2018-1395
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to answ er additional contractor questions #29-33 and update the answ er provided in Q-4. Questions
#1-28 w ere answ ered in Amendment 0002. The closing date and time remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J18R5007
X 9B. DATED (SEE ITEM 11)
20-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2018
CODE
ARMY CONTRACTING AGENCY - ITEC4
3050 RODMAN AVE BLD 60 3RD FLOOR
ROCK ISLAND IL 61299-5000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J18R5007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of this Amendment, 0003 is to answer contractor question #29-33 and provide an updated answer to Q-
4. Answers to questions #1-28 were provided in amendment 0002.
The closing date and tiem remain unchanged.
Q-29 1.1.5 is requiring energy consumption report calculating the total energy savings for the project. I cannot find in any of the documents what the KW rate is for Bldg 350 to calculate energy savings.
A-29 Use the parameters below:
2-lamp (32W each) fluorescent (per 1.1)
Replace 4,624 fluorescent light fixtures (per 1.1.5.4)
The building is occupied 3,120 hours/yr (per1.1.5.9)
Q-30 Are we required to tie 2 corners of the light fixtures to the structure?
A-30 The current suspended ceiling framing system have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories (Per UFGS Section 09 51 00 Acoustical Ceilings mentioned in 3.1.2). The contractor shall inspect the ceiling frame system and shall provide additional support if needed. Luminaires shall be securely fastened to the ceiling framing member by mechanical means.
Q-31 Do we need to include hurricane clips on 4 corners of the fixture?
A-31 Same as Q-30.
Q-32 Will CAD files be made available for the awarded contractor to create lighting level diagrams?
A-32 CAD files are available for APPENDIX B – Project Drawings. However CAD files for APPENDIX B-2
Drawings for Automatic Controls are NOT available.
Q-33 Are there exposed ceilings where the new fixture whips or lighting control conduits are to be painted?
A-33 No (per1.1)
The below is provided as an update to Amendment 0002.
Q-4. Please identify all computer rooms on plans. They need to be designed for 50fc whereas the remaining rooms need to be designed for 30fc.
A-4. The computer rooms are inside the dotted lines page 2, APPENDIX B
(End of Summary of Changes)