01330_SUBMITTALS__PROPOSALS.DOC

DOC document 31 KB Posted

Attached to
Post-wide paving & civil works re-compete, APG, MD
Solicitation number
W56ZTN-18-R-0002
Issued by

About this file

01330

View the file

Other files

File Type Posted
A07-CONTRACTOR_Line_Items_for_bid-OPTION_3_rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_1_-rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_4-rev9July18R.xls XLS spreadsheet
RFIs_to_Paving_Solicitation_as_of_11_Jul_18.docx DOCX document
Amendment_No_0008_dated_11_July_2018.pdf PDF
A07-CONTRACTOR_Line_Items_for_bid-BASE_YEAR-rev9July18R.xls XLS spreadsheet
A07-CONTRACTOR_Line_Items_for_bid-OPTION_2-rev9July18R.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_2-rev3July18.xls XLS spreadsheet
W56ZTN-18-R-0002-Amendment_0007.pdf PDF
CONTRACTOR_Line_Items_for_bid-BASE_YEAR-rev3July18.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_4-rev3July18.xls XLS spreadsheet
CONTRACTOR_Line_Items_for_bid-OPTION_YEAR_3-rev3July18.xls XLS spreadsheet
A07_AMENDMENT_0006_DATED_27_JUNE_2018.pdf PDF
RFIs_to_Paving_Solicitation_as_of_27_Jun_18.docx DOCX document
A07_Amendment_No_0005_dated_21_June_2018.pdf PDF
A07_Amendment_No_0004_dated_11_June_18.pdf PDF
RFIs_to_Paving_Solicitation_as_of_11_Jun_18.docx DOCX document
A07_SITE_VISIT_SIGN-IN_SHEETS_08_MAY_2018.pdf PDF
AMENDMENT_NO_0003_DATED_5_JUNE_2018.pdf PDF
A07_-_Sample_Projects_from_Prior_Contracts_(Amendment_0002_attachment).pdf PDF
A07-W56ZTN-18-R-0002-Amendment_0002.pdf PDF
W56ZTN-18-R-0002-Amendment_0001.pdf PDF
A07-Past_Performance_Questionnaire-Attachment.docx DOCX document
02010_Unexploded_Ordnance.doc DOC document
02371_GABIONS.rtf RTF text file
01400_Contractor_Quality_Control.rtf RTF text file
03307_MISC._STRUCTURES.rtf RTF text file
02840_TRAFFIC_BARRIERS.rtf RTF text file
02618_PAVEMENT_MARKINGS.rtf RTF text file
02410_UNDERDRAINS.rtf RTF text file
02964_MILLING_ASPHALT_PAVEMENT.rtf RTF text file
16375__LOOP_DETECTORS.rtf RTF text file
02375_SOIL_STAB__MATTING.rtf RTF text file
02500_STORM_DRAINAGE__SEDIMENT_CONTROL.rtf RTF text file
01012_Excavation_Pmt_form_1247-R.doc DOC document
02800_CURBS_GUTTERS__WALKS.rtf RTF text file
01011_General_Conditions.rtf RTF text file
02315_EXCAVATION_FOR_INCIDENTAL_CONSTRUCTION.rtf RTF text file
02000_WORK_ZONE.rtf RTF text file
02241_AGGRGATES.rtf RTF text file
02223_EXCAVATION__GRADING.rtf RTF text file
03200_REINFORCING.rtf RTF text file
02485_TOPSOIL__TURF.rtf RTF text file
02230_CLEARING__GRUBBING.rtf RTF text file
02557_HOT_MIX_PATCH.rtf RTF text file
03371_WHEEL_STOPS.rtf RTF text file
02515_PORTLAND_CEMENT_CONCRETE.rtf RTF text file
02762_JOINT_SEALING.rtf RTF text file
01561_Environmental_Conditions.doc DOC document
02554_HOT_MIX_ASPHALT.rtf RTF text file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01330

SUBMITTALS & PROPOSALS

GENERAL

Proposals and submittals shall be provided in separate documents.

1. PROPOSALS

Documents that include proposed deviations from the contract are not by definition submittals, they are by definition proposals. All proposals shall be identified as proposals. Where the contractor intends to deviate from a specified requirement, the contractor shall clearly mark that document as a PROPOSAL.

2. SUBMITTALS

The contractor shall provide submittals as required in the Maryland State Specification, and in these specifications.

2.1 SUBMITTAL REVIEW

Prior to submitting them to the Government, the contractor shall review and certify in writing that what is being submitted meets the requirements specified.

3. SIGNED CERTIFICATRION: Each submittal shall be signed by an official of the company and shall contain the name and address of the Contractor, the material manufacturer, and the project name. Copies of laboratory reports submitted shall contain the name and address of the testing laboratory, and the dates of the tests to which the reports apply.

4. NUMBER TO BE PROVIDED: Four sets of signed shop drawings, plant and material lists, catalog cuts, equipment lists, etc, shall be provided not less than three weeks prior to procurement of such materials, equipment, etc.

5. Government approval of submittals shall not be construed as relieving the Contractor from meeting specified requirements.

6. Submittals not called for by the government require no action by the government.

7. SAMPLES: Samples required by the government shall be:

7.1 Properly identified and labeled for ready identification

7.2 Be certified in writing by the contractor as meeting the specified requirements.

7.3 Be stored at the job site until all work has been completed and accepted by the Contracting Officer.

7.4 May be retained by the government; or the contractor shall remove any samples, as required by the contracting officer.

**END OF SECTION**