LCAAP_Industry_Day__1_-_Briefing_Charts.PDF

PDF 2 MB Posted

Attached to
Lake City Army Ammunition Plant (LCAAP) Industry Day #4
Solicitation number
W52P1J-17-R-0141
Issued by

About this file

This briefing document provides details regarding an upcoming solicitation for operation of the Lake City Army Ammunition Plant and associated small caliber ammunition production. The opportunity involves a full and open competition for one facility contract and one production contract with both requirements and indefinite delivery indefinite quantity contract line items. Key estimated dates include industry days in October 2017 and March 2018, release of a draft RFP in June 2018, final RFP release in November 2018, and proposal due date in January 2019. The period of performance is anticipated to be ten to fifteen years beginning in fiscal year 2020 if all option periods and award terms are exercised. The document outlines incumbent contractors, current and planned modernization projects, potential future technologies, and anticipated contract terms such as firm-fixed pricing with economic price adjustments and required delivery timelines.

LCAAP Industry Day #1 - Briefing Charts

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

FINAL

As of 12 OCT 17

Jennifer Paul Jeremy Lucid Dennis Durkin

Todd Townsend Lake City Army Ammunition Plant (LCAAP) 18 October 2017

Industry Day #1

FINAL 12 OCT 17

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

LCAAP Industry Day Agenda

Day #1 October 18, 2017 o 0830 – 0900: Registration at Hotel o 0900 – 1030:

o Opening Remarks o Tentative Acquisition Strategy o Contract Terms & Conditions o Future Technologies Overview o 1030 – 1045: Break o 1045 – 1115:

o Q&A Session o Tour Preview o 1115 – 1215: Lunch o 1215 – One-on-One Discussions o 15 minute maximum per company o Schedule to be provided with attendance confirmation notice

Day #2 October 19, 2017 o 0800: Depart Hotel on Bus to LCAAP o 0830 – 0900: Safety Briefing, PPE o 0900 – 1200: LCAAP Tour o Building 3 – 7.62mm & Cal .50

Production o Building 1 – SCAMP 5.56mm

Production o Building 8 – Ballistic Range Facility o 1200 – 1300: Lunch o Box lunch on site o 1300 – 1600: LCAAP Tour o Building 35/Explosives Area –

Primers & Pyrotechnics o Building 2 – 5.56mm Production &

Links Manufacturing o Plant windshield tour o 1630: Depart LCAAP on Bus to Hotel

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Industry Day Objectives

•Provide potential offerors with a general program overview

•Initiate dialogue with industry during one-on-one sessions

•Solicit input and comments from industry for use in finalizing a strategy that will ensure a mutually beneficial contract for Government and industry

•Provide attendees the ability to meet potential partners

•Encourage open and continuous exchange of information and ideas throughout this process

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Disclaimer

• Industry Day is for information and planning purposes only. This does not constitute a formal solicitation or a Request For Proposal (RFP). This is not to be construed as a commitment by the Government in any way

• All items are in planning stages. Milestones, timeframes, and quantities are estimates only. The Government is NOT bound by any of the quantities or information presented today

• Do not rely on information presented today in formulating your proposal

• No Government personnel, except for the Contracting Officer, can make any commitments on behalf of the Government

• The Government does not intend to award a contract on the basis of Industry Day or otherwise pay respondents for participation in this event

• Should an RFP be issued, any information contained within the RFP supersedes the information presented at this Industry Day

• This briefing package, along with all information, questions, and answers that are provided as part of this Industry Day, will be posted to Federal Business Opportunities (FBO) website: www.fbo.gov http://www.fbo.gov/

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Rules of Engagement

•The Government will NOT answer verbal questions during the Industry Day briefing

•Questions/Comments must be submitted via the forms provided -Some questions may require additional time for complete response -Q&As will be posted on FBO website -Contractors should not submit questions with proprietary information

•Personal Electronic Devices are NOT permitted at any point

•All questions are to be directed to:

-Contracting Officer at jennifer.n.paul.civ@mail.mil -Contract Specialist at benjamin.j.gillen.civ@mail.mil mailto:jennifer.n.paul.civ@mail.mil mailto:benjamin.j.gillen.civ@mail.mil

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

LCAAP History

•LCAAP was built in the 1940s

•Only Government-Owned, Contractor- Operated (GOCO) small caliber ammunition plant

•During WWII, the plant produced over 2B rounds annually

•In the last 15 years, significant USG and Industry investments in the plant totaling over $650M have resulted in:

-Modernized equipment, facilities and infrastructure

- Increased small caliber ammunition production by over 300% (from 400M rounds/year up to a peak of 1.4B rounds/year)

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Orbital ATKRemington ArmsUSA Olin

GWOT

2001-present

GULF WAR

Plant

VIETNAM

1966-1975

Plants

Indicates LCAAP Production Only (prime contract)

KOREA

1950-1953

Plants

Plants

WWII

1941-1945

LCAAP Production History

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

13 4 18 13 26 37 53 57 60 63 72 79 70 77 70 53 56 48 63 23 38 46 70 120 168 198 217 243 232 222 225 207 173 161 125 117

1035 1048 1093 1098

900 919

1348 1375

1186 1129

1184 1162

RO

U

N

DS

O F

AM

M

U N

TI

O

N (i n M ill io ns

Total Military Ammunition Production at LCAAP FY99-FY16

Cal .50 7.62mm 5.56mm Total

LCAAP Annual Production

FISCAL YEAR

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

General Information

•System for Award Management (SAM)

•All contractors who provide goods/services to Department of Defense (DoD) must be registered in SAM. If you are not registered in SAM, you cannot be awarded a DoD contract

•Website for registering in the SAM is:

http://www.sam.gov

•You may also contact the Federal Service Desk at www.fsd.gov, to request assistance with the SAM registration process http://www.sam.gov/

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

General Information

•Facility Clearance (FCL)

•All contractors who operate LCAAP must be able to obtain a FCL

•It is anticipated that the next contract will require the generation, handling, and storage of classified material up to Secret

•More information regarding the process for obtaining an FCL can be found at:

http://www.dss.mil/isp/fac_clear/per_sec_clear_proc_faqs.html http://www.dss.mil/isp/fac_clear/per_sec_clear_proc_faqs.html

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

General Information

Technical Data Packages (TDPs) •TDPs will be provided after issuance of the Draft RFP

•Drawings for TDPs are restricted and available only to firms registered with US/Canada Joint Certification Program (JCP) -Approximately 2-3 weeks is required for JCP certification -For information on becoming certified, please visit:

https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defa ult.aspx

•Contractors must obtain an FBO vendor account to access TDPs -Data Custodian identified in the DD2345 can request explicit access to the TDPs and be approved/granted access

-Approximately 2-3 days are required to process each explicit access request https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

General Information

• The Government plans to establish the following data repositories to post documents in support of proposal development:

Virtual Technical Library (VTL)

• Online library to include, but not be limited to:

- Baseline Facility Assessment (BFA)

- Baseline Environmental Conditions Assessment (BECA)

- Manufacturing, operating, and inspection procedures

- Quality performance and test procedures

- Maintenance procedures and records

- Material and component purchase descriptions

On-Site Library (OSL)

• Physical library maintained at LCAAP to include documents and information deemed too sensitive to post online

• VTL and OSL are tentatively scheduled to be established by Summer of 2018

- Individuals may submit requests for access

- PCO will determine validity of request and approve accordingly

- Access may be limited to certain number of individuals per company

• Once established, VTL/OSL rules and instructions will be posted to www.fbo.gov

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Milestones (Subject to Change)

Tentative Acquisition Milestones

INDUSTRY

DAY #1

INDUSTRY

DAY #2

DRAFT RFP

RELEASE

INDUSTRY

DAY #3

FINAL RFP

RELEASE

OCT 17

MAR 18

JUN 18

AUG 18

NOV 18

PROPOSALS

DUE

DISCUSSIONS

(IF NEEDED)

FINAL

PROPOSALS

DUE

CONTRACT

AWARD

JAN 19

MAY 19

JUN 19

SEP 19

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Tentative Acquisition Strategy

•Acquisition Strategy has NOT been formally approved -Cost Benefit Analysis currently being conducted and may influence final Acquisition Strategy

-Plan to finalize by next Industry Day in March 2018

•Full and Open competition, Best Value Tradeoff source selection

•One (1) RFP, One (1) Proposal, and Tentatively Two (2) contracts:

-Facility Contract -Production Contract with both Requirements and Indefinite Delivery, Indefinite Quantity (IDIQ) Contract Line Item Numbers (CLINS)

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Tentative Acquisition Strategy

•Current Production Contract expires for ordering 30 SEP 19 - Final deliveries required NLT 30 SEP 20

•Current Facility Contract expires 30 SEP 20

•One year (01 OCT 19 – 30 SEP 20) allowed for transition

•Period of Performance (PoP) for resultant contracts is TBD Possibilities under consideration include:

-Ten (10) Year (FY20-FY29) if option and full award term are exercised Base Award of 5 years One (1) Evaluated Option Period for 2 years to be exercised at time of award One (1) Evaluated Award Term for up to an additional 3 years

-Fifteen (15) Year (FY20-FY34) if option and full award term are exercised Base Award of 5 years One (1) Evaluated Option Period for 5 years to be exercised at time of award One (1) Evaluated Award Term for up to an additional 5 years

Seeking Industry Feedback on PoP

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Tentative Performance Work Statements

The following Performance Work Statements (PWS) are under consideration to be either indirectly or directly funded

• Indirect: Shall be accomplished by contractor at no direct cost to the Government (i.e., borne by the product)

• Direct: Shall be subject to availability of funds, and may be cost reimbursable IAW FAR 52.216-11; no fees are permitted

1. Support of On-site Government Ballistic Services Office 11. Government Property

2. Goods/Services for On-site Government Personnel 12. Ammunition Materiel Management

3. Army Family Housing 13. Traffic Management

4. Facility Plans, Strategies, and Analyses 14. Occupational Health Clinic

5. Safety 15. Mowing of Vegetation

6. Security/Antiterrorism 16. Mail Services

7. Fire and Emergency Services 17. Propellant Mitigation

8. Maintenance 18. Contract Production Delivery Reporting

9. Environmental 19. ARMS

10. Utilities and Energy 20. Contract Start-Up

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Note: Operating contractor will be required to retain any ARMS agreements beyond 30 SEP 2020

ARMS Tenants

•Armament Retooling and Manufacturing Support (ARMS) scope of work provides for commercial, third party, and tenant use of facilities, with prior Government approval

•Current ARMS agreements:

Company Industry Date of Expiration

Federal Cartridge Co. Sport Ammo 31 MAR 18 Elite Cuisine Food Service 31 MAR 18 American Marksman Manufacturing 07 AUG 18 All Copy Products Printing & Mail 30 SEP 18 Dba Temp Help Prime Contractor 30 SEP 18 MAST Technology Munitions Mfg. 30 SEP 18 BDI Sales, Gen Supply 30 SEP 18 Fastenal Company Material Storage 07 FEB 18 CM Power General Contractor 30 APR 19 IAMAW Labor Union 30 JUN 19 Bullseye International Laundry 30 SEP 19 ECC Professional Services 30 SEP 19 Dba First Impressions Prime Contractor 30 SEP 19 Adecco, N.A. Staffing Services 31 MAR 20 B&R Insulation Environmental Services 30 SEP 20 CMG General Contractor 31 MAR 21 20mm d.b.a (OATK) Defense 30 SEP 24

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Projected Pricing Ranges

Note: Projected quantity ranges are estimates only and should not be construed as a commitment on behalf of the Government

Range Ctg, 5.56mm Family Ctg, 7.62mm Family Cal .22 Family Cal .50 Family

Qty From Qty To Qty From Qty To Qty From Qty To Qty From Qty To

1 150,000,000 300,999,999 20,000,000 50,999,999 200,000 749,999 10,000,000 24,999,999

2 301,000,000 525,999,999 51,000,000 88,999,999 750,000 1,499,999 25,000,000 34,999,999

3 526,000,000 750,999,999 89,000,000 126,999,999 1,500,000 2,999,999 35,000,000 49,999,999

4 751,000,000 975,999,999 127,000,000 164,999,999 3,000,000 4,299,999 50,000,000 59,999,999

5 976,000,000 1,320,000,000 165,000,000 230,000,000 4,300,000 6,000,000 60,000,000 75,000,000

Seeking Industry Feedback on Pricing Ranges

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Requirement CLINS

•Includes all 5.56mm, 7.62mm, .50 Cal, .30 Cal, and .22 Cal families of small caliber ammunition awarded by ACC-RI with the exception of the IDIQ CLINS specified under this contract

•ACC-RI is considering reserving the right NOT to award any item(s) if:

-There are delinquent quantities under contract associated with that caliber

-Contractor does not have existing capability to produce within Government’s required delivery date for particular order without impacting other deliveries

-Contractor cannot produce without Government funded facilitization (perishable tooling excluded), or

-The item is a new item not previously procured under the contract

•Firm-Fixed-Price (FFP) unit prices will be required for multiple volumes in each delivery order

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature N/A Cartridge, 5.56mm, Ball, M855, Reference; Carton

A071 Cartridge, 5.56mm, Ball, M193; Packed 10-Ctgs/10 Round Clip

A075 Cartridge, 5.56mm, Blank, M200, Linked; Packed 200-Ctgs/Belt, Link, Ctg, M27

AB73 Ctg, 5.56, Ball, M855A1&M856A1 Tracer, Linked (4:1); Packed 200Ctgs/Belt,Lk,Ctg,M27

AB74 Cartridge, 5.56mm, Tracer, M856A1; Packed 20-Ctgs/Carton

AB76 Ctg, 5.56, Ball, M855&M856A1 Tracer, Lkd(4:1); Pkd 200-Ctgs/Belt,Lk,Ctg,M27

AC04 Cartridge, 5.56mm, High Pressure Test, M197A1 HPT

5.56mm Requirement CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature A111 Cartridge, 7.62mm, Blank, M82; Packed 100-Ctg/Belt, Link, Ctg, M13, Two (2) Configurations: with Bandoleer and without Bandoleer

A112 Cartridge, 7.62mm, Blank, M82; Packed 20-Ctg/Carton

A122 Cartridge, 7.62mm, NATO, Ball, M80; Packed 20-Ctg/Carton

A129 Cartridge, 7.62mm, HPT, M60:PACK 20 CRTG/CTN:12

A130 Cartridge, 7.62mm NATO, Ball, M80; Packed 5-Ctg/5 Round Clip

A140 Cartridge, 7.62mm NATO, Tracer, M62:PACK 20-CRTG

A146 Cartridge, 7.62mm NATO, Tracer, M62; Packed 100-Ctg/Belt, Link, Ctg, M13

A150 Cartridge, 7.62mm NATO, REFERENCE:PACK 20-CRTG/CTN

A151 Cartridge, 7.62mm, Ball, M80 & Tracer, M62, (OH Fire Application), Linked (4:1)

A164 Cartridge, 7.62mm, Ball, M80; Packed 750-Ctg/Belt, Link, Cartridge, M13

A165 Cartridge, 7.62mm, Ball, M80 and Tracer, M62, Linked (4:1)

A168 Cartridge, 7.62mm, Ball, M80 and Tracer, M62, Linked (9:1)

A255 Cartridge, 7.62mm, 4 Ball, M80, Tracer, M276

A257 Cartridge, 7.62mm Ball, M80: M276 LINK, M13

AA11 Cartridge, 7.62mm, SPECIALBALL, LONG RANGE, M118

AB80 Cartridge, 7.62mm, Ball, M80A1: Packed 5-CTG/5 ROUND CLIP

AB81 Cartridge, 7.62mm, Ball, M80A1: Packed 750-CTG/BELT, LINK, Ctg, M13

AB85 Ctg. 7.62mm Trace M62A1 Linked

AB88 Cartridge, 7.62mm, Ball, M80A1 and Tracer, M62A1, Linked (4:1)

AB89 Cartridge, 7.62mm, Ball, M80A1 and Tracer, M62A1, Linked (9:1)

7.62mm Requirement CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature N/A Cal .50, M33, Reference

N/A Cal .50, Reference (lead free)

A531 Cal .50, API, M8 BULK Pack 120

A541 Cal .50, M20, AP Incendiary Tracer (APIT); Packed 120 Ctgs/Box, M2A1; 2 Box/Wbd

A552 Cal .50, BALL, M33, BULK, 120CRTG

A552 Cal .50, BALL, M33, BULK, 120CRTG/CTN (lead free)

A575 Cal .50 HPT M1:BULK PACK 120-CRTG

A585 Cal .50, APIT, M20, LINKED M9

A606 Cal .50 API MK211-0 Single Round

A607 Cal .50, Linked 4 API MK211 MOD 1 to 1 APIT M20

AA06 Cal .50 MK211/MK263/M20

AA41 Cal .50 MK211/MOD1 SINGLE ROUND

AA42 Cal .50 API-DT MK257 Mod 0 Single Round

AA50 Cal .50 2 API MK211 Mod 1/2AP MK263 Mod 0/1 API-DT MK257

AA58 Cal .50 AP MK263 SINGLE ROUND

AB30 Cal .50 4 API M8/1 API-DT MK257

Cal .50 Requirement CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature

A201 Cartridge, CAL .30 ARMOR PIERCING M2

A222 Cartridge, CAL .30.BLANK, M1909, CTN, BOX, Ammo

AB68 Cartridge, CAL .30 ARMOR TEST PARTS KITS M2A1

CNTNR

A091 Cartridge, Cal .22 Long Rifle Match

Cal .30 and Cal .22 Requirement CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature A059 Cartridge, 5.56mm, Ball, M855; Packed 10-Ctgs/10 Round Clip; Bandoleer, M8

A062 Cartridge, 5.56mm, Ball, M855, Linked; Packed 200-Ctgs/Belt, Link, Ctg, M27

A080 Cartridge, 5.56mm, Blank, M200; Packed 20-Ctgs/Carton

AB56 Cartridge, 5.56mm, Ball, M855A1, Linked; Packed 200-Ctgs/Belt, Link

AB57 Cartridge, 5.56mm, Ball, M855A1; Packed 10-Ctgs/Clip

AB58 Cartridge, 5.56mm, M855A1, Ball (10-Round Clips); Packed 10-Ctg/ Clip

AB77 Cartridge, 5.56mm, M855A1 Clipped Bulk

5.56mm IDIQ CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature

A131 Cartridge, 7.62mm NATO M80 Ball & M62 Tracer, 4:1, packed 100 cartridges/belt

A143 Cartridge, 7.62mm NATO M80 Ball, packed 100 cartridges/belt

AB72 Cartridge, 7.62mm, Blank, M82A1, "Ceremonial" (Bottlenose)

AB79 Cartridge, 7.62mm, Ball, M80A1: Packed 100 CTG/ BELT, LINK Ctg, M13

AB82 Cartridge, 7.62mm, Ball, M80A1: Packed 20-CTG/CARTON

AB84 Cartridge 7.62mm Trace M62A1 : Packed 20-CTG/CARTON

AB86 Cartridge 7.62mm M80A1 Linked 4:1 with M62A1

A159 Cartridge 7.62mm Dummy

7.62mm IDIQ CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

DODIC Nomenclature A555 Cal .50 M33 Ball, packed 100 cartridges/belt

A555 Cal .50 M33 Ball, packed 100 cartridges/belt (lead free)

A557 Cal .50 M33 Ball and M17 Tracer, 4:1, packed 100 cartridges/belt

A557 Cal .50 M33 Ball and M17 Tracer, 4:1, packed 100 cartridges /belt (lead free)

A576 Cal .50, M8 API, M20 APIT AND M9

A598 Cal .50, M1A1 PACK 100-CRTGS

Cal .50 IDIQ CLINS

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Anticipated Contract Terms & Conditions

• FFP contract with Economic Price Adjustment (EPA)

- Government currently considering EPA for copper and zinc as well as currency fluctuation for Mk211 (Projectile)

• Required delivery after Government places an order on contract:

- All DO1 quantity - NTE date is SEP 2021 (regardless of what months awards are made in

FY20)

- All DO2 quantity - NTE is SEP 2022 (regardless of what months awards are made in FY21)

- Everything subsequent SEP would be the NTE date for next delivery order

• Ammunition must be built to U.S. Military Technical Data Packages (TDPs)

• Progress Payments are planned predicated on an adequate accounting system

• Government is considering allowing LCAAP to be used for commercial use

- Use of LCAAP may be allowed for commercial use with PCO approval and consideration

- Government is considering including an evaluation factor for offeror’s compensation to the

Government for use of facility

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Anticipated Contract Terms & Conditions

•Ownership and Data Rights:

-Ownership and rights for all Capital & Intellectual Property vests in the Government for:

All Government furnished property, modifications to Government furnished property, contractor acquired property, and intellectual property

•Pricing:

-Volume level unit prices will be proposed for all DODICs broken out by cartridge and pack out configuration

-Ordering periods correspond to Government fiscal years (e.g., DO 01 = 01 OCT 2019 to 30 SEP 2020)

-Unit prices utilized will reflect cumulative family quantities per ordering period at time of award

-Government will adjust unit prices for DODICS previously issued under that DO for that family, if the change in cumulative family quantity results in reduced price

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Anticipated Contract Terms & Conditions

• Pricing Example (all quantity ranges/prices are for illustration purposes):

• 30 OCT 19, Government issues DO for 45M cartridges of A059 at $0.50 each

• 02 JAN 20, Government issues modification to same DO for 40M cartridges of AA33

• As both DODICs are within 5.56mm family, both of their quantities count towards the cumulative family total, resulting in total family quantity for that DO of 85M cartridges

• 40M cartridges of AA33 are awarded at unit price of $0.34 each and price for the initial 45M cartridges of A059 awarded is adjusted from $0.50 each to $0.48 each

DODIC A059 DODIC AA33

Range

(Millions) Unit Price Range (Millions) Unit Price

1-50 $0.50 each 1-50 $0.39 each 51-99 $0.48 each 51-99 $0.34 each

100-200 $0.46 each 100-200 $0.29 each

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Indemnification

•Clause indemnifies contractor against claims by third persons for death, personal injury, or loss of, damage to, or loss of use of property -Applicable only to claims or losses resulting from “unusually hazardous” risk when the claim or loss is not covered by insurance

-Generally covers two types of risk – explosive and environmental -Excludes loss or damage caused by willful misconduct or lack of good faith on the part of the contractor’s principal officials

•Requests for Indemnification will be considered for this acquisition -Offerors will be required to prepare and submit a cost justification package

•Secretary of Army approval is required to include indemnification clause, FAR 52.250-1, and should not be assumed to be guaranteed

•Operating contractor must still maintain both usual and customary commercial insurance coverage for itself, its operations, and its employees

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Quality Assurance

•Standard Compliance Requirements, such as -Quality Management System (QMS) per ISO or Equivalent -Configuration Management -Critical Characteristics Control -Acceptance Inspection Equipment (AIE) -First Article Acceptance Testing (FAAT) -Lot Acceptance Requirement/Lot Acceptance Test Report

(LATR)

-Ammunition Data Card

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

GFE/GFM vs Contractor Furnished

•Items Under Consideration:

-Ammo Cans M2A2 M548

-Weapons & Spare Parts

-Reference Ammunition

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Current Modernization Projects To Date

•Major manufacturing equipment investments -Upgrades to 5.56mm rotary case, bullet, priming, loading -New 5.56mm penetrator fabrication -New 7.62mm case -New cal .50 case, bullet draws, loading and priming -Link manufacture upgrades – All calibers -Packaging improvements – All calibers -New 5.56mm primer assembly including Safe Pack

•Major infrastructure improvements -HVAC buildings 1 & 3 -New Fire and Emergency Service Facility -Building 1 Compressed air system -Steam main replacement

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Planned Modernization Projects

•Major projects under consideration to support current production:

-New Water Treatment Facility -Automation of primer manufacturing -Tracer charging (all calibers) -Facilitization for Lead-Free Primer -Facilitization for Classified Manufacturing -Explosive Manufacturing Upgrades -Plant wide roofing replacements -HVAC energetic manufacturing wings

Planned Projects are Subject to Actual Budgets & Resources

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Potential Future Technologies

• RDT&E Overview

• Approved CDDs for 5.56mm, 7.62mm, and .50 Caliber driving new products to address gaps to:

- Enhance Warfighter Survivability

- Increase Lethality

- Lighten Warfighter Load

- Improve Warfighter Training

• Initial focus is 7.62mm followed by 5.56mm and .50 Caliber

- In addition, Next Generation (NG) systems are being developed in parallel

• Goal will be to transition manufacturing of these products to LCAAP in parallel to a LRIP at the prime Engineering Manufacturing and Development (EMD) contractor location

- Plan to have at least Government Purpose Rights (GPR) – TBD

- Plan to have a detailed Technical Data Package (TDP) – TBD

- Plan to, at a minimum, Load, Assemble and Pack (LAP) at LCAAP - TBD

- Make Buy decision on unique components will be done on a case by case basis

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

2017 2018 2019 2020 2021 2022 2023 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

.50 CAL RRA

.50 CAL APTC

2016 2017 2018 2019 2020 2021 2022 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

5.56mm ADVAP 5.56mm OWL

Potential Future Technologies

2016 2017 2018 2019 2020 2021 2022 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

7.62mm RRA 7.62mm OWL 7.62mm LSCA 7.62mm ADVAP

MDD

PDR

MS-B

CDR

MS-C

Fielding Decision

Lightweight Small Caliber Ammunition (LSCA) [Estimated LCAAP Contract Award FY23] Reduce Warfighter burden

One Way Luminescence (OWL) [Estimated LCAAP Contract Award FY23] Significantly reduced signature preventing threat from tracing round back to shooter while providing Enhanced Performance Round (EPR) effects in the tracer

Enhance Warfighter Survivability & Enhance Lethality

Lighten Warfighter Load

Reduced Range Ammo (RRA) [Estimated LCAAP Contract Award FY24] Reduce maximum range while maintaining tactically relevant training range Improve Warfighter Training

Advanced Armor Piercing (ADVAP) [Estimated LCAAP Contract Award FY20] Provide overmatch capability vs. broad spectrum of hard targets

Increase Lethality

All Purpose Tactical Cartridge (APTC) [Estimated LCAAP Contract Award FY25] Improve .50 caliber capability to include overmatch capability against a broad spectrum of targets;

implement LSCA and OWL

Increase Lethality / Lighten Warfighter Load / Enhance Warfighter Survivability

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Questions

•Based on today’s presentation, industry is invited to provide comments/questions on the upcoming acquisition

•Comments/questions should be submitted via Q&A form on FBO website (www.fbo.gov) by 3 NOV 17 and directed to:

-Contracting Officer at jennifer.n.paul.civ@mail.mil -Contract Specialist at benjamin.j.gillen.civ@mail.mil

•Industry should provide rationale for any comments or concerns mailto:jennifer.n.paul.civ@mail.mil mailto:benjamin.j.gillen.civ@mail.mil

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Conclusion

•All information provided today is TENTATIVE and subject to change

•All information regarding LCAAP acquisition, to include future industry day announcements, draft solicitation, Q&A will be posted on FBO website (www.fbo.gov)

•Search FBO site for “LCAAP” or Solicitation Number "W52P1J-17-R-0141"

•It is the responsibility of the contractors to check this website frequently for the latest information regarding this acquisition

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Acronyms

ACC-RI Army Contracting Command – Rock Island ADVAP Advanced Armor Piercing AIE Acceptance Inspection Equipment AP Armor Piercing API Armor Piercing Incendiary APIT Armor Piercing Incendiary Trace API-DT Armor Piercing Incendiary – Dim Trace APTC All Purpose Tactical Cartridge ARMS Armament Retooling Manufacturing Support Cal Caliber CDD Capability Development Document CDR Critical Design Review CLINS Contract Line Item Numbers CTG(S) Cartridge(s) CTN Carton DO Delivery Order DOD Department of Defense DODICS Department of Defense Identification Codes EMD Engineering & Manufacturing Development EPA Economic Price Adjustment

EPR Enhanced Performance Round F&C Function & Casualty FAAT First Article Acceptance Test FAR Federal Acquisition Regulation FBO Federal Business Opportunities FCL Facility Clearance FFP Firm Fixed Price FOUO For Official Use Only FY Fiscal Year GFE Government Furnished Equipment GFM Government Furnished Material GOCO Government Owned Contractor Operated GPR Government Purpose Rights GWOT Global War on Terror HPT High Pressure Test HVAC Heating Ventilation & Air Conditioning IAW In Accordance With IDIQ Indefinite Delivery Indefinite Quantity IP Intellectual Property ISO International Organization for Standardization

UNCLASSIFIED

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is unlimited

Acronyms

JCP Joint Certification Program JMC Joint Munitions Command LAP Load, Assemble, & Pack LATR Lot Acceptance Test Report LCAAP Lake City Army Ammunition Plant LSCA Lightweight Small Caliber Ammunition LRIP Low Rate Initial Production MDD Materiel Development Decision MFG Manufacturing MOD Modernization MS-B Milestone B MS-C Milestone C NG Next Generation NLT No Later Than NTE Not To Exceed OH Overhead OWL One Way Luminescence PCO Procuring Contracting Officer PDR Preliminary Design Review

PM MAS Project Manager Maneuver Ammunition Systems PoP Period of Performance PPE Personal Protective Equipment PWS Performance Work Statement Q&A Questions & Answers QMS Quality Management System Qty Quantity RDT&E Research Development Test & Engineering RFP Request For Proposal RRTA Reduced Range Training Ammunition SAM System for Award Management SCAMP Small Caliber Ammunition Modernization Program TBD To Be Determined US United States USG United States Government V&P Velocity & Pressure WBD Wire bound WW Waste Water WWII World War II

Industry Day #1
LCAAP Industry Day Agenda
Industry Day Objectives
Disclaimer
Rules of Engagement
LCAAP History
LCAAP Production History
LCAAP Annual Production
General Information
General Information
General Information
General Information
Tentative Acquisition Milestones
Tentative Acquisition Strategy
Tentative Acquisition Strategy
Tentative Performance Work Statements
ARMS Tenants
Projected Pricing Ranges
Requirement CLINS
5.56mm Requirement CLINS
7.62mm Requirement CLINS
Cal .50 Requirement CLINS
Cal .30 and Cal .22 Requirement CLINS
5.56mm IDIQ CLINS
7.62mm IDIQ CLINS
Cal .50 IDIQ CLINS
Anticipated Contract Terms & Conditions
Anticipated Contract Terms & Conditions
Anticipated Contract Terms & Conditions
Indemnification
Quality Assurance
GFE/GFM vs Contractor Furnished
Current Modernization Projects To Date
Planned Modernization Projects
Potential Future Technologies
Potential Future Technologies
Questions
Conclusion
Acronyms
Acronyms

File details come from the government source that posted it. Updated .