Exhibit_C_-_CDRL_A003_-_Technical_Report_-_Frozen_Plan.pdf
PDF 4 KB Posted
- Attached to
- Solicitation for Main Rotor Blade Federal contract opportunity
- Solicitation number
- W58RGZ-19-R-0198
About this file
This document contains a Contract Data Requirements List and details of a federal contract opportunity for the overhaul of main rotor blades. The CDRL requires the contractor to submit technical reports detailing any changes made to the overhaul plan that affect critical characteristics within 30 days of the change. The reports are to be distributed to the Army Research, Development and Engineering Command.
The federal contract opportunity is a solicitation seeking proposals for an IDIQ contract to overhaul main rotor blades over five years. The contractor must overhaul a minimum of 500 blades per year up to a maximum of 3,984 blades total, including 664 for foreign military sales. Proposals are due on May 6, 2019. The solicitation documents attachments containing the DMWR and MEOs must be requested separately from Army contacts following procedures provided. Eligible contractors include three incumbent sources currently approved by the Aviation Engineering Directorate.
Exhibit C CDRL A003
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
11/15/2017Page 1 of 2
1615-01-1061903
MAIN ROTOR BLADE
D. SYSTEM / ITEM
A003
1. DATA ITEM NO.
GDULA, ROBERT H.
G. PREPARED BY
10/26/2017
H. DATE
MCREE, DAVID L.
I. APPROVED BY
10/26/2017
J. DATE
MAYHALL, CONNIE
LOG #
CONCUR:
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
DATE: 10/27/2017
4. AUTHORITY (DATA ACQUISITION DOC NO.) 5. CONTRACT REFERENCE
2. TITLE OF DATA ITEM
6. REQUIRING OFFICE
3. SUBTITLE
F. CONTRACTORE. CONTRACTOR / PR NO.
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
8. APP CODE
b. COPIES
DRAFT FINAL
REG REPRO
a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT
SUBMISSION
15. TOTAL
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
RDMR-SEU
NSN
PRID: PART NUMBER:CB362 70150-09100-043 STATUS: R
AMSRD-AMR-SE-TD-ST/DM
Technical Report - Study/Services Process Plan
DI-MISC-80508B SOW, PARA T RDMR-SEU
LT
A
B SEE BLK 16
N/A
30DAC
SEE BLK 16
0 1 0
0 1 0
16. REMARKS:
BLOCKS 8, 10 & 13: When the contractor makes a change to the plan (as frozen at the time the PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within 30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.
BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only;
test and evaluation; date of determination: 7 July, 2005. Other requests for this documentation shall be referred to Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.
Export Control Act Warning - Not required
BLOCK 12: The first submission of the overhaul, repair, upgrade, modification, or recapitalization plan will be used by the Government for informational purposes only.
BLOCK 14: Documentation shall be provided electronically in adobe acrobat .pdf or compatible format on compact disk read only memory device (cd-rom).
DISTRIBUTION
a. Complete packages sent to: Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.
b. Letter of transmittal only sent to procurement Contracting Officer as specified in contract.
POC: PHONE:
11/15/2017Page 2 of 2
File details come from the government source that posted it. Updated .