DRAFT_Task_Order_0001_PWS_Platform_Mission_Equipment_Software_Branch_(PMESB)__06_Feb_2017.docx
DOCX document 62 KB Posted
- Attached to
- Platform Mission Equipment Software Branch Federal contract opportunity
- Solicitation number
- W56JSR-17-R-0005
About this file
DRAFT Task Order 0001 PWS Platform Mission Equipment Software Branch
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
For
Platform Mission Software Equipment Branch (PMESB) System and Software Support
Task Order-0001
Solicitation Number: W56JSR-17-R-0005/0001
06 February 2017
Unclassified/FOUO/Procurement Sensitive Table of Contents
| 1.0 Scope | 3 |
| 1.1 Background | 3 |
| 1.1.1 Organization | 3 |
| 1.1.2 Mission Areas | 3 |
| 1.1.2.1 Post Production/Post Deployment Software Support | 3 |
| 1.1.2.2 System/Software Engineering and Integration | 4 |
| 1.1.2.3 MIL-STD-1553 | 4 |
| 1.2 Applicability | 5 |
| 1.3 Reserved | 5 |
| 1.4 Order Type | 5 |
| 1.5 Period of Performance | 5 |
| 1.6 Place of Performance | 5 |
| 1.6.1 Onsite (Government Facility) | 5 |
| 1.6.2 Offsite (Contractor Facility) | 6 |
| 1.6.3 Supported Systems | 6 |
| 2.0 Applicable Documents and Websites | 6 |
| Reference Websites | 6 |
| Reference Documents | 7 |
| 3.0 Requirements | 8 |
| 3.1 General | 8 |
| 3.2 Performance | 8 |
| 3.2.1 Contract Management | 8 |
| 3.2.2 System(s) Engineering Support | 13 |
| 3.2.3 Software Engineering Support | 17 |
1.0 Scope
The scope of this PWS is to provide support services to CECOM SEC/IEW&S/S&ME - (ME) (formerly known as SEC/ISR/ACS/Avionics) Branch in the following:
· Provide system/software engineering and integration support for Aviation Systems, Tactical Air Traffic Control, Position/Navigation/Terrain systems, and Command and Control systems.
· Provide support for Post Deployment and Post Production (PPSS/PDSS) activities for the Platform Mission Software Equipment Branch systems described in Appendix C System Description.
Provide MIL-STD-1553 engineering, validation and testing, and system integration 1.1
1.1 Background
1.1.1 Organization
The Software Engineering Center (SEC), PMESB is responsible for providing primary system/software engineering support to aviation navigation, communications, ground support avionics, command and control, and tactical air traffic control systems during their development and integration into weapon systems. Also, SEC ME is the leading Army Tri-Service organization for MIL-STD-1553 engineering, validation and test, and system integration support.
1.1.2 Mission Areas
1.1.2.1 Post Production/Post Deployment Software Support
SEC PMESB is responsible for the Post Production/Post Deployment Software Support (PPSS/PDSS) of 13 avionics systems. This support is essential in maintaining readiness for today’s modern aircraft. The software maintenance entails making changes to software, testing the changes, and releasing the software to the field promptly. SEC PMESB is also responsible for the configuration management of all associated software and documentation for each of these systems. The SEC PMESB provides PPSS/PDSS support to systems sponsored by the following organizations:
Support Systems Organization Sponsors
| PEO IEWS, PdM Electro-Optical/Infrared (EO/IR) |
| PEO GCS, PM Heavy Brigade Combat Team (HBCT) |
| PEO IEWS, PdM Combat Terrain Information Systems (CTIS) |
| CECOM Logistics and Readiness Center (LRC) Airborne Battle Command Program Support Office (ABCPS) |
| SOSE&I/Direct Reporting Program Manager Position, Navigation, and Timing (PNT) |
| Navy Naval Air Systems Command (NAVAIR) |
| PEO Aviation, PdM Aviation Mission Equipment (AME) |
| U.S Coast Guard |
| PEO Aviation, PdM Air Traffic Control (ATC) |
| U.S. Marines |
| PEO Aviation, PD Aviation Network Mission Planning (ANMP) |
| U.S. Air Force |
PEO Solider, PM Air Warrior (AW)
1.1.2.2 System/Software Engineering and Integration
The SEC PMESB is responsible for providing system/software engineering support for avionics systems throughout their life cycle. Upon development, the SEC PMESB is involved with the integration of avionics systems into weapon/aircraft systems, such as the Improved Cargo Helicopter (ICH), HH-60L (MEDEVAC), RC-12 Guardrail Common Sensor, OH-58D, AH-64A/D and SOA aircraft (MH-47E and MH-60L). Support includes requirement’s definition, analysis, design, and interface control working groups, technical interchange, test planning, and document generation/review, including the preparation or validation of MIL-STD-1553 Multiplex Interface Control Document (MICD) and Software/Interface requirements documents.
1.1.2.3 MIL-STD-1553
SEC PMESB provides engineering experience and expertise on all aspects of MIL-STD-1553 matters, ranging from participating in the writing of MIL-STD-1553 requirements to providing avionics maintenance test systems. The Validation and Test Facility (VALFAC) is a test laboratory that provides independent MIL-STD-1553 Validation and Verification test services for DoD MIL-STD-1553 subsystems in accordance with Tri-Service test standards. VALFAC will enable US Army and other DoD components to continue ensuring Contractor Furnished Equipment (CFE) and Government Furnished Equipment (GFE) meet the requirements of governing communications standards.
1.2 Applicability
This task order effort is within scope of SEC PMESB IDIQ PWS W56JSR-17-D-TBD
1.3 Reserved
1.4 Order Type
Subtasks under this effort shall be proposed on a Cost Plus Fixed Fee (Level of Effort) term basis for all items other than travel, Other Direct Costs (ODC) materials, equipment, and licenses. Travel materials, equipment, and licenses shall be proposed on a cost basis in accordance with Federal Acquisition Regulation (FAR) 16.302.
1.5 Period of Performance
The period of performance shall be 12 months from the date of award, with three 12 month option periods thereafter.
1.6 Place of Performance
1.6.1 Onsite (Government Facility)
The performance of the requirements set forth within this PWS shall be conducted at the Communications-Electronics Command-Life Cycle Management Command (CECOM-LCMC) SEC facility at Building 6006 Combat Drive, Aberdeen Proving Ground (APG), MD 21005. The contractor in support of this requirement shall utilize these facilities as the primary locations for management, system & software engineering, and software maintenance work. The Government will provide on-site Contractor personnel with adequate workspace and equipment/material (to include desks, chairs, cabinet space, and telephones), and access to printers, FAX machine, scanners and photocopiers at the Government facility where the work will be performed for contractor use on a rent-free basis IAW FAR 52.245-9.
1.6.2 Offsite (Contractor Facility)
The Government laboratory shall be used to optimize productivity. Consequently, all contractor engineers are required to work onsite. Subsequently, all other administrative performance may be executed offsite, as specified in Appendix A – Level of Effort
1.6.3 Supported Systems
Appendix C depicts a representative list of systems that are currently supported by the PMSEB. The list is dynamic in nature and subject to change, systems may be added or deleted based upon technical, organizational, or other managerial considerations. Services supporting other functional areas may be added over time as business goals evolve, new systems are transitioned or as the mission changes.
2.0 Applicable Documents and Websites
The following documents and websites are referenced for the performance of this contract. The Government reserves the right to update relevant documents.
Reference Websites http://www.dtic.mil/dtic/ http://www.apd.army.mil/
Governing Documents:
Joint Travel Regulations (JTR) https://www.defensetravel.dod.mil/Docs/perdiem/JTR.pdf
AR 715-9, Operational Contract Support Planning, and Management http://www.apd.army.mil/pdffiles/r715_9.pdf
AR 25-1, Army Information Technology www.apd.army.mil/pdffiles/r25_1.pdf
AR 25-2, Information Assurance http://www.apd.army.mil/pdffiles/r25_2.pdf
AR 735-5, Property Accountability Policies http://www.apd.army.mil/pdffiles/r735_5.pdf
DoDI 8510.01 Risk Management Framework (RMF) for DoD Information Technology http://www.dtic.mil/whs/directives/corres/pdf/851001_2014.pdf
CNSSI No 1253, Security Categorization, and Control Selection for National Security Systems https://www.cnss.gov/CNSS/issuances/Instructions.cfm (search for No 1253)
NIST 800-53 Rev 4, Security, and Privacy Controls for Federal Information Systems and Organizations http://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r4.pdf
05-PR-M-0002, Army Best Business Practice for Information Assurance Training https://atc.us.army.mil/iastar/docs/Training_BBP.pdf
DoD 8570.01-M, Information Assurance Workforce Improvement Program http://www.dtic.mil/whs/directives/corres/pdf/857001m.pdf
AR-380-67, Personnel Security Program www.apd.army.mil/pdffiles/r380_67.pdf
Reference Documents
CECOM Policy Memo No. 13-11 Information Technology (IT) Strategic Planning, Acquisition, and Accreditation Procedures PWS Attachment 1
SEC SOP E-09 22 April 2012 PWS Attachment 2
IEWS-CM-202, IEWSD Configuration Management Process Description (CM PD) Document PWS Attachment 3
CECOM Pamphlet 25-1 U.S. Army Communications- Electronics Command (CECOM) Standard Operating Procedures (SOP) for Information Technology (IT) Acquisitions PWS Attachment 4
SEC Lab Configuration Control Board (CCB) Configuration Baseline v1.0 August 2012 (To be provided upon award)
AR 73-1 Test and Evaluation Policy https://acc.dau.mil/adl/en-US/649679/file/71925/r73_1%5B1%5D.pdf
AS4111 Validation Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals 1998-10-01 http://standards.sae.org/as4111
AS4112 Production Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals 1989-01-11 http://standards.sae.org/as4112
AS4113 Validation Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Controllers 1989-01-11 http://standards.sae.org/as4113
AS4114 Production Test Plan for the Time Division Command/Response Multiplex Data Bus Controllers 1989-01-11 http://standards.sae.org/as4114
AS4115 Test Plan for the Digital Time Division Command/Response Multiplex Data Bus System 1989-01-11 http://standards.sae.org/as4115
AS4116 Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Monitors 1990-09-10 http://standards.sae.org/as4116
AS4117 Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Couplers, Terminators, and Data Bus Cables 1991-03-19 http://standards.sae.org/as4117
Department of the Army Pamphlet 738-751 Functional User’s Manual for the Army Maintenance Management System-Aviation http://www.apd.army.mil/pdffiles/p738_751.pdf
3.0 Requirements
This PWS addresses all Task Order 0001 support services activities, deliverables, and testing for the systems identified in Appendix A.
3.1 General
Base IDIQ PWS section 3.1 entitled “General” and all subsections are hereby incorporated and in full force and effect within this Task Order W56JSR-17-D-TBD/0001.
3.2 Performance
The contractor is responsible for the performance of the requirements as identified below
3.2.1 Contract Management
The Contractor shall provide contract management support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.1.1 The Contractor shall monitor, manage, administrate, and lead this Task Order for PMESB.
Performance Standards
a) STD: Deliverables are made by the due date as specified in the applicable CDRLs AQL: Deliverables are made within 2 business days of due date
b) STD: Personnel meets all qualifications as prescribed in Level of Effort - Appendix A unless agreed upon by the government.
AQL: 100% compliant with standard
c) STD: Monthly costs shall not exceed planned cost by more than 10% unless agreed upon by the government AQL: 100% compliant with standard
Deliverables C001 Funds & Man-hour Expenditure Report C002 Performance and Cost Report E003 Bi-Weekly Status Report F005 Contract Management Plan
3.2.1.1 The Contractor shall submit and prepare reports for PMESB contract management.
Performance Standards
a) STD: Reports are accurate and complete IAW CDLRs with no more than 5% of the individual Deliverable requiring rework to address any errors AQL: Reports are accurate and complete IAW CDRL 90% of the time
b) STD: Deliverables are made in accordance with Schedule AQL: Deliverables are made within two business days of schedule
Deliverables C001 Funds & Man-hour Expenditure Report C002 Performance and Cost Report E001 Critical Personnel Change E002 Hand Receipt Audit E003 Bi-Weekly Status Report F006 Data Accession List F012 Trip/Travel Report
3.2.1.3 The Contractor shall conduct and document bi-weekly status meetings with the government for ME Contract.
Performance Standards
a) STD: Status meeting is held bi-weekly unless changes are agreed upon by the government AQL: 100% compliant with standard
b) STD: Bi-Weekly Status Report shall be delivered no later than two business days before the subject event.
AQL: Compliant with standard 85% of the time
c) STD: Meeting Minutes shall be distributed no later than five business days following the subject event.
AQL: Compliant with standard 85% of the time
Deliverables A002 Meeting Minutes E003 Bi-Weekly Status Report
3.2.1.4 The Contractor shall develop and provide estimates for software development, hardware fabrication, and purchases.
Performance Standards
a) STD: Deliverables are complete IAW CDRL with no more than 5% of the deliverables requiring rework to address any errors AQL: 100% compliant with standard
b) STD: Deliverables are provided within ten business days of request AQL: Compliant with standard 90% of the time
Deliverables F008 Project Directive
3.2.1.5 The Contractor shall perform and report property audits for the PMESB.
Performance Standards
a) STD: Reports are accurate and complete with no more than 5% of the individual Deliverable requiring rework to address any errors AQL: Reports are accurate and complete IAW Standard 90% of the time
b) STD: Property audits are conducted IAW AR 735-5 Property Accountability Policies AQL: 100% compliant with standard
Deliverables E002 Hand Receipt Audit
3.2.1.6 The Contractor shall collect, analyze, and report data and responses for PMESB suspenses.
Performance Standards
a) STD: Data needed for suspense is present, accurate, and complete.
AQL: Compliant with standard 85% of the time
b) STD: Suspense response/data delivered by initial suspense due date AQL: Compliant with standard 80% of the time
Deliverables F009 Suspense Response
3.2.1.7 The Contractor shall create, setup, and perform demonstrations for PMESB Capabilities.
Performance Standards
a) STD: Prepared demonstration materials are compliant with CDRL with less than 5% individual materials requiring rework to address any errors AQL: Compliant with standard 85% of the time
b) STD: Demonstrations are readied and conducted in accordance with schedule AQL: Compliant with standard 85% of the time
c) STD: No substantive or repeated flaws are found while performing demonstrations AQL: Compliant with standard 80% of the time
d) STD: Appropriately dressed during demonstrations AQL: Compliant with standard 90% of the time
Deliverables A001 Demonstration Materials
3.2.1.8 The Contractor shall develop and deliver security releases to include IAVA and STIG compliance.
Performance Standards
a) STD: IAVA releases on a quarterly release AQL: 100% compliance with standard.
b) STD: Army and DoD IA vulnerability management program, communications tasking orders (CTOs) AQL: 100% compliance with standard.
c) STD: ARCYBER OPORDS, CTOs, Situational Awareness Reports (SARs), Alerts and Bulletins AQL: 100% compliance with standard.
d) STD: No denial of Authorization-To-Operate (ATO), caused by unapplied security updates or patches, attributable to the contractor. However, if the government's actions creates a situation where the patch could not be applied then it is not attributable to the AQL: 100% compliance with standard.
Deliverables D003 Release Package H001 IAVA and STIG Compliance Report
3.2.1.9 The Contractor shall maintain and establish subscriptions to Government provided DoD and Army sites for security for security alerts, bulletins, and IAVA updates, as well as vendor, provided security updates to maintain the PMESB systems security posture.
Performance Standards
a) STD: Subscriptions are established within three business days of COR notification AQL: Within five business days of notification
b) STD: Subscription is maintained throughout the contract AQL: 100% compliant with standard
c) STD: Compliant with CDRL, unless otherwise directed by the government AQL: Within five business days of bulletin
Deliverables H002 Vulnerability Report
3.2.2 System(s) Engineering Support
The Contractor shall provide system(s) engineering and associated support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.2.1 The Contractor shall conduct and document technical analysis for avionics systems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government
AQL: 100%
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
Deliverable F011 Technical Analysis Report
3.2.2.2 The Contractor shall develop and provide systems engineering specifications for avionics systems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government
AQL: 100%
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
Deliverable F010 Systems Engineering Specification
3.2.2.3 The Contractor shall plan, execute, record, evaluate, report, and observe verification and validation testing for avionics systems.
Performance Standards
a) STD: IAW AR 73-1 Test and Evaluation Policy, unless otherwise directed by the government
AQL: 100%
b) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors such as spelling, grammar, and formatting, etc.
Deliverables F003 System Test Plan F004 System Test Report
3.2.2.4 The Contractor shall plan, execute, evaluate, and report the systems to be transitioned to the ME for PPSS/PDSSS responsibilities.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors in spelling, grammar, formatting, etc.
Deliverables F011 Technical Analysis Report
3.2.2.5 System/Software technical document(s) support.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within 2 business days
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors in spelling, grammar, formatting, etc.
Deliverable D004 System Transition Package
3.2.2.6 The Contractor shall plan, execute, record, evaluate, report, and observe verification and validation testing for MIL-STD-1553 interfaces.
Performance Standards
a) STD: IAW SAE Test Plan Standards, unless otherwise directed by the government AQL: 100% compliant with standard
b) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors such as spelling, grammar, and formatting, etc.
Deliverables F002 MIL-STD-1553 Interface Test Report
3.2.2.7 The Contractor shall document and identify any operational faults occurring on MIL-STD-1553 data bus systems.
Performance Standards
a) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors such as spelling, grammar, and formatting
b) STD: Data Bus Analysis Report submitted 10 business days from the report of fault.
AQL: No more than five business days late.
c) STD: MIL-STD-1553 Data Bus Testing IAW SAE Standards, unless otherwise directed by the government AQL: 100% compliant with standard
d) STD: IAW Department of the Army Pamphlet 738-751 Functional User’s Manual for the Army Maintenance Management System-Aviation, unless otherwise directed by the government
AQL: 100%
Deliverables F007 Data Bus Analysis Report
3.2.2.8 The Contractor shall enhance, develop, operate, and maintain simulators of MIL-STD-1553 data bus systems and subsystems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
c) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package F010 Systems Engineering Specification D002 Information Assurance Artifacts
3.2.3 Software Engineering Support
The Contractor shall provide software engineering and associated support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.3.1 The Contractor shall develop, update, modify, and integrate Software for avionics systems.
Performance Standards
a) STD: Software contains no Cat I or II software anomalies, as defined in the SEC Software Anomalies Categorization, without the explicit written approval of the government AQL: 100% Compliant with standard
b) STD: Software contains no Cat III, IV or V software anomalies as defined in the SEC Software Anomalies Categorization AQL: Compliant with standard 85% of the time
c) STD: Deliverables are made on schedule AQL: Within two business days
d) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
e) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package D002 Information Assurance Artifacts
3.2.3.2 The Contractor shall produce, replicate, and distribute release packages for Avionics Systems Software and Related Hardware.
Performance Standards
a) STD: Deliverables are compliant with CDRL with no more than 10% of the deliverables requiring rework to address errors.
AQL: 100% compliant with standard
b) STD: Replicated Release Package distributed within three business days of request AQL: Within two business days
Deliverable D003 Release Package
3.2.2.3 The Contractor shall maintain, operate, enhance, and develop Laboratories for PMESB Systems.
Performance Standards
a) STD: IAW Army Information Technology AR 25-1 AQL: 100% complaint with standard
b) STD: IAW Information Assurance AR 25-2 AQL: 100% compliant with standard
c) STD: Compliant with SEC Lab Configuration Control Board (CCB) Configuration Baseline AQL: 100% compliant with standard
Deliverables D002 Information Assurance Artifacts F001 Analysis of Alternatives Report
3.2.3.4 The Contractor shall assist the Government to prepare and execute all associated tasks required to obtain and maintain the PMESB System Laboratories Risk Management Framework (RMF) Authorization-To-Operate accreditation.
Performance Standards
a) STD: IAW CDRL scheduled final delivery dates.
AQL: No later than two business days after scheduled final delivery dates.
b) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
c) STD: IAW 8510.01 AQL: 100% compliant with standard
d) STD: IAW CNSSI No 1253 AQL: 100% compliant with standard
e) STD: IAW NIST 800-53 Rev 4 AQL: 100% compliant with standard
f) STD: No denial of Authorization-To-Operate (ATO), caused by unapplied security updates or patches, attributable to the contractor. However, if the government's actions creates a situation where the patch could not be applied then it is not attributable to the contractor AQL: 100% compliance with standard
Deliverable D002 Information Assurance Artifacts
3.2.3.5 The Contractor shall develop, operate, maintain, and enhance simulators and software tools for software engineering environments.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
c) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package D002 Information Assurance Artifacts
3.2.3.6 The Contractor shall design, build, and test cables, connectors, and hardware items for software engineering environments and PMESB projects.
Performance Standards
a) STD: Cables, connectors, and hardware items compliant with the design specification.
AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors such as spelling, grammar, and formatting.
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard Deliverable B001 Engineering Drawing
3.2.3.7 The Contractor shall perform Configuration Management activities for PMESB and branch systems. The current Configuration Management Library resides on the SEC SharePoint website.
Performance Standards
a) STD: IAW IEWSD Configuration Management Process Description, IEWD-CM-202, unless otherwise directed by the government AQL: 100% compliant with standard
3.2.3.8 The Contractor shall conduct Configuration Management Audit for avionics systems and PMESB projects.
Performance Standards
a) STD: Perform configuration management audit IAW IEWS-CM-202 AQL: 100% compliant with standard
b) STD: Audit reports are delivered in accordance with schedule AQL: Within two business days of schedule
Deliverable G002 Configuration Audit Report
3.2.3.9 The Contractor shall update and maintain Configuration/Data Management Plan for PMESB and branch systems.
Performance Standards
a) STD: Compliant with IAW IEWS-CM-202, unless otherwise directed by the government AQL: 100% complaint with standard
b) STD: Deliverables are made in accordance with Schedule AQL: Within two business days of schedule
Deliverable G001 Configuration/Data Management Plan
4.0 Quality Assurance Surveillance Plan (QASP)
The Base IDIQ PWS (W56JSR-17-D-TBD) section 4.0 entitled Quality Assurance Surveillance Plan is hereby incorporated and is in full force and effect within the Task Order.
5.0 Deliverables
Data shall be delivered IAW the attached CDRLs, DD Forms 1423, which cite the Data Item Descriptions (DIDs) or other appropriate references for technical data and other information required during the performance of this contract.
| Identifier |
| Name |
| Description |
| A001 |
| Demonstration Materials |
| DI-ADMN-81373 |
| A002 |
| Meeting Minutes |
| DI-ADMN-81505 |
| B001 |
| Engineering Drawing |
| DI-DRPR-81680 |
| C001 |
| Funds & Man-hour Expenditure Report |
| DI-FNCL-80331A |
| C002 |
| Performance and Cost Report |
| DI-FNCL-80912 |
| D001 |
| Software Engineering Package |
| DI-MCCR-80700 |
| D002 |
| Information Assurance Artifacts |
| DI-MCCR-80700 |
| D003 |
| Release Package |
| DI-MCCR-80700 |
| D004 |
| System Transition Package |
| DI-MCCR-80770 |
| E001 |
| Critical Personnel Change |
| DI-MGMT-80268A |
| E002 |
| Hand Receipt Audit |
| DI-MGMT-80269 |
| E003 |
| Bi-Weekly Status Report |
| DI-MGMT-80368A |
| F001 |
| Analysis of Alternatives Report |
| DI-MISC-80508B |
| F002 |
| MIL-STD-1553 Interface Test Report |
| DI-MISC-80508B |
| F003 |
| System Test Plan |
| DI-MISC-80508B |
| F004 |
| System Test Report |
| DI-MISC-80508B |
| F005 |
| Contract Management Plan |
| DI-MISC-80508B |
| F006 |
| Data Accession List |
| DI-MISC-80508B |
| F007 |
| Data Bus Analysis Report |
| DI-MISC-80508B |
| F008 |
| Project Directive |
| DI-MISC-80508B |
| F009 |
| Suspense Response |
| DI-MISC-80508B |
| F010 |
| Systems Engineering Specification |
| DI-MISC-80508B |
| F011 |
| Technical Analysis Report |
| DI-MISC-80508B |
| F012 |
| Trip/Travel Report |
| DI-MISC-81943 |
| G001 |
| Configuration/Data Management Plan |
| DI-SESS-81875 |
| G002 |
| Configuration Audit Report |
| DI-SESS-81887 |
| H001 |
| IAVA and STIG Compliance |
| DI-MGMT-80368A |
| H002 |
| Vulnerability Report |
| DI-MGMT-80368A |
| F013 |
| Phase Out Plan |
| DI-MISC-80508B |
File details come from the government source that posted it. Updated .