W56HZV-21-R-L067 Solicitation Rock Island Arsenal.pdf
PDF 924 KB Posted
- Solicitation number
- W56HZV-21-R-L067
About this file
This solicitation is for museum exhibit fabrication and installation services at the Rock Island Arsenal Museum in Rock Island, Illinois. The Army Contracting Command - Detroit Arsenal intends to competitively award a firm fixed price contract under a total small business set-aside for a 12-month base period. Services will include preparing shop drawings, fabricating exhibit components, packing, shipping, and installing historic objects. A site visit is scheduled for January 12, 2022, and questions are due by January 14 with answers to be posted by January 20. Offerors must fill out representations for 52.209-11, 52.204-24, 52.204-25, 52.204-26, 252.204-7007, and 252.204-7017 along with the pricing workbook and past performance questions. Access to museum drawings requires a request to the contract specialist.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W56HZV21RL067 28-Dec-2021
b. TELEPHONE NUMBER
586-282-2754
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 28 Jan 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W56HZV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KELSEY LEONARD
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-DTA
6501 E. 11 MILE RD
DETROIT ARSENAL MI 48397-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W50U8G 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
CENTER OF MILITARY HISTORY
PATRICK ALLIE
1 ROCK ISLAND
ROCK ISLAND IL 61299-5000
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$30,000,000
NAICS:
712110
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF70
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section A - Solicitation/Contract Form
A.1
ITEM/DESCRIPTION OF REQUIREMENT
Under the authority of FAR 12 the Government intends to award to a small business concern (primary NAICS code is 712110) for the procurement of museum exhibit fabrication and installation services in support of the Rock Island Arsenal Museum, Rock Island, Illinois. This solicitation is intended to result in 12-month contract.
A.2 SITE VISIT
A site visit will be conducted on Wednesday, 12 January 2022 at 1400 hrs. (2:00 PM Eastern Standard Time).
Contractors and Government Point of Contact (POC) will meet at Rock Island Arsenal, 1 Rock Island Arsenal, Rock Island, IL 61299-5000. The POCs for this site visit are Roxann Showers and Patrick Allie. Contracting POC is Kelsey Leonard, Contract Specialist, ACC-DTA. Information provided at this site visit, as well as answers to questions, shall not change the terms and conditions of the solicitation and specifications. Terms remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply (see detailed proposal instructions for information on questions). All questions and answers must be in writing. Email all questions to Kelsey.d.leonard.civ@army.mil. Questions must be received NLT Friday, 14 January 2022 at 1400hrs. (2:00 PM Eastern Standard Time). Answers will be provided with questions to all contractors.
A.3 ELECTRONIC CONTRACTING
((a) All Army Contracting Command – Detroitsolicitations will be publicized on the System for Award Management website (https://www.beta.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) RESERVED
(c) RESERVED
(d) RESERVED
(e) RESERVED
(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. Any questions regarding this RFP must be received by the Contract Specialist no later than January 14th, 2022 at 2:00PM Eastern Time. Responses to questions are not considered changes to the RFP as the only way the RFP can be modified is through an amendment that will be issued. Oral explanations or instructions given before the award of a contract will not be binding. The Government will post all Questions and Answers (Q&As) to beta.SAM.gov no later than 2:00PM Eastern Time on January 20, 2022. The Government will notify potential offerors if an extension is needed to post the Q&As. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.4 ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
A.5 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.6 ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-dta/CompMgmtOffice.html
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Museum Fabrication Services
FFP
This CLIN is to provide all personnel, equipment, tools, materials, supervision, shipping, other items and non-personal services necessary to perform fabrication services as defined in this Performance Work Statement.
Period of Performance:
15 March 2022- 14 March 2023.
WAWF Invoicing Instructions: Invoices will be submitted electronically through DFAS payment automated system Wide Area Work Flow. Training is available at http://www.wawftraining.com/. Please use a 2-in-1 invoice FOB: Destination
PSC CD: Z2JA
NET AMT
0002 12 Months Museum Installation Services
FFP
This CLIN is to provide all personnel, equipment, tools, materials, supervision, shipping, other items and non-personal services necessary to perform installation services as defined in this Performance Work Statement.
Period of Performance:
15 March 2022- 14 March 2023.
WAWF Invoicing Instructions: Invoices will be submitted electronically through DFAS payment automated system Wide Area Work Flow. Training is available at http://www.wawftraining.com/. Please use a 2-in-1 invoice
0003 1 Job Travel
FFP
This CLIN is for all travel necessary to perform fabrication and installation at the Rock Island Arsenal Museum. The contractor shall invoice all travel IAW the Joint Travel Regulations.
Period of Performance:
15 March 2022- 14 March 2023.
Invoicing Instructions:
WAWF Invoicing Procedures: Invoices will be submitted electronically through DFAS payment automated system Wide Area Work Flow. Training is available at http://www.wawftraining.com/. Please use a 2-in-1 invoice.
0004 1 Job CDRLs A001-A006
FFP
Data Deliverables as set forth in Contract Data Requirements List (CDRL) DD Form 1423, CDRL A001-A006.
Period of Performance:
15 March 2022- 14 March 2023.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS) Rock Island Arsenal Exhibit Fabrication and Installation
PART C.1
GENERAL INFORMATION
C.1 Description of Services
Army Museum Enterprise (AME) requires services necessary for the fabrication and installation of a new exhibit at the Rock Island Arsenal Museum in Rock Island, Illinois. The contractor shall create shop drawings and fabricate all exhibit components. In addition, the contractor shall pack, ship and install exhibit components in the exhibit area, install historic objects into those components, and perform the final focusing of lighting.
C.1.2 Background
The effort is in support of the AME’s mission to collect, preserve, interpret, and display historical military material, culture, or artifacts.
C.1.3 Objectives
C.1.3.1 Fabricate the exhibit components to the standards set forth in the AME Design Package Attachments 001, 002, and 003.
C.1.3.2 Purchase, install and make modifications to the building’s electrical system, lighting, audio visual, multimedia and any other exhibit components needing electrical power as noted in the AME Design Package Attachments 001, 002, and 003.
C.1.3.3 Transport and install the exhibit components into the exhibit space prepared by the AME to house the exhibit as noted in the AME Design Package Attachments 001, 002, and 003.
C.1.3.4 Install historic objects into the exhibition components fabricated by the contractor as noted in the AME Design Package Attachments 001, 002, and 003.
C.1.3.5 Do final focusing of lighting. This covers all lighting; case lighting, graphics lighting, track lighting and any other exhibit components with lighting as noted in the AME Design Package Attachments 001, 002, and 003.
C.1.4 Scope
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform fabrication and installation as defined in this Performance Work Statement except the Government Furnished Property identified in Section C.3 at the Rock Island Arsenal Museum in Rock Island, Illinois. The contractor shall perform to the standards in this contract.
C.1.5 Period of Performance: Work shall be completed no later than 12 months from the start of the contract.
C.1.6 General Information
C.1.6.1 Quality Control (QC): The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control plan is the means by which the contractor complies with the requirement of the contract. . At a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, “Performance Requirements Summary”. IAW CDRL A001, after the acceptance of the quality control plan, the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.
C.1.6.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards.
It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
C.1.6.3 Recognized Holidays
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
C.1.6.4 Hours of Operation: The contractor is responsible for conducting delivery, installation of exhibit components, installation of historic objects and final focusing of lights between the hours of 8am to 5pm (Central Standard Time), Monday-Friday except Recognized Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
C.1.6.5 Place of performance is the Rock Island Arsenal Museum in Rock Island, Illinois.
C.1.6.6 Security Requirements: iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Contracting Officer Representative (COR).This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR not later than (NLT) 21 calendar days after contract award. Training may be obtained at http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.
C.1.6.6.1 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
C.1.6.6.2 ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT
All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training. AT Level I awareness training is available at https://jkodirect.jten.mil Course #JS-US007-14.
C.1.6.7 Special Qualifications: Each of the contractor personnel performing the delivery and installation of the exhibit components are required to possess a valid Government issued photo Identification for entry onto Rock Island Arsenal, Illinois. The contractor shall be prepared to provide information on personnel performing the delivery and installation at the Rock Island Arsenal Museum in Rock Island, Illinois.
C.1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any on site post award/ kick off meeting conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. In addition, the Contracting Officer, COR, and other Government personnel, as appropriate, may meet twice per month with the contractor to review the contractor's performance. These meetings shall be via video or tele conference. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
C.1.6.9 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the Contract Manager is absent shall be designated in writing to the Contracting Officer and COR. The Contract Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
C.1.6.10 Identification of Contractor Employees: All contract personnel attending meetings, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Personnel will be required to obtain required documentation for entry onto the base each day.
PART C.2
DEFINITIONS & ACRONYMS
PWS – Performance Work Statement
Contracting Officer’s Representative (COR): A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to the contractor
Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
Quality Assurance. Those actions taken by the Government to assure services meet the requirements of the Performance Work Statement.
PART C.3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
C.3.1 The Government shall provide exhibit design and production ready graphic files at the contract kick off meeting.
C.3.2 Services:
C.3.2.1 Utilities. All utilities in the facility will be available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.
C.3.3 The Government will furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS. At the close of each work period, workspace shall be secured by the contractor.
W56HZV21RL067
PART C.4
CONTRACTOR FURNISHED ITEMS AND SERVICES
(RESERVED)
PART C.5
SPECIFIC TASKS
C.5.1 Basic Services. The contractor shall provide services for:
C.5.1.1 Project Schedule. Contractor shall prepare and present to COR a proposed project schedule complete with meeting and milestone dates for COR approval (IAW CDRL A002). Contractor shall, during the course of the project, track the project to see that the project remains on schedule.
C.5.1.2. The contractor shall provide shop drawings, necessary for the fabrication of the exhibit. (IAW CDRL A003)
C.5.1.3 Status Report: contractor shall submit to the COR for review and approval information relevant to the current level of project progress (IAW CDRL A004). Information is defined as drawings, files, and any other material relevant to the project at that given moment.
C.5.1.4 Provide samples of all materials, colors and finishes to be used in the project prior to the start of fabrication. Acceptance or rejection of the samples shall be submitted to the contractor by the COR. (IAW CDRL A005). If deemed necessary by the Government the fabricator shall fabricate prototypes and mockups prior to the start of fabrication. Acceptance or rejection shall be submitted to the contractor by the COR.
C.5.1.5 Provide PDF copies of the final graphic production files (IAW CDRL A006) for final review and approval by AME prior to the fabrication of graphics.
C.5.1.6 Fabricate all components of the exhibit as specified in the AME Design Package Attachments 001, 002, and 003.
C.5.1.7 The contractor shall provide the opportunity for two field visits of Army personnel to the contractor’s shop.
Travel costs to the fabricator’s facility to be covered by the Government.
C.5.1.8 Contractor shall be responsible for packing, transporting, unloading and unpacking all of the components either produced by the fabricator or purchased by the contractor. The contractor is responsible for all items during transportation. Fabricator shall coordinate delivery of components, unloading, and unpacking of components with the COR.
C.5.1.9 Contractor shall be responsible for installation of all exhibit components into the exhibit space and other modifications such as demolition, painting, or new wall construction as required by the AME Design Package Attachments 001, 002, and 003.
C.5.1.10 Contractor shall be responsible for maintaining the exhibit space for cleanliness for the duration of the installation.
C.5.1.11 Contractor shall install all objects contained within the exhibit space by using gloves, lifts or any other object handling devices to install objects into the display as specified in the AME Design Package Attachments 001, 002, and 003 under the supervision of COR.
C.5.1.12 Contractor shall be responsible for final focusing of lighting.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance Threshold Method of
Surveillance PRS # 1. Contractor shall maintain quality control.
(IAW CDRL A001)
paragraph C.1.6.1.of the
PWS.
Contractor shall track and maintain the quality of the project.
Zero deviation from standard.
100% inspection
PRS # 2. Contractor shall track the project progress.
(IAW CDRL A002)
paragraph C.5.1.1, C.5.1.3 of the PWS.
Contractor shall track project status using agreed upon schedule.
Zero deviation from standard.
100% inspection
PRS # 3. Contractor personnel shall produce shop drawings.
(IAW CDRL A 003)
paragraph C.5.1.2 of the
PWS.
Contractor shall produce detail drawings for the fabrication of the exhibit.
Zero deviation from standard.
100% inspection
PRS # 4. Contractor shall provide satisfactory exhibit component fabrication for the project.
IAW paragraph C.5.1.4, C.5.1.5, C.5.1.6, C.5.1.7 of the PWS.
Contractor shall fabricate exhibits based on design plans.
Zero deviation from standard.
100% inspection
PRS # 5. Contractor personnel shall provide satisfactory exhibit component installation for the project.
IAW paragraph C.5.1.9, C.5.1.10, C.5.1.12 of the
PWS.
Contractor shall install exhibit components to match the specifications in the design package.
Zero deviations from standards.
100% inspection
PRS # 6. Contractor personnel shall provide satisfactory object installation for the project.
IAW paragraph C.5.1.11 of
Contractor shall install objects to match designs as shown in the CMH design package.
Zero deviation from standard.
100% inspection
PRS # 7. Packing and transporting and unloading of fabricated components.
IAW paragraph C.5.1.8 of
Contractor shall meet all delivery deadlines as shown in the project schedule developed in C.5.1.1
Any deviations greater than 5 days must be submitted to the COR for approval.
PRS # 8. Final focusing of lights.
IAW paragraph C.5.1.12 of
Contractor shall meet all installation. All exhibits shall match designs.
Zero deviation from standard.
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Contractor shall develop a Quality Assurance Plan document.
IAW paragraph of C.1.6.1 of the PWS and IAW CDRL A001
1 1 Word document supplied as electronic file.
COR
Contractor shall provide document-showing the proposed schedule for the project.
IAW paragraph of C.5.1.1 of the PWS and IAW CDRL A002
1 1 Word document supplied as electronic file.
COR
Contractor shall provide shop drawings for the fabrication of the project.
IAW paragraph of C.5.1.2 of the PWS and IAW CDRL A003.
1 1 PDF document.
COR
Contractor shall provide document showing project progress for the project.
IAW paragraph of C.5.1.3 of the
Bi monthly, first day of the month.
1 Word document supplied as electronic file.
COR
Deliverable Frequency # of Copies Medium/Format Submit To PWS and IAW CDRL A004.
Contractor shall provide samples.
IAW paragraph of C.5.1.4 of the PWS and IAW CDRL A005.
1 1 Word document supplied as electronic file.
COR
Contractor shall provide a PDF proof package of the final graphic production files.
IAW paragraph of C.5.1.5 of the PWS and IAW CDRL A006.
1 1 Electronic PDF files.
COR
Fabrication and Install all Exhibit components into the exhibit galleries.
IAW paragraph C.5.1.6, C.5.1.7, C.5.1.8, C.5.1.9, C.5.1.10, of the PWS & IAW
CDRL A006
1 1 Product as specified in the exhibit design
Install Objects into the exhibit space.
IAW paragraph C.5.1.11 of the PWS & IAW CDRL A006
1 1 Product as specified in the exhibit design
Perform final focusing of lights
IAW paragraph C.5.1.12 &
IAW CDRL A006
1 1 Product as specified in the exhibit design package
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 15-MAR-2022 TO
14-MAR-2023
N/A CENTER OF MILITARY HISTORY
PATRICK ALLIE
1 ROCK ISLAND
ROCK ISLAND IL 61299-5000
W50U8G
0002 POP 15-MAR-2022 TO
14-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 15-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 15-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.242-17 Government Delay Of Work APR 1984
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2in1
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0490
Issue By DoDAAC W56HZV
Admin DoDAAC** W56HZV
Inspect By DoDAAC W50U8G
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) W50U8G
Service Acceptor (DoDAAC) W50U8G
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Contracting Officer Representative (COR): Roxann Showers, Email: roxann.showers.civ@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
H.1 Contractor Performance Assessment Reporting System (CPARS)
H.1.1 The contractor will register at the CPARS Access site: http://www.cpars.csd.disa.mil/cparsmain.htm.
H.1.2 The contractor's performance under this contract shall be assessed by the Government. An interim assessment will be prepared every 12 months and a final assessment will be prepared when the contract is physically complete.
The Contracting Officer (Assessing Official), the Contract Administration Office, or any other Government source deemed appropriate will provide to the Procuring Contracting Officer (PCO) information relative to the contractor's performance in the following areas: Technical (Quality of Product or Services); Cost Control; and Management (Subcontract Management, Program Management or Other Management). The assessment/review will be accomplished using the Contractor Performance Assessment Reporting System (CPARS). The completed evaluations shall not be released to anyone other than Government personnel and the contractor whose performance is being evaluated.
Section I - Contract Clauses
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
52.204-2 Security Requirements MAR 2021 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.209-1 Qualification Requirements FEB 1995 52.211-2 Availability of Specifications, Standards, and Data Item
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
APR 2014
52.213-3 Notice to Suppliers APR 1984 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-23 Limitations on Pass-Through Charges JUN 2020 52.216-1 Type Of Contract APR 1984 52.219-32 Orders Issued Directly Under Small Business Reserves MAR 2020 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-25 Affirmative Action Compliance APR 1984 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-19 Compliance with Environmental Management Systems MAY 2011 52.224-2 Privacy Act APR 1984 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-13 Notice Of Progress Payments APR 1984 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-36 Payment by Third Party MAY 2014
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-17 Government Delay Of Work APR 1984 52.243-1 Changes--Fixed Price AUG 1987 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.252-3 Alterations in Solicitation APR 1984 52.252-5 Authorized Deviations In Provisions NOV 2020 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirement
NOV 2020
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
JAN 2018
252.219-7000 Advancing Small Business Growth SEP 2016 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7013 Duty-Free Entry--Basic APR 2020 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
APR 2019
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7007 Limitation Of Government's Obligation APR 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.237-7022 Services at Installations Being Closed MAY 1995 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JAN 2021
252.246-7008 Sources of Electronic Parts MAY 2018 252.247-7022 Representation of Extent of Transportation by Sea. JUN 2019 252.247-7023 Transportation of Supplies by Sea FEB 2019
52.204-1 APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of the Contracting Officer Kimberly A. Nelson and shall not be binding until so approved.
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(a) Definition: "Qualification requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
(Name) usarmy.detroit.tacom.mbx.lcmc-competition-management-of@mail.mil (Address) 6501 E. 11 Mile Rd., ATTN: AMSTA-CSC-M, Detroit Arsenal, MI 48397-5000
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name Manufacturer's Name Source's Name Item Name Service Identification Test Number (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not in itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract.
This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate the contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interests, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and
(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes'', as amended (41 U.S.C. 601-613).
Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of…
This is the start of the file's text. The full file is on GovTribe.