Attachment_0001-_Statement_of_Work_(SOW)_for_Technical_Support_of_the_AMRDEC_PIF.docx

DOCX document 105 KB Posted

Attached to
Technical Support of the Aviation and Missile Research, Development, Engineering Center's (AMRDEC) Prototype Integration Facility (PIF)
Solicitation number
W58RGZ-17-R-0001
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION

W58RGZ-17-R-0001
STATEMENT OF WORK

FOR TECHNICAL SUPPORT OF THE AMRDEC PIF

Attachment 0001 9 November 2016

STATEMENT OF WORK

FOR

TECHNICAL SUPPORT OF THE

AVIATION AND MISSILE RESEARCH, DEVELOPMENT, AND

ENGINEERING CENTER PROTOTYPE INTEGRATION FACILITY

9 November 2016

Prepared by

PROTOTYPE INTEGRATION FACILITY

ENGINEERING DIRECTORATE

AVIATION AND MISSILE RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER

TABLE OF CONTENTS

Acronym List 6

1.0 SCOPE 10

2.0 APPLICABLE DOCUMENTS 11

3.0 REQUIREMENTS 11

3.1General Requirements11
3.1.1 Data11
3.1.2 Government Furnished Property12
3.1.3 Travel12
3.1.4 Training12
3.2Transition12
3.2.1 Transition In13
3.2.2 Transition Out13
3.3 Program Management14
3.3.1 Program Management Data Items14
3.3.2 Program Manager14
3.3.3 TO/DO Award Process14
3.3.4 Contractor Project Lead15
3.3.5 Programmatics15
3.3.6 Contractor Integrated Technical Information Service15
3.3.7 Office Space for Government Personnel16
3.3.8 Risk Management16
3.3.9 Subcontractor Management16
3.3.10 Counterfeit Risk Management Plan16
3.3.11 Program Management Reviews17
3.4 Design17
3.4.1 Design Data Items17
3.4.2 Research and Development18
3.4.3 Electrical Design18
3.4.4 Mechanical Design18
3.4.5 Aerospace Design18
3.4.6 Modeling and Simulation18
3.4.7 Software19
3.4.8 Knowledge Transfer Systems19
3.4.9 Design Reviews19
3.4.10 Technical Data Package19
3.4.11 Drawings19
3.4.12 Design Documentation20
3.4.13 Obsolescence Mitigation20
3.5 Fabrication21
3.5.1 Fabrication Data Items21
3.5.2 Mechanical Systems Fabrication21
3.5.3 Electrical Systems Fabrication21
3.5.4 Composites Fabrication21
3.5.5 Acquisition of Materials21
3.5.6 Warranties22
3.6 Subsystem/System Integration22
3.6.1 Subsystem/System Integration Data Items22
3.6.2 Interface Requirements22
3.6.3 Sub-system Integration22
3.6.4 System-level Integration22
3.7 Qualification Testing22
3.7.1 Qualification Testing Data Items22
3.7.2 Validation of Procedures23
3.7.3 Qualification Testing23
3.7.4 Acceptance Testing23
3.7.5 Functional Configuration Audit23
3.7.6 Physical Configuration Audit23
3.7.7 Test Reviews24
3.7.8 Flight Readiness Reviews24
3.8 Logistics24
3.8.1 Logistics Data Items24
3.8.2 Packaging24
3.8.3 Delivery of Hardware24
3.8.4 Delivery of Software24
3.8.5 Receiving and Storage24
3.9 Operation and Support25
3.9.1 Operation and Support Data Items25
3.9.2 Installation and Setup25
3.9.3 Training25
3.9.4 Overhaul25
3.9.5 Reset26
3.9.6 Flight Operations26
3.10 Airworthiness26
3.10.1 Airworthiness Release26
3.10.2 Airworthiness Qualification Specifications26
3.10.3 Airworthiness Assessments26
3.11 Quality Management26
3.11.1 Quality Data Items27
3.11.2 Quality Manager27
3.11.3 PIF QMS Registration27
3.11.4 Contractor QMS28
3.11.5 Calibration28
3.11.6 Foreign Object Elimination28
3.11.7 Software Quality28
3.11.8 Metrics Collection and Reporting30
3.11.9 Continuous Improvement30
3.11.10 “Lead Free” Considerations30
3.12 Configuration Management31
3.12.1 Configuration Management Data Items31
3.12.2 Configuration Management Lead31
3.12.3 Designators/Nomenclatures32
3.12.4 Data Management32
3.12.5 ePDM32
3.12.6 Serialization32
3.12.7 Records32
3.12.8 Master Library32
3.13 Safety33
3.13.1 Safety Data Items33
3.13.2 System Safety Program Plan33
3.13.3 Safety at RSA and Other Facilities33
3.13.4 Safety and Accident Prevention Program33
3.13.5 Safety Reporting34
3.14 Hazardous Material Management34
3.14.1 Hazardous Material Management Data Items34
3.14.2 Hazardous Material Management Program34
3.14.3 Handling and Disposal of HazMat34

3.15 Legal 35

3.16 Security35
3.16.1 Facilities35
3.16.2 Personnel35
3.16.3 Specifications35
3.16.4 Distribution Statements and Export Control Warning35
3.16.5 Classified Markings36

4.0 CONTRACTOR MANPOWER REPORTING 36

5.0 ANTITERRORISM/OPERATIONS SECURITY 36

5.1 AT Level I Training 36

5.2 AT Awareness Training for US Based Contractor Personnel

Traveling Overseas36
5.3iWATCH Training36
5.4Contracts that Require Handling or Access to Classified Information37
5.5Threat Awareness Reporting Program Training37
5.6Contractors Requiring Common Access Cards37
5.7Contractors that do not Require CAC, but Require Access to a
DoD Facility or Installation37
5.8Identification of Contractor Employees37
5.9Security Education, Training & Awareness Training38
5.10Combating Trafficking in Persons, Cyber Awareness Challenge,
Personal Identification Information (PII) and Sexual Harassment
Response Program (SHARP) Training38
5.11OPSEC Training38
5.12Government Information Systems and Information Awareness Requirements39
5.13Information Assurance (IA)/ Information Technology (IT) Training and/or Certification39
5.14Access and General Protection/Security Policy and Procedures39
5.15Contract Requiring Performance or Delivery in a Foreign Country39

ACRONYM LIST

2DTwo-dimensional
3DThree-dimensional
ABCLAs Built Configuration List
AMCOMAviation and Missile Command
AMCRArmy Materiel Command Regulation
AMRDECAviation and Missile Research, Development, and Engineering Center
AQSAirworthiness Qualification Specifications
ARArmy Regulation
ASAerospace Standard
ASMEAmerican Society of Mechanical Engineers
ATAntiterrorism
ATCTSArmy Training Certification Tracking System
ATOAntiterrorism Officer
ATPAcceptance Test Procedures
ATRAcceptance Test Report
AUPAcceptable Use Policy
BOMBill of Materials
CACCommon Access Card
CADComputer-Aided Design
CAGECommercial and Government Entity
CDLSConfiguration Data Lists
CDRLContract Data Requirements List
CFAEContractor Furnished Aeronautical Equipment
CFEContractor Furnished Equipment
CFRCode of Federal Regulations
CFSRContract Funds Status Report
CIConfiguration Item
CITISContractor Integrated Technical Information Service
CMConfiguration Management
CMMICapability Maturity Model-Integrated
CNCComputer Numerical Controlled
COMComputer Operation Manual
COMSECCommunications Security
CONUSContinental United States
CORContracting Officer’s Representative
COTSCommercial Off-the-shelf
CPLContractor Project Lead
CSAConfiguration Status Accounting
DALData Accession List
DBDDDatabase Design Description
DIDData Item Description
DoDDepartment of Defense
DRIPDesign Review Information Package
DRMODefense Reutilization and Marketing Office
DSLDocument Summary List
ECPEngineering Change Proposal
EDEngineering Directorate
EDFPEngineering Data for Provisioning
EIRSEquipment Inventory Records
EMITPElectromagnetic Interference Test Procedures
EPAEnvironmental Protection Agency
ePDMelectronic Product Data Management
ERREngineering Release Record
ESDEngineering Support Data
ESOHEnvironmental Safety and Occupational Health
EVMSEarned Value Management System
FAAFederal Aviation Administration
FACARFailure Analysis and Corrective Action Report
FARFederal Acquisition Regulation
FBIFederal Bureau of Investigation
FCAFunctional Configuration Audit
FODForeign Object Damage and Debris
FOEForeign Object Elimination
FPCONForce Protection Condition
FYFiscal Year
GFEGovernment Furnished Equipment
GFPGovernment Furnished Property
GIDEPGovernment Industry Data Exchange Program
GOGOGovernment-owned Government-operated
GPLGovernment Project Lead
GWIGeneral Work Instructions
HazMatHazardous Materials
HMMPHazardous Materials Management Program
HQDAHeadquarters, Department of the Army
IAInformation Assurance
IAWIn Accordance With
ICDInterface Control Document
IDDInterface Design Description
IETMInteractive Electronic Technical Manuals
IPEInformation Processing Equipment
IPMRIntegrated Program Management Report
IRSInterface Requirements Specification
MICDMultiplex Interface Control Document
MPCMPMass Properties Control and Management Process
MWOModification Work Order
NACINational Agency Check with Inquiries
NASNational Aerospace Standard
NCIC-IIINational Crime Information Center Interstate Identification Index
NDINon-developmental Items
NISPOMNational Industrial Security Program Operating Manual
NORNotice of Revisions
NSNNational Stock Number
OCDOperational Concept Description
OCONUSOutside the Continental United States
ODC/ODSOzone Depleting Chemical/Ozone Depleting Substance
OEPOrder Execution Plan
OPSECOperations Security
ORFPOrder Request for Proposal
OSHAOccupational Safety and Health Administration
PBLIProduct Base Line Index
PCAPhysical Configuration Audit
PIFPrototype Integration Facility
PIIPersonal Identification Information
POPPIF Operating Procedures
POCPoint of Contact
Post-DOALPost-Delivery Order Award Lead
Pre-DOALPre-Delivery Order Award Lead
PPLProvisioning Parts List
PPSProduct Performance Specifications
QMSQuality Management System
QPPQuality Program Plan
RFVRequest for Variation
RFWRequest for Waiver
RMPRisk Management Plan
RSARedstone Arsenal
SAESociety of Automotive Engineers
SAPPSafety and Accident Prevention Program
SARSafety Assessment Report
SCNSpecification Change Notice
SCOMSoftware Center Operator Manual
SDDSoftware Design Description
SDPSoftware Development Plan
SEISoftware Engineering Institute
SERService Engineering Report
SETASecurity Education, Training & Awareness
SHARPSexual Harassment Assault Response Program
SIESpecial Inspection Equipment
SIOMSoftware Input/Output Manual
SIPSoftware Installation Plan
SOOStatement of Objectives
SOPStandard Operating Procedures
SOWStatement of Work
SPISpecial Packaging Instructions
SPSSoftware Product Specification
SQASoftware Quality Assurance
SRSSoftware Requirements Specification
SSDDSystem/Subsystem Design Description
SSHARSystem Safety Hazard Analysis Report
SSPPSystem Safety Program Plan
SSPPRSystem Safety Program Progress Report
SSSSystem/Subsystem Specification
SSWGSystem Safety Working Group
STSpecial Tooling
STDSoftware Test Description
STESpecial Test Equipment
STPSoftware Test Plan
STRSoftware Test Report
STRPSoftware Transition Plan
SUMSoftware User’s Manual
SVDSoftware Version Description
TDPTechnical Data Package
TMTechnical Manual
TPSTest Program Set
TO/DOTask Order/Delivery Order
TSDBTerrorist Screening Database
WBSWork Breakdown Structure

1.0 SCOPE

The Aviation and Missile Research, Development, and Engineering Center (AMRDEC), Engineering Directorate (ED) Prototype Integration Facility (PIF) provides a rapid response capability for generating hardware solutions to support the Department of Defense (DoD) and other Federal Agencies. The PIF operates nine facilities including buildings 3328, 3629, 4762, 4773, 4770, 4803, 5405, 5685, and 7231 at Redstone Arsenal (RSA), Alabama (AL), and will be supported by off-site contractor facilities in the Huntsville-Decatur-Albertville Combined Statistical Area. Government owned and Government operated, the PIF offers single-source convenience, turn-key solutions for development, fabrication, systems integration, modification, experimentation, and subsystem/system-level testing.

The PIF maintains a collaborative environment optimally structured for supporting quick reaction delivery of hardware solutions. PIF Government personnel are grouped by customer and function. There is a team of approximately 60 Government Project Leads (GPL) who are the primary points of contact (POC) for PIF customers and are responsible for successful project execution. A GPL or other Government personnel will be assigned as a Contracting Officer’s Representative (COR) on each task order/delivery order (TO/DO). There are also a number of robust Government support teams in place which make up the backbone of the organization including business and strategic operations, engineering design, production management, facilities management, configuration management, and mission assurance, the last of which includes quality assurance, test, and flight activities management.

This statement of work (SOW) describes the requirement to provide labor, materials, and facilities to support the PIF at RSA. The Contractor’s efforts under this SOW support the following specific PIF capabilities: program management, design and analysis, three-dimensional (3D) modeling, rapid prototyping, mechanical fabrication, advanced composites, printed wiring board fabrication, circuit assembly and test, circuit board fabrication and plating, cable/wiring harness assembly, electrical and mechanical assembly, platform integration, aircraft modification, field retrofits, operations support, documentation support, and sustainment support in Continental United States (CONUS) and Outside the Continental United States (OCONUS). These efforts support all new and existing platforms, systems, subsystems, parts, items, and components, and emerging future technology.

The following terms are used throughout the SOW, and are defined as follows:

Platform - A combination of hardware, software/firmware, structures and personnel that provide a dedicated function serving a Government requirement. To this extent, platforms include, but are not limited to, airborne vehicles, wheeled/tracked vehicles, watercraft, spacecraft, missiles, electronics equipment, shelters, ground support equipment, support structures, marine devices, launchers, the Warfighter/personnel, and emerging future technology, e.g. V-22 Osprey, Multi-Mission Launcher, and Mine-Resistant Ambush Protected vehicles.

System - A combination of hardware and software/firmware that performs a dedicated function serving a Government requirement, including, but not limited to, electronics equipment, networks, shelters, ground support equipment, and support structures which use one or more subsystems.

Subsystem - Electronic/mechanical/structural equipment, associated components/parts/items, and/or software/firmware that support one or more systems.

Part/Item/Component - A tangible, distinct, serviceable and/or replaceable element, assembly/subassembly, or tool required in support of a subsystem or system.

2.0 APPLICABLE DOCUMENTS

Applicable top-level documents are identified by number, title, date, and category in the Document Summary List (DSL), an attachment to the Contract. The document versions specified on the DSL take precedence over the generic references (without revision letters) cited in this SOW.

3.0 REQUIREMENTS

The Contractor shall support weapons systems at all phases of the acquisition life cycle. Requirements may differ from project to project, but will fit under one or more of the following areas: general requirements; transition between contracts; program management; system life cycle support to include design, fabrication, subsystem/system integration, qualification testing, logistics, and operation and support; and key overarching activities to include airworthiness certifications, quality management, configuration management, safety, hazardous material management, legal, and security.

3.1 General Requirements

The general areas to be supported are set forth in this section of this SOW. These areas are not meant to be definitive, but rather represent in summary form the general areas to be supported. Detailed requirements will be set forth in the TO/DOs issued under the contract.

3.1.1 Data. The Contractor shall deliver data in accordance with (IAW) Exhibit A, Contract Data Requirements List (CDRL), as specified in a given TO/DO or required as a standard item pursuant to this contract. All data shall be submitted strictly IAW the DD Form 1423, CDRLs. The following Data Item Descriptions (DIDs) apply to this SOW. Specific data requirements will be defined in the individual TO/DOs and shall be prepared IAW the following:

DI-SESS-80858Supplier’s Configuration Management Plan
DI-SESS-81253Configuration Status Accounting Information
DI-MGMT-80004Management Plan
DI-MGMT-81398Hazardous Materials Management Program (HMMP) Plan
DI-MGMT-81808Contractor’s Risk Management Plan
DI-MISC-81397Hazardous Materials Management Program (HMMP) Report
DI-SAFT-81626System Safety Program Plan (SSPP)
DI-QCIC-81379Quality System Plan
DI-MGMT-81945Phase-Out Transition Plan

3.1.2 Government Furnished Property. The Contractor shall perform the requirements of this SOW and the requirements of each individual TO/DO utilizing Government Furnished Property (GFP) and Government facilities provided by the Government-owned Government-operated (GOGO) PIF. In the event the Government cannot provide the GFP or facilities necessary to perform the requirements of this SOW, the Contractor shall provide the necessary facilities and/or property. The Contractor shall maintain the GFE per the maintenance instructions and warranties which the Government will provide upon transition of GFE to the Contractor.

3.1.3 Travel. The Contractor shall travel in accordance with the requirements specified in the TO/DOs issued under this contract. The Contractor shall make all CONUS and OCONUS travel arrangements needed to complete efforts required by the individual TO/DOs issued. For some efforts, travel shall be required on short notice.

3.1.4 Training. The Contractor shall provide and maintain a trained workforce capable of performing the requirements specified in the TO/DOs issued under this contract. All related training, continuing education, certification courses, and other similar events shall be the financial responsibility of the Contractor. Scheduling of training shall be managed so as to minimize impacts to fulfillment of TO/DO requirements.

3.2 Transition

The Contractor shall fully cooperate in planning, committing resources, and communicating with the Government and the incumbent and/or follow-on contractors to provide an orderly transition between contracts. The Contractor shall manage its activities during transition and monitor, document and report all concerns to the COR/GPL. The transition periods will consist of the time frames required for completion of efforts under the incumbent contract W58RGZ-12-D-0089 and for completion of efforts under this contract after award of any subsequent follow-on contract. It is estimated that the overlaps of performance may continue from 18-30 months after date of this contract award. The Contractor shall be required to perform orders under this contract while the incumbent contractor is completing contractual requirements under the previous contract. The Contractor shall carefully coordinate resource requirements, to include transition of incumbent personnel and use of government facilities, machines and GFE to prevent disruption of support to on-going requirements. The Contractor shall cooperate in the resolution of all transition issues to assure successful performance of requirements under this contract and to prevent disruption of performance under the incumbent contract and any follow-on contract. The Contractor shall appoint a Contractor Project Lead (CPL) for the transition effort to interface with the COR/GPL.

3.2.1 Transition In. The Contractor shall provide program management and oversight during transition-in to ensure that TO/DOs executed during the transition-in period are successfully performed with no negative cost, schedule, or performance impact to the tasks being completed by both the Contractor and the incumbent. The transition process may involve the temporary sharing and/or eventual transfer of GFP from the incumbent to the Contractor. During this transition period, the Contractor shall ensure that GFP is properly maintained during and after use so as to promote the safety and well-being of all personnel.

The Contractor shall maintain facilitization and staffing plans for transitioning in efforts. The Contractor shall occupy or have a plan to lease space, hire personnel and facilitize that space as required by TO/DO. The facilities shall be covered by the appropriate quality certifications to accomplish the intended requirements of the contract. All facilities shall have safety and security plans to include appropriate fire protection at all proposed facilities.

3.2.2 Transition Out. The Contractor shall perform transition-out efforts and ensure an orderly transition between this contract and efforts required by any follow-on contract. The Contractor shall ensure that all TO/DOs executed under this contract are successfully completed during the transition out phase with no negative cost, schedule, or performance impact to the tasks required by this contract and any follow-on contract. The transition process may involve the temporary sharing and/or eventual transfer of GFP. During this transition period, the Contractor shall ensure that GFP is properly maintained during and after use so as to promote the safety and well-being of all personnel.

The Contractor shall maintain facilitization and staffing plans for transitioning out efforts as they are completed. The Contractor shall downsize, or have a plan to reduce infrastructure costs as TO/DOs are closed out. Personnel shall be optimized to maximize efficiencies in cost, schedule and performance for open TO/DOs.

3.3 Program Management

The Contractor shall provide overall program management of cost, schedule, and performance of each TO/DO to ensure successful contract execution, as well as program management of the entire contract.

3.3.1 Program Management Data Items. As required by each individual TO/DO, the Contractor shall develop data IAW the DIDs listed below:

DI-ADMN-80925Revision to Existing Government Documents
DI-ADMN-81249Conference Agenda
DI-ADMN-81250Conference Minutes
DI-ADMN-81313Progress Report (Studies)
DI-MGMT-81334Contract Work Breakdown Structure
DI-ADMN-81373Presentation Material
DI-ADMN-81505Report, Record of Meeting/Minutes
DI-MGMT-80004Management Plan
DI-MGMT-80061Engineering & Technical Services Accomplishment Report
DI-MGMT-80227Contractor’s Progress, Status & Management Report
DI-MGMT-81452Mass Properties Control and Management Process (MPCMP)Report
DI-MGMT-81453Data Accession List (DAL)
DI-MGMT-81606Statement of Work (SOW)
DI-MGMT-81808Contractor’s Risk Management Plan
DI-MGMT-81809Risk Management Status Report

DI-MISC-81384 Service Engineering Report (SER)

DI-MISC-81832Counterfeit Prevention Plan
DI-SAFT-80101System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80102Safety Assessment Report (SAR)
DI-SAFT-80105System Safety Program Progress Report (SSPPR)
DI-MGMT-80033Site Preparation Requirements & Installation Plan

3.3.2 Program Manager. The Contractor shall appoint a Program Manager to provide the overall management of program, personnel, planning, quality control, business management/contracting, direction, coordination and reviews necessary to assure effective contract performance. The Contractor Program Manager shall serve as a counterpart to, and interface with, the PIF-3 Manager for the contract. The Contractor Program Manager shall attend or provide representation at the weekly PIF team meeting.

3.3.3 TO/DO Award Process. In some cases the Contractor will receive a TO/DO Statement of Objectives (SOO) from the Government, and in response the Contractor shall provide a proposed TO/DO SOW IAW DI-MGMT-81606 and MIL-HDBK-245 (for guidance only). The Contractor shall provide an Order Execution Plan (OEP) IAW DI-MGMT-80004 in response to each Order Request for Proposal (ORFP) received from the Government, which will include a SOW. As specified in the ORFP, the OEP must delineate how the Contractor plans to accomplish the effort supporting the specific TO/DO, to include a breakout of labor hours by labor category, travel, required material, and other direct costs; a TO/DO integrated master schedule; and a schedule for the planned expenditure of funds, all to at least the third level Work Breakdown Structure (WBS) IAW MIL-STD-881.

The Contractor shall perform specific work as directed and funded by individual TO/DOs. Each awarded TO/DO will include, at a minimum, the estimated cost ceiling and applicable fee arrangement or fixed price, as applicable; funding; the period of performance; the required deliverables (with CDRL references); the TO/DO-specific SOW; and any special instructions and clauses applicable to the given TO/DO.

3.3.4 Contractor Project Lead. The Contractor shall identify a CPL for each TO/DO to serve as a counterpart to the COR/GPL. The CPL shall work with COR/GPL to facilitate the successful award and execution of TO/DOs.

3.3.5 Programmatics. The Contractor shall develop, implement and perform programmatic processes to accomplish all efforts as described in this SOW. The Contractor shall develop and maintain integrated master schedules IAW DI-MGMT-81861 as specified within individual TO/DOs. The Contractor shall perform cost/schedule analysis and tracking to allow the COR/GPL or designated representative visibility of each project. The Contractor shall track actual costs and schedules against budgeted estimates. The Contractor shall maintain current and complete Performance and Cost expenditures for each TO/DO issued using automated cost reporting methods and software. The Contractor shall prepare a report of this information IAW DI‑FNCL‑80912. The Contractor shall establish and maintain an Earned Value Management System (EVMS) in compliance with ANSI/EIA 748 to manage and track the status of TO/DOs that meet the criteria for EVMS as delineated in the TO/DOs. As required by individual TO/DOs, the Contractor shall develop the following data IAW the DIDs listed below:

DI-FNCL-80331Funds & Man-Hour Expenditure Report
DI-MGMT-80368Status Report
DI-MGMT-80555Program Progress Report
DI-MGMT-81468Contract Funds Status Report (CFSR)
DI-MGMT-81861Integrated Program Management Report (IPMR)
DI‑FNCL‑80912Performance and Cost Report

3.3.6 Contractor Integrated Technical Information Service. The Contractor shall provide a Contractor Integrated Technical Information Service (CITIS) for data storage for purchasing status, property management, logistics products, engineering data, manufacturing and production status, and all data generated for this contract, for on-line viewing and retrieval by the COR/GPLs and other Government personnel. The Contractor shall backup the CITIS data daily.

All CDRL data shall be submitted IAW DD Form 1423. The Contractor shall submit CDRL data into the AMRDEC electronic Product Data Management (ePDM; i.e., Windchill) site and shall interface with the AMRDEC ePDM site to resolve comments related to CDRL data.

3.3.7 Office Space for Government Personnel. The Contractor shall provide office space and general office equipment, excluding computers, for up to three Government personnel at each contractor facility, not to exceed 15 personnel total for all contractor facilities combined. The contract COR will issue a written notification identifying the Government personnel requiring access. Within 48 hours of receipt of that notification, the Contractor shall grant full access to the Government personnel including provision of any and all items or paperwork that the Government personnel will need in order to be granted occupancy of the office space unescorted on a partial or full-time basis and may include provision of facility identification, access codes, and key cards.

3.3.8 Risk Management. The Contractor shall execute a risk management program that assesses and identifies program risks and identifies mitigation approaches to reduce the cost, schedule, and technical risks for each order/activity. The Contractor shall develop, submit, and implement a Risk Management Plan (RMP) IAW DI-MGMT-81808. Additional program specific requirements for Risk Mitigation Plans will be identified in individual TO/DOs.

3.3.9 Subcontractor Management. The Contractor shall identify processes for selecting, qualifying and managing subcontractors/suppliers, managing product and processes, flowing applicable requirements to subcontractors/suppliers, assessing subcontractor/suppliers capabilities, verifying compliance of subcontractors/suppliers and establishing metrics for continuously monitoring and rating supplier performance. The supplier rating system results shall be made available for Government review via in-plant reviews or on-line quality system. The Contractor shall address product acceptance requirements for suppliers with emphasis on product verification at the supplier level in order to reduce the amount of incoming receiving inspection and test. The Contractor shall identify key features, characteristics and performance requirements that shall be verified at the component acceptance test level. The Contractor shall flow down all applicable quality requirements, associated specifications, and any other contractual agreements to their lower tier subcontractors/suppliers and verify their compliance.

3.3.10 Counterfeit Risk Management Plan. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan for submittal and Government approval in accordance with DI-MISC-81832 and AMRDEC Standard Operating Procedures (SOP) 70-04. The Plan shall meet the requirements of Society of Automotive Engineers (SAE) AS5553 for electronic items and SAE AS6174 for non-electronic items, and shall apply to all subcontractors. The Contractor shall procure parts, materials, and materiel from original manufacturers or the original manufacturers' franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-PRO-010.

3.3.11 Program Management Reviews. The Contractor shall conduct quarterly reviews with the Government of all active TO/DOs and continuous improvement programs. Historical figures indicate that there are approximately 200 active task orders and up to five continuous improvement initiatives at any given time. The Contractor shall conduct monthly reviews with the PIF-3 Manager and other Government personnel to discuss issues or items of concern for both active tasks and in-process OEPs, as well as the overarching contract. Review materials shall be provided IAW with DI-ADMN-81373. The Contractor shall provide additional program management reviews as required by individual order SOWs.

3.4 Design

The Contractor shall research and develop design concepts for new and the upgrade of existing systems, subsystems and components as required by each individual TO/DO.

3.4.1 Design Data Items. The Contractor shall perform design efforts, IAW individual TO/DOs issued, to support electronic and mechanical systems, subsystems and components design, fabrication, assembly, integration, test/qualification and sustainment. As required by each individual TO/DO, the Contractor shall develop the following data IAW the DIDs listed below:

DI-ATTS-80283Test Program Set (TPS) Acceptance Test Report (ATR)
DI-ATTS-80285Engineering Support Data (ESD)
DI-DRPR-81961Engineering Drawing Tree
DI-EMCS-80201Electromagnetic Interference Test Procedures (EMITP)
DI-SESS-80198Internal Loads and Static Strength Analysis Report
DI-GDRQ-81234Estimated Weight and Balance Report - Mass Properties Data
for Missiles
DI-HFAC-80746Human Engineering Design Approach Document-Operator
DI-MFFP-81403Corrosion Prevention and Control Plan
DI-MGMT-81501Weight and Balance Report for Aircraft
DI-SESS-80688Engineer Design Test Plan
DI-MGMT-81117Technical and Management Work Plan
DI-MGMT-81232System Problem Report - SPR

DI-MISC-80048 Scientific and Technical Reports Summary

DI-MISC-80508Technical Report - Study/Services
DI-MISC-80711Scientific & Technical Reports
DI-MISC-80759Contractor Validation Plan
DI-SESS-81000Product Drawings/Models and Associated Lists
DI-SESS-81001Conceptual Design Drawings/Models
DI-SESS-81002Developmental Design Drawings/Models and Associated Lists
DI-SESS-81003Commercial Drawings/Models and Associated Lists
DI-SESS-81704Test Plans/Test Procedures
DI-PSSS-81656Bill of Materials (BOM) for Diminishing Manufacturing Sources and Material Shortages Management

The Contractor shall ensure that all design activities are in compliance with the following standards:

SAE-ARP-4754Guidelines for Development of Civil Aircraft and Systems
SAE-ARP-4761Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and EquipmentDO-178Software Considerations in Airborne Systems and Equipment Certification
ISO/IEC 12207Systems and Software Engineering
MIL-STD-882Systems Safety
MIL-STD-961Defense and Program-unique Specifications Format and Content

3.4.2 Research and Development. The Contractor shall conduct research on potential design solutions, identify available system options, conduct analysis of alternatives, and develop final design solutions that meet system requirements as defined in the individual TO/DOs.

3.4.3 Electrical Design. The Contractor shall design/layout printed circuit boards, cables, wire harnesses, and other electronic assemblies from engineering sketches and schematics as required by each individual TO/DO. Acceptance of cables and wire harnesses will be IAW SAE AS50881, Wiring Aerospace Vehicle and IPC/WHMA-A-620 – Requirements and Acceptance for Cable and Wire Harness Assemblies.

3.4.4 Mechanical Design. The Contractor shall develop mechanical designs and concepts of housings, chassis, fixtures, jigs, tools and other mechanical assemblies as required by each individual TO/DO.

3.4.5 Aerospace Design. The Contractor shall develop and design aerospace components for aircraft as required by each individual TO/DO.

3.4.6 Modeling and Simulation. The Contractor shall model, simulate and analyze designs of electrical circuits and mechanical systems, subsystems and components as required by each individual TO/DO.

3.4.7 Software. The Contractor shall develop and integrate software code for the function of integrated circuits, circuit card assemblies, electronic, and electro-mechanical assemblies as required by each individual TO/DO.

3.4.8 Knowledge Transfer Systems. The Contractor shall design and develop hardware and software systems, as required by the TO/DOs, that provide a representative mockup of the operation of an aircraft, vehicle, or other complex system to be used for knowledge transfer purposes.

3.4.9 Design Reviews. The Contractor shall conduct design reviews to include design requirements reviews, concept reviews, interim design reviews, detailed design reviews, software reviews, and other reviews as required by the TO/DOs. The concept design review shall be a review of the design concept or concepts being considered for a particular application. The interim design review shall be a technical review of the basic design approach for a Configuration Item (CI) or for a functionally related group of CIs. Detailed design reviews shall be conducted on each CI prior to fabrication/production/coding release to insure that the detail design solutions and technical data package are updated. The overall risks associated with the technical design, manufacturing, cost and schedule for each CI shall also be reviewed during the detailed design review.

3.4.10 Technical Data Package. The Contractor shall provide a Technical Data Package (TDP) as required by each individual TO/DO. The technical description of an item shall be adequate to support the acquisition strategy for the item, to include production, engineering and logistics support. The TDP shall define the performance requirements for the item and procedures required to ensure adequate performance. The TDP shall be prepared IAW MIL-STD-31000 and consist of applicable technical data such as models, engineering drawings, associated lists, specifications, standards, performance requirements, quality requirements, software documentation and packaging details suitable for competitive re-procurement as required by each individual TO/DO.

3.4.11 Drawings. The Contractor shall prepare Product Drawings/Models and Associated Lists IAW DI-SESS-81000 or Developmental Design Drawings/Models and Associated Lists IAW DI-SESS-81002 using American Society of Mechanical Engineers (ASME) Y14.24, Y14.100, and Y14.37. The contractor shall prepare the type of drawings required by each individual TO/DO. Units of measure shall be US customary units. The Contractor shall develop Interface Control Documents (ICD) for production systems of each variant and prepare a Drawing Tree IAW DI-DRPR-81961 for each variant as required by each individual TO/DO.

3D Digital Computer-Aided Design (CAD) Model files specifically requested in individual TO/DOs or developed as an integral part of the design process shall be delivered as attachments to the associated two-dimensional (2D) drawings. Successful delivery of these files shall be contingent on properly linked assemblies, models, and drawings.

3.4.12 Design Documentation. The Contractor shall develop and compile electrical and mechanical schematics and drawings, designs and quality assurance provisions as required by individual TO/DOs. This shall include the update of technical manuals, development of Modification Work Orders (MWO), TDPs, provisioning, engineering change proposals, technical manuals, and other logistical data. The Contractor shall prepare all engineering documentation IAW MIL-STD-52406-IS and MIL-PRF-5480. The Contractor shall prepare technical manuals IAW MIL-PRF-63002, MIL-STD-40051-1 and MIL-STD-40051-2. Additional data requirements shall be defined in the individual TO/DOs and shall be prepared IAW the following:

DI-SESS-81758 Logistics Product Data DI-SESS-81759 Logistics Product Data Summaries

DI-ILSS-80095Integrated Logistics Support Plan
DI-ILSS-80134Proposed Spare Parts List
DI-ILSS-80872Training Materials
DI-ILSS-81251Equipment Inventory Records (EIRS)
DI-SESS-81495Failure Modes, Effects, and Criticality Analysis Report
DI-SESS-81497Reliability and Maintainability Predictions Report
DI-SESS-81518Instructional Performance Requirements Document
DI-SESS-81519Instructional Media Requirements Document
DI-SESS-81520Instructional Media Design Package
DI-SESS-81521Training Program Structure Document
DI-SESS-81523Training Conduct Support Document
DI-SESS-81525Test Package
DI-SESS-81715Provisioning Parts List (PPLs)
DI-SESS-81874Engineering Data for Provisioning (EDFP)
DI-SESS-81968Reliability and Maintainability (R&M) Allocation Report
DI-TMSS-80067Technical Manual (TM) Contractor Furnished Aeronautical
Equipment or Contractor Furnished Equipment (CFAE/CFE)
Notices
DI-TMSS-80527Commercial Off-The-Shelf (COTS) Manual & Associated
Supplemental Data
DI-TMSS-81818Technical Manual Validation Plan

3.4.13 Obsolescence Mitigation. The Contractor shall provide required support to conduct obsolescence assessments and develop processes, procedures and execution plans for component/system obsolescence mitigation. Continuous technological improvement activities shall maximize opportunities for product improvement available from emerging technological advances in the commercial market place. Non-developmental items (NDI) and COTS products shall be used to the maximum practicable extent. The Contractor shall apply commercially available processes and technologies to the maximum practicable extent.

3.5 Fabrication

The Contractor shall fabricate and assemble hardware and software/firmware into an end item in order to prove out design concepts, documentation, and manufacturability and support the development of rapid response hardware integration solutions as required by individual TO/DOs.

3.5.1 Fabrication Data Items. Specific data requirements will be defined in the individual TO/DOs and shall be prepared IAW the following:

DI-SESS‑81359 Parts List

3.5.2 Mechanical Systems Fabrication. The Contractor shall fabricate mechanical systems and assemblies of housings, chassis, fixtures, jigs, tools and other mechanical assemblies as required by each individual TO/DO. Material, tolerance and schedule requirements will differ from part to part. Some requirements may best be fulfilled through the utilization of traditional and advanced machining and manufacturing techniques such as Computer Numerical Controlled (CNC) machining, welding, drilling, pressing, forging, casting, molding, extrusions, laminated assemblies, additive manufacturing, and 3D printing. The Contractor shall apply paint, adhesives, lubricants, and other coatings as required by the TO/DOs.

3.5.3 Electrical Systems Fabrication. The Contractor shall fabricate printed circuit boards, cables, wiring harnesses and other electronic assemblies as required by each individual TO/DO. The Contractor shall comply with the requirements IAW SAE-AS50881, Wiring, Aerospace Vehicle and IPC/WHMA-A-620 – Requirements and Acceptance for Cable and Wire Harness Assemblies, for all design and fabrication of wiring harnesses unless otherwise specified at the TO/DO level.

3.5.4 Composites Fabrication. The Contractor shall fabricate and repair advanced composite components for aerospace and military systems as required by each individual TO/DO. Advanced composites may include utilization of fiber reinforcements, matrix components (resins and hardeners), pre-impregnated materials, paste adhesives, sealants, laminated parts, and other materials as specified in the TO/DOs.

3.5.5 Acquisition of Materials. The Contractor shall compile parts, materials, and supply lists IAW DI-SESS‑81359; acquire parts, materials, and supplies necessary to perform all fabrication efforts; and maintain inventory control of all parts, equipment, tools and supplies IAW the Government Property clause of the contract.

3.5.6 Warranties. The Contractor shall convey all commercial warranties obtained by the Contractor to the Government with the items covered by these warranties. Items acquired under this contract may require warranty protection; however, the type of warranty and extent of coverage will be determined on a TO/DO basis.

3.6 Subsystem/System Integration

The Contractor shall integrate parts/items/components into subsystems as required by individual TO/DOs. The Contractor shall integrate those subsystems into existing systems and platforms as required by individual TO/DOs.

3.6.1 Subsystem/System Integration Data Items. Specific data requirements will be defined in the individual TO/DOs and shall be prepared IAW the following:

DI-SESS-81248 Interface Control Document (ICD)

3.6.2 Interface Requirements. The Contractor shall identify and address all interface requirements during the design process. The Contractor shall identify and document internal and external interfaces and dependencies in an Interface Control Document IAW DI-SESS-81248. The Contractor shall utilize open architecture when possible as defined by the TO/DOs.

3.6.3 Sub-system Integration. The Contractor shall integrate parts/items/components into sub-systems and conduct testing to ensure that these sub-systems function together to achieve the intended system requirements as defined by the TO/DOs.

3.6.4 System-level Integration. The Contractor shall integrate sub-systems into existing systems and platforms in preparation for qualification testing as defined by the TO/DOs.

3.7 Qualification Testing

The Contractor shall test and/or qualify processes, hardware, software, and firmware as required by individual TO/DOs.

3.7.1 Qualification Testing Data Items. As required by each individual TO/DO, the Contractor shall develop data IAW the DIDs listed below:

DI-QCIC-80553Acceptance Test Plan (ATP)
DI-QCIC-81110Inspection & Test Plan
DI-QCIC-81890Qualification Test Report
DI-QCIC-81891Acceptance Test Report (ATR)
DI-SESS-81022Configuration Audit Summary Report and Certification
DI-SESS-81646Configuration Audit Plan
DI-SESS-81704Test Plans/Test Procedures

3.7.2 Validation of Procedures. The Contractor shall validate end item qualification test procedures, Acceptance Test Plans (ATPs) and equipment, including Special Inspection Equipment (SIE) and Special Test Equipment (STE), prior to use for inspection or test of hardware as required by individual TO/DOs. The Contractor shall provide the Government the opportunity to participate in the validation of these procedures and equipment. The Contractor shall prepare inspection and test plans IAW DI-QCIC-81110.

3.7.3 Qualification Testing. The Contractor shall prepare test procedures IAW DI-SESS-81704 and conduct qualification testing in accordance with Government-approved qualification test procedures as required by each TO/DO. The Contractor shall provide a Qualification Test Report IAW DI-QCIC-81890 upon completion of testing as required by each individual TO/DO.

3.7.4 Acceptance Testing. The Contractor shall prepare Acceptance Test Plans IAW DI-QCIC-80553 and conduct acceptance testing in accordance with Government-approved ATPs as required by each TO/DO. The Contractor shall provide an Acceptance Test Report IAW DI-QCIC-81891 upon completion of testing as required by each individual TO/DO.

3.7.5 Functional Configuration Audit. Contractual compliance to the Functional Baseline stage defined by the PIF Quality Management Systems (QMS) will be verified by the Government through Functional Configuration Audits (FCAs) or as required by each individual TO/DO.

The Contractor shall prepare an FCA plan IAW DI-SESS-81646 and conduct a FCA with Government witness to verify that the functional baseline stage adequately reflects the requirements of individual TO/DOs. The FCA may be performed incrementally as the Contractor completes CI verification. The Contractor shall complete the FCA after the Qualification Test has been completed. The Contractor shall submit the results of this audit IAW DI-SESS-81022.

3.7.6 Physical Configuration Audit. The Contractor shall prepare a PCA plan IAW DI-SESS-81646 as required by each individual TO/DO. The Government will conduct a PCA to verify that the configuration documentation accurately reflects the design requirements and the as-built CIs. The Contractor shall support the PCA by providing the necessary documents, drawings and resources to each member of the Government audit team. The Contractor shall correct any discrepancies identified by the Government. The Government may perform the PCA incrementally and will complete the PCA after the Qualification Test has been completed. The Contractor shall submit the results of this audit IAW DI-SESS-81022.

3.7.7 Test Reviews. The Contractor shall support test readiness reviews as specified by the TO/DOs.

3.7.8 Flight Readiness Reviews. The Contractor shall support flight readiness reviews as specified by the TO/DOs.

3.8 Logistics

The Contractor shall preserve, package, transport, deliver, and support the fielding of all hardware by the most economically feasible means available that meets schedule and transportation requirements while applying commercially available processes and technologies to the maximum practicable extent unless otherwise specified within individual TO/DOs.

3.8.1 Logistics Data Items. The Contractor shall develop the data IAW the DIDs listed below:

DI-MISC-81499Packaging Kit Contents List
DI-PACK-80120Preservation and Packing Data
DI-PACK-80121Special Packaging Instructions (SPI)
DI-PACK-80880Transportability Report
DI-PACK-81059Performance Oriented Packaging Test Report

3.8.2 Packaging. The Contractor shall provide packaging support for hardware and software as specified in the TO/DOs. The Contractor shall package parts/items/components for optimal preservation during shipping and storing. The Contractor shall include a packing list with the packaged parts/items/components IAW DI-PACK-80120 as specified by the TO/DOs.

3.8.3 Delivery of Hardware. The Contractor shall deliver hardware to field sites as required by each individual TO/DO. The term “hardware” includes all hardware items procured, fabricated, integrated or otherwise supported under this contract.

3.8.4 Delivery of Software. The Contractor shall deliver and install software onto associated platforms as required by each individual TO/DO.

3.8.5 Receiving and Storage. The Contractor shall comply with any specific instructions for packaging, delivery, receipt and storage of Government property in addition to the requirements of Federal Acquisition Regulation (FAR) clause 52.245-1 as specified by each individual TO/DO.

3.9 Operation and Support

The Contractor shall provide required support to develop processes, procedures and execution plans for the installation, setup, overhaul, and reset of components, systems or subsystems and associated hardware as required by the TO/DOs. The Contractor shall conduct flight operations as required by the TO/DOs.

3.9.1 Operation and Support Data Items. As required by each individual TO/DO, the Contractor shall develop data IAW the DIDs listed below:

DI-MISC-81321 Equipment Installation Instructions

For all modification, repair, and overhaul activities the Contractor shall comply with all applicable U.S. Army regulations and requirements including:

DA PAM 750-8The Army Maintenance Management System (TAMMS) Users Manual
DA PAM 738-751Functional Users Manual for the Army Maintenance Management System - Aviation
DA PAM 95-9Management of Aviation Critical Safety Items
TM 1-1500-323-24-1 through 4Installation and Repair Practices Series
TM 1-1500-328-23Aeronautical Equipment Maintenance Management Policies and Procedures
TM 1-1500-204-23-1 through 11General Aircraft Maintenance Series

3.9.2 Installation and Setup. The Contractor shall provide installation services for equipment that the contractor has produced, acquired, or received from the Government as GFE as specified in the TO/DOs. The Contractor shall prepare Equipment Installation Instructions IAW DI-MISC-81321. The Contractor shall prepare the field site for the location of permanent or temporary systems installations as specified in the TO/DOs. The Contractor shall perform the setup of equipment and ensure that the system is fully operational.

3.9.3 Training. The Contractor shall provide field training support for operation and maintenance of installed equipment, as required by TO/DO.

3.9.4 Overhaul. The Contractor shall develop processes and procedures for overhaul of military hardware IAW DI-MISC-81321 as specified by TO/DO. When required, the Contractor shall perform verification, validation, demonstration, and other unique objectives within the same TO/DO or by subsequent…