REQUEST FOR INFORMTION (RFI) RESPONSES TO SOLICITATION NO. W56ZTN-18-R-0002 DATED 27 JUNE 2018
| 1 |
| For the Ductile Iron Pipe, assumed to be for a water line; is the testing of the line and tap into existing line to be included in these unit prices? |
Yes. Unit Pricing shall be fully loaded prices.
| 2 |
| In regards to the Key Personnel can the QC Manager hold the Degree in the Civil Construction Field in lieu of the Project Manager? |
| No. Project Manager shall have an Engineering Degree as required in the solicitation. |
| 3 |
| Regarding Key Personnel QC Manager: Can additional personnel be utilized that have the ACI and NICET certification as part of the QC Team? |
| Yes. |
| 4 |
| Regarding Key Personnel QC Manager: It is stated in this section that you’re requiring a Storm Water Permit Certification. Are you referring to the Maryland Dept. of the Environments Soil Erosion and Sediment Control Certification otherwise known as the MDE Green Card? |
| Yes. The Government is referring to the Maryland Department of the Environment (MDE) Erosion and Sediment Control Certification. |
| 5 |
| Regarding Key Personnel QC Manager: Currently the WACEL Level 1 Soil Certification has been utilized as and or equal to the (NICET) Level 1 Soil certification. Please confirm. |
| Yes. Government will accept WACEL or NICET Certification. |
| 6 |
| Can a Third-Party Engineering and Inspection Firm that hold the (ACI) Concrete Field Testing Certification, Storm Water Permit Certification and level 1 Soil Certification be used in conjunction with our QC Manager to fulfill requirements of the QCM and perform all the required testing for the Contract. |
| Yes. See revised RFP sections with changes made in track changes. |
| 7 |
| What is the anticipated award date for this contract? |
| See the Delivery Information in the Solicitation for anticipated Period of Performance (POP) dates. |
| 8 |
| On the Base Year spreadsheet, to the right of 1007AO-1007AS there is information for 5008AA-5008AD which includes pricing. On the other 4 spreadsheets, only part of this information is there. Is this missing? |
Is a revised Pricing sheet going to be provided to include the above referenced “revised CLIN” numbers?
See the revised CLIN Listings issued under Amendment No. 0004 dated 11 June 18.
| 9 |
| Specifications needed to CLIN numbers 10 25 AF – 10 25 AQ fencing system, chain link, gates and wire. |
| Please note that specifications for Chain Link Fence requirements shall be in accordance with the specifications outlined by the Maryland Department of Transportation State Highway Administration, Standard Specification for Construction and Materials Manual dated January 2011 as specified in the Scope of Work, Specification 2.1. Please review line items. |