Attachment___01_Performance_Requirements_Summary.docx

DOCX document 23 KB Posted

Attached to
Domestic Appliance Repair
Solicitation number
W564KV16R0033
Issued by

About this file

Performance Requirements Summary

View the file

Other files

File Type Posted
Attachment___29_Price_Exhibit_Amnd1.xlsx XLSX spreadsheet
W564KV-16-R-0033_Amendment1.pdf PDF
Offeror_Solic_Questions_ANSWERED.docx DOCX document
Attachment___18_Common_Standard_Item_Parts.xlsx XLSX spreadsheet
Attachment___25_eMH_Barcode_Label _Sample.pdf PDF
Attachment___19_Repair_WO's_Historical_Data.xlsx XLSX spreadsheet
Attachment___07_Appropriation_Classes_5JAN16.xlsx XLSX spreadsheet
Attachment___27_Work_Order_Form _Sample.pdf PDF
Attachment___12_GFP_(Govt_Furn_Parts)_list_10May16.xlsx XLSX spreadsheet
Attachment___16_DARMS_CONTRACTOR_Instructions.pdf PDF
Attachment___26_409th_Non_Conformance_Report.pdf PDF
Attachment___14_Emergency_Phone_Register.xlsx XLSX spreadsheet
Attachment___03_Depreciation_list_as_of_March_15.xlsx XLSX spreadsheet
Attachment___23_DRL_Part_2.pdf PDF
Attachment___22_Europe_pop_living_On-Off-Post_Dwellings_4JAN16.xlsx XLSX spreadsheet
Attachment___10_MLFB_Master_FY16_v20JAN16.xlsx XLSX spreadsheet
Attachment___09_Gross_Negligence_letter_as_of_13_Apr_16.docx DOCX document
Attachment___20_Listing_of_Service_Codes_and_Repair_Codes.doc DOC document
Attachment___06_NAK_Customer_Not_at_Home.docx DOCX document
Attachment___13_Sites_destinations_from_local_FMO_4JAN16.xlsx XLSX spreadsheet
Attachment___31_QASP_APPLIANCE_REPAIR_CONRACT.doc DOC document
Attachment___17_List_all_appliances_installed_in_Europe_8JAN16.xlsx XLSX spreadsheet
Attachment___30_PWS_APPLIANCE_REPAIR_CONTRACT.docx DOCX document
Attachment___02_DELIVERABLES_SCHEDULE.docx DOCX document
Attachment___23_DRL_Part_1.pdf PDF
Attachment___04_MEL_2015.xlsx XLSX spreadsheet
W564KV-16-R-0033.pdf PDF
Attachment___11_Parts_for_Cannibalization20AUG15.xlsx XLSX spreadsheet
Attachment___21_General_Remote_Sites.xlsx XLSX spreadsheet
Attachment___28_Past_Performance_Questionnaire.docx DOCX document
Attachment___24_eMH_Service_Request_Types _Sample.pdf PDF
Attachment___29_Price_Exhibit.xlsx XLSX spreadsheet
Attachment___05_Tools_and_Test_Equipment_in_Service_Vehicles.docx DOCX document
Attachment___15_FMOs_in_Europe_and_POCs.xlsx XLSX spreadsheet
Attachment___08__CUSTOMER_QUESTIONNAIRES_CARD.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
PENALTIES
1) PWS Part 1 Management and Administration (Para 1.6.1) All Phase -In functions shall be performed in an effective and efficient manner as outlined in PWS to facilitate a seamless transition from incumbent contract to contract awardee.
95% of necessary personnel actions, deliverables and actions are completed within the 30 day phase-in period, IAW established milestone time frames
>95% Percent Total PRS Compliant Rate
100% Inspection of COR; PRS Inspection Checklist.
1.0% deduction of total Monthly Invoice amount for all areas
2) PWS Part 1 Management and Administration (Para. 1.6.8) Quality Control – The Contractor shall prepare at a minimum semiannually a report where more than one visit was required to complete a repair and establish procedures to reduce the number of repeat visits. The Government may request a follow on report on a monthly basis after the initial report.
100% delivered on time. Report shall forward to the COR at a minimum semiannually, or on a monthly basis, if requested by the COR; Monthly COR PRS inspection checklist Pass / Fail criteria.
95 % accuracy
100% Inspection of COR; PRS Inspection Checklist.
1.5% deduction of total Monthly Invoice amount for all areas
3) PWS Part 5 Specific Tasks (para. 5.1 c. Basic Services) The Contractor shall only perform work which was authorized by the Government and is within the Scope of the Contract.
It is the Contractor’s responsibility to ensure that locations visited and work performed are authorized by the SPOC/Call Center Contractor and are within the scope of this PWS; Monthly COR PRS inspection checklist Pass / Fail criteria.
100 % accuracy
SPOC log comparison, random sampling, calling customers; PRS Inspection Checklist

2.0% deduction of total Monthly Invoice amount for all areas

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
PENALTIES
4) PWS Part 5 Specific Tasks (para. 5.2 b. Repair Services) The Contractor shall respond to all repair calls within the given timeframe in accordance with the PWS 5.2
95% of calls shall be responded to within 1 Contractor working day for ranges, refrigerators and freezers, or within 2 Contractor working days for washers, dishwashers and dryers. This doesn’t apply if the customer requested an appointment on a later date; Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total PRS Compliant Rate
100 % Inspection by COR, verified Customer complaints; PRS Inspection Checklist
5.0% deduction of total Monthly Invoice amount for the Area where the failure occurred
5) PWS Part 5 Specific Tasks (para. 5.2 b. Repair Services) The Contractor shall respond to Short Notice repair calls within the given timeframe in accordance with the PWS 5.2. The reason for the short notice Service should be on the service request and properly annotated on the Work Order by the Contractor (e. g. Four burners defective, Washer shorts the power supply etc.).
98% of emergency calls are responded to in accordance with the PWS;

Monthly COR PRS inspection checklist Pass / Fail criteria.

>98 Percent Total PRS Compliant Rate
100 % Inspection by COR, verified Customer complaints; PRS Inspection Checklist
2.0% deduction of total Monthly Invoice amount for the Area where the failure occurred
6) PWS Part 5 Specific Tasks (para. 5.4 Work Order Form) Work Orders and matching eMH Service Requests shall be provided to the local Domestic Appliance Inspectors within the given timeframe in accordance with the PWS 5.2
95% Documentation is provided to the local Domestic Appliance Inspectors, correct and complete, within two working days after completion of the call; Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total PRS Compliant Rate
100 % Inspection by COR, verified Customer complaints; PRS Inspection Checklist
1.0% deduction of total Monthly Invoice amount for the Area where the failure occurred
PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
PENALTIES
7) PWS Part 5 Specific Tasks (para. 5.5 Invoicing) Data Requirements - Invoices, and Invoice Attachments shall be provided in a correct and timely manner
85% delivered on time, the invoices shall be put in iRAPT NLT the 5th working day of the follow on month;

Monthly COR PRS inspection checklist Pass / Fail criteria.

100 % accuracy
100% Inspection of COR; PRS Inspection Checklist.
Memo for contract file
8) PWS Part 5 Specific Tasks (para. 5.6.1 Repairs) The Contractor shall complete all repairs within the first visit at customer’s homes, Troop buildings, Contractor Shop or FMO’s. This does not apply to cases where it is the Government’s fault a repair cannot be completed within the first visit (e.g. no spare parts available to the Contractor etc.)
90% of all repairs are completed within the first visit; Monthly COR PRS inspection checklist Pass / Fail criteria.
>90 Percent Total PRS Compliant Rate
100% Inspection of COR; verified customer complaints, PRS Inspection Checklist.
5.0% deduction of total Monthly Invoice amount for the Area where the failure occurred

9) PWS Part 5 Specific Tasks (para. 5.6.1 Repairs) Quality Control – The Contractor shall perform all Services in a professional manner, without damages to customer’s or Government’s property.

No more than 4% verified customer complaints, verified damages are settled within three weeks;

Monthly COR PRS inspection checklist Pass / Fail criteria.

>96 Percent Total PRS Compliant Rate
Random Sampling,

Unscheduled Inspections, verified customer Complaints; PRS Inspection Checklist.

1.0% deduction of total Monthly Invoice amount for the Area where the failure occurred

10) PWS Part 5 Specific Tasks (para. 5.6.1 8 Repair Price Limitation) Quality Control – The Contractor shall repair all appliances within the MEL table. The MEL calculation shall include the FFP repair rate for the appliance, the price for the GFP, and Common Standard Item Parts

100% of all repairs shall be within the MEL table; Monthly COR PRS inspection checklist Pass / Fail criteria.
100 % accuracy
100% Inspection of COR; PRS Inspection Checklist.
3.0% deduction of total Monthly Invoice amount for the Area where the failure occurred
PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
PENALTIES
11) PWS Part 5 Specific Tasks (para. 5.6.1 9 Cannibalization) Quality Control – The Contractor shall only cannibalize the repair parts listed on Attachment # 11 to use for future repairs
100% of the cannibalized repair parts shall be listed on Attachment # 11; Monthly COR PRS inspection checklist Pass / Fail criteria.
100 % accuracy
Random Sampling,

Unscheduled Inspections; PRS Inspection Checklist.

1.0% deduction of total Monthly Invoice amount for the Area where the failure occurred

12) PWS Part 5 Specific Tasks (para. 5.7 Parts Management) Contractor-Provided Common Item Repair Parts Management shall be accomplished efficiently, cost effective to the Government
No more than 5% late repairs due to lack of Contractor-Provided Common Item Standard Parts; Monthly COR PRS inspection checklist Pass / Fail criteria.
>95 Percent Total PRS Compliant Rate
Random Sampling,

Unscheduled Inspections, Customer Complaints; PRS Inspection Checklist.

1.0% deduction of total Monthly Invoice amount for Common Item Parts Standard Parts for the Area where the failure occurred

13) PWS Part 5 Specific Tasks (para. 5.7 (1) Common Standard Item Parts) Contractor shall provide a monthly report of Common Item Parts used and the cost thereof (Common Standard Item Consumption Report)
100 % delivered on the 5th working day of the following month; Monthly COR PRS Inspection checklist Pass / Fail criteria.
100 % accuracy
100% Inspection of COR PRS Inspection Checklist.
1.0% deduction of total Monthly Invoice amount for all areas
14) PWS Part 5 Specific Tasks (para. 5.8 a. Appliance Information) Data Requirements – The Contractor shall check the Data plate on each serviced appliance. The appliance data shall be recorded and verified every time. The Contractor shall put/update all required Data in DARMS as defined in the PWS.
95 % data accuracy; Monthly COR PRS inspection checklist Pass / Fail criteria.
95 % data accuracy
100% Inspection of COR PRS Inspection Checklist.
4.0% deduction of total Monthly Invoice amount

for all areas

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
PENALITIES
15) PWS Part 5 Specific Tasks (para. 5.9 c. Contractor Personnel) The Contractor shall provide training to his technicians throughout the life of the contract on new appliance models, both US and European.
100% delivered on time. Documentation of training and attendees shall be

submitted to the COR within 5 days after the training event; Monthly COR PRS inspection checklist Pass / Fail criteria.

100 % accuracy
100 % Inspection by COR and QA Specialist; Inspection Checklist.
1.0% deduction of total Monthly Invoice amount

For all areas

File details come from the government source that posted it. Updated .