Questions_and_Answers_23_JAN_2019.docx

DOCX document 75 KB Posted

Attached to
Army Combat Fitness Test (ACFT) Equipment
Solicitation number
W56HZV-19-R-0028
Issued by

About this file

This synopsis describes a forthcoming solicitation for Army Combat Fitness Test equipment. The United States Army Contracting Command - Warren intends to issue a request for proposal to acquire a minimum of 26,000 sets and maximum of 30,000 sets of 11 pieces of fitness equipment per set. Equipment includes a hexagon bar, bumper plates, barbell collars, a sled, medicine balls, kettlebells, and a measuring tape. Delivery of all equipment sets is required by October 1, 2019. The solicitation will be a 100% small business set-aside and award a firm fixed price indefinite delivery indefinite quantity contract over three ordering periods.

Q&A as of 23 January 2019.

View the file

Other files

File Type Posted
Attachment_0001_rev1_Range_Pricing_Evaluation_Worksheet.xlsx XLSX spreadsheet
W56HZV-19-R-0028_Solicitation_Amendment_009.pdf PDF
Questions_and_Answers_1_FEB_2019.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_009_Confromed_Copy.pdf PDF
Questions_and_Answers_31_JAN_2019.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_008_Confromed_Copy.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_008.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_007.pdf PDF
Questions_and_Answers_30_JAN_2019.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_007_Confromed_Copy.pdf PDF
Attachment_0002_TIQv2.docx DOCX document
Questions_and_Answers_28_JAN_2019.docx DOCX document
W56HZV19R0028-0006.pdf PDF
Attachment_0002_TIQ.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_006_Confromed_Copy.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_005_Confromed_Copy.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_005.pdf PDF
Questions_and_Answers_18_JAN_2019.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_004.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_004_Confromed_Copy.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_003.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_003_Confromed_Copy.pdf PDF
Attachment_0001_rev1_Price_Evaluation_Worksheet.xlsx XLSX spreadsheet
Questions_and_Answers_16_JAN_2019.docx DOCX document
W56HZV-19-R-0028_Solicitation_Amendment_002.pdf PDF
W56HZV-19-R-0028_Solicitation_Amendment_002_Conformed_Copy.pdf PDF
Questions_and_Answers_10_JAN_2019.docx_--_btm_comments.docx DOCX document
W56HZV19R0028-0001.pdf PDF
Attachment_0001_Range_Pricing_Evaluation_Worksheet.xlsx XLSX spreadsheet
W56HZV-19-R-0028.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56HZV-19-R-0028

Questions and Answers

10 JAN 2019

1) Is this an all or none requirement? If not and a vendor only quotes on some of the items, will this hinder any chance for an award?

ANSWER: Yes, this is an all or none requirement. The offeror must provide each of the 11 components consisting of a complete set in order to be eligible for award.

2) Can we bid on the weights alone?

ANSWER: No

3) We have a new patented strap clamp that is made of rubber and works on all bars. Can we use these as the clamps on the solicitation?

ANSWER: Clamps must meet the salient characteristics in accordance with the requirements found in C.2.2.3., Barbell Collar/Spring (pair).

4) Is this is a new requirement?

ANSWER: Due in part to the current requirement being larger than 25% of any previous acquisitions, W56HZV-19-R-0028 is considered a new requirement.

5) Our assumption is the shipping will occur to a site within CONUS, correct?

ANSWER: The Government will ship sets to locations OCONUS and CONUS. All shipments of ACFT equipment will be FOB Origin. The Government will utilize Government Bill of Lading (GBL) Transportation Authorization Code (TAC) for all direct vendor delivery of ACFT equipment to the units in accordance with F.1., Shipping.

6) FOB Point, we are responsible for paying shipping to the port, however is the Army paying the loading costs? If we are to pay the loading costs, does the Army have estimates?

ANSWER: No. All shipments of ACFT equipment will be FOB Origin. The Government will utilize Government Bill of Lading (GBL) Transportation Authorization Code (TAC) for all direct vendor delivery of ACFT equipment to the units in accordance with F.1., Shipping.

7) Will the GOV shutdown push back the delivery dates noted in the PWS? If the Army receives bids on 1/28/19 and makes a decision by 2/28/19 this leaves approximately 45-day turn around for the 2019 April order.

ANSWER: Per Solicitation Amendment 0001, delivery dates and schedule have been revised.

8) This is approximately an $8M dollar outlay for half the order, with it being an IDIQ is the Army confident that dollar allocations of the contract minimums will be fulfilled at contract award?

ANSWER: As the Government requires ACFT Equipment sets, a delivery order will be issued for the minimum number identified in the Solicitation and will be fully funded at time of award.

9) "The original “sources sought” memo came out 10/26/18 addressing needs of ACFT equipment by 10/1/19. That’s an eleven month lead time. On 11/14/18 a production spreadsheet was sent out with a request to complete and submit it by 11/19/18. We showed a delayed start to deliver the first sets with a completion period of 10 months. Since the beginning of this process, and as time has transpired, we have seen that the OCT 2019 deadline to receive all equipment has not changed. Now, the tentative award will be issued in MAR 2019 with the OCT 2019 deadline unchanged. That’s six months. An award in March, with an October deadline to complete all deliveries, results in a production time much shorter than the original sources sought lead time requirement. Most, if not all, companies will need several months to implement the production plan needed for this project. Can the final due date of the equipment sets be changed to match the original sources sought lead time of ten months with a several month delay in receiving the first sets allowed as well?"

ANSWER: The initial sources sought was a notification to industry of the Army’s requirement. The production spreadsheet was an additional RFI to determine industry’s capacity to manufacture and deliver ACFT equipment sets. The Army’s requirement is to implement ACFT no later than 01 OCT 2019. Not issuing ACFT equipment sets by 1 OCT 2019 will negatively impact individual Soldier readiness across the entire US Army. Therefore, a contractor must deliver ACFT Equipment sets in accordance with the delivery schedule as set forth in Solicitation Amendment 0001.

10) "Is it correct that the Army could issue an award for 3000 ACFT sets as late as 3/31/19 and would expect delivery to the units by 4/15/19, meaning that any potential awardees would likely need to start procurement and production of the equipment prior to award?"

ANSWER: Per Solicitation Amendment 0001, delivery dates and schedule have been revised.

11) Understanding that the contract will be "FOB Origin" and that sets will be shipped via GBL, am I correct in assuming that "delivered to" date and place means delivered to our company-managed consolidation point for pick up by government contracted carriers? Should this pick-up point be in CONUS for all shipments, or is a European point acceptable/desirable for at least the European final destinations?

ANSWER: Place of shipment is FOB Origin. The Government will pick-up ACFT Equipment sets from the contractor’s designated facility(s) once the contractor has met its obligation in meeting the delivered to date.

12) Do the Berry Amendment restrictions apply to this contract? I do not see it mentioned anywhere.

ANSWER: Yes

13) Past performance is not mentioned in Section L, but item (10) on page 55 reads, "Past performance information, when included as an evaluation factor, to include...” Is past performance information requested in our response?

ANSWER: No

14) Is there a deadline for asking questions?

ANSWER: Yes, 18 JAN 2019. Final response to all questions will be provided no later than 23 JAN 2019.

15) On page 57, item (j), there is a request for an offeror to include their Unique Entity Identifier in the vendor box on the SF1449 form. This section indicates that this code can be retrieved at Caution-www.sam.gov < Caution-http://www.sam.gov >. I am familiar with SAM registration but cannot find any reference to this UEI code or how to get one on the SAM site.

ANSWER: Unique Entity Identifier (formerly DUNS) number means the nine-digit number established and assigned by Dun and Bradstreet, Inc. (D&B) to uniquely identify business entities. A Unique Entity Identifier number may be obtained from the D&B by telephone (currently 866-705-5711) or the Internet (currently at http://fedgov.dnb.com/webformVisit disclaimer page).

16) Will COTS items be accepted from TAA countries?

ANSWER: IAW FAR 25.401, TAA items will not be accepted. Items from qualifying countries IAW 252.225-7002, 252.225-7001, & 252.225-7000 may be accepted.

17) Does the Government still intend to award this Solicitation in March 2019?

a. If not, when is the anticipated award date?

ANSWER: Yes

18) Please provide information regarding the site survey.

a. What are the expectations for the site survey?
b. What exactly will be inspected by DCMA?

c. What location(s) does the government intend to inspect (e.g. the kitting facility or manufacturing facility)?

ANSWER: DCMA Pre-Award Site Survey will assist the contracting officer determine contractor responsibility. A Pre-award Survey can focus on virtually every facet of a business such as: technical capability, financial stability, quality assurance capability, safety, etc. The pre-award survey is the buyer’s opportunity to gain a wealth of information about a prospective supplier's capabilities. Some of the most commonly requested factors for evaluation are as follows.

a. Technical Capability: An assessment of the offeror's key management/technical personnel to determine if they have the basic technical knowledge, experience and understanding of the requirements necessary to produce the required product or provide the required service. Adequate technical and/or management resources must be available during the period of performance in the event of an award.

b. Production Capability: An evaluation of the offeror's ability to plan, control, and integrate manpower, facilities, and other resources necessary for successful contract completion. This includes assessing and reporting the following: The offeror's Plan of Performance (POP); Organization & Management; Plant Facilities & Equipment; Materials & Purchased parts; Production Control System; Subcontracting; Labor Resources; current and past delivery performance.

c. Financial Capability: To make a determination that the offeror has adequate financial resources, or access to them, to acquire needed facilities, equipment, materials, etc., necessary for successful completion of a specific contract as well as any existing DOD contract backlog. Adequate financing is one of the most important prerequisites for successful contract performance.

d. Packaging: An assessment of the offeror's ability to meet the solicitation packaging requirements, including preservation, unit pack, packing, marking, and unitizing for shipment.

19) Is the Government aware that certain items that make up the ACFT Sets/ Kits are only manufactured in China and there are ZERO manufactures in the USA i.e. the 40lb kettlebell and 10lb rubber medicine ball, with some other Kit items most likely in the same situation? Understanding this as fact, Per FAR 19.102F SIZE STANDARDS, this solicitation cannot be set aside for small business, if the non-manufacturing rules apply and the Buy American provisions apply. No bidder will meet the small business set aside requirements due to the fact that they will be purchasing 40lb kettlebells and 10lb rubber medicine balls from Chinese factories (although with their logo, the manufacturer itself is a foreign entity), and they will be viewed as a large business.

ANSWER: Numerous U.S. based small businesses responded to the Government’s Market Research. These businesses indicated they could manufacture/obtain one to all eleven of the kit items domestically or through a qualifying country.

20) Per the FAR, below are the reasons for exemption from the BAA and we believe all or most of them apply to this solicitation:

. Iron, steel or manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of satisfactory quality;

. Inclusion of iron, steel or manufactured goods produced in the United States will increase the cost of the project by more than 25 percent;

. Applying the Buy American restriction is inconsistent with the public interest.

. Use outside the United States. The Buy American Act expressly provides that agencies are not required to purchase domestic end products or construction materials "for use outside of the United States."59 As used here, the "United States" includes the 50 states, the District of Columbia, and "outlying areas" (e.g., Puerto Rico),60 but excludes areas over which the United States lacks "complete sovereign jurisdiction," such as military bases leased from foreign governments.

ANSWER: The Government’s Market Research indicated that all eleven kit items could be obtained without needing an exception to the Buy American Act (BAA).

21) Is the Government aware of the manufacturing capacity issues regarding the specified products: USA made bumper plates and nylon sled? Each of these items are only available through one US manufacturing source: Hi Temp and Spud. This creates a major performance risk to the Government, along with increased and unreasonable costs when compared to a functional and/or exact "imported" equal item. We believe it also makes this Solicitation unfairly restrictive, due to being available from only 1 manufacturing source.

ANSWER: Numerous U.S. based small businesses responded to the Government’s Market Research. These businesses indicated they could manufacture/obtain one to all eleven of the kit items domestically or through a qualifying country.

22) Is there a deadline date for Q & A?

ANSWER: Yes, questions will not be accepted after 5 p.m. EST, 18 JAN 2019. The Government anticipates answering all questions no later than 23 JAN 2019.

23) Is the monthly schedule flexible as long as full delivery is made prior to the 30 Sep 2019 deadline?”

ANSWER: The Government has reviewed its delivery schedule and have amended the solicitation to reflect the first delivery required 60 days after receipt of award (DARO).

24) What warranties and life span is expected on the products?

ANSWER: Standard manufacturer warranty and the government anticipates a life span up to 10 years.

25) C.2.2.1.(c) Hexagon Bar/Trap-Bar: Is 40x40mm square tubing allowed for the Hex Bar?

ANSWER: Hex bar must meet the salient characteristics in accordance with the requirements found in C.2.2.1., Hexagon Bar/Trap-Bar.

26) C.2.2.1 Hexagon Bar/Trap-Bar: What is the maximum loading requirement on the Hex Bar?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.1.

27) C.2.2.2. (b) Bumper Plates: What is the definition of “solid”, does it also include plates made out of virgin or recycled rubber granules? C.2.2.2. (c) Bumper Plates: What is the rationale for the shore durometer tolerance A of +/- 0.3? The standard for the rubber industry is shore durometer A +/- 5.0 according to ISO 7619-1:2010 (Rubber, vulcanized or thermoplastic – Determination of indentation hardness – Part 1: Durometer method (Shore hardness). Can this specification be changed to shore durometer tolerance A of +/- 5.0?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.2.

28) C.2.2.5. (a) 10lb Rubber Medicine Ball: Are materials with equal performance to rubber allowed? The medicine balls we wish to provide are made of PVC in accordance with California Proposition 65. Can the medicine ball be made of PVC?

ANSWER: 10lb Rubber Medicine Ball must meet the salient characteristics in accordance with the requirements found in C.2.2.5.(a), The medicine ball shall be made from hard rubber and 9” in diameter with no more than ½ inch in deviation;

29) Because this procurement is structured as a small business set-aside purchase of a single kit of 11 component items, it is our understanding that 13 CFR 121.406(c)(1) applies. Can you please confirm that per 13 CFR 121.406(c)(1) "50 percent of the total value of the components of the kit must be manufactured by business concerns in the United States which are small under the size standards for the NAICS codes of the components being assembled"? If not, please explain the applicable requirements.

ANSWER: Yes, this regulation applies.

16 January 2019

30) In your questions and answers you mention that this is a Berry Amendment but also list three FARs (252.225-7002, 252.225-7001, & 252.225-7000) that all consider COTS items made in USA. As the contract is written COTS items are accepted. Please clarify.

ANSWER: Berry Amendment is a statute and is required. DFARS 225.7002-1 has been added to the RFP. As prescribed, Berry Amendment only applies to measuring tools for the purposes of this RFP. COTS items are allowed in accordance with referenced provisions and salient characteristics required under Section C. COTS items from qualifying countries that meet the salient characteristics required under Section C are also allowed in accordance with referenced Buy America provisions. COTS is a subset of a commercial item.

31) In section C.2.2.1 it states the trap bar/hex bar must be Olympic size. By rule, no hex bar is Olympic size. Are standard hex bars acceptable for this solicitation as long as they meet the other specifications?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.1.

32) In section C.2.2.2 it states Insert type: forged stainless steel (prefer stainless steel disc insert). Is either a pressed sleeve or integrated hub (disc insert) acceptable for this solicitation?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.2.

33) In section C.2.2.3 the specs for the spring collars it states: Must ensure collar/spring and bar selected are fully compatible. Fits allowable range between 1.937 to 2.015 (inches). C.2.2.1 requires: "1.5"SCH 80 pipe sleeves" this would require the "allowable range" to be adjusted. We recommend 1.85 - 1.93 inches. Will that be acceptable for this solicitation?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.3.

34) In section C.2.2.5 the specs for the med ball it states (e) Weight cannot shift inside and cannot be filled with sand or similar material. We have fulfilled USG orders with 10 lb medicine balls that are made with a soft rubber (semi-malleable) and filled with sand and air but do not bounce. We used with these med balls because they were deemed acceptable by the US Army School of Physical Fitness at Fort Jackson and are 100% US sourced. Will these be acceptable for this solicitation?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.5.

35) We need clarification on one part of the ACFT spec where the math doesn’t seem to add up, specifically regarding the length of the hex bar sleeve. The spec calls out that the Hex Bar Sleeve must be 16.4" long and accommodate 4 x 45lb plates and a collar:

The spec then calls out the widths of both the 45lb bumper and the collar: 3.75” and 2” respectively.

When you add together the widths of the 4 x 45lb bumpers and the collar, the length is more than 16.4”: (4 x 3.75”) + 2” = 17”

And this only gets worse when you factor in the upper tolerance of the bumper width (17.26” max).

Will the Army accept a bar/bumper/collar combo that will work together regardless of the spec? Or do they need to modify their values in the spec to specify a longer sleeve length?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.1.

36) With the crating requirement, there will be a cost associated with 18,000 crates. Should we put that cost as a separate line item?

ANSWER: Please refer to Sections L.4.1.3 and L.4.2.

37) Can you please let me know if some of the items are made in China or any other non TAA country, that these would be acceptable to bid? Are open market items acceptable to bid?

ANSWER: The government is relying on industry to source all materials in accordance with all provisions set forth in the RFP.

38) Can you please confirm that a squat stand is not required?

ANSWER: The squat stand is not required.

39) If two delivery orders are issued against the RFP, does that mean that no payments will be made to either vendor by the Government until the complete 18,304 sets are delivered to Government contracted carrier's containers, or will payments be made monthly as deliveries are made?

ANSWER: Invoices can be billed monthly to the Government as deliveries are made to the Government.

40) It seems like in Section F.1 Shipping that shipments will be picked up from the contractor with your own carriers. Is that the case for all shipments or just certain locations? If shipments are to be sent directly to the end users is there a list of locations/addresses? my main concern is if they are all stateside or not.

ANSWER: All shipments will be FOB Origin via Government Bill of Lading (GBL). Awardee(s) will not be required to ship or deliver completed ACFT equipment sets.

41) C.2.2.5.(a) 10lb Rubber Medicine Ball: The medicine ball that we wish to offer is 9.84” (250mm) in diameter and the specifications stipulate 9” diameter with 1/2 inch in deviation. Will a medicine ball that is 250mm in diameter be acceptable?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.5.

18 January 2019

42) In relation to the technical description of the 10lb med-ball in C.2.2.5.(a), will PVC (polyvinyl chloride) be considered to be an acceptable alternative to rubber? PVC is a common rubber alternative. Please confirm if you can amend the specification at C.2.2.5.(a) to include this as an allowable rubber-like material?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.5.

23 January 2019

43) Does each component and 100% of the kit need to come from the United States? Or does only 50% need to come from the US?

ANSWER: All domestic end products must be manufactured in the USA or a qualifying country as outlined within the RFP provisions. All components, or qualifying country components, must exceed 50% of the cost of all its components to an end product. Please also review all applicable provisions within the RFP, to include all referenced provisions mentioned.

44) If non-US sources are allowed, which specific countries are allowed to comprise less than 50% of the kit cost?

ANSWER: Please see DFARS 252.225.7002 for a list of “qualifying countries” and reference Q&A #43 for additional guidance.

45) Specifically, can any component or COTS item in the kit come from China?

ANSWER: Please reference Q&A #43.

46) Section C.2.2.5 indicates the 10lb Rubber Medicine Ball must both be made of solid rubber as well as inflatable. Can you clarify if this needs to be inflatable or solid rubber since it can’t be both?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.5.

47) Section F.1 indicates all shipments of ACFT equipment will be FOB Origin (the legal fact that the buyer assumes title of the goods the moment the freight carrier picks up and signs the bill of lading at the origin pick-up location). Will we be required to pay any type of freight charge associated with the shipments? If so, will shipping costs to each location be provided prior to the bid submission deadline? If we are required to pay any freight charges, how will we be billed?

ANSWER: Please reference Q&A #40.

48) Section C.2.2.1 (f) indicates the hexagon bar requires rust proofing. Is powder coat, cerakote, or zinc primed then powder coated treatment considered rust proofing?

ANSWER: Any industry recognized standard rust-proof powder coating applied to the steel tubing is acceptable.

49) Section F.3.1 indicates that in the multiple award scenario based on the total sets delivered, two contractors would provide a total of 90,176 sets.

Delivery Order 1: 18,304 sets Delivery Order 2: 13,392 sets Delivery Order 3: 13,392 sets

Total sets delivered per single vendor: 45,088 sets Total sets delivered total from two vendors: 90,176 sets

Can you confirm if the Army is needing more than the potential 50,000 total sets as listed in the current solicitation?

ANSWER: The USG requirement is a minimum total of 36,608 ACFT equipment sets with a maximum ceiling of 50,000 ACFT equipment sets. It is the USG’s intent to make an award up to two offerors, with each awardee being issued a delivery order for 18,304 ACFT equipment sets. An awardee may receive future delivery orders up to an additional 13,392 ACFT equipment sets over a 3 year ordering period.

50) Would the government consider broadening the Standard diameter acceptable range and tolerance from 450mm to 445mm – 450mm +/- 1mm?

ANSWER: The Government has reviewed its specifications and have amended section C.2.2.2.

51) Considering that several ACFT kit line items may be sourced from TAA compliant countries, will there be any negotiations on pricing allowed for ordering periods 2 and 3 due to currency exchange fluctuations?

ANSWER: Please reference Q&A #16 and reference provision 52.216-1 within the RFP.

52) Can you provide a list of foreign articles that you will treat as domestic for this contract?

ANSWER: Please reference Q&A #37 & #43.

53) Have the DCMA site surveys caused an extension to the deadline? If not, do you see a reason for a vendor to submit an offer if they are not be able to satisfy the delivery terms?

ANSWER:

a. DCMA site surveys have not caused any extensions to the RFP close date. DCMA site surveys may continue as necessary after the RFP deadline. DCMA site surveys are not contingent on the RFP close date.

b. Please review sections L & M within the RFP in order to determine factors that will determine technical acceptance.

54) Due to the government requiring Buy American Act items, the government is creating unnatural relationships to be created across the fitness industry. Many major fitness manufacturers are only making 1 of each of the items in the U.S. and are being forced to buy from competitors for other items to kit this buy. Has the government considered the risk associated with this scenario because the Army can only hold the prime contractor responsible, not subcontractors/suppliers?

ANSWER: Yes, the USG has considered this risk and initiated a market research survey to determine industry capabilities and constraints. Numerous U.S. based small businesses responded to the Government’s Market Research and indicated they could manufacture/obtain one to all eleven of the required items domestically or through a qualifying country.

55) If the winning contractor does not meet the deadline, what are the Army’s plans for the prime contractor in regards to contract noncompliance? Will the contractor be terminated for default?

ANSWER: DCMA site surveys will be used to assist in making contractor responsibility determinations and ensure that awardee(s) will be able to meet all requirements and (delivery) deadline(s). If awardee(s) miss the deadline, the contracting officer will make decisions at that time on how to proceed.

56) Shouldn’t the Army have DCMA audit/inspect BEFORE a solicitation closes?

ANSWER: DCMA site surveys may continue as necessary even after the RFP deadline. An offeror’s proposal may be utilized by DCMA to assess contractor responsibility. Therefore, DCMA site surveys are not contingent on the RFP close date.

57) Why is the Army requiring vulcanized rubber bumper plates and not the normally purchased, and less expensive and more accessible, virgin rubber bumper plates?

ANSWER: Vulcanized rubber bumper plates was never articulated in the RFP or any corresponding amendments. Please reference Section C.2.2.2. for minimum specifications required.

58) Why did the Army choose to use vulcanized rubber bumper plates that have a larger width than virgin rubber bumper plates that actually have a smaller width and allows for more plates to fit on the trap bar? If the Army is concerned with how many bumper plates can fit on the bar, shouldn’t the Army consider alternative plates?

ANSWER: Vulcanized rubber bumper plates was never articulated in the RFP or any corresponding amendments. Please reference Section C.2.2.2. for minimum specifications required.

59) The government issued a sources sought request and took industry feedback on the production of items. The government is also claiming that industry has responded where there is at least one manufacturer of each item in the US. If there is only one manufacturer of this item in the US, isn’t the government creating an extreme level of risk for the completion and execution of the contract?

ANSWER: The USG developed its requirements in order to meet the conditions of the Army Combat Fitness Test (ACFT). The USG will begin administering the ACFT, Army wide, as of 1 OCT 2019. Numerous U.S. based small businesses responded to the Government’s Market Research. Our market research results indicated that small businesses could manufacture/obtain one to all eleven of the kit items domestically, or through a qualifying country, by the delivery date required.

60) Has the government considered the risk associated with putting the Army’s entire ACFT production of an item on one US small business?

ANSWER: Yes.

61) The government states that there are US based manufacturers of Trap Bars, sleds, bumper plates, kettlebells, tape measures, 10lb rubber medicine balls, and collars. Please provide a list of those companies that responded that have the ability to produce US based trap bars.

ANSWER: The synopsis posted on 20 NOV 2018 to FBO.gov provided a list of companies that participated in the market survey and chose to be publically identified. Aside from what has already been made public, the USG will not release any proprietary information that will impact the integrity of competing offerors.

62) Because the Army is requiring that the winning contractor(s) provide all of the items from US based manufacturers, please provide a list of manufacturers that produce the items required.

ANSWER: Both US based and qualifying countries of end manufacturers are accepted. Please also see Q&A #61.

63) When the DCMA audit has been completed and the Army is made aware that US production capability cannot meet the requirement of this fitness purchase, does the Army intend to re-solicit the requirement with BAA requirements removed?

ANSWER: If no offeror submits a successful bid, the USG will reconsider its requirements at that time.

64) How is the government going to ensure that BAA compliance is met throughout this process? Many companies do not understand how BAA works and may attempt to circumvent the requirements. This is an important question because the government has based its procurement strategy on the fact that they believe all items can be procured using BAA compliance. If the winning contractor cannot meet the BAA compliance, will the Army terminate the contract and put it out for re-bid?

ANSWER: The Army will not make a contract award without determining contractor responsibility in accordance with Sections M.3.6 and M.4. In addition, please also see Q&A #55.

65) Is the Army going to ensure BAA requirements are met through DCMA oversight throughout the period of performance?

ANSWER: DCMA will provide contract administration oversight after contract has been awarded.

66) The government keeps referring to the bumper plates on the ACFT requirements document as “Hi-Temp” plates. Does the government realize that “Hi-Temp” is a brand name, and not a style of plate?

ANSWER: “Hi-Temp” is not articulated anywhere within solicitation #W56HZV-19-R-0028 or any corresponding amendments.

67) How does the government intend to ensure that the manufacturers of the steel-based items are using US produced steel and stay in compliance with the Barry Amendment?

ANSWER: Specialty metals is not a characteristic of a component, or an end item, that makes up items within the ACFT equipment set.

68) Does the Army consider the products being procured as a kit for purposes of the "Kit Assemblers" exception found at 13 CFR Sec. 121.406(c)?

ANSWER: Please see Q&A #29.

69) Section 225.7002-1 Restrictions (1) indicates not to acquire:

(1) Any of the following items, either as end products or components, unless the items have been grown, reprocessed, reused, or produced in the United States.

(vi) Synthetic fabric or coated synthetic fabric, including all textile fibers and yarns that are for use in such fabrics.

Can you confirm if this applies to the Sled (With Pull Strap) being requested in C.2.2.4 (a) which states the following:

"Can be made of thick heavy duty nylon, fiber glass, polyester, or a combination of different fibers;"

ANSWER: No, this does not apply to the sled. However, BAA provisions within the RFP do apply.

image2.jpeg image1.jpeg

File details come from the government source that posted it. Updated .