02002_STAKE_OUT.rtf
RTF text file 40 KB Posted
- Solicitation number
- W56ZTN-18-R-0002
About this file
02002
Text of this file
02002-1
SECTION 02002
CONSTRUCTION STAKE OUT
1. GENERAL:
Provide all labor, materials, equipment and services necessary for and incidental to the execution and completion of construction stake outs, layouts, grades and elevation controls.
2. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced.
2.1 The work under this Section shall be in accordance with section 107 of the Maryland Department of Transportation State Highway Administration's Standard Specifications for Construction and Materials," dated July 2008, including the latest errata and addenda thereto, referred to herein as the Maryland State Specification, except as may be modified herein.
2.2 References to "Engineer" or "Administration" shall be interpreted to mean "Contracting Officer" or "Government," respectively, with the exception that Section 107.03 shall be interpreted to mean the Contractors Engineer and Surveyor.
2.3 Delete all references to "Measurement and Payment."
3. All control data shall be tied into the post system. Point of Contact for Control Data on APG is Mr. Gene Burchette at the ATC Geodetic Section 410-278-2427 or 410-278-3527.
4. CONSTRUCTION METHODS
4.1 All work shall be performed in accordance with Section 107 of the Maryland State Specification with the noted exception that this work shall be performed by the Contractor.
*END OF SECTION*
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.