This document contains a Contract Data Requirements List (CDRL) for the M200A1 Trailers federal contract opportunity. The CDRL outlines fourteen required data items to be delivered by the contractor, including engineering change proposals, non-conformance reports, test plans and reports, production and quality data, provisioning documentation, and operations security documentation. Key deliverables include a non-destructive weld inspection sampling plan due 30 days after production start, provisional and final inspection records due 105 and 180 days after order receipt respectively, and a program production data report delivered monthly beginning 30 days after production start. Data must be submitted electronically using specified file formats and distribution methods. The CDRL provides delivery due dates, distribution instructions, and data rights markings for each required item.
Exhibit A - CONTRACT DATA REQUIREMENTS LIST 30 May 2019
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
CONTRACT DATA REQUIREMENTS LIST (CDRL)
30 May 2019
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
M200A1 Trailer
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP), Value Engineering Change Proposal
(VECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639
5. CONTRACT REFERENCE
C.3.1, C.3.2.1, C.3.4
6. REQUIRING OFFICE
SFAE-CSS-JL-LT
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
AS NEEDED
12. DATE OF FIRST
SUBMISSION
N/A 14. DISTRIBUTION
8. APP CODE
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16 REMARKS
Electronic Data Delivery. Data requirements specified herein shall be delivered in an electronic format. The file format and delivery method will be dependent upon the file type and size. The files shall be MS Windows 10 and MS Office 13 software compatible. Available methods of delivery are: electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
Prepare the ECP in accordance with forms DD1692-DD1692-7, DD1692C. The contractor shall properly define ECPs as either Class I or Class II as defined in Instructions for DD Form 1692.
The contractor shall submit a PDF file electronically to the Government for Government Configuration Control Board (CCB) review and approval:
The contractor shall submit the PDF file via e-mail to the following e-mail addresses:
joseph.d.elwart.civ@mail.mil christopher.l.start.civ@mail.mil
Forms are available from the DoD Forms Management website at:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm.
VECPs shall be submitted as a major change. VECP preparation, submission, and Government action shall be IAW FAR 52.248-1.
Major and minor classification and ECP priority are defined in the DD1692 form preparation instructions.
Applies to Not Separately Priced (NSP) CLINs:
The contractor shall seek written Government authorization if there is a need to depart from any performance or design requirement of the specification, drawing or other document for exact number of units or a specific period. When Government approved engineering changes are incorporated into the contract, the contractor shall provide the Government with actual serial numbers of the trailers changed during production to the email addresses provided below.
For ECPs or VECPs that are larger than 10MB but less than 2 GB, deliver to e-mail addresses via Army SAFE FTP site: https://safe.amrdec.army.mil/safe2.
Technical data shall be marked with an appropriate Distribution Statement and, as applicable, the Export Control Notice, prior to distribution, regardless of media. The Contractor shall contact the Program Office, SFAE-CSS-JL-LT, for the appropriate distribution statement/export control warning, prior to finalization of data.
SFAE-CSS-JL-LT 0 2 0
PCO 1
Engineer 1
APM 1
15. TOTAL 0 5 0
G. PREPARED BY
Joseph Elwart
H. DATE
I. APPROVED BY
Laurie Austin
J. DATE
09-13-2018
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
E. SYSTEM/ITEM.
A002
3. TITLE OF DATA ITEM
Request for Variance (RFV)
DI-SESS-80640
5. CONTRACT REFERENCE
C.3.1, C.3.3.1, C.3.4
6. REQUIRING OFFICE
10. DIST STATEMENT
12. DATE OF FIRST
SUBMISSION
N/A 14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
N/A a. ADDRESSEE
b. COPIES
Draft
Electronic Data Delivery. Data requirements specified herein shall be delivered in an electronic format. The file format and delivery method will be dependent upon the file type and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
Available methods of delivery are: electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
The contractor shall submit a RFV, in accordance with DD Form 1694, within 24 hours of identification of a known departure from requirements or approved configuration.
Forms are available from the DoD Forms Management website at:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm.
The contractor shall submit a PDF file electronically to the Government for Government Configuration Control Board (CCB) review and approval:
The contractor shall submit the PDF file via e-mail to the following e-mail addresses:
joseph.d.elwart.civ@mail.mil christopher.l.start.civ@mail.mil
Technical data shall be marked with an appropriate Distribution Statement and, as applicable, the Export Control Notice, prior to distribution, regardless of media. The Contractor shall contact the Program Office, SFAE-CSS-JL-LT, for the appropriate distribution statement/export control warning, prior to finalization of data.
Web Database 0 1 0
15. TOTAL 0 3 0
Joseph Elwart
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
F. SYSTEM/ITEM.
A003
4. TITLE OF DATA ITEM
NDT Weld Inspection Sampling Plan
DI-QCIC-81115 NOT 1, See Block 16
5. CONTRACT REFERENCE
E.15.2
6. REQUIRING OFFICE
11. DIST STATEMENT
DIST. STATEMENT
REQUIRED: C
ASREQ
12. DATE OF FIRST
SUBMISSION
30 Days after production start 14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
N/A a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall present an NDT weld inspection sampling plan IAW DI-QCIC-81115 NOT 1 for USG approval.
SFAE-CSS-JL-LT 1 3
PCO 0 1
Engineer 0 1
QA 1 1
15. TOTAL 0 3 0
Todd Kohler
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A004
2. TITLE OF DATA ITEM
Conference Agenda and Conference Minutes
DI-ADMN-81249B
DI-ADMN-81250
5. CONTRACT REFERENCE
C.2.1, C.2.2
6. REQUIRING OFFICE
9. DIST STATEMENT REQUIRED
12. DATE OF FIRST
SUBMISSION
See Block 16 14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall support periodic Conferences, Meetings or Reviews.
The contractor shall prepare and provide an agenda and read ahead package no later than 8 days prior to any meeting to the email addresses below. The Government has 2 days to review. The contractor shall resubmit 2 days after Government review.
The contractor shall prepare and distribute minutes of the meeting to include people in attendance, agendas, and topics of discussion.
The contractor shall make electronic delivery of the minutes 15 days after the Conference, Meeting or Review via e-mail to the following addresses:
charley.g.jackson2.civ@mail.mil
15. TOTAL
Melissa Dycio
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A005
2. TITLE OF DATA ITEM
Product Quality Deficiency Report (PQDR) Responses
3. SUBTITLE
PDQR
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80736
5. CONTRACT REFERENCE
E.13.1
6. REQUIRING OFFICE
As required
12. DATE OF FIRST
SUBMISSION
See Block 16
a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall submit Product Quality Deficiency Reports in accordance with section E.13. Emails shall be submitted within 30 days after each incident. For submittal and to process PQDRs, the contractor shall access the Product Data Reporting and Evaluation Program (PEDREP) website at:
https://www.pdrep.csd.disa.mil/
Keith G. Alvae
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A006
2. TITLE OF DATA ITEM
Test Work Authorization Document
3. SUBTITLE
TWAD
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81912
5. CONTRACT REFERENCE
E.8.5, E.8.5.1
6. REQUIRING OFFICE
12. DATE OF FIRST
SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall submit the Test Work Authorization Document 10 days prior to the contractor projected installation date.
Electronic submission is required via e-mail in contractor format. The e-mails shall be submitted to:
Administrative Contracting Officer (ACO) PD-LTV Test Manager
PD-LTV QAR
Email addresses to be provided at Start of Work Meeting.
Omar Hudson
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A007
2. TITLE OF DATA ITEM
Failure Analysis Corrective Action Report (FACAR)
3. SUBTITLE
FACAR
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81315B
5. CONTRACT REFERENCE
E.9.1, E.9.2.1, E.9.2.2, E.9.2.3, E.10.1
6. REQUIRING OFFICE
12. DATE OF FIRST
SUBMISSION
See Block 16 a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall submit a FACAR in accordance with section E.9.2.
DI-SESS-81315B is tailored as follows:
2. Delete
3. A through 3.M Delete
The FACAR data stream (i.e. Section VI of the Test Incident Report (TIR)) shall be prepared by the contractor in the American Standard Code for Information Interchange (ASCII) format for Corrective Action data streams identified at Attachment 0009 of the contract and as described herein. With the exception of supporting documentation (see section E.9.2.3), all required text shall be submitted to ATIRS (Army Test Incident Reporting System) in the ASCII format Corrective Action data stream format.
No contractor entries are required in data blocks 102, 103, 104, and 105. The first contractor entry for each FACAR shall record OPEN in data block 100. Following the Final Corrective Action Review Board (CARB), the Government CARB will provide the contractor with official notification on all closed FACARs. Once notification is received that FACARs are closed, the contractor shall amend data block 100 to reflect COMPLETED.
Electronic submission is required via e-mail. The e-mails shall be submitted to:
Administrative Contracting Officer (ACO) omar.l.hudson.civ@mail.mil PD-LTV Test Manager atirs.help@us.army.mil
Email addresses to be provided at Start of Work Meeting
Omar Hudson
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A008
2. TITLE OF DATA ITEM
Final Inspection Record (FIR)
3. SUBTITLE
FIR
DI-QCIC-81068
5. CONTRACT REFERENCE
E.4.1.1, E.5
6. REQUIRING OFFICE
12. DATE OF FIRST
SUBMISSION
90 DARO (draft) 14. DISTRIBUTION
180 DARO (Final) a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall submit Final Inspection Records in accordance with section E.4.1.1 and section E.5.
The draft FIR is required 105 days after receipt of order.
The final FIR is required 180 days after receipt of order.
Electronic submission is required via e-mail in *.pdf format. The e-mails shall be submitted to:
Administrative Contracting Officer (ACO) Quality Assurance Representative (QAR)
Keith.g.alvae.civ@mail.mil
Keith G. Alvae
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A009
2. TITLE OF DATA ITEM
Product Support Package List (PSPL)
3. SUBTITLE
PSPL
4. AUTHORITY (Data Acquisition Document No.)
MIL-HDBK-502A
5. CONTRACT REFERENCE
E.8.3.2
6. REQUIRING OFFICE
12. DATE OF FIRST
SUBMISSION
60 DARO 14. DISTRIBUTION
See Block 16
a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall prepare and provide a Product Support Package List (PSPL) by e-mail, in contractor format, to the Government 60 days prior to delivery of trailers to the Government test site.
The e-mails shall be submitted to:
Administrative Contracting Officer (ACO) PD-LTV Test Manager
Fred Burdine
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
A010
2. TITLE OF DATA ITEM
Production Database
DI-CMAN-80792A
5. CONTRACT REFERENCE
C.4
6. REQUIRING OFFICE
C
Bi-weekly
12. DATE OF FIRST
SUBMISSION
30 DARO
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
b. COPIES
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
The contractor shall maintain a database in accordance with Section C.4.
Submit electronically to:
frederick.d.burdine.civ@mail.mil
15. TOTAL 0 2 0
Fred Burdine
H. DATE I. APPROVED BY
Laurie Austin
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
1CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704 -0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if i t does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contra ct/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
M200A1 Trailer
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE
Operations Security (OPSEC) Annex and Training
DI-MGMT-80934C
5. CONTRACT REFERENCE
C.10.6
6. REQUIRING OFFICE
SFAE-CSS-JL-LT
7. DD 250 REQ
LT
9. DIST STATEMENT
Annually
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
See Block 16
Draft Final
16. REMARKS
Electronic Data Delivery. Data requirements specified herein shall be delivered in an electronic format. The file format and delivery method will be dependent upon the file type and size. The files shall be MS Windows 10 and MS Office 13 software compatible. Available methods of delivery are: electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
Block 4: Operations Security Annex Details: This annex provides a risk management process to implement cost-effective measures to eliminate or protect unclassified indicators of critical or sensitive information and activities from adversary exploitation.
The OPSEC Annex shall identify and address information specific to the contactors operating locations that is not already covered in the government OPSEC plan.
The OPSEC Annex shall be reviewed and revised as follows:
The reviewers, as a minimum, shall be the site OPSEC Officer in conjunction with the Army Counterintelligence agent, if available. The reviewer’s name and title, date of the review, and status of review (document changes or no changes necessary) shall be documented and posted on JPO JLTV Share Point within 30 days of the review.
A revision of the OPSEC Annex shall be required when there is a change in threat or operational environment, security countermeasures, or a change in technology that requires the development of new Essential Elements of Friendly Information or Critical Information List. The contractor shall notify the PEO-CS&CSS JPO JLTV Security Manager of a change in environment. Upon Government approval, via procuring contracting officer (PCO) letter, the contractor shall update the Annex and submit to the Government within 30 days.
All U.S. contractors with access to CUI information shall be required to follow the program’s OPSEC Plan and the contractor’s annex to protect program information. To ensure contractors have cognizance of the program specific OPSEC Plan, all U.S. contractors shall provide OPSEC training for all of its program personnel within 15 days of starting on the program and on an annual basis. Annually, contractors shall complete OPSEC training which shall be included in the OPSEC Annex report, validating 100% compliance.
Contractor format is acceptable.
Block 12: Initial Submission Formal delivery of the OPSEC Annex shall be delivered 60 days after receipt of Government’s OPSEC Plan.
Block 13: A review of the OPSEC Annex shall be completed annually and the report shall be delivered to the government no later than 30 September. Any changes that do not warrant a revision as described above shall be incorporated within 30 days of the review as an Interim Update and posted on JPO JLTV Share Point.
Block 14: This information shall be submitted electronically and encrypted to the JPO JLTV Share Point. All submissions shall be prepared and delivered in Microsoft Office file format (MS Word, MS Excel, etc).
Repro = electronic copy
SEE BLK 16
Gioacchino Ciraulo
H. DATE
1 May 2017
I. APPROVED BY
Laurie Austin
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
M200A1 Trailer
E. CONTRACT/PR NO. F. CONTRACTOR
A012
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Provisioning
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A
5. CONTRACT REFERENCE
C.5, E.8.3.4
6. REQUIRING OFFICE
SFAE-CSS-JL-LT
7. DD 250 REQ 9. DIST STATEMENT
As Needed
12. DATE OF FIRST SUBMISSION
8. APP CODE 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
As Needed
Draft format. The file format and delivery method will be dependent upon the file type and size. The files shall be MS Windows 10 and MS Office 13 software compatible. Available methods of delivery are:
electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
When updates to data or provisioned parts is required as a result of engineering changes (ECP, RFD, etc.), changes to vendor information, or errors and inconsistencies, the Contractor shall provide the following Logistics Product Data to support the update and provisioning effort:
(1) Drawings or catalog pages for new or changed contractor spare parts or repair parts
(2) Engineering notes for the changes
(3) Part Number and Cage Codes
(4) Estimated Unit Price
(5) Quantity per Assembly
(6) For errors and inconsistencies discovered in TM 9-2330-205-13&P, the Contractor shall provide the following information to support the Governments submission of recommended corrections on DA Form 2028 Recommended Changes to Equipment Technical Publications:
Part I: All Publications and Blank Forms
(a) Item number
(b) Page number
(c) Paragraph Number
(d) Line Number
(e) Figure Number
(f) Table Number
(g) Item Number
(h) Recommended Changes
Part II: Repair Parts and Special Tools List (RPSTL) and Supply Catalogs/Supply Manuals
(a) Column Number
(b) Reference Number
(c) Part Number and National Stock Number
(d) Total Number of Major Items Supported Submit electronically to:
15. TOTAL 0 0 0
Fred Burdine
H. DATE I. APPROVED BY
Laurie Austin
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page____of ____Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
M200A1 Trailer
E. CONTRACT/PR NO. F. CONTRACTOR
A013
2. TITLE OF DATA ITEM
Special Tools
3. SUBTITLE
Provisioning
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80868
5. CONTRACT REFERENCE
E.8.3.6
6. REQUIRING OFFICE
SFAE-CSS-JL-LT
7. DD 250 REQ 9. DIST STATEMENT
A
As Needed
12. DATE OF FIRST SUBMISSION
8. APP CODE 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
As Needed
Draft and size. The files shall be MS Windows 10 and MS Office 13 software compatible.
Available methods of delivery are: electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
The contractor shall deliver a list of Support Equipment, Tools, and Test Equipment (STTE) for government approval for any new special tool they propose to be utilized to maintain the M200A1. The list shall contain the Item Name, Company Name (Source), NSN, Unit Price, Cage Code, and Part Number.
The initial draft of this list is due 45 business days prior to the delivery of PVT trailers to the Government.
The Government shall review the draft STTE list and provide comments NLT 10 business days after receipt.
The contractor shall correct the STTE List and provide a final corrected copy to the Government within 10 business days after receipt.
For proposed special tools that receive Government approval, the contractor shall create and provide Special Tool Kits (STKs) containing the special tools. The contractor shall ship one (1) STK along with the PVT trailers and PSP to the designated test site.
The special tools shall be packed in hard plastic, watertight container and comply with the requirements of Method 44 in MIL-STD-2073-1 "Department of Defense Standard Practice for Military Packaging." The container(s) shall secure its contents to prevent damage through the container or damage to other components within the container.
The contractor shall modify the Government approved STKs based on the results from the contractor Validation and Government Verification.
Submit electronically to:
15. TOTAL 0 0 0
Fred Burdine
H. DATE I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page____of ____Pages
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
G. SYSTEM/ITEM.
A014
5. TITLE OF DATA ITEM
Program Production Data
3. SUBTITLE
In-process and delivery data report.
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80555A T
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
12. DIST STATEMENT
DIST. STATEMENT
REQUIRED: C
ASREQ
12. DATE OF FIRST
SUBMISSION
30 Days after production start 14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
MONTHLY a. ADDRESSEE
b. COPIES
Draft format. The file format and delivery method will be dependent upon the file type and size. The files shall be MS Windows 10 and MS Office 13 software compatible. Available methods of delivery are:
electronic mail, file transfer protocol, CD-ROM, and AMRDEC Safe Access File Exchange Delivery.
DID Tailored Omit – Paras 3.2, 3.5-3.9, 3.12
The contractor will formally distribute production data. Formally called CPUs or concerns per unit.
The contractor shall provide in their own format in-process CPUs, CPUs found during delivery and CPUs found during government acceptance. DI-MGMT-80555A is tailored.123
SFAE-CSS-JL-LT 0 4 0
PCO 1
Engineer 1
APM 1
QA 1
15. TOTAL 0 5 0
Todd Kohler
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages