W56HZV16R0092-0002.pdf

PDF 45 KB Posted

Attached to
GENERAL MECHANICS TOOL KIT
Solicitation number
w56hzv16r0092
Issued by

About this file

Amendment 0002 and changes to the attachments

View the file

Other files

File Type Posted
W56hzv16R0092_SOL_Amendment_0005.pdf PDF
Attach_0001_-_GMTK_component_list_Rev4.xlsx XLSX spreadsheet
W56hzv16R0092_SOL_Amendment_0004.pdf PDF
Attach_0003_TIQ14NOV2017.docx DOCX document
Questions_and_Answers_for_the_GMTK_0002.pdf PDF
Attachment_0001_-_GMTK_component_list_Rev3.xlsx XLSX spreadsheet
W56HZV16R0092-0003.pdf PDF
Attach_0005_-_Replacement_Spreadsheet.xlsx XLSX spreadsheet
Attach_0006_Product_Engineering_Requirements_(003).docx DOCX document
Attach_0002_-_PES_Oct_2017.xlsx XLSX spreadsheet
Attach_0001_-_GMTK_component_list_Rev3.xlsx XLSX spreadsheet
Attach_0003_TIQ14Aug2017.docx DOCX document
Attach_0004_-Technical_Factor_Elements-DELETED.xlsx XLSX spreadsheet
W56hzv16R0092_SOL_Amendment_0001B.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2017NOV17

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

COLETTE THOMAS

EMAIL: COLETTE.F.THOMAS.CIV@MAIL.MIL

W56HZV-16-R-0092

2017OCT30

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 20

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: COLETTE THOMAS

Buyer Office Symbol/Telephone Number: CCTA-HCP-A/(586)282-7439

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. The purpose of Amendment 0001 to Solicitation W56HZV-16-R-0092 is to correct:

a) Section L, L.1.4.9 from Standard Form 33, Block 9 to Standard Form 1449.

b) Block 6, Solicitation Issue Date, which is blank to read: 30 Oct 2017

c) Block 8, Offer Due Date/Local Time, which is blank to read: 1 Dec 2017

d) Attachment 0001, Component List regarding the requirements at the bottom of the spreadsheet from "Attachment 0004 to Attachment 0003"

e) Quantity ranges for CLINs 0011AA through 0015AA to match Attachment 0002, ADD Attachment 0002 to section J Pricing Evaluation Sheet

2. Change the following on Solicitation W56HZV-16-r-0092:

a) Attachment 0003, Technical Information Questionnaire, item #3 to remove "if available" language.

b) Attachment 0003, Technical Information Questionnaire, Reference: Description Drawing 0627B0000 has been changed from Note 3.4.6 to

Note 3.4.3.

c) Update 52.216-4216 Evaluation Criteria for Range Pricing.

d) Section M, 4.1.1., from:

"...every individual item listed in Attachment 0003, with the exception of items listed in L.3.1.1, shall have a drawing number, a brand name, and a part number of the item included in the offer. For the Tool Chest SubFactor, each of the requirements listed in

Attachment 0001..."

To: "...every individual item listed in Attachment 0001, with the exception of items listed in L.3.1.1, shall have a drawing number, a brand name, and a part number of the item included in the offer. For the Tool Chest SubFactor, each of the requirements listed in

Attachment 0003..."

e) L.1.4.6 has been changed from:

Each volume listed below shall also be submitted via a separate set of CD-ROMs or DVDs. The Offeror shall submit two identical sets of

CD-ROMs or DVDs for each volume.

To: Each volume listed below shall also be submitted electronically via Federal Business Opportunities (FBO).

f) L.1.4.7 has been changed from: L.1.4.7 Each CD-ROM or DVD shall be labeled so it is easily identifiable for evaluation purposes

(example: Volume II, Technical Factor, Set 1 of 3, CD 1 of X), and shall also include the Offeror's name and the solicitation number. Each volume shall include a (i) title page, (ii) table of contents, and (iii) list of tables and figures. Each page of the proposal shall be numbered, and each paragraph of the proposal shall have a reference number. Provide a list of all attachments and substantiating data in the table of contents. The

Offeror's submission and any supplemental information (such as spreadsheets, backup data, and technical information) shall be in accordance with the following:

To: L.1.4.7 Each Volume shall be labeled so it is easily identifiable for evaluation purposes (example: Volume II, Technical Factor), and shall also include the Offeror's name and the solicitation number. Each volume shall include a (i) title page, (ii) table of contents, and (iii) list of tables and figures. Each page of the proposal shall be numbered, and each paragraph of the proposal shall have a reference number. Provide a list of all attachments and substantiating data in the table of contents. The Offeror's submission and any supplemental information (such as spreadsheets, backup data, and technical information) shall be in accordance with the following:

3. Delete the following on Solicitation W56HZV-16-R-0092:

a) Attachment 0004, Technical Factor Elements from Section J.

4. Add the following on Solicitation W56HZV-16-R-0092:

2 20

W56HZV-16-R-0092 0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

a) CLIN 0016AA for Product Verification Testing.

b) Narrative on CLIN 0016AA stating "PVT is due 150 days after contract award"

c) Narrative on CDRL A004 Product Verification Test Report stating "PVTR due

30 days after PVT approval."

d) Narrative in Section D, Delivery stating "Contractor shall have the capacity to deliver 2,000 units per month 120 days after PVTR approval in the first ordering year and the capacity to deliver 1,000 units per month in subsequent ordering years. PVT is due 150 days after contract award. PVTR is due 30 days after PVT approval."

e) Add the following exceptions to Attachment 0006:

(1) Army Drawing 0705D2004, Revision A, dated 2 June 2017:

*Zone B3, Part number 0705D2004-5 in the Approved Source(s) table, remove

Vendor Part No. "44014" and replace with "40014"

(2) Army Drawing 0712A0000, Revision A, dated 2 June 2017:

*Zone B3, Part number 0712A0000-4 in the Approved Source(s) table, remove

"SCREWDRIVER, FLAT TIP, CABINET, 3/16", 6" BLADE" and replace with

"SCREWDRIVER, PHILLIPS, #2, STUBBY"

f) The Question and Answer period shall end on 21 November 2017 at 1pm Eastern Time.

5. Except herein all other terms and conditions remain in full force and effect.

*** END OF NARRATIVE A0004 ***

3 20

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0011 GENERAL MECHANICS TOOL KIT

NSN: 5180-01-605-5146

0011AA FIRST ORDERING PERIOD $ ___________________________ __________________

See Range Pricing

COMMODITY NAME: GENERAL MECHANICS TOOL KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

700 2000 $

2001 3000 $

3001 4000 $

4001 5000 $

5001 6000 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING AND MARKING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

4 20

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0012 GENERAL MECHANICS TOOL KIT

NSN: 5180-01-605-5146

0012AA SECOND ORDERING PERIOD $ ___________________________ __________________

See Range Pricing

COMMODITY NAME: GENERAL MECHANICS TOOL KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

450 950 $

951 1250 $

1251 1800 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING AND MARKING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5 20

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 GENERAL MECHANICS TOOL KIT

NSN: 5180-01-605-5146

0013AA THIRD ORDERING PERIOD $ ___________________________ __________________

See Range Pricing

COMMODITY NAME: GENERAL MECHANICS TOOL KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

450 950 $

951 1250 $

1251 1800 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING AND MARKING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

6 20

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0014 GENERAL MECHANICS TOOL KIT

NSN: 5180-01-605-5146

0014AA FOURTH ORDERING PERIOD $ ___________________________ __________________

See Range Pricing

COMMODITY NAME: GENERAL MECHANICS TOOL KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

450 950 $

951 1250 $

1251 1800 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING AND MARKING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

7 20

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0015 GENERAL MECHANICS TOOL KIT

NSN: 5180-01-605-5146

0015AA FIFTH ORDERING PERIOD $ ___________________________ __________________

See Range Pricing

COMMODITY NAME: GENERAL MECHANICS TOOL KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

450 950 $

951 1250 $

1251 1800 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING AND MARKING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W911RQ) XR W0MC USA DEP RED RIVER

DIR FOR CONTRACTING KO

100 MAIN DRIVE BUILDING 431

TEXARKANA,TX,75507-5000

8 20

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0016 PRODUCT VERIFICATION TEST

0016AA PRODUCT VERIFICATION TEST (PVT) $ $ _______________________________ ______________ __________________

COMMODITY NAME: PRODUCT VERIFICATION TEST

Packaging and Marking _____________________

PVT is due 150 days after contract award

(End of narrative D001)

Quantity: 1

(End of narrative D002)

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0018 DATA ITEM _________

A004 DATA ITEM: PRODUCT VERIFICATION $ _______________________________ __________________

SERVICE REQUESTED: PRODUCT TEST/INSPECTION RPT

PVTR will be due 30 days after PVT approval

(End of narrative D002)

9 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Performance Work Statement

For

General Mechanics Tool Kit

1. General Information. This Performance Work Statement (PWS) is for the General Mechanics Tool Kit (GMTK) and contains___________________ information regarding its requirements, each mandatory review and the information required at each review, and the Contract Data

Requirements List (CDRL) document requirements.

2. Approach. The time period immediately following contract award up to the Product Verification Test will consist of three (3) ________ phases. The first phase consists of a post award teleconference. The second phase will be designated for Tool Layout Development as well as unique descriptive data submission. During this phase, the Contractor will submit the following for review and development: 1)

Unique Descriptive Data; and 2) Draft tool layouts. This phase also includes discussions between Government representatives and the

Contractor to achieve an acceptable tool layout that meets all the requirements of the technical data package. The second phase will conclude with a Critical Design Review (CDR) during which a finalized tool listing, unique descriptive data, and tool layout drawings will be submitted to the Government for final approval prior to production of the Product Verification Test (PVT) kits. Upon final CDR approval, the Government will release the Contractor to begin PVT kit production. The third and final Phase will be a site visit to take place prior to the PVT.

2.1. Applicable Documents. Army Technical Data Package List (TDPL) 0627A0000:59678, dated 12 June 2017 (except as revised____________________ by Attachment 0006).

3. Requirements.____________

3.1. General Requirements. The contractor shall provide the facilities, services, personnel, parts, supplies, materials,____________________ and equipment to complete all three phases of the technical reviews.

3.1.1. Phase One: Post Award Meeting. The Contractor shall use the layouts provided in drawing 0627D0000 as a baseline for its tool _____________________________ layout. No more than 10 days post award, a Post Award Meeting shall be scheduled as a teleconference between Government representatives and the Contractor. This meeting will give the Contractor the opportunity to ask questions or receive clarifications about the tool layout.

3.1.2. Phase Two: Tool Layout Development. The Contractor shall provide layout drawings in accordance with CDRL A005 and ___________________________________ unique descriptive data for each tool set component in accordance with CDRL A006.

3.1.2.1. Critical Design Review (CDR). At the closure of tool layout discussions, the Contractor shall submit the Final Tool ____________________________

Layout Drawings in accordance with CDRL A005. Upon final CDR approval, the Government will release the Contractor to begin production of the PVT kits.

3.1.3. Phase Three: Site Visit. The Government will schedule a site visit, at the Governments expense, to the Contractors _______________________ facility between 30 to 60 days prior to the start of Product Verification Test (PVT). During this visit, the Contractor shall have personnel available to provide a tour as well as to show the progress it has made to date on this contract. In addition, the Contractor shall have as much of the PVT articles available for preliminary inspection as possible to reduce the potential for PVT failures. At a minimum, every tool in the tool load and all drawings, technical documentation, and any physical samples available for the tool chest shall be available for review and physical inspection.

3.1.4. Warranty and Replacement Items. The Contractor shall communicate to the product users the identity of warranted _______________________________ items via a place card or data plate permanently attached inside the container/tool box. This can be accomplished by attaching either a new placard/data plate or revising the existing one with the PM SKOT information as shown below. The placard/data plate shall include the date of manufacture. Warranty claim contact information for the Solider is as follows:

Enter Warranty Claims at:

Website: https://tools.army.mil/default.aspx

Or for assistance call

Toll Free: 1-586-282-3403

DSN: 273-3403

EMAIL: mailto:usarmy.detroit.tacom.mbx.ilsc-questions@mail.mil

3.1.5. The Contractor shall submit a Replacement Items List in accordance with CDRL A007, based upon data elements displayed in Attachment 0005.

3.1.6. Quantities. The contractor shall have the capacity to deliver 2,000 units per month 120 days after PVTR approval in the first ordering year and the capacity to deliver 1,000 units per month in subsequent ordering years. PVT is due 150 days after contract award. PVTR is due 30 days after PVT approval.

10 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

4. Other Documentation.

4.1 Engineering Change Proposals shall be submitted in accordance with CDRL A001.

4.2 Request for Variance shall be submitted in accordance with CDRL A002.

4.3 Notice of Revision shall be submitted in accordance with CDRL A003.

4.4 Product Verification Test Report shall be submitted in accordance with CDRL A004.

*** END OF NARRATIVE C0001 ***

11 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

The contractor shall have the capacity to deliver 2,000 units per month 120 days after PVTR approval in the first ordering year and the capacity to deliver 1,000 units per month in subsequent ordering years. PVT is due 150 days after contract award. PVTR is due 30 days after PVT approval.

*** END OF NARRATIVE D0002 ***

12 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0001 COMPONENT LIST 14-NOV-2017 003 EMAIL

Attachment 0002 PRICE EVALUATION SHEET 14-NOV-2017 001 EMAIL

Attachment 0003 TECHNICAL INFORMATION QUESTIONAIRE 14-NOV-2017 002 EMAIL

Attachment 0004 TECHNICAL FACTOR ELEMENTS DELETED 021 EMAIL

Attachment 0005 REPLACEMENT WARRANTY SHEET 15-FEB-2017 014 EMAIL

Attachment 0006 PRODUCT ENGINEERING REQUIREMENTS 14-NOV-2017 002 EMAIL

13 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 PROPOSAL INSTRUCTIONS

L.1 PROPOSAL FORMAT AND INSTRUCTIONS

The Offeror's proposal, subject to the Submission, Modification, Revision and Withdrawal paragraph of FAR 52.215-1, Instructions to

Offerors - Competitive Acquisitions, shall be submitted in the format as set forth in this RFP. The Government will not assume the

Offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an Offeror's responsibility to submit a well-written proposal with adequately detailed information which clearly demonstrates an understanding of and the ability to comply with the RFP requirements to allow for a meaningful review.

L.1.2 Proposal Instructions: The proposal shall be accompanied by a cover letter (Letter of Transmittal) prepared on the companys letterhead, which identifies all enclosures being submitted. Extreme care and attention shall be given to ensure that all required items are included in the proposal. Include all supplemental documentation such as any collateral material (i.e. brochures and catalogs), also in the English language, which is to be included in the proposal. The Government reserves the right to reject any proposals submitted that contain exceptions In Accordance With (IAW) M.2 Rejection of Offers.

L.1.3 Single Proposal Submission

Offerors are limited to submitting one proposal with one approach (design) to meeting the requirements of this solicitation. An offeror is defined as an entity competing independently that does not share a common parent, does not have a parent/subsidiary relationship with any other offeror, and is not affiliated with any other offeror (as defined in Federal Acquisition Regulation (FAR) 19.101). The substantiating technical information submitted shall be for the General Mechanic Toolkit proposed.

L.1.4 Notice Regarding Proposal Submission

L.1.4.1 Minimum Acceptance Period.

ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.

L.1.4.2. The Government requires a minimum acceptance period of 60 calendar days.

L.1.4.3. The offeror shall clearly state in its proposal the acceptance period. Offerors may specify a longer acceptance period than the Government's minimum acceptance period stated above.

L.1.4.4. An offer allowing less than the Government's minimum acceptance period may be rejected.

L.1.4.5 Submission Due Date and Time: The Offeror's proposal shall be received at the address listed below in section L.1.4.9 no later than 3:00 p.m., local Warren, MI time on 1 December 2017.\-\-\-\- The Offeror shall ensure its proposal is received at the initial point of entry to the Government infrastructure.

L.1.4.6 Submission Instructions: Each volume listed below shall also be submitted electronically through Federal Business Opportunities

(FBO).

L.1.4.7 Each Volume shall be labeled so it is easily identifiable for evaluation purposes (example: Volume II, Technical Factor), and shall also include the Offeror's name and the solicitation number. Each volume shall include a (i) title page, (ii) table of contents, and (iii) list of tables and figures. Each page of the proposal shall be numbered, and each paragraph of the proposal shall have a reference number. Provide a list of all attachments and substantiating data in the table of contents. The Offeror's submission and any supplemental information (such as spreadsheets, backup data, and technical information) shall be in accordance with the following:

(a) Files in Microsoft Office version 2007, 2010 or 2013 applications: Word, Excel, or PowerPoint. Spreadsheets must be sent in a file format that includes all formulae, macro and format information. Print image is not acceptable. Use of Government supplied solicitation attachments is mandatory. Vendors should refrain from any attempts to unlock or recreate the Government provided files. Failure to follow these instructions may result in the offerors proposal being rejected IAW M.2.

(b) Files in Adobe PDF (Portable Document Format).

(c) Files in HTML (Hypertext Markup Language): HTML documents must not contain active links to live internet sites or pages. All linked information must be contained within the electronic proposal and be accessible offline.

14 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(d)The Offerors shall make every effort to ensure that the proposal is virus-free. Proposals (or portions thereof) submitted which indicate the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as

"unreadable" as described in FAR 15.207(c).

L.1.4.8 Proposal Submission Guidance: The Offerors proposal shall contain all pertinent representations, certifications, and the specified information required for evaluation of the proposal. It is critical that all offerors carefully and completely identify the volumes and attachments of its proposal.

L.1.4.9 All proposals delivered in response to this RFP, whether hand-carried or submitted via U.S. mail, shall be addressed as follows:

U.S. Army Contracting Command Warren

Bid Room, Bldg 231, Mail Stop 303

Attn: General Mechanics Tool Kit Proposal

6501 E. 11 Mile Road

Warren, MI 48397-5000

Solicitation Number: W56HZV-16-R-0092

Proposal Due Date & Time: (Refer to Standard Form 1449, Block 9)

TO BE DELIEVERED UNOPENED

(Offerors Name)

L.1.5 Lateness: The lateness rules for submitted proposals outlined in FAR 52.215-1, "Instructions to Offerors Competitive Acquisition are incorporated into this RFP.

L.1.6 Award without Discussions: In accordance with FAR 52.212-1, the Government intends to evaluate proposals and award a contract without discussions with Offerors (this excludes clarifications as described in FAR 15.306(a)). Therefore, the Offerors initial proposal should contain the Offerors best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If discussions are held, they will be conducted with all offerors included in the competitive range. If conducted, discussions on pricing issues do not obligate the Government to discuss technical issues, nor do discussions on technical issues obligate the Government to discuss pricing issues. The burden of providing thorough and complete information remains with the offerors. The Government is not obligated to make another request for the required information, nor does the Government assume the duty to search for data to cure problems it finds in proposals.

L.1.7 Berry Amendment Notice: Food, clothing, fabrics, and hand or measuring tools cannot be acquired unless they have been grown, reprocessed, reused, or produced in the United States. For more information, reference DFARs 225.7002 and Berry Amendment 10 U.S.C.

2533a.

Hand or measuring tools subject to Berry Amendment restrictions include those listed in Federal supply classifications 51 and 52 IAW

DFARs 225.7001.

IAW DFARS PGI 225.7002-1(b), the term produced in the United States with respect to hand or measuring tools is defined as follows: __________________

(1) The hand or measuring tool was assembled in the United States out of components, or otherwise made from raw materials into the finished product that is to be provided to the Government.

(2) If a hand or measuring tool was assembled in a country other than the United States, then disassembled and reassembled in the United

States, the hand or measuring tool was not produced in the United States.

(3) The requirement to buy hand or measuring tools produced in the United States does not impose any restriction on the source of the components of the hand or measuring tools. This is unlike the Berry Amendment restriction on clothing (see 225.7002-1(a) (2)), which explicitly requires domestic source for the materials and components of clothing (other than unusual components such as sensors or electronics), as well as the additional separate restrictions on various types of fibers and fabrics that might be components of the clothing.

(4) If the acquisition of the hand or measuring tools is also subject to the Buy American Act (see FAR 25.1), then in order to qualify as a domestic end product, the cost of the components mined, produced, or manufactured in the United States or a qualifying country must exceed 50 percent of the cost of all the components of the hand or measuring tool.

(5) Buy American Act Notice: This acquisition is subject to the Buy American Act in accordance with FAR 25.1.

L.2 PROPOSAL CONTENT

L.2.1 Unless otherwise specified, electronic proposal file documents shall be formatted for an 8.5" x 11" page with a minimum font size of 10 pt. and a minimum of 0.5" margins. Schedules, drawings and other documents more appropriate to larger size shall be submitted

15 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

formatted for pages no larger than 11" x 17" dimensions.

Proposal Format: All proposal information shall be in the English language and in U.S. dollars. The proposal shall include a volume for each factor of the evaluation. Each section of the proposal shall be separated by volume (see below) to facilitate review by the

Government.

Volume I: Solicitation

Volume II: Technical

Volume III: Price

L.2.2 VOLUME I: SOLICITATION

In this Volume, the Offeror shall provide the following:

L.2.2.1 A scanned image of the Standard Form 1449 (SF1449) cover page signed by a person authorized to sign proposals on behalf of the

Offeror. Blocks 12, 14, 15A, 15B, 15C, 16, 17, and 18 must be filled in by the Offeror.

L.2.2.2 One copy of this solicitation (Sections A-K) with all clause and other fill-ins completed, including Representations and

Certifications in Section K. System for Award Management (SAM) certifications need not be separately submitted; however, all Offerors must be successfully registered and valid in SAM prior to award.

L.2.2.3 Organizational Conflict of Interest:

L.2.2.3.1 The Offeror shall provide an affirmative statement in the electronic cover letter that the Offeror does not have an

Organizational Conflict of Interest as it applies to this solicitation.

L.2.2.3.2 The provisions of FAR 9.5, Organizational and Consultant Conflicts of Interest (OCI), apply to any award made under this solicitation. The potential Offeror shall review their current and planned participation in any other Government contracts, subcontracts, consulting, or teaming arrangements where they may be in a position of actual or perceived bias or unfair competitive advantage.

L.2.2.3.3 The Offeror shall disclose any potential OCI situations to the Contracting Officer as soon as identified including prior to proposal submission. The disclosure shall include the facts and an analysis of the actual or perceived conflict and recommend an approach(es) to neutralize or mitigate the potential conflict. The preferred approach to potential conflicts is to negate or obviate the conflict. Mitigation is considered only if it is not practical to negate or obviate the conflict. The Contracting Officer will review the contractor's proposed resolution to any potential conflicts for sufficiency.

L.2.2.4 For other than US Small Business concerns, a Small Business Subcontracting Plan IAW FAR 52.219-9 must be submitted.

L.3 Volume II: Technical Factor

The Technical Factor consists two SubFactors:

1) Tool Components List (see Attachment 0001) and

2) Tool Chest (see Army TDPL 0627A0000:59678).

L.3.1 SubFactor 1 Tool Components List

Offerors shall clearly establish conformance with all of the RFPs technical requirements, as prescribed in Army TDPL 0627A0000:59678 and

Attachment 0001, Component List, of the solicitation.

L.3.1.1 General Mechanics Tool Kit Spreadsheet.

This solicitation requires items to be provided based on the approved sources listed in Army TDPL 0627A0000:59678. Attachment 0001:

Component List of the solicitation shall be completed by the offeror. The offeror shall complete the spreadsheet by choosing the drawing part number included in the offer from Column C. The majority of the items will then self-populate with the corresponding brand and part number. Drawing numbers that do not include a list of sources will be left with a blank cell for the Brand Offered and Part No. Offered columns; the offeror shall enter the brand and part number offered for those items in the correct blank cells. Lines 173, 281, 346, 367, 412, 489, 490, 524, 525, 556, 557, 594, and 595 are all items that will not be evaluated. They are included in Attachment 0001 as a reminder that they are components of the tool load and are required to be supplied initially and available as replacement parts. No information is required for the Brand and Part Number columns. Line 755 also does not require input on Attachment 0001 and will be evaluated under SubFactor 2 (L.3.2).

L.3.2 SubFactor 2 Tool Chest.

Offerors shall complete Attachment 0003 GMTK Tool Chest Technical Information Questionnaire (TIQ). Offeror response shall include all substantiating data required by each line of the TIQ.

16 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

The substantiating technical support information submitted by the Offeror shall be sufficient for the Government to conclude that each proposal meets the requirements IAW the Army TDPL 0627A0000:59678. Failure to provide adequate technical support information may make the Offeror ineligible for award IAW M.2. All responses and substantiating data must be in the English language. Hyperlinks or other links to websites will not be acceptable as substantiating technical support information.

L.4 Volume III/Price Factor

L.4.1.Attachment 0002 Pricing Evaluation Worksheet.

The offeror shall prepare Attachment 0002 Pricing Evaluation Worksheet in accordance with the instructions, and submit the completed attachment with its proposal. The offeror shall enter firm fixed unit prices for each CLIN and Quantity Range within the attachment.

For CLINs with range pricing, offerors must fill in a price for all ranges, even if the prices are the same for each range within an

Ordering Period. Transportation costs (Continental United States ONLY) shall be incorporated into the proposed unit prices and are not a separately evaluated price related factor.

The offeror shall not enter any Prices into Section B. All proposed unit prices proposed shall be binding.

L.4.2 The Offeror is required to submit data other than certified cost or pricing data, IAW FAR 15.403-3(c), to support the proposed prices, including any offered discounts, established catalog prices, price lists, or other verifiable and established records that are regularly maintained by the vendor and published or otherwise available for customer inspection. The above information is intended to establish the reasonableness of the Offeror's proposed prices.

L.4.3 Offerors shall describe the basis for any out-year escalation used in the calculation of the out-year prices.

L.4.4 Offerors shall provide rationale to explain any significant variances amongst the proposed ranges within an ordering year.

L.4.5 In addition to the above information, in accordance with FAR 15.306, the Government reserves the right to request additional or more detailed information to support its determination of price reasonableness.

*** END OF NARRATIVE L0001 ***

17 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 BASIS FOR AWARD

M.1.1 GENERAL The Government plans to award a 5 year, Indefinite Delivery Indefinite Quantity (IDIQ) type contract for the General

Mechanics Tool Kit (GMTK) as a result of this solicitation. The Government reserves the right to make no award as a result of this solicitation.

M.1.2 It is the Government's intent to award a single contract. Contract award will be made using a Lowest Price Technically Acceptable

(LPTA) source selection process IAW FAR 15.101-2 (b)(1), which states award will be made on the basis of the lowest total evaluated priced proposal meeting the acceptability standards for non-cost factors. The Government intends to conduct a price evaluation on all offerors and then conduct a technical capability review of the lowest total evaluated priced proposal. If the lowest total evaluated priced proposal is determined to be technically unacceptable, then the Government will conduct a technical capability review on the next lowest total evaluated priced proposal. Unless the Government determines it is in its best interests to conduct discussions, the

Government will follow this process until the lowest total evaluated price, technically acceptable proposal is identified.

M.1.3 Award without Discussions: In accordance with FAR 52.212-1(g), the Government intends to evaluate proposals and award a contract without discussions with Offerors (this excludes clarifications as described in FAR 15.306(a)). Therefore, the Offeror's initial proposal should contain the Offeror's best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If discussions are held, they will be conducted with all offerors included in the competitive range. If conducted, discussions on pricing issues do not obligate the Government to discuss technical issues, nor do discussions on technical issues obligate the Government to discuss pricing issues.

M.2 REJECTION OF OFFERS

M.2.1 The Offeror must carefully read, and provide all the information requested in Section L. If there are parts of Section L that the

Offeror does not understand, the Offeror shall request clarification from the Contracting Officer no later than 10 business days prior to solicitation closing date. In accordance with FAR 52.215-1, contained in this RFP, the Government may reject any or all proposals if such action is in the Governments best interest. Examples include, but are not limited to the following:

M.2.1.1 When an Offeror's proposal merely offers to perform work according to the solicitation terms or fails to present more than a statement indicating its capability to comply with the solicitation terms and does not provide support and elaboration as specified in

Section L of this solicitation.

M.2.1.2 When an Offeror's proposal merely repeats the requirements stated on the drawings of Army TDPL 0627A0000:59678 without elaboration.

M.2.1.3 When an Offeror's proposal offers a product or service that does not meet all stated material requirements of the solicitation.

M.2.1.4 When an Offeror's proposal takes exceptions to the attachments, exhibits, enclosures, or other solicitation terms and conditions.

M.2.1.5 The proposal fails to respond to all items in SubFactor 1, Attachment 0001: Component List or SubFactor 2: Tool Chest, or fails to provide support with meaningful substantiating data, as specified in L.3.

M.3 EVALUATION PROCESS

M.3.1 Source Selection Authority: The Source Selection Authority (SSA) is the official designated to direct the source selection process and select the Offeror for contract award.

M.3.2 Source Selection Evaluation Board (SSEB): A Source Selection Evaluation Board (SSEB) has been established by the Government to evaluate proposals in response to this solicitation. The SSEB is comprised of technically qualified individuals who have been selected to conduct this evaluation IAW the Evaluation Criteria for this solicitation.

M.3.3 Determination of Responsibility

M.3.3.1 Determination of Responsibility and Eligibility for Award: Per FAR 9.103, contracts will be placed only with contractors that the Contracting Officer determines to be responsible. The prospective Offeror, in order to qualify as a source for this acquisition, must be able to demonstrate that it meets standards of responsibility set forth in FAR 9.104 including provisions for small business contained in 9.104-3(d) if applicable. In addition, the Government may assess the Offeror's financial ability to meet the RFP requirements. The Government reserves the right to conduct a Pre-award Survey on any or all Offerors (or its Subcontractors) to aid the

Contracting Officer in the evaluation of each Offerors proposal and ensure that a selected offeror is responsible. No award can be made to an Offeror who has been determined not responsible by the Contracting Officer. To ensure that the Offeror meets the responsibility criteria of FAR 9.101, the Government may:

a. Perform a Pre-award Survey or arrange a visit to the Offerors facility. The offeror's refusal to authorize the Government to visit

18 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

the offerors facility may result in a determination that the offeror is not responsible.

b. Ask the Offeror to provide technical, production, quality, and financial information. If the Offeror does not provide the Government with the data as requested within 7 days from receipt of the request, or if the Offeror refuses to have the Government visit its facility, the Contracting Officer may determine the offeror to be not responsible. If the Government visits the offeror's facility, the offeror shall ensure that it has current data relevant to its proposal available for the Government to review.

M.3.4 Evaluation

M.3.4.1 This will be a Lowest Price Technically Acceptable (LPTA) source selection process in accordance with (IAW) FAR 15.101-2, as follows:

Each proposal will be evaluated to determine a total evaluated price, which will include an assessment of price reasonableness. An evaluation of the Technical Factor proposal on an Acceptable/Not Acceptable basis will only be conducted on the offeror with the lowest total evaluated price. In order to be considered for award, the Offeror's proposal must be rated Acceptable for 100 percent of SubFactor

1, Attachment 0001: Component List and SubFactor 2: Tool Chest SubFactor 2, Attachment 0003: GMTK Tool Chest Technical Information

Questionnaire (TIQ). Should the lowest total evaluated priced Offeror's proposal be assessed as Not Acceptable under any of the requirements cited in L.3, it shall be ineligible for award and the next lowest priced offeror's proposal may be evaluated, continuing until the lowest-priced offeror is found with a technically acceptable proposal. Offerors whose Technical proposals are rated Not

Acceptable may be notified at any time that their proposal will no longer be considered for award. Award will be made to the proposal with the lowest total evaluated price which was also rated Acceptable under the Technical Factor.

M.3.4.2 The Government reserves the right to conduct discussions in accordance with FAR 15.306 at any time during this process. If so, discussions will be conducted with all offerors determined to be in the competitive range.

M.4 VOLUME II: TECHNICAL FACTOR

M.4.1 Proposals will be evaluated on an Acceptable/Not Acceptable basis. This assessment will be performed using the substantiating documentation/data submitted in support of Attachments 0001 and 0003.

M.4.1.1 Evaluators will review data required by L.3. To be rated Acceptable under the Technical Factor, both Technical SubFactors must be found Acceptable, including any applicable technical support information. For the Tool Component List SubFactor, every individual item listed in Attachment 0001, with the exception of items listed in L.3.1.1, shall have a drawing number, a brand name, and a part number of the item included in the offer. For the Tool Chest SubFactor, each of the requirements listed in Attachment 0003 shall be addressed and substantiating data shall be assembled and submitted as a single Adobe PDF document.

M.4.1.2 The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of providing thorough and complete information rests with the offeror.

M.4.1.3 Exceeding Technical Requirements

The offeror will not be awarded extra credit for exceeding the technical requirements outlined in the technical specification Army TDP

0627A0000:59678 and Section L.3 of the solicitation.

M.5 Price Factor

M.5.1 The Price Factor evaluation will consider the Total Evaluated Price. The Price Factor will be assessed based upon Total Evaluated

Price to the Government to include an assessment of price reasonableness.

M.5.2 Reasonableness exists when the offered price does not exceed what would be incurred by a prudent person in the conduct of competitive business. The Government may make a determination of reasonableness by any means allowable under FAR 15.404-1.

M.5.3. Total Evaluated Price Calculation

a. The Total Evaluated Price shall equal the sum of the proposed prices for all CLINS as calculated in Attachment 0002.

b. For CLINs with range pricing, the Government will calculate a weighted average unit price by summing the unit prices proposed for each quantity range by the weighting percentages as stated in Attachment 0002. This weighted average unit price will then be multiplied by the estimated quantity to develop an extended price for each CLIN.

19 20

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.5.4 Unbalanced Pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items or ranges is significantly over or understated as indicated by the application of cost/price analysis techniques. Offerors are cautioned that a proposal the Government assesses to be unbalanced as to cost, may be unacceptable for award.

*** END OF NARRATIVE M0001 ***

20 20

SECTION A
SECTION B
SECTION C
SECTION D
SECTION J
SECTION L
SECTION M