DRAFT PMESB RFP Attachment 0001
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMESB Task Order 0001, Solicitation W56JSR-17-R-0005
Section B – Supplies or services and prices/costs
| ITEM NO |
| SUPPLIES/SERVICES |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Budget Support |
Service Requested: Budget support CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.1 through and including 3.2.1.9.
Performance 12 months from effective date of contract award.
| EA |
| 12 |
| 0002 |
| Electronics Support |
Service Requested: Electronic support CLIN Contract Type:
IAW TO 0001 PWS Section 3.2.1 through and including 3.2.1.9
| EA |
| 48 |
| 0003 |
| Engineering Support |
Service Requested: Engineering support CLIN Contract Type:
| EA |
| 48 |
| 0004 |
| Program Support |
Service Requested: Program support CLIN Contract Type:
| EA |
| 24 |
| 0005 |
| Property Management Support |
Service Requested: Property management CLIN Contract Type:
| EA |
| 12 |
| 0006 |
| Test Engineer Support |
Service Requested: Test Engineer Support CLIN Contract Type:
12 months from effective date of contract award
| EA |
| 240 |
| 0007 |
| Technical Writer Support |
Service Requested: Technical writer CLIN Contract Type:
| EA |
| 36 |
| 0008 |
| System Administration Support |
Service Requested: System Administration CLIN Contract Type:
IAW TO 0001 PWS Section 3.2.2 through and including 3.2.2.8
| EA |
| 96 |
| 0009 |
| System Engineer Support |
Service Requested: System engineer CLIN Contract Type:
| EA |
| 180 |
| 0010 |
| Software Configuration Support |
Service Requested: Software configuration CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.3 through and including 3.2.2.9
| EA |
| 48 |
| 0011 |
| Software Developer Support |
Service Requested: Software developer CLIN Contract Type:
IAW TO 0001 PWS Section 3.2.3 through and including 3.2.2.9
| EA |
| 480 |
| 0012 |
| Software Engineer Support |
Service Requested: Software engineer CLIN Contract Type:
| EA |
| 504 |
| 0013 |
| Material |
CLIN Contract Type:
Cost No Fee
IAW TO 0001 PWS Section 3.1 and all subsections. This is a Government plug total dollar amount, deviation is not authorized.
| 1 |
| LO |
$225,559.00
| 0014 |
| Travel & Other Direct Cost |
CLIN Contract Type:
IAW TO 0001 PWS Section 3.1.5. This is a Government plug total dollar amount, deviation is not authorized.
| 1 |
| LO |
$18,818.00
| 0015 |
| Transition-in Plan |
CLIN Contract Type:
Firm Fixed Price
IAW TO 0001 PWS Section 3.1.4
60 days from effective date of contract award
| 1 |
| LO |
| 0016 |
| Contract Data Requirements List (CDRL) |
| A001 |
| CDRL – Presentation Material – Demonstration Material |
Service Requested: DI-ADMN-81373
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| A002 |
| CDRL – Report- Record of Meeting Minutes |
Service Requested: DI-ADMN-81505
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| B001 |
| CDRL – Report- Record of Meeting Minutes |
Service Requested: DI-ADMN-81505
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| C001 |
| CDRL – Report- Record of Meeting Minutes |
Service Requested: DI-ADMN-81505
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| C002 |
| CDRL – Monthly Performance & Cost Report |
Service Requested: DI-FNCL-80912
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| D001 |
| CDRL – Computer Software End Items – Software Engineering |
Service Requested: DI-MCCR-80700
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| D002 |
| CDRL – Computer Product End Items IA Artifacts |
Service Requested: DI-MCCR-80700
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| D003 |
| CDRL – Computer Software Product End Items – Release Package |
Service Requested: DI-MCCR-80700
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| D004 |
| CDRL – Computer Software End Items – System Transition PKG |
Service Requested: DI-MCCR-80700
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| E001 |
| CDRL – Status Report – Critical Personnel Change |
Service Requested: DI-MGMT-80269
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| E002 |
| CDRL – Status Report – Hand Receipt Audit |
Service Requested: DI-MGMT-80269
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| E003 |
| CDRL – Status Report – Bi Weekly Status Report |
Service Requested: DI-MGMT-80368A
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F001 |
| CDRL – Technical Report – Analysis of Alternatives |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F002 |
| CDRL – Technical Report – MIL STD 1553 Interface Test Report |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F003 |
| CDRL – Technical Report – System Test Report |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F004 |
| CDRL – Technical Report – Contract Management Plan |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F005 |
| CDRL – Technical Report – Data Accession List |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F006 |
| CDRL – Technical Report – Data Bus Analysis Report |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F007 |
| CDRL – Technical Report – Project Directive |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F008 |
| CDRL – Technical Report – Suspense Reponses |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F009 |
| CDRL – Technical Report – System Engineering Specification |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F010 |
| CDRL – Technical Report – Technical Analysis Report |
Service Requested: DI-MISC-80508B
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| F011 |
| CDRL – Trip / Travel Reports |
Service Requested: DI-MISC-81943
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| G001 |
| CDRL – Configuration Management Plan (MIL-STD-3046) |
Service Requested: DI-SESS-81875
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| G002 |
| CDRL – Configuration Audit Report |
Service Requested: DI-SESS-81887
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| H001 |
| CDRL – Cybersecurity Compliance Status Report IAVA & STIG |
Service Requested: DI-MGMT-80368A
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| H002 |
| CDRL – Cybersecurity Compliance Status Report IAVA & STIG |
Service Requested: DI-MGMT-80368A
Inspection and Acceptance Inspection: Destination Acceptance: Destination
DLVR SCH PERF COMPL
REL CD Quantity Date 001 1 See DD Form 1423
| 1 |
| LO |
$ **NSP**
| 1001 |
| Budget Support Option Period 1 |
Service Requested: Budget support CLIN Contract Type:
12 months from CLIN 0001 end date.
| EA |
| 12 |
| 1002 |
| Electronics Support Option Period 1 |
Service Requested: Electronic support CLIN Contract Type:
12 months from CLIN 0002 end date.
| EA |
| 48 |
| 1003 |
| Engineering Support Option Period 1 |
Service Requested: Engineering support CLIN Contract Type:
12 months from CLIN 003 end date.
| EA |
| 48 |
| 1004 |
| Program Support Option Period 1 |
Service Requested: Program support CLIN Contract Type:
12 months from CLIN 004 end date.
| EA |
| 24 |
| 1005 |
| Property Management Support Option Period 1 |
Service Requested: Property management CLIN Contract Type:
12 months from CLIN 005 end date.
| EA |
| 12 |
| 1006 |
| Test Engineer Support Option Period 1 |
Service Requested: Test Engineer Support CLIN Contract Type:
12 months from CLIN 006 end date.
| EA |
| 240 |
| 1007 |
| Technical Writer Support Option Period 1 |
Service Requested: Technical writer CLIN Contract Type:
12 months from CLIN 007 end date.
| EA |
| 36 |
| 1008 |
| System Administration Support Option Period 1 |
Service Requested: System Administration CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.2 through and including 3.2.2.8
Performance 12 months from CLIN 008 end date.
| EA |
| 96 |
| 1009 |
| System Engineer Support Option Period 1 |
Service Requested: System engineer CLIN Contract Type:
12 months from CLIN 009 end date.
| EA |
| 180 |
| 1010 |
| Software Configuration Support Option Period 1 |
Service Requested: Software configuration CLIN Contract Type:
12 months from CLIN 0010 end date.
| EA |
| 48 |
| 1011 |
| Software Developer Support Option Period 1 |
Service Requested: Software developer CLIN Contract Type:
12 months from CLIN 0011 end date.
| EA |
| 480 |
| 1012 |
| Software Engineer Support Option Period 1 |
Service Requested: Software engineer CLIN Contract Type:
| EA |
| 504 |
| 1013 |
| Material Option Period 1 |
CLIN Contract Type:
IAW TO 0001 PWS Section 3.1 and all subsections. This a Government plug total dollar amount, deviation is not authorized.
| 1 |
| LO |
$225,559
| 1014 |
| Travel & Other Direct Cost Option Period 1 |
CLIN Contract Type:
IAW TO 0001 PWS Section 3.1.5. This a Government plug total dollar amount, deviation is not authorized.
12 months from CLIN 0013 end date.
| 1 |
| LO |
$18,818.00
| 2001 |
| Budget Support Option Period 2 |
Service Requested: Budget support CLIN Contract Type:
12 months from CLIN 1001 end date.
| EA |
| 12 |
| 2002 |
| Electronics Support Option Period 2 |
Service Requested: Electronic support CLIN Contract Type:
12 months from CLIN 1002 end date.
| EA |
| 48 |
| 2003 |
| Engineering Support Option Period 2 |
Service Requested: Engineering support CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.1 through and including 3.2.1.9.
Performance 12 months from CLIN 2003 end date.
| EA |
| 48 |
| 2004 |
| Program Support Option Period 2 |
Service Requested: Program support CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.1 through and including 3.2.1.9.
Performance 12 months from CLIN 1004 end date.
| EA |
| 24 |
| 2005 |
| Property Management Support Option Period 2 |
Service Requested: Property management CLIN Contract Type:
12 months from CLIN 1005 end date.
| EA |
| 12 |
| 2006 |
| Test Engineer Support Option Period 2 |
Service Requested: Test Engineer Support CLIN Contract Type:
12 months from CLIN 1006 end date.
| EA |
| 240 |
| 2007 |
| Technical Writer Support Option Period 2 |
Service Requested: Technical writer CLIN Contract Type:
12 months from CLIN 1007 end date.
| EA |
| 36 |
| 2008 |
| System Administration Support Option Period 2 |
Service Requested: System Administration CLIN Contract Type:
12 months from CLIN 1008 end date.
| EA |
| 96 |
| 2009 |
| System Engineer Support Option Period 2 |
Service Requested: System engineer CLIN Contract Type:
12 months from CLIN 1009 end date.
| EA |
| 180 |
| 2010 |
| Software Configuration Support Option Period 2 |
Service Requested: Software configuration CLIN Contract Type:
12 months from CLIN 1010 end date.
| EA |
| 48 |
| 2011 |
| Software Developer Support Option Period 2 |
Service Requested: Software developer CLIN Contract Type:
12 months from CLIN 1011 end date.
| EA |
| 480 |
| 2012 |
| Software Engineer Support Option Period 2 |
Service Requested: Software engineer CLIN Contract Type:
Cost Plus Fixed Fee
IAW TO 0001 PWS Section 3.2.3 through and including 3.2.2.9
12 months from CLIN 1012 end date
| EA |
| 504 |
| 2013 |
| Material |
CLIN Contract Type:
IAW TO 0001 PWS Section 3.1 and all subsections. This a Government plug total dollar amount, deviation is not authorized.
| 1 |
| LO |
$225,559
| 2014 |
| Travel & Other Direct Cost Option Period 2 |
CLIN Contract Type:
Cost No Fee IAW TO 0001 PWS Section 3.1.5. This a Government plug total dollar amount, deviation is not authorized.
Performance 12 months from CLIN 2013 end date
| 1 |
| LO |
$18,818
Performance Work Statement (PWS)
For
Platform Mission Software Equipment Branch (PMESB) System and Software Support
Task Order-0001
Solicitation Number: W56JSR-17-R-0005/0001
10 April 2017
Unclassified/FOUO/Procurement Sensitive Table of Contents
| 1.0 Scope | 3 |
| 1.1 Background | 3 |
| 1.1.1 Organization | 3 |
| 1.1.2 Mission Areas | 3 |
| 1.1.2.1 Post Production/Post Deployment Software Support | 3 |
| 1.1.2.2 System/Software Engineering and Integration | 4 |
| 1.1.2.3 MIL-STD-1553 | 4 |
| 1.2 Applicability | 5 |
| 1.3 Reserved | 5 |
| 1.4 Order Type | 5 |
| 1.5 Period of Performance | 5 |
| 1.6 Place of Performance | 5 |
| 1.6.1 Onsite (Government Facility) | 5 |
| 1.6.2 Offsite (Contractor Facility) | 5 |
| 1.6.3 Supported Systems | 6 |
| 2.0 Applicable Documents and Websites | 6 |
| Reference Websites | 6 |
| Reference Documents | 7 |
| 3.0 Requirements | 8 |
| 3.1 General | 8 |
| 3.1.4 Transition-in Plan | 8 |
| 3.2 Performance | 8 |
| 3.2.1 Contract Management | 8 |
| 3.2.2 System(s) Engineering Support | 13 |
| 3.2.3 Software Engineering Support | 17 |
| 4.0 Quality Assurance Surveillance Plan (QASP) | 21 |
| 5.0 Deliverables | 21 |
1.0 Scope
1.1 Background
1.1.1 Organization
1.1.2 Mission Areas
1.1.2.1 Post Production/Post Deployment Software Support
1.1.2.2 System/Software Engineering and Integration
1.1.2.3 MIL-STD-1553
1.2 Applicability
This task order (0001) is within the scope of SEC PMESB IDIQ PWS W56JSR-17-D-TBD. Consequently all W56JSR-17-D-TBD terms and conditions are in full force and effect.
1.3 Reserved
1.4 Order Type
Subtasks under this effort shall be proposed on a Cost Plus Fixed Fee (Level of Effort) term basis for all items other than travel, Other Direct Costs (ODC) materials, equipment, and licenses. Travel materials, equipment, and licenses shall be proposed on a cost basis in accordance with Federal Acquisition Regulation (FAR) 16.302.
1.5 Period of Performance
The period of performance shall be 12 months from the effective date of award, with two 12 month option periods thereafter.
1.6 Place of Performance
IAW with W56JSR-17-D-TBD
1.6.3 Supported Systems
Attachment 0004 depicts a representative list of systems that are currently supported by the PMSEB. The list is dynamic in nature and subject to change, systems may be added or deleted based upon technical, organizational, or other managerial considerations. Services supporting other functional areas may be added over time as business goals evolve, new systems are transitioned or as the mission changes.
1.4 Level of Effort (LOE) – Fixed Fee
2.0 Applicable Documents and Websites
IAW with W56JSR-17-D-TBD
3.0 Requirements
This PWS addresses all Task Order 0001 support services activities, deliverables, and testing for the systems identified in Attachment 0004.
3.1 General
3.1.4 Transition-in Plan
The contractor shall provide a 60-day Transition-in Plan for the period from 07 October 2017 to 07 December 2017. The plan shall articulate processes and procedures for assuming full responsibility for all contract obligations no later than 07 December 2017. Throughout the 60-day transition period, the incumbent contractor shall be responsible for all contract requirements. Consequently, the succeeding contractor shall be fully staffed and responsible for all contract obligations by 07 December 2017.
3.2 Performance
The contractor is responsible for the performance of the requirements as identified below
3.2.1 Contract Management
The Contractor shall provide contract management support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.1.1 The Contractor shall monitor, manage, administrate, and lead this Task Order for PMESB.
Performance Standards
a) STD: Deliverables are made by the due date as specified in the applicable CDRLs AQL: Deliverables are made within 2 business days of due date
b) STD: Personnel meets all qualifications as prescribed in the IDIQ base PWS, section 3.1.6, unless agreed upon by the government.
AQL: 100% compliant with standard
c) STD: Monthly costs shall not exceed planned cost by more than 10% unless agreed upon by the government AQL: 100% compliant with standard
Deliverables C001 Funds & Man-hour Expenditure Report C002 Performance and Cost Report E003 Bi-Weekly Status Report F005 Contract Management Plan
3.2.1.2 The Contractor shall submit and prepare reports for PMESB contract management.
Performance Standards
a) STD: Reports are accurate and complete IAW CDLRs with no more than 5% of the individual Deliverable requiring rework to address any errors AQL: Reports are accurate and complete IAW CDRL 90% of the time
b) STD: Deliverables are made in accordance with Schedule AQL: Deliverables are made within two business days of schedule
Deliverables C001 Funds & Man-hour Expenditure Report C002 Performance and Cost Report E001 Critical Personnel Change E002 Hand Receipt Audit E003 Bi-Weekly Status Report F006 Data Accession List F012 Trip/Travel Report
3.2.1.3 The Contractor shall conduct and document bi-weekly status meetings with the government for ME Contract.
Performance Standards
a) STD: Status meeting is held bi-weekly unless changes are agreed upon by the government AQL: 100% compliant with standard
b) STD: Bi-Weekly Status Report shall be delivered no later than two business days before the subject event.
AQL: Compliant with standard 85% of the time
c) STD: Meeting Minutes shall be distributed no later than five business days following the subject event.
AQL: Compliant with standard 85% of the time
Deliverables A002 Meeting Minutes E003 Bi-Weekly Status Report
3.2.1.4 The Contractor shall develop and provide estimates for software development, hardware fabrication, and purchases.
Performance Standards
a) STD: Deliverables are complete IAW CDRL with no more than 5% of the deliverables requiring rework to address any errors AQL: 100% compliant with standard
b) STD: Deliverables are provided within ten business days of request AQL: Compliant with standard 90% of the time
Deliverables F008 Project Directive
3.2.1.5 The Contractor shall perform and report property audits for the PMESB.
Performance Standards
a) STD: Reports are accurate and complete with no more than 5% of the individual Deliverable requiring rework to address any errors AQL: Reports are accurate and complete IAW Standard 90% of the time
b) STD: Property audits are conducted IAW AR 735-5 Property Accountability Policies AQL: 100% compliant with standard
Deliverables E002 Hand Receipt Audit
3.2.1.6 The Contractor shall collect, analyze, and report data and responses for PMESB suspenses.
Performance Standards
a) STD: Data needed for suspense is present, accurate, and complete.
AQL: Compliant with standard 85% of the time
b) STD: Suspense response/data delivered by initial suspense due date AQL: Compliant with standard 80% of the time
Deliverables F009 Suspense Response
3.2.1.7 The Contractor shall create, setup, and perform demonstrations for PMESB Capabilities.
Performance Standards
a) STD: Prepared demonstration materials are compliant with CDRL with less than 5% individual materials requiring rework to address any errors AQL: Compliant with standard 85% of the time
b) STD: Demonstrations are readied and conducted in accordance with schedule AQL: Compliant with standard 85% of the time
c) STD: No substantive or repeated flaws are found while performing demonstrations AQL: Compliant with standard 80% of the time
d) STD: Appropriately dressed during demonstrations AQL: Compliant with standard 90% of the time
Deliverables A001 Demonstration Materials
3.2.1.8 The Contractor shall develop and deliver security releases to include IAVA and STIG compliance.
Performance Standards
a) STD: IAVA releases on a quarterly release AQL: 100% compliance with standard.
b) STD: Army and DoD IA vulnerability management program, communications tasking orders (CTOs) AQL: 100% compliance with standard.
c) STD: ARCYBER OPORDS, CTOs, Situational Awareness Reports (SARs), Alerts and Bulletins AQL: 100% compliance with standard.
d) STD: No denial of Authorization-To-Operate (ATO), caused by unapplied security updates or patches, attributable to the contractor. However, if the government's actions creates a situation where the patch could not be applied then it is not attributable to the AQL: 100% compliance with standard.
Deliverables D003 Release Package H001 IAVA and STIG Compliance Report
3.2.1.9 The Contractor shall maintain and establish subscriptions to Government provided DoD and Army sites for security for security alerts, bulletins, and IAVA updates, as well as vendor, provided security updates to maintain the PMESB systems security posture.
Performance Standards
a) STD: Subscriptions are established within three business days of COR notification AQL: Within five business days of notification
b) STD: Subscription is maintained throughout the contract AQL: 100% compliant with standard
c) STD: Compliant with CDRL, unless otherwise directed by the government AQL: Within five business days of bulletin
Deliverables H002 Vulnerability Report
3.2.2 System(s) Engineering Support
The Contractor shall provide system(s) engineering and associated support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.2.1 The Contractor shall conduct and document technical analysis for avionics systems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government
AQL: 100%
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
Deliverable F011 Technical Analysis Report
3.2.2.2 The Contractor shall develop and provide systems engineering specifications for avionics systems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government
AQL: 100%
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
Deliverable F010 System Engineering Specification
3.2.2.3 The Contractor shall plan, execute, record, evaluate, report, and observe verification and validation testing for avionics systems.
Performance Standards
a) STD: IAW AR 73-1 Test and Evaluation Policy, unless otherwise directed by the government
AQL: 100%
b) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors such as spelling, grammar, and formatting, etc.
Deliverables F003 System Test Plan F004 System Test Report
3.2.2.4 The Contractor shall plan, execute, evaluate, and report the systems to be transitioned to the ME for PPSS/PDSSS responsibilities.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors in spelling, grammar, formatting, etc.
Deliverables F011 Technical Analysis Report
3.2.2.5 System/Software technical document(s) support.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within 2 business days
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard
c) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors in spelling, grammar, formatting, etc.
Deliverable D004 System Transition Package
3.2.2.6 The Contractor shall plan, execute, record, evaluate, report, and observe verification and validation testing for MIL-STD-1553 interfaces.
Performance Standards
a) STD: IAW SAE Test Plan Standards, unless otherwise directed by the government AQL: 100% compliant with standard
b) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable, and includes errors such as spelling, grammar, and formatting, etc.
Deliverables F002 MIL-STD-1553 Interface Test Report
3.2.2.7 The Contractor shall document and identify any operational faults occurring on MIL-STD-1553 data bus systems.
Performance Standards
a) STD: Deliverables are compliant with CDRL AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors such as spelling, grammar, and formatting
b) STD: Data Bus Analysis Report submitted 10 business days from the report of fault.
AQL: No more than five business days late.
c) STD: MIL-STD-1553 Data Bus Testing IAW SAE Standards, unless otherwise directed by the government AQL: 100% compliant with standard
d) STD: IAW Department of the Army Pamphlet 738-751 Functional User’s Manual for the Army Maintenance Management System-Aviation, unless otherwise directed by the government
AQL: 100%
Deliverables F007 Data Bus Analysis Report
3.2.2.8 The Contractor shall enhance, develop, operate, and maintain simulators of MIL-STD-1553 data bus systems and subsystems.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
c) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package F010 System Engineering Specification D002 Information Assurance Artifacts
3.2.3 Software Engineering Support
The Contractor shall provide software engineering and associated support services IAW all base PWS W56JSR-17-D-TBD terms and conditions, and as identified within this task order.
3.2.3.1 The Contractor shall develop, update, modify, and integrate Software for avionics systems.
Performance Standards
a) STD: Software contains no Cat I or II software anomalies, as defined in the SEC Software Anomalies Categorization, without the explicit written approval of the government AQL: 100% Compliant with standard
b) STD: Software contains no Cat III, IV or V software anomalies as defined in the SEC Software Anomalies Categorization AQL: Compliant with standard 85% of the time
c) STD: Deliverables are made on schedule AQL: Within two business days
d) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
e) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package D002 Information Assurance Artifacts
3.2.3.2 The Contractor shall produce, replicate, and distribute release packages for Avionics Systems Software and Related Hardware.
Performance Standards
a) STD: Deliverables are compliant with CDRL with no more than 10% of the deliverables requiring rework to address errors.
AQL: 100% compliant with standard
b) STD: Replicated Release Package distributed within three business days of request AQL: Within two business days
Deliverable D003 Release Package
3.2.2.3 The Contractor shall maintain, operate, enhance, and develop Laboratories for PMESB Systems.
Performance Standards
a) STD: IAW Army Information Technology AR 25-1 AQL: 100% complaint with standard
b) STD: IAW Information Assurance AR 25-2 AQL: 100% compliant with standard
c) STD: Compliant with SEC Lab Configuration Control Board (CCB) Configuration Baseline AQL: 100% compliant with standard
Deliverables D002 Information Assurance Artifacts F001 Analysis of Alternatives Report
3.2.3.4 The Contractor shall assist the Government to prepare and execute all associated tasks required to obtain and maintain the PMESB System Laboratories Risk Management Framework (RMF) Authorization-To-Operate accreditation.
Performance Standards
a) STD: IAW CDRL scheduled final delivery dates.
AQL: No later than two business days after scheduled final delivery dates.
b) STD: Required documentation must be complete and accurate AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors in spelling, grammar, formatting, etc.
c) STD: IAW 8510.01 AQL: 100% compliant with standard
d) STD: IAW CNSSI No 1253 AQL: 100% compliant with standard
e) STD: IAW NIST 800-53 Rev 4 AQL: 100% compliant with standard
f) STD: No denial of Authorization-To-Operate (ATO), caused by unapplied security updates or patches, attributable to the contractor. However, if the government's actions creates a situation where the patch could not be applied then it is not attributable to the contractor AQL: 100% compliance with standard
Deliverable D002 Information Assurance Artifacts
3.2.3.5 The Contractor shall develop, operate, maintain, and enhance simulators and software tools for software engineering environments.
Performance Standards
a) STD: Deliverables are made on schedule AQL: Within two business days
b) STD: Software delivered IAW CDRL unless otherwise approved by the government AQL: 100% complaint with standard
c) STD: Applicable DISA Security Technical Implementation Guide (STIG)/Security Readiness Guides (SRG) AQL: Within the acceptable level of risk established by the Authorizing Official (AO)
Deliverables D001 Software Engineering Package D002 Information Assurance Artifacts
3.2.3.6 The Contractor shall design, build, and test cables, connectors, and hardware items for software engineering environments and PMESB projects.
Performance Standards
a) STD: Cables, connectors, and hardware items compliant with the design specification.
AQL: No major rework required. Major rework includes substantial defects in quality which detract from the meaning of the content. Minor rework is acceptable and includes errors such as spelling, grammar, and formatting.
b) STD: Compliant with CDRL, unless otherwise directed by the government AQL: 100% compliant with standard Deliverable B001 Engineering Drawing
3.2.3.7 The Contractor shall perform Configuration Management activities for PMESB and branch systems. The current Configuration Management Library resides on the SEC SharePoint website.
Performance Standards
a) STD: IAW IEWSD Configuration Management Process Description, IEWD-CM-202, unless otherwise directed by the government AQL: 100% compliant with standard
3.2.3.8 The Contractor shall conduct Configuration Management Audit for avionics systems and PMESB projects.
Performance Standards
a) STD: Perform configuration management audit IAW IEWS-CM-202 AQL: 100% compliant with standard
b) STD: Audit reports are delivered in accordance with schedule AQL: Within two business days of schedule
Deliverable G002 Configuration Audit Report
3.2.3.9 The Contractor shall update and maintain Configuration/Data Management Plan for PMESB and branch systems.
Performance Standards
a) STD: Compliant with IAW IEWS-CM-202, unless otherwise directed by the government AQL: 100% complaint with standard
b) STD: Deliverables are made in accordance with Schedule AQL: Within two business days of schedule
Deliverable G001 Configuration/Data Management Plan
4.0 Quality Assurance Surveillance Plan (QASP)
The Base IDIQ PWS (W56JSR-17-D-TBD) section 4.0 entitled Quality Assurance Surveillance Plan is hereby incorporated and is in full force and effect within the Task Order.
5.0 Deliverables
Data shall be delivered IAW the attached CDRLs, DD Forms 1423, which cite the Data Item Descriptions (DIDs) or other appropriate references for technical data and other information required during the performance of this contract.
| Identifier |
| Name |
| Description |
| A001 |
| Demonstration Materials |
| DI-ADMN-81373 |
| A002 |
| Meeting Minutes |
| DI-ADMN-81505 |
| B001 |
| Engineering Drawing |
| DI-DRPR-81680 |
| C001 |
| Funds & Man-hour Expenditure Report |
| DI-FNCL-80331A |
| C002 |
| Performance and Cost Report |
| DI-FNCL-80912 |
| D001 |
| Software Engineering Package |
| DI-MCCR-80700 |
| D002 |
| Information Assurance Artifacts |
| DI-MCCR-80700 |
| D003 |
| Release Package |
| DI-MCCR-80700 |
| D004 |
| System Transition Package |
| DI-MCCR-80770 |
| E001 |
| Critical Personnel Change |
| DI-MGMT-80268A |
| E002 |
| Hand Receipt Audit |
| DI-MGMT-80269 |
| E003 |
| Bi-Weekly Status Report |
| DI-MGMT-80368A |
| F001 |
| Analysis of Alternatives Report |
| DI-MISC-80508B |
| F002 |
| MIL-STD-1553 Interface Test Report |
| DI-MISC-80508B |
| F003 |
| System Test Plan |
| DI-MISC-80508B |
| F004 |
| System Test Report |
| DI-MISC-80508B |
| F005 |
| Contract Management Plan |
| DI-MISC-80508B |
| F006 |
| Data Accession List |
| DI-MISC-80508B |
| F007 |
| Data Bus Analysis Report |
| DI-MISC-80508B |
| F008 |
| Project Directive |
| DI-MISC-80508B |
| F009 |
| Suspense Response |
| DI-MISC-80508B |
| F010 |
| Systems Engineering Specification |
| DI-MISC-80508B |
| F011 |
| Technical Analysis Report |
| DI-MISC-80508B |
| F012 |
| Trip/Travel Report |
| DI-MISC-81943 |
| G001 |
| Configuration/Data Management Plan |
| DI-SESS-81875 |
| G002 |
| Configuration Audit Report |
| DI-SESS-81887 |
| H001 |
| IAVA and STIG Compliance |
| DI-MGMT-80368A |
| H002 |
| Vulnerability Report |
| DI-MGMT-80368A |
File details come from the government source that posted it. Updated .