This document provides an overview of modernization efforts undertaken at the Lake City Army Ammunition Plant (LCAAP) from 2013 to 2018. Significant investments totaling over $133 million were made across several key areas including the ballistics range, link manufacturing, energetics, packaging, and 5.56mm ammunition production.
Upgrades to the ballistics range included relocating downrange gun houses and establishing new trace performance observation bunkers and houses. In link manufacturing, several outdated presses and furnaces were replaced and upgraded to improve production capabilities. The energetics area received control system replacements and upgrades to explosive neutralization and drying processes. Packaging modernization involved installing semi-automated crate closure systems and new printing equipment. For 5.56mm ammunition, case simulators and primer handling systems were modernized. Additional projects enhanced .50 caliber bullet production, facilitated a charging wing for 7.62mm development, and supported critical infrastructure needs. The overview indicates the Army's commitment to continuous LCAAP improvement to support future production contracts.
LCAAP Industry Day #2 - Modernization Briefing Charts
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Final As of 26 MAR 18
Dennis Durkin Lake City Army Ammunition Plant (LCAAP) Modernization Projects Overview 11 April 2018
Industry Day #2
26MAR18 FINAL
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
• LCAAP Modernization has provided significant investment to upgrade production equipment and processes
• Objective has been to continue modernization activities
• Focus on obsolete equipment and processes
LCAAP Modernization Effort (2013-2018)
FY13 FY14 FY15 FY16 FY17 FY18 Total
$17.5M $23.6M $25.0M $9.1M $9.1M $49.6M $133.9M
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Effort (2013-2018)
Project Number Project Title FY Awarded
SC-41 Single Point of Fire 13 $7,508,053
SC-42 Covered Accuracy Range - Design 13 $997,367
SC-43 SCAMP Case Simulators 13 $2,176,172
SC-44 Chemical/Metal Lab Upgrade 13 $4,628,440
SC-45 Cal .50 Bullet Front End - Design 13 $1,933,096
SC-52 Explosive Neutralization - Develop/Bench Scale 13 $275,704
SC-45 Cal .50 Bullet Front End - Execution 14 $8,171,483
SC-62 5.56 BAM Refurbishment Phase I 14 $1,661,924
SC-64 Link Heat Treat Furnace 14 $4,777,771
SC-65 Range Safety Automation - Design 14 $495,090
SC-66 Manurhin Loader Refurbishment 14 $2,577,482
SC-67 TNR Distributive Control System 14 $1,308,617
SC-81 5.56mm Case Cup Anneal 14 $4,580,538
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Project Number Project Title FY Awarded
SC-65 Range Safety Automation - Execution 15 $3,693,372
SC-84 5.56mm Tracer Charging Modernization - Ph 1 15 $383,457
SC-86 5.56mm Safe Pack Unloader - Line 1 15 $3,228,131
SC-87 Link Press Modernization 15 $6,801,192
SC-88 Explosive Lab Equipment Upgrade 15 $191,328
SC-89 5.56 Manurhin Tip ID Upgrade 15 $1,393,156
SC-80 SCAMP Propellant Delivery Upgrade - Design 16 $1,299,439
SC-62 5.56 BAM Refurbishment Phase II 16 $2,122,693
SC-94 5.56mm Isotopic Gage Upgrade 16 $1,940,445
SC-103 SCAMP Material Handling - Concept Design 16 $804,266
SC-104 5.56mm Crate Closure System (5) 16 $2,290,843
LCAAP Modernization Effort (2013-2018)
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Effort (2013-2018)
Project Number Project Title FY Awarded
SC-125 Cal .50 Ammunition Can Leak Test System 17 $599,850
SC-126 Primer Component Wash System Upgrade 17 $2,804,195
SC-127 7.62mm Crate & Cal .50 Can Printing Upgrades 17 $2,766,322
SC-128 7.62mm & Cal 0.50 Crate Assembly Equipment 17 $2,960,756
SC-129 M249 Magazine Marker Upgrade 18 $1,136,653
SC-134 Cal .50 Link Press Replacement 18
SC-139 5.56mm Clip Pack Line Upgrades 18
SC-140 West Charging Wing Facilitization for 7.62 18
SC-141 7.62mm Long Lead Equipment 18
SC-142 Pyrotechnic Drying Ovens 18
SC-143 Primer Mix House Upgrades 18
SC-144 Energetic Neutralization Upgrades 18
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Project Description Status
Single Point of Fire • Relocate all down range production gun houses to main building
• Establish new trace performance observation houses based on firing from main building
• Establish new bunkers at 1300 & 1625 yards to support trace performance testing
• Install new Trace Observation Evaluation System (TOES) hardware in new observation houses
Complete
• Waiting on AAIE for TOES
Range Safety Automation
• Replace manual Command and Control of range operation with automated system using existing Lenel badging system
• Replace manual tracking of down range personnel via log book
• Upgrade gate access points to operate from Lenel system
In Process
• All hardware installed
• Debugging interface to plant wide Lenel system
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Single Point of Fire
Down range 7.62 Trace Performance Gun House
New Trace Performance Firing Positions in Main Building
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Single Point of Fire
Old 7.62 Trace Performance Observation House
New Trace Performance Observation House with TOES Camera
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Single Point of Fire
Bunker view from Main Building
New Bunkers
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Single Point of Fire
Screen shot of TOES Engineering Test
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Range Safety Automation
Current Range Controls with Logbook and Lock-Outs
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Motorized Vehicle Gate with Badge Reader
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Ballistic Range
Range Safety Automation
Tracer Observer Station with Badge-In Sensor
Tracer Observer House Door with Door Position Sensors
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
Project Description Status
Link Press Modernization
• Refurbish seven 30 ton link presses used for 5.56 and
7.62 links
• Replace two Danly 100 ton link presses with a single press used for cal .50 links
• Upgrade ancillary equipment for link manufacture
In Process
• Four presses refurbished
• New 100 ton Minster
• New die-set for 7.62
• New strip de-coiler, straighten and feed systems Link Heat Treat Furnace
• Replace four obsolete heat treat furnaces with a single austempering heat treat system
• Replace furnace atmosphere generator
• Replace molten salt holding tank
Complete
• All equipment in production
Cal .50 Link Press Replacement
• Replace two 100 ton link presses used for cal .50
• Upgrade ancillary equipment for link manufacture
In Process
• Funded but not yet awarded
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
Existing 30 ton press and ancillary feed equipment
Link Press Modernization
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
Refurbished 30 ton press
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
New ancillary feed equipment
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
Existing 100 ton Minster and Danly presses
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
New 100 ton press
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
Link Heat Treat Furnace
1960 vintage Heat Treat Furnace
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
New Heat Treat Furnace with Salt Quench and Rinse
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Link Manufacturing
New Endothermic Gas Generator
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
Project Description Status TNR Distributive Control System
• Replace controller used for synthesis of TNR, Lead Styphnate and Tetracene
• Replace controller without impacting production
Complete
• Replaced obsolete ABB System Six with
DeltaV DCS
Energetics Neutralization Upgrades
• Replace ten flat bottom rectangular tanks uses to neutralize explosive waste from energetic manufacturing operation
• Upgrade process to remotely monitor/control neutralization operations
In Process
• Funded but not yet awarded
Pyrotechnic Drying Ovens
• Replace 1940 vintage pyrotechnic constituent drying ovens
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
TNR Distributive Control Upgrade
Original TNR Control Room and Controller
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
TNR Distributive Control Upgrade
TNR Controller Graphical Screen – New Controller
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
• Rectangular, flat bottom tanks
• Steam sparging used to heat and mix waste water
• Neutralized “sludge”
Neutralization Upgrades
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
Neutralization Upgrades
Manual feed of neutralization agents from behind Lexan shielding
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Energetics
Pyrotechnic Drying Ovens
Steam Heated Drying Ovens for Pyrotechnic Constituents
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
Project Description Status
5.56 Crate
Closure System
• Replace manual crate assembly stations on five packaging lines with semi-automated systems
In Process
• Three systems installed and operating
• Two systems competing acceptance testing
7.62 & Cal .50 Crate Closure System
• Replace manual crate assembly stations on two cal .50 packaging lines and three 7.62 packing lines with semi-automated systems
In Process
• CDR complete, fabricating equipment
7.62 Crate & Cal
.50 Ammo Can Printing Upgrades
• Replace existing contact pad printing equipment for 7.62mm ammunition crates
• Replace existing contact pad printing equipment for Cal .50 ammunition cans
In Process
• PDR complete, CDR in May
5.56 Clip Pack
Line Upgrades
• Replace existing clipping machine, point protector carton assembly and ancillary feeders on three packing lines
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
5.56 Crate Closure System
Manual Crate Assembly Operation
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
5.56 Crate Closure System
Semi-automated Carte Assembly Machine Similar systems will be installed for 7.62 and Cal .50
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
7.62 Crate & Cal .50 Ammo Can Printing
System
Contact Print Roller for Existing Crate Printing Equipment
Lot Number
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
7.62 Crate & Cal .50 Ammo
Can Printing System
ATK Developed Cal .50 Crate Printing and Palletizing System
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
7.62 Crate & Cal .50 Ammo Can Printing
System
ATK Developed Ammo Can Printing System
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
5.56 Clip Carton Packing System
Existing Cartridge Clipping Operation
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Packaging
5.56 Clip Carton Packing System
Existing Point Protector Carton Insert Operation
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Project Description Status
SCAMP
Propellant Delivery System - Design
• Design a replacement propellant handling system for SCAMP Loading Lines
• Conduct destructive testing of system components to validate design safety
In Process
• Vacuum propellant delivery design developed.
• Initial test of propellant receiver failed.
SCAMP Case Simulators
• Replace/upgrade 1970 hydraulic case simulators used for the off-line adjustment of case tool modules
Complete
• Simulators installed for initial and final draw, heading, head-turn, 1st and 2nd taper, final trim and pierce operations
5.56 Primer Safe
Pack Unloader
• Develop a primer delivery system for 5.56 that will handle Safe Pack Carriers (Hazard Classification 1.4)
• Replace 1970 vintage bulk primer delivery system on SCAMP Priming Line 1 (Hazard Classification 1.1)
In Process
• Equipment is installed, acceptance test complete and equipment turned over to production.
• Follow-on effort for lines 2-5 is funded but not yet awarded
5.56 Isotopic
Gauge Upgrades
• Develop a replacement for existing obsolete isotopic detectors, no longer available from vendor
• Replace isotopic detectors on Loading lines 1-5
In Process
• Prototype detector is complete and being tested
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Existing Propellant Delivery System Layout
Cart track system (1970s)
Vacuum system (1980s)
Propellant Delivery System - Design
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Propellant Delivery System - Design
Existing Drum CarrierExisting Drum Dumping Station
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Case Simulators
Tool Module
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Case Simulators
Hydraulic Simulator Upgraded, Servo Driven, HMI Controlled Case Simulator
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Primer Safe Pack Unloader
Current primer storage at priming line
Primers delivered in bulk cardboard boxes, 1.1 Hazard
Classification
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Primer Safe Pack Unloader
Primer delivery to feeder bowl Primers being loaded into current delivery system
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Primer Safe Pack Unloader
Primer Safe Pack Carrier
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Primer Safe Pack Unloader
Safe Pack Elevator Safe Pack Unloader inside
Barricade
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Isotopic Gauge Upgrade
Isotopic Gauges (3)
• Propellant Height
• Bullet Core
Presence
• Redundant
Propellant Height
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – 5.56mm
Isotopic Gauge Upgrade
Radioactive “Device” approved by NRC and licensed NRC Region 3
Source upgraded to Americim-241 in 2010 when Cesium-137 source reached its half-life.
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Project Description Status Cal .50 Bullet Front End
• Replace bullet jacket 1st Draw Presses
• Replace Inter-draw Anneal
• Replace bullet jacket final Draw Presses
• Eliminate jacket Trim operation
Complete
• Equipment operating in production
West Charging Wing Facilitization for 7.62
• Refurbish a charging wing to be used for Load Assemble and Pack of developmental ammunition
• Upgrade infrastructure to support loading operations of developmental cartridges
In Process
• Funded but not yet awarded
7.62 Long Lead
Equipment
• Procure and install 7.62 loader
• Install vacuum propellant delivery system
• Install high speed deluge
• Procure and install die-set bullet assembly machine
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Cal .50 Bullet Front End
Cal .50 Bullet Jacket 1st Draw Press
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Jacket Trim Machines
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Cal .50 Bullet Front End
Cal .50 Bullet Jacket Draw Presses Pinch Trim eliminates Final Trim
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Cal .50 Bullet Jacket Anneal, Pickle, Wash
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
West Charging Wing Facilitization for 7.62
Exterior view of west wing
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Interior view of west wing
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Pyrotechnic Pass Through
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Long Lead Equipment
Cartridge Loading Machine
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Other
Long Lead Equipment
Bullet Assembly Machine
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Production Base Support (2013-2018)
• Production Base Support has provided significant investment to LCAAP Infrastructure since 2013.
• Objectives are safety, environmental, process improvements, energy, and employee quality work environment (QWE) enhancements.
• Focus area is “mainly outside the production buildings”.
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Production Base Support (2013-2018)
PBS Infrastructure and LIF Project Title Plant Impact
New Emergency Services Center - Complete Safety
Interior Buss Replacement 7.62/Cal .50 - Complete Continuity of Production and Safety
5.56 Electrical Switchgear Upgrade - Complete Continuity of Production
HVAC for 5.56/7.62/Cal .50 Production Buildings - Construction Complete, Commissioning Summer 2018
Quality Work Environment
5.56 Exterior Switchgear Replacement - Complete Continuity of Production and Safety
Conductive Floor Replacement - Complete Continuity of Production and Safety
Hard Road Surface Recapitalization - Complete Continuity of Production and Safety
Fire Station & Waste Water Treatment Plant Partial Roof Replacement - Complete
Continuity of Production
Structural Upgrades Ballistic Testing, Lead Shop and Water Treatment Plant
Continuity of Production and Safety
OSHA Guarding Phase 4 Safety
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Production Base Support (2013-2018)
PBS Infrastructure and LIF Project Title Plant Impact
Steam Plant PLC and Economizer Controls Upgrade Safety and Environmental
Exterior Steam Main Supports Phase 1 - Complete Continuity of Production
5.56 Compressed Air System - Complete Continuity of Production
Structural Upgrades for 5.56/7.62/Cal .50 and Primer Production Buildings (Design) - Complete
Continuity of Production and Safety
Water Wells Continuity of Production
Switchgears Upgrades for 5.56/7.62/Cal .50 and Primer Production Buildings
Continuity of Production
HVAC for Explosive Wings of 5.56/7.62/Cal .50 Production Buildings (Design)
Continuity of Production and Safety
Water Treatment Plant (Design) Continuity of Production and Safety Propellant Storage Buildings Temperature Control and Monitor Upgrades
Continuity of Production and Safety
Water Supply and Tower Upgrades Continuity of Production and Safety Bldg. 3 Roof Replacement for 7.62 and Cal .50 Production Building
Continuity of Production
Warehouse Replacement Study Continuity of Production
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Modernization Efforts – Summary
• Significant investments have been made at LCAAP from a production, infrastructure, and QWE perspective.
• Modernized LCAAP is cornerstone to follow on production/facilities contract.
• Army supports continuous improvement at LCAAP notwithstanding budget environment.
• Modernization of LCAAP will continue through the next contract, pending availability of funding.
| Industry Day #2 |
| LCAAP Modernization Effort (2013-2018) |
| LCAAP Modernization Effort (2013-2018) |
| LCAAP Modernization Effort (2013-2018) |
| LCAAP Modernization Effort (2013-2018) |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Ballistic Range |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Link Manufacturing |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Energetics |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – Packaging |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – 5.56mm |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| LCAAP Modernization Efforts – Other |
| Production Base Support (2013-2018) |
| Production Base Support (2013-2018) |
| Production Base Support (2013-2018) |
| LCAAP Modernization Efforts – Summary |