Attachment 009 RIA Museum Floor Plan Elec Panels Coor.pdf

PDF 42 KB Posted

Attached to
Rock Island Arsenal Museum Fabrication & Installation
Solicitation number
W56HZV-21-R-L067
Issued by

About this file

This document contains details of a federal contract solicitation for museum fabrication and installation services. The Army Contracting Command - Detroit Arsenal intends to competitively award a firm fixed price contract under a Total Small Business Set-Aside for 12 months to fabricate exhibit components, pack, ship, and install historic objects and focus lighting at the Rock Island Arsenal Museum in Illinois. Services include preparing shop drawings, fabricating exhibit components, packing, shipping and installation of historic objects, and performing final lighting focus. A site visit is scheduled for January 12, 2022 and questions are due by January 14, 2022 with answers posted by January 20, 2022. Responses must include provisions 52.209-11, 52.204-24, 52.204-25, 52.204-26, 252.204-7007, and 252.204-7017 as well as the pricing workbook and past performance questions. Museum drawings can be requested from Contract Specialist Kelsey Leonard via email or Department of Defense Secure File Exchange.

View the file

Other files

File Type Posted
Rock Island Solicitation Responses to Vendor Follow Up Questions and Updated Question Responses_03FEB22.docx DOCX document
W56HZV-21-R-L067 Solicitation Amendment 0006.pdf PDF
Rock Island Solicitation Responses to Vendor Follow Up Questions.docx DOCX document
W56HZV-21-R-L067 Solicitation Amendment 0005.pdf PDF
Exhibit- Attachment 005 Past Performance Questions_Updated date based on RFP due date.docx DOCX document
Exhibit- Attachment 003 AME Component Database_Updated 26JAN.xlsx XLSX spreadsheet
Exhibit- Attachment 006 2.1.4_Rock Island Arsenal, 1862 to Today MEDIA PIECE.docx DOCX document
Rock Island Solicitation Responses to Vendor Questions.docx DOCX document
Attachment 008 RIA Museum Artifact List.xlsx XLSX spreadsheet
Attachment 010 E104 Proposed Special Systems 11x17.pdf PDF
Attachment 007 3.5.1_Interwar Tank Development, 1919-1940 MEDIA PIECE.docx DOCX document
W56HZV-21-R-L067 Solicitation Amendment 0004_.pdf PDF
W56HZV-21-R-L067 Solicitation Amendment 0003_Changes to due dates.pdf PDF
W56HZV-21-R-L067 Solicitation Amendment 0002_Question Period Extended.pdf PDF
Rock Island Solicitation Question and Answer_2.docx DOCX document
Rock Island Arsenal Visitor Control Center to Rock Island Arsenal Museum - Google Maps.pdf PDF
W56HZV-21-R-L067 Solicitation Amendment 0001_Site Visit Information.pdf PDF
Rock Island Solicitation Question and Answer.docx DOCX document
Exhibit- Attachment 005 Past Performance Questions_Updated Date.docx DOCX document
CDRL A005-A006 Rock Island.pdf PDF
Exhibit- Attachment 005 Past Performance Questions.docx DOCX document
Exhibit- Attachment 004 Pricing Workbook.xlsx XLSX spreadsheet
W56HZV-21-R-L067 Solicitation Rock Island Arsenal.pdf PDF
CDRL A001-A004 Rock Island.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Revision information: 1

2 Revision information: 2

3 Revision information: 3

4 Revision information: 4

Title: RIA floorplan

Date: 25 august 2020

Drawn by: showers

Scale: 1/16 = 1’

SECURITY

PIPES

ELECTRIC

LIGHT BRIDGES

” x

8”

[2 9.

” x

8”

[2 9.

54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”] 54” x 18” [29.75”]

.2

5”

97.5”

.5

54” x 18” [29.75”]

15.5” 69.5”

50.75” 70” 69” 66” [13”] 90.4”

92.5”

78.5”

56.875”

46”

33”

EXIT

79.25” [17”]

29.5” 26.5”

52.5” 67.5”

103” sw itch 46”

78.75”

67.5” 67” 67” 67”

101”

67” 67” 67”

101.5”

Mens RestroomLadies Restroom

VENT DUCT

108.5”

284”101.5” 80.75”

45”

ADA

G

G

G039

G042 G043

G

G046

G048

G female worker diorama with monitor

G

G055

G061

G

G060

G067

G069

G

G079 educational projects

G003

G006

1.3

G

G

G

G

G008

G

G horse G017

G010

G013

G015

G

G027

G029 G030

G024

G

G033

G

G

G053

G

G

G077G078

G002

30”x30” figure case

G

000 G00 platform item on floor w/ jack support items on floor w/ jack support ite m o n flo or w /s up po rt ite m o n flo or w

/s up po rt ite m o n flo or w / j ac k su pp or t

G014

G

G019

G020

RI

A to da y

G

G023

G028

G

G

3.3 infographic

G

G032

G

G035

G

G038

G

G041 cr at e su sp en de d

G041

G0

G054 G056 G056 education wallsG057

G062

G063

G064G065

G

G

G050

G062

G068

G

G

G

G073G075

G

G

G080

G081

G082 donna.r.johnson Callout Column is the location of (1 of 3) main electrical panels.

The Code required clearances about the panel are the following, no exceptions:

30" wide, 36" in front, and the area of the top of panel projected up to 6'.

Moving involves extreme cost and am assuming not an option.

The exhibit space will have to accommodate these code clearance requirements.

donna.r.johnson Callout Column is the location of (2 of 3) main electrical panels. Same clearances are required.

donna.r.johnson Callout Column is the location of (3 of 3) main electrical panels. Same clearances are required.

donna.r.johnson Rectangle donna.r.johnson Rectangle donna.r.johnson Rectangle

File details come from the government source that posted it. Updated .