RFIs_to_Paving_Solicitation_as_of_27_Jun_18.docx

DOCX document 19 KB Posted

Attached to
Post-wide paving & civil works re-compete, APG, MD
Solicitation number
W56ZTN-18-R-0002
Issued by

About this file

Responses to RFIs dated 27 June 2018

View the file

Other files

File Type Posted
A07-CONTRACTOR_Line_Items_for_bid-OPTION_3_rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_1_-rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_4-rev9July18R.xls XLS spreadsheet
RFIs_to_Paving_Solicitation_as_of_11_Jul_18.docx DOCX document
Amendment_No_0008_dated_11_July_2018.pdf PDF
A07-CONTRACTOR_Line_Items_for_bid-BASE_YEAR-rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_2-rev9July18R.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_2-rev3July18.xls XLS spreadsheet
W56ZTN-18-R-0002-Amendment_0007.pdf PDF
CONTRACTOR_Line_Items_for_bid-BASE_YEAR-rev3July18.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_4-rev3July18.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_3-rev3July18.xls XLS spreadsheet
A07_AMENDMENT_0006_DATED_27_JUNE_2018.pdf PDF
A07_Amendment_No_0005_dated_21_June_2018.pdf PDF
A07_Amendment_No_0004_dated_11_June_18.pdf PDF
RFIs_to_Paving_Solicitation_as_of_11_Jun_18.docx DOCX document
A07_SITE_VISIT_SIGN-IN_SHEETS_08_MAY_2018.pdf PDF
AMENDMENT_NO_0003_DATED_5_JUNE_2018.pdf PDF
A07_-_Sample_Projects_from_Prior_Contracts_(Amendment_0002_attachment).pdf PDF
A07-W56ZTN-18-R-0002-Amendment_0002.pdf PDF
W56ZTN-18-R-0002-Amendment_0001.pdf PDF
A07-Past_Performance_Questionnaire-Attachment.docx DOCX document
02010_Unexploded_Ordnance.doc DOC document
02371_GABIONS.rtf RTF text file
01400_Contractor_Quality_Control.rtf RTF text file
03307_MISC._STRUCTURES.rtf RTF text file
02840_TRAFFIC_BARRIERS.rtf RTF text file
02618_PAVEMENT_MARKINGS.rtf RTF text file
02410_UNDERDRAINS.rtf RTF text file
02964_MILLING_ASPHALT_PAVEMENT.rtf RTF text file
16375__LOOP_DETECTORS.rtf RTF text file
02375_SOIL_STAB__MATTING.rtf RTF text file
02500_STORM_DRAINAGE__SEDIMENT_CONTROL.rtf RTF text file
01012_Excavation_Pmt_form_1247-R.doc DOC document
02800_CURBS_GUTTERS__WALKS.rtf RTF text file
01011_General_Conditions.rtf RTF text file
02315_EXCAVATION_FOR_INCIDENTAL_CONSTRUCTION.rtf RTF text file
02000_WORK_ZONE.rtf RTF text file
02241_AGGRGATES.rtf RTF text file
02223_EXCAVATION__GRADING.rtf RTF text file
03200_REINFORCING.rtf RTF text file
02485_TOPSOIL__TURF.rtf RTF text file
02230_CLEARING__GRUBBING.rtf RTF text file
02557_HOT_MIX_PATCH.rtf RTF text file
03371_WHEEL_STOPS.rtf RTF text file
02515_PORTLAND_CEMENT_CONCRETE.rtf RTF text file
02762_JOINT_SEALING.rtf RTF text file
01561_Environmental_Conditions.doc DOC document
02554_HOT_MIX_ASPHALT.rtf RTF text file
02002_STAKE_OUT.rtf RTF text file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMTION (RFI) RESPONSES TO SOLICITATION NO. W56ZTN-18-R-0002 DATED 27 JUNE 2018

No.
Question:
Response:
1
For the Ductile Iron Pipe, assumed to be for a water line; is the testing of the line and tap into existing line to be included in these unit prices?

Yes. Unit Pricing shall be fully loaded prices.

2
In regards to the Key Personnel can the QC Manager hold the Degree in the Civil Construction Field in lieu of the Project Manager?
No. Project Manager shall have an Engineering Degree as required in the solicitation.
3
Regarding Key Personnel QC Manager: Can additional personnel be utilized that have the ACI and NICET certification as part of the QC Team?
Yes.
4
Regarding Key Personnel QC Manager: It is stated in this section that you’re requiring a Storm Water Permit Certification. Are you referring to the Maryland Dept. of the Environments Soil Erosion and Sediment Control Certification otherwise known as the MDE Green Card?
Yes. The Government is referring to the Maryland Department of the Environment (MDE) Erosion and Sediment Control Certification.
5
Regarding Key Personnel QC Manager: Currently the WACEL Level 1 Soil Certification has been utilized as and or equal to the (NICET) Level 1 Soil certification. Please confirm.
Yes. Government will accept WACEL or NICET Certification.
6
Can a Third-Party Engineering and Inspection Firm that hold the (ACI) Concrete Field Testing Certification, Storm Water Permit Certification and level 1 Soil Certification be used in conjunction with our QC Manager to fulfill requirements of the QCM and perform all the required testing for the Contract.
Yes. See revised RFP sections with changes made in track changes.
7
What is the anticipated award date for this contract?
See the Delivery Information in the Solicitation for anticipated Period of Performance (POP) dates.
8
On the Base Year spreadsheet, to the right of 1007AO-1007AS there is information for 5008AA-5008AD which includes pricing. On the other 4 spreadsheets, only part of this information is there. Is this missing?

Is a revised Pricing sheet going to be provided to include the above referenced “revised CLIN” numbers?

See the revised CLIN Listings issued under Amendment No. 0004 dated 11 June 18.

9
Specifications needed to CLIN numbers 10 25 AF – 10 25 AQ fencing system, chain link, gates and wire.
Please note that specifications for Chain Link Fence requirements shall be in accordance with the specifications outlined by the Maryland Department of Transportation State Highway Administration, Standard Specification for Construction and Materials Manual dated January 2011 as specified in the Scope of Work, Specification 2.1. Please review line items.