Attachment_0003_-_SF_364.pdf PDF
Exhibit_C_-_CDRL_A003_-_Technical_Report_-_Frozen_Plan.pdf PDF
Attachment_0006_-_Frozen_M&O_Plan_Guidance.pdf PDF
Attachment_0009_-_HQAMC-Level_Protest_Procedures_(October_2015).pdf PDF
Exhibit_A_-_CDRL_A001_-_Logistics_Product_Data_-_TAMMS-A.PDF PDF
Attachment_0010_-_Critical_Characteristics.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-19-R-0198

X

2019APR05

2019MAY0601:00am

DOA1

2019APR05 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

ANDREW CAMERON

(256)842-7478

CCAM-AL-M

ANDREW.E.CAMERON.CIV@MAIL.MIL

X 1 25

1 79

X 1

X 5 X 23

X 31 X 32 X 36

X 44

X 47

X 50

X 67

X 68

X 75

X 78

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ANDREW CAMERON

Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-7478

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

Title_____ Date________

NOTICE TO OFFERORS - FLIGHT SAFETY PARTS FEB/1996

REQUIRING ENGINEERING TESTING

(a) The parts being procured under this solicitation are identified as flight safety parts requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources (1) who have been approved in accordance with AMCOM (previously ATCOM) source approval procedures and (2) whose part has successfully completed all required engineering testing. Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section B are eligible for award.

(b) By submitting an offer/bid/quote, the contractor certifies that (1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and (2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.

*** END OF NARRATIVE A0001 ***

1. This item is a Critical Safety Item (CSI). __________________________________________

2. This will be a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-

22.

3. There is a Depot Maintenance Work Requirement for the repair of the Main Rotor Blade (MRB); however, this requirement is for items that have been classified as CSI, and is therefore restricted to approved sources. Sikorsky Aircraft Corporation, 6900 Main Street, Stratford, CT 06615-9129 (CAGE Code 78286), International Aviation Composites 8715 Harmon Rd., Fort Worth, TX 76177-7501 (CAGE Code

1BHR6), and Israel Aerospace Industries - Bedek Accessories Mata, Atarot Airport, Jerusalem, Israel (CAGE Code 2491A) are the only approved sources. No other sources have the capabilities in place to accomplish this overhaul effort.

4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.

5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.

6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.

7. The minimum quantity of 500 each (US quantity) shall be obligated on Delivery Order (DO) 0001, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.

8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.

9. The Government intends to award only one basic Fixed Price IDIQ contract as a result of this solicitation; however, the Government reserves the right to make multiple awards if it determines that doing so is in its best interest.

10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the

Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.

Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).

2 79

W58RGZ-19-R-0198 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Ordering Period 2 will be from 366 DACA through 730 DACA.

Ordering Period 3 will be from 731 DACA through 1,095 DACA.

Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.

Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.

11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each

CLIN/SubCLIN.

12. The offer acceptance period is 120 days from the date for receipt of offers specified in Block 8, unless a different period is inserted by the vendor in their quote.

13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.

14. Offers shall be submitted in accordance with FAR Clause 52.215-1. Facsimile and electronic submissions are not authorized.

Proposals shall be mailed to:

Army Contracting Command - Redstone

ATTN: Andrew E. Cameron, CCAM-ALB

Bldg. 5303, 2nd Floor

Redstone Arsenal, AL 35898-5280

Note: IAW FAR Clause 52.215-1, the Government intends to evaluate proposals and award a contract without discussions with offerors

(except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

15. If any offeror chooses to hand carry its proposal, the offeror must reach the appointed location (identified as building 5300, 5300

Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post. Please note that any proposals delivered late as a result of failure to comply with the procedure will not be accepted, IAW FAR 52.215-1 entitled "Instructions to Offerors-Competitive Acquisition".

16. The Contractor is required to submit a Frozen Maintenance and Overhaul (M&O) Plan in accordance with CDRL A003. The documentation shall be submitted within 30 days after contract award (DACA).

17. The Contractor shall flow down the critical characteristics and QE-STD-1 to all suppliers of Critical Safety Items (CSI).

18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

19. The Contractor may be requested to submit additional cost or pricing data if only one offer is received IAW DFARS Clause 252.215-

7008, entitled "Only One Offer."

20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".

21. Access to DLA EMALL is NOT authorized. ___

22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Other Direct Cost

(ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.

23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:

A. https: //www.logsa.army. mil/etms/online.cfm - Technical Manuals and Bulletins

B. http: //www.apd.army. mil/ - DA Pamphlets and Army Regulations

3 79

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _________________________________________

TELEPHONE NUMBER: _____________________________

FAX NUMBER: ___________________________________

E-MAIL ADDRESS: _______________________________

*** END OF NARRATIVE A0002 ***

4 79

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

THE CONTRACTOR IS REQUIRED TO SUBMIT A FROZEN

MAINTENANCE AND OVERHAUL PLAN IN ACCORDANCE WITH

EXHIBIT C DATA ITEM A003 THE DOCUMENTATION SHALL BE

SUBMITTED 30 DAYS AFTER CONTRACT AWARD.

THE FROZEN MAINTENANCE AND OVERHAUL PLAN MUST BE_________________________________________________

SUBMITTED AND APPROVED BEFORE OVERHAUL MAY BEGIN._________________________________________________

(End of narrative A001)

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Main Rotor Blade, output NSN: 1615-01-

106-1903, as shown in CLINs 0002AA - 0002AC and

0003AA - 0003AC.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of repairables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the Government Quality Office for scheduling of the

PVA by email to the following address:

QS-Contracts@amrdec.army.mil

With copy emailed to the Contract Specialist at:

andrew.e.cameron.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

5 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-B, Andrew E. Cameron

Redstone Arsenal, Alabama 35898-5000 or emailed to:

andrew.e.cameron.civ@mail.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Jeanie Clark. The Contracting Officer will approve the PVA invoice.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 MAIN ROTOR BLADE

NSN: 1615-01-106-1903

Mfr CAGE: 78286

Mfr Part Number: 70150-09100-043

The minimum quantity for this solicitation/contract is 500. For planning purposes, this solicitation/contract assumes the quantities will be evenly split among CLINs

0002AA, 0002AB, and 0002AC; however, the exact quantity applicable to each CLIN may vary. The entire quantity could be placed under a single

CLIN or any possible combination of two or three

CLINs which totals to 500.

(End of narrative A001)

0002AA UPGRADE/OVERHAUL MAIN ROTOR BLADE (US) $ $ ______________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

6 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 167 each estimated qty

Ordering Period 2: 235 each estimated qty

Ordering Period 3: 235 each estimated qty

Ordering Period 4: 235 each estimated qty

Ordering Period 5: 235 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 1615-01-074-5150, P/N: 70150-09100-041

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Upgrade/Overhaul shall be in accordance with the Statement of Work/Specifications -

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

Statement Of Work (SOW).

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 167 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 235 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

7 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0002AB OVERHAUL CAT III MAIN ROTOR BLADE (US) $ $ ______________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AB are:

Ordering Period 1: 167 each estimated qty

Ordering Period 2: 235 each estimated qty

Ordering Period 3: 235 each estimated qty

Ordering Period 4: 235 each estimated qty

Ordering Period 5: 235 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Overhaul CAT III shall be in accordance with the Statement of Work/Specifications -

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

Statement Of Work (SOW).

8 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 167 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 235 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0002AC OVERHAUL CAT I/II MAIN ROTOR BLADE (US) $ $ _______________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AC are:

Ordering Period 1: 166 each estimated qty

9 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 2: 235 each estimated qty

Ordering Period 3: 235 each estimated qty

Ordering Period 4: 235 each estimated qty

Ordering Period 5: 235 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Overhaul CAT I/II shall be in accordance with the Statement of Work/Specifications -

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

Statement Of Work (SOW).

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 166 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 235 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 235 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

10 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0003 MAIN ROTOR BLADE

NSN: 1615-01-106-1903

Mfr CAGE: 78286

Mfr Part Number: 70150-09100-043

0003AA UPGRADE/OVERHAUL MAIN ROTOR BLADE (FMS) $ $ _______________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 56 each estimated qty

Ordering Period 3: 56 each estimated qty

Ordering Period 4: 56 each estimated qty

Ordering Period 5: 56 each estimated qty

The Maximum quantity for FMS requirements is 664.

This quantity may fall under CLIN 0003AA, 0003AB, 0003AC, or any combination of the three.

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 1615-01-074-5150, P/N: 70150-09100-041

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Upgrade/Overhaul shall be in accordance with the Statement of Work/Specifications -

11 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

SOW.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 0 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 56 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 56 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 56 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 56 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

12 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003AB OVERHAUL CAT III MAIN ROTOR BLADE (FMS) $ $ _______________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AB are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 55 each estimated qty

Ordering Period 3: 55 each estimated qty

Ordering Period 4: 55 each estimated qty

Ordering Period 5: 55 each estimated qty

The Maximum quantity for FMS requirements is 664.

This quantity may fall under CLIN 0003AA, 0003AB, 0003AC, or any combination of the three.

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Overhaul CAT III shall be in accordance with the Statement of Work/Specifications -

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

SOW.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 0 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 55 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 55 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 55 ea, FMS

13 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

YEAR 5- U/P $_____________ (FFP) Est Qty 55 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0003AC OVERHAUL CAT I/II MAIN ROTOR BLADE (FMS) $ $ ________________________________________ ______________ __________________

COMMODITY NAME: MAIN ROTOR BLADE

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AC are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 55 each estimated qty

Ordering Period 3: 55 each estimated qty

Ordering Period 4: 55 each estimated qty

Ordering Period 5: 55 each estimated qty

The Maximum quantity for FMS requirements is 664.

This quantity may fall under CLIN 0003AA, 0003AB, 0003AC, or any combination of the three.

This CLIN will be used only if a FMS Customer

14 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

OUTPUT:

NSN: 1615-01-106-1903, P/N: 70150-09100-043

Overhaul CAT I/II shall be in accordance with the Statement of Work/Specifications -

Government Specifications.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the

SOW.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 0 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 55 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 55 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 55 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 55 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Instructions.

(End of narrative D001)

15 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs

0002AA, 0002AB, 0002AC, 0003AA, 0003AB, and/or

0003AC.

The Government's estimated quantity per ordering period is 10 each. The estimated quantity of 10 is for proposal evaluation purposes only.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

Scrapped assets from CLINs 0002AA, 0002AB, 0002AC, 0003AA, 0003AB, and/or 0003AC shall be in accordance with the Statement of Work

Specifications - Government Specifications.

As applicable on delivery orders issued, units determined to be scrapped in accordance with

Section C shall be reflected as an increase in

CLIN 0004AA with a corresponding decrease in

16 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

quantity and funds in CLINs 0002AA, 0002AB, 0002AC, 0003AA, 0003AB, and/or 0003AC, as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for CLINs 0002AA, 0002AB, 0002AC, 0003AA, 0003AB, and/or 0003AC.

P/N: 70150-001-041

NSN: 8145-01-081-9236

The Government estimates that a quantitiy of 10

EACH will be required for each of the ordering periods. The estimated quantity of 10 is for proposal evaluation purposes only.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

17 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

The contractor shall provide the container in accordance with Attachment 0001 - M&O Packaging

Requirements and the Statement of

Work/Specifications - Contractor

Specificationsand reusable containers.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The Contractor, IAW the Statement of Work, shall submit a Report of Discrepancy (ROD) SF Form 364 through the DCMA QAR for verification within 7 working days to the address shown on Data Item

A002. Assets received with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data is included in the unit prices of CLINs

0002AA, 0002AB, 0002AC, 0003AA, 0003AB, and/or

0003AC.

The Contractor shall provide Data Items A001 - A006 in accordance with the Contract Data Requirements

List, Exhibits A, B, C, D, E, and F.

(End of narrative A001)

A001 LOGISTICS PRODUCT DATA - TAMMS-A $ ** NSP ** ________________________________ __________________

18 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: DATA ITEM A001

DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER DI-

SESS-81758A

The contractor shall provide data as required based upon delivery schedules and contract requirements.

Within two business days after a Government QA acceptance the contractor shall submit a copy of the

Wide Area Work Flow (WAWF) receiving reports listing each Serial Number (SN) shipped via e-mail to the address listed below. A final receiving report for each Delivery Order (DO) and or contract closeout shall be via submittal to WAWF; use DODAAC W81D17.

The Requiring Office will verify final accounting of all TAMMS-A data reported against the contract/DO and verify that all TAMMS-A data has been received.

Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within 10 working days after receipt of the requiring office comments.

TAMMS-A submittal/approval shall be via contractor/vendors use of the TAMMS-A/MCDS web portal https://tamms-a.redstone.army.mil . If the web portal is unavailable or the contractor currently does not have a TAMMS-A/MCDS account, see the Statement of Work attachments for additional instructions.

(End of narrative C001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-80503 (AS REQUIRED)

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments

0003 (Standard Form 364) and 0004 (Report of

Discrepancy Guidance) for completing the Report of

Discrepancy.

(End of narrative C001)

19 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

A003 TECHNICAL REPORT - STUDY/SERVICES - FROZEN M&O ______________________________________________

PLAN $ ** NSP ** ____ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MISC-80508B(AS REQUIRED)

Data Item A003 refers to the Frozen M&O Plan. The

M&O Plan shall be submitted to this office within 30 days after contract award date.

When the contractor makes a change to the plan (as frozen at the time the

PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within

30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.

Note: A copy of the plan shall be forwarded to the contract specialist at:

U.S. ARMY Contracting Command - Redstone

ATTN: Andrew Cameron, CCAM-ALM

5300 Martin Road

Bldg 5303, 2nd Floor

Redstone Arsenal, AL 35898-5000

THE FROZEN PLAN MUST BE SUBMITTED AND APPROVED, AND

THE CORRELATION STUDY MUST BE COMPLETED, BEFORE

OVERHAUL OF ASSETS CAN BEGIN.

(End of narrative C001)

Deliveries or Performance _________________________

A004 TECHNICAL REPORT - STUDY/SERVICES - 1348-1A $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A004

DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER :

20 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DI-MISC-80508B

The contractor shall deliver the report within 5 working days of receipt of repairables.

(End of narrative C001)

Deliveries or Performance _________________________

A005 CONTRACT DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A005

DATA ITEM A005 - DATA ACQUISITION DOCUMENT NUMBER :

DI-PSSS-81995

Date of first submission is 5 working days after receipt of reparables.

Frequency of submission is monthly.

Data shall be prepared in accordance with Attachment

0005, Template for Depot Maintenance Production

Report, and submitted to the following email addresses:

usarmy.redstone.usamc.mbx.immc-smb-ammo@ mail.mil usarmy.uh60m-oteam@ mail.mil

(End of narrative C001)

Deliveries or Performance _________________________

A006 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: DATA ITEM A006

DATA ITEM A006 - DATA ACQUISITION DOCUMENT NUMBER :

DI-QCIC-80736 (AS REQUIRED)

No report is necessary unless there is a deficiency.

Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.

21 79

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative C001)

Deliveries or Performance _________________________

22 79

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 Statement of Work/Specifications Government Specifications

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul/upgrade for Main Rotor Blade that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul/upgrade, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of overhaul/upgrade, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to overhaul/upgrade. The Contractor shall continue the overhaul/upgrade process on all end items when the total cost to overhaul/upgrade does not exceed $137,413.84. The overhaul/upgrade line items shown in section B are firm-fixed price. The contractor will be required to complete the overhaul/upgrade on all end items regardless of the damage as long as the total contractor cost to overhaul/upgrade does not exceed $137,413.84. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm the total cost to overhaul/upgrade will exceed $137,413.84. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer.

No additional funding except for missing parts will be provided to the contractor to complete the overhaul/upgrade of the end item. The firm fixed prices in the overhaul/upgrade CLINs must include/cover all mandatory and non-mandatory parts as required by the Depot

Maintenance Work Requirement (DMWR). The Government cannot guarantee the condition of the assets sent to the Contractor for overhaul/upgrade.

c. In the event that the total contractor cost to overhaul/upgrade is determined (approved by PCO) to exceed $137,413.84, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with

(IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled/upgraded at the firm fixed price in the awarded contract.

d. Overhaul/upgrade shall be accomplished IAW Depot Maintenance Work Requirement (DMWR) DMWR-1-1615-281, Dated 02/10/2012, No

Change #, and Maintenance Engineering Orders B1023, B1059E, B1062A, B1078, B1138, B1146A, B1266A, B1304, B1305, B1313, B1439, B1472, B1507A, B1551, B1670, B1674A, B1703A, B1713, B1730, B1945, B1980, B2026, B2202, B2304, B2310, B2387, B2433, B2462, B2482, B2483, B2557, B2617B, B2745, C4598, C4659D, and T1356D.

e. Critical Safety Item: The overhaul/upgrade shall comply with the critical characteristics identified as an attachment

(Attachment 0010) to the solicitation/contract.

f. Upon receipt of the repairables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental

Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-

23, w/chg 12, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-F. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section E of the solicitation/contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the

TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-

751, TB 1-1500-341-01, TM 1-1500-328-23.

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall repair are identified below:

23 79

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Input NSN P/N

1615-01-074-5150 70150-09100-041

1615-01-106-1903 70150-09100-043

Output NSN P/N

1615-01-106-1903 70150-09100-043

m. The overhaul/upgrade planned quantity for 5 years is minimum 500, maximum 3,964. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract delivery schedule, located in paragraph 12 of page

35. Serviceable assets shall be returned to W562RM.

n. Inventory Transactions - The contractor shall prepare the following reports:

1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.

2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form

1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf

The contractor shall prepare this data to include the following corresponding receipt information:

A. National Stock Number (NSN) - (Positions 8-22)

B. Condition Code - (Position 71)

C. Unit Price - (Positions 74-80)

D. Total Price - (Block 1)

E. Actual Quantity Received - (Block 10)

F. Nomenclature - (Block 17)

G. Signature and Date - (Blocks 22 and 23)

If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

o. Reserved

p. Reserved.

q. The Government reserves the right to replace any items scrapped.

r. Overhaul Repair Report: N/A

s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.

t. Supplier Interface and Oversight: The Contractor shall prepare the Process Plan IAW DI-MISC-80508, QE-STD-2, and the M&O Plan

Description and Guidance Instructions. See http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar and select "AMCOM

Maintenance and Overhaul (M&O) SAR."

u. Shipping Containers NSN: 8145-01-081-9236, P/N: 70150-001-041 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

*** END OF NARRATIVE C0001 ***

--Appendix 1--

QE-STD-1

REVISION D

1 OCT 96

C-2 FLIGHT SAFETY PARTS

CRITICAL CHARACTERISTICS

NEW MANUFACTURE

QE-STD-1

Paragraph

Purpose------------------------------------- 1.0

24 79

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Scope--------------------------------------- 2.0

References---------------------------------- 3.0

Definitions--------------------------------- 4.0

Policy-------------------------------------- 5.0

Requirements-------------------------------- 6.0

Manufacturing Planning---------------------- 6.1

Plan Content-------------------------------- 6.1.1

Frozen Planning Requirements---------------- 6.1.2

Changes to Frozen Planning------------------ 6.1.3

Audits-------------------------------------- 6.2

Critical Characteristics-------------------- 6.3

Inspection of Critical Characteristics------ 6.3.1

Variability Reduction Methods--------------- 6.3.2

NonConforming Critical Characteristics------ 6.3.3

Contradictory Critical Characteristics------ 6.3.4

Delivered Nonconformances------------------- 6.3.5

Records------------------------------------- 6.4

Traceability of Records--------------------- 6.4.1

Purchasing Records-------------------------- 6.4.2

Retention of Records------------------------ 6.4.3

Certification of Personnel------------------ 6.5

Tolerance of Measurement & Test Equipment--- 6.6

Serialization------------------------------- 6.7

1.0 PURPOSE: To establish the minimum level of activity that is required to manufacture Flight Safety Parts (FSPs) containing ________

Manufacturing Critical Characteristics (CCs). Requirements established herein are intended to establish and maintain the integrity of

CCs throughout the manufacturing process.

2.0 SCOPE: This document is to be used in conjunction with other…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .