Attachment 0005_MEO B2930.pdf
PDF 132 KB Posted
- Solicitation number
- W58RGZ-19-R-0090
About this file
Attachment 0005 MEO B2930
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 5-DEC-09 1401-R-E
AR 70-62 •11 May 2016 B 2930
Sep 21, 2017 1
FPI Process Update WP 0009 P/N 70250-12051-045
Technical
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY
UH60 DAA
DMWR 1-1620-247 dated 21 July 2017 TN168974A, 177671
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
Update the FPI process.
KERNAN.JAMES.
J.JR.1258452760
Digitally signed by
KERNAN.JAMES.J.JR.1258452760
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=KERNAN.JAMES.J.JR.1258452760 Date: 2017.09.13 10:45:08 -05'00'
SALAZAR.ALBER
TO.JAIME.12571
46258
Digitally signed by
SALAZAR.ALBERTO.JAIME.1257146258
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=SALAZAR.ALBERTO.JAIME.12571462 Date: 2017.09.13 10:31:04 -05'00'
A.J. SALAZAR (CAMBER)
HORN.REINHOL
D.J.1087783495
Digitally signed by
HORN.REINHOLD.J.1087783495
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HORN.REINHOLD.J.1087783495 Date: 2017.09.13 14:54:43 -05'00'
JAMES KERNAN RON HORN
PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
0009 CHANGE the FPI PROCEDURES section to read:
"All fluorescent penetrant parts listed in applicable OIPs shall be inspected 100% of inspectable areas (unless otherwise specified by DMWR) per ASTM-E1417, Type I, Method A, C, or D, with sensitivity level 3 or higher, as applicable. Inspection method for each part shall be incorporated into locally developed non-destructive inspection procedure as specified in ASTM E1417 and approved by NAS 410 Level III. Technicians performing inspection shall be certified per NAS 410. Only Qualified Penetrant materials in QPL-AMS-2644 shall be used in performance of inspection."
Distribution Statement D:- Distribution authorized to Department of Defense and U.S. DoD contractors only to protect critical technology effective as of 26 June 2014. Other requests for this document must be referred to U.S. Army Aviation and Missile Research, Development and Engineering Center, ATTN: RDMR -AEM , Corpus Christi, TX 78419-5211
MED FORM 04 APR 2017
File details come from the government source that posted it.