LCAAP_Industry_Day__1_-_Briefing_Charts.PDF
PDF 2 MB Posted
- Solicitation number
- W52P1J-17-R-0141
About this file
This briefing document provides details regarding an upcoming solicitation for operation of the Lake City Army Ammunition Plant and associated small caliber ammunition production. The opportunity involves a full and open competition for one facility contract and one production contract with both requirements and indefinite delivery indefinite quantity contract line items. Key estimated dates include industry days in October 2017 and March 2018, release of a draft RFP in June 2018, final RFP release in November 2018, and proposal due date in January 2019. The period of performance is anticipated to be ten to fifteen years beginning in fiscal year 2020 if all option periods and award terms are exercised. The document outlines incumbent contractors, current and planned modernization projects, potential future technologies, and anticipated contract terms such as firm-fixed pricing with economic price adjustments and required delivery timelines.
LCAAP Industry Day #1 - Briefing Charts
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
FINAL
As of 12 OCT 17
Jennifer Paul Jeremy Lucid Dennis Durkin
Todd Townsend Lake City Army Ammunition Plant (LCAAP) 18 October 2017
Industry Day #1
FINAL 12 OCT 17
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP Industry Day Agenda
Day #1 October 18, 2017 o 0830 – 0900: Registration at Hotel o 0900 – 1030:
o Opening Remarks o Tentative Acquisition Strategy o Contract Terms & Conditions o Future Technologies Overview o 1030 – 1045: Break o 1045 – 1115:
o Q&A Session o Tour Preview o 1115 – 1215: Lunch o 1215 – One-on-One Discussions o 15 minute maximum per company o Schedule to be provided with attendance confirmation notice
Day #2 October 19, 2017 o 0800: Depart Hotel on Bus to LCAAP o 0830 – 0900: Safety Briefing, PPE o 0900 – 1200: LCAAP Tour o Building 3 – 7.62mm & Cal .50
Production o Building 1 – SCAMP 5.56mm
Production o Building 8 – Ballistic Range Facility o 1200 – 1300: Lunch o Box lunch on site o 1300 – 1600: LCAAP Tour o Building 35/Explosives Area –
Primers & Pyrotechnics o Building 2 – 5.56mm Production &
Links Manufacturing o Plant windshield tour o 1630: Depart LCAAP on Bus to Hotel
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Industry Day Objectives
•Provide potential offerors with a general program overview
•Initiate dialogue with industry during one-on-one sessions
•Solicit input and comments from industry for use in finalizing a strategy that will ensure a mutually beneficial contract for Government and industry
•Provide attendees the ability to meet potential partners
•Encourage open and continuous exchange of information and ideas throughout this process
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Disclaimer
• Industry Day is for information and planning purposes only. This does not constitute a formal solicitation or a Request For Proposal (RFP). This is not to be construed as a commitment by the Government in any way
• All items are in planning stages. Milestones, timeframes, and quantities are estimates only. The Government is NOT bound by any of the quantities or information presented today
• Do not rely on information presented today in formulating your proposal
• No Government personnel, except for the Contracting Officer, can make any commitments on behalf of the Government
• The Government does not intend to award a contract on the basis of Industry Day or otherwise pay respondents for participation in this event
• Should an RFP be issued, any information contained within the RFP supersedes the information presented at this Industry Day
• This briefing package, along with all information, questions, and answers that are provided as part of this Industry Day, will be posted to Federal Business Opportunities (FBO) website: www.fbo.gov http://www.fbo.gov/
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Rules of Engagement
•The Government will NOT answer verbal questions during the Industry Day briefing
•Questions/Comments must be submitted via the forms provided -Some questions may require additional time for complete response -Q&As will be posted on FBO website -Contractors should not submit questions with proprietary information
•Personal Electronic Devices are NOT permitted at any point
•All questions are to be directed to:
-Contracting Officer at jennifer.n.paul.civ@mail.mil -Contract Specialist at benjamin.j.gillen.civ@mail.mil mailto:jennifer.n.paul.civ@mail.mil mailto:benjamin.j.gillen.civ@mail.mil
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
LCAAP History
•LCAAP was built in the 1940s
•Only Government-Owned, Contractor- Operated (GOCO) small caliber ammunition plant
•During WWII, the plant produced over 2B rounds annually
•In the last 15 years, significant USG and Industry investments in the plant totaling over $650M have resulted in:
-Modernized equipment, facilities and infrastructure
- Increased small caliber ammunition production by over 300% (from 400M rounds/year up to a peak of 1.4B rounds/year)
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Orbital ATKRemington ArmsUSA Olin
GWOT
2001-present
GULF WAR
Plant
VIETNAM
1966-1975
Plants
Indicates LCAAP Production Only (prime contract)
KOREA
1950-1953
Plants
Plants
WWII
1941-1945
LCAAP Production History
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
13 4 18 13 26 37 53 57 60 63 72 79 70 77 70 53 56 48 63 23 38 46 70 120 168 198 217 243 232 222 225 207 173 161 125 117
1035 1048 1093 1098
900 919
1348 1375
1186 1129
1184 1162
RO
U
N
DS
O F
AM
M
U N
TI
O
N (i n M ill io ns
Total Military Ammunition Production at LCAAP FY99-FY16
Cal .50 7.62mm 5.56mm Total
LCAAP Annual Production
FISCAL YEAR
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
General Information
•System for Award Management (SAM)
•All contractors who provide goods/services to Department of Defense (DoD) must be registered in SAM. If you are not registered in SAM, you cannot be awarded a DoD contract
•Website for registering in the SAM is:
http://www.sam.gov
•You may also contact the Federal Service Desk at www.fsd.gov, to request assistance with the SAM registration process http://www.sam.gov/
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
General Information
•Facility Clearance (FCL)
•All contractors who operate LCAAP must be able to obtain a FCL
•It is anticipated that the next contract will require the generation, handling, and storage of classified material up to Secret
•More information regarding the process for obtaining an FCL can be found at:
http://www.dss.mil/isp/fac_clear/per_sec_clear_proc_faqs.html http://www.dss.mil/isp/fac_clear/per_sec_clear_proc_faqs.html
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
General Information
Technical Data Packages (TDPs) •TDPs will be provided after issuance of the Draft RFP
•Drawings for TDPs are restricted and available only to firms registered with US/Canada Joint Certification Program (JCP) -Approximately 2-3 weeks is required for JCP certification -For information on becoming certified, please visit:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defa ult.aspx
•Contractors must obtain an FBO vendor account to access TDPs -Data Custodian identified in the DD2345 can request explicit access to the TDPs and be approved/granted access
-Approximately 2-3 days are required to process each explicit access request https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
General Information
• The Government plans to establish the following data repositories to post documents in support of proposal development:
Virtual Technical Library (VTL)
• Online library to include, but not be limited to:
- Baseline Facility Assessment (BFA)
- Baseline Environmental Conditions Assessment (BECA)
- Manufacturing, operating, and inspection procedures
- Quality performance and test procedures
- Maintenance procedures and records
- Material and component purchase descriptions
On-Site Library (OSL)
• Physical library maintained at LCAAP to include documents and information deemed too sensitive to post online
• VTL and OSL are tentatively scheduled to be established by Summer of 2018
- Individuals may submit requests for access
- PCO will determine validity of request and approve accordingly
- Access may be limited to certain number of individuals per company
• Once established, VTL/OSL rules and instructions will be posted to www.fbo.gov
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Milestones (Subject to Change)
Tentative Acquisition Milestones
INDUSTRY
DAY #1
INDUSTRY
DAY #2
DRAFT RFP
RELEASE
INDUSTRY
DAY #3
FINAL RFP
RELEASE
OCT 17
MAR 18
JUN 18
AUG 18
NOV 18
PROPOSALS
DUE
DISCUSSIONS
(IF NEEDED)
FINAL
PROPOSALS
DUE
CONTRACT
AWARD
JAN 19
MAY 19
JUN 19
SEP 19
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Tentative Acquisition Strategy
•Acquisition Strategy has NOT been formally approved -Cost Benefit Analysis currently being conducted and may influence final Acquisition Strategy
-Plan to finalize by next Industry Day in March 2018
•Full and Open competition, Best Value Tradeoff source selection
•One (1) RFP, One (1) Proposal, and Tentatively Two (2) contracts:
-Facility Contract -Production Contract with both Requirements and Indefinite Delivery, Indefinite Quantity (IDIQ) Contract Line Item Numbers (CLINS)
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Tentative Acquisition Strategy
•Current Production Contract expires for ordering 30 SEP 19 - Final deliveries required NLT 30 SEP 20
•Current Facility Contract expires 30 SEP 20
•One year (01 OCT 19 – 30 SEP 20) allowed for transition
•Period of Performance (PoP) for resultant contracts is TBD Possibilities under consideration include:
-Ten (10) Year (FY20-FY29) if option and full award term are exercised Base Award of 5 years One (1) Evaluated Option Period for 2 years to be exercised at time of award One (1) Evaluated Award Term for up to an additional 3 years
-Fifteen (15) Year (FY20-FY34) if option and full award term are exercised Base Award of 5 years One (1) Evaluated Option Period for 5 years to be exercised at time of award One (1) Evaluated Award Term for up to an additional 5 years
Seeking Industry Feedback on PoP
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Tentative Performance Work Statements
The following Performance Work Statements (PWS) are under consideration to be either indirectly or directly funded
• Indirect: Shall be accomplished by contractor at no direct cost to the Government (i.e., borne by the product)
• Direct: Shall be subject to availability of funds, and may be cost reimbursable IAW FAR 52.216-11; no fees are permitted
1. Support of On-site Government Ballistic Services Office 11. Government Property
2. Goods/Services for On-site Government Personnel 12. Ammunition Materiel Management
3. Army Family Housing 13. Traffic Management
4. Facility Plans, Strategies, and Analyses 14. Occupational Health Clinic
5. Safety 15. Mowing of Vegetation
6. Security/Antiterrorism 16. Mail Services
7. Fire and Emergency Services 17. Propellant Mitigation
8. Maintenance 18. Contract Production Delivery Reporting
9. Environmental 19. ARMS
10. Utilities and Energy 20. Contract Start-Up
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Note: Operating contractor will be required to retain any ARMS agreements beyond 30 SEP 2020
ARMS Tenants
•Armament Retooling and Manufacturing Support (ARMS) scope of work provides for commercial, third party, and tenant use of facilities, with prior Government approval
•Current ARMS agreements:
Company Industry Date of Expiration
Federal Cartridge Co. Sport Ammo 31 MAR 18 Elite Cuisine Food Service 31 MAR 18 American Marksman Manufacturing 07 AUG 18 All Copy Products Printing & Mail 30 SEP 18 Dba Temp Help Prime Contractor 30 SEP 18 MAST Technology Munitions Mfg. 30 SEP 18 BDI Sales, Gen Supply 30 SEP 18 Fastenal Company Material Storage 07 FEB 18 CM Power General Contractor 30 APR 19 IAMAW Labor Union 30 JUN 19 Bullseye International Laundry 30 SEP 19 ECC Professional Services 30 SEP 19 Dba First Impressions Prime Contractor 30 SEP 19 Adecco, N.A. Staffing Services 31 MAR 20 B&R Insulation Environmental Services 30 SEP 20 CMG General Contractor 31 MAR 21 20mm d.b.a (OATK) Defense 30 SEP 24
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Projected Pricing Ranges
Note: Projected quantity ranges are estimates only and should not be construed as a commitment on behalf of the Government
Range Ctg, 5.56mm Family Ctg, 7.62mm Family Cal .22 Family Cal .50 Family
Qty From Qty To Qty From Qty To Qty From Qty To Qty From Qty To
1 150,000,000 300,999,999 20,000,000 50,999,999 200,000 749,999 10,000,000 24,999,999
2 301,000,000 525,999,999 51,000,000 88,999,999 750,000 1,499,999 25,000,000 34,999,999
3 526,000,000 750,999,999 89,000,000 126,999,999 1,500,000 2,999,999 35,000,000 49,999,999
4 751,000,000 975,999,999 127,000,000 164,999,999 3,000,000 4,299,999 50,000,000 59,999,999
5 976,000,000 1,320,000,000 165,000,000 230,000,000 4,300,000 6,000,000 60,000,000 75,000,000
Seeking Industry Feedback on Pricing Ranges
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Requirement CLINS
•Includes all 5.56mm, 7.62mm, .50 Cal, .30 Cal, and .22 Cal families of small caliber ammunition awarded by ACC-RI with the exception of the IDIQ CLINS specified under this contract
•ACC-RI is considering reserving the right NOT to award any item(s) if:
-There are delinquent quantities under contract associated with that caliber
-Contractor does not have existing capability to produce within Government’s required delivery date for particular order without impacting other deliveries
-Contractor cannot produce without Government funded facilitization (perishable tooling excluded), or
-The item is a new item not previously procured under the contract
•Firm-Fixed-Price (FFP) unit prices will be required for multiple volumes in each delivery order
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature N/A Cartridge, 5.56mm, Ball, M855, Reference; Carton
A071 Cartridge, 5.56mm, Ball, M193; Packed 10-Ctgs/10 Round Clip
A075 Cartridge, 5.56mm, Blank, M200, Linked; Packed 200-Ctgs/Belt, Link, Ctg, M27
AB73 Ctg, 5.56, Ball, M855A1&M856A1 Tracer, Linked (4:1); Packed 200Ctgs/Belt,Lk,Ctg,M27
AB74 Cartridge, 5.56mm, Tracer, M856A1; Packed 20-Ctgs/Carton
AB76 Ctg, 5.56, Ball, M855&M856A1 Tracer, Lkd(4:1); Pkd 200-Ctgs/Belt,Lk,Ctg,M27
AC04 Cartridge, 5.56mm, High Pressure Test, M197A1 HPT
5.56mm Requirement CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature A111 Cartridge, 7.62mm, Blank, M82; Packed 100-Ctg/Belt, Link, Ctg, M13, Two (2) Configurations: with Bandoleer and without Bandoleer
A112 Cartridge, 7.62mm, Blank, M82; Packed 20-Ctg/Carton
A122 Cartridge, 7.62mm, NATO, Ball, M80; Packed 20-Ctg/Carton
A129 Cartridge, 7.62mm, HPT, M60:PACK 20 CRTG/CTN:12
A130 Cartridge, 7.62mm NATO, Ball, M80; Packed 5-Ctg/5 Round Clip
A140 Cartridge, 7.62mm NATO, Tracer, M62:PACK 20-CRTG
A146 Cartridge, 7.62mm NATO, Tracer, M62; Packed 100-Ctg/Belt, Link, Ctg, M13
A150 Cartridge, 7.62mm NATO, REFERENCE:PACK 20-CRTG/CTN
A151 Cartridge, 7.62mm, Ball, M80 & Tracer, M62, (OH Fire Application), Linked (4:1)
A164 Cartridge, 7.62mm, Ball, M80; Packed 750-Ctg/Belt, Link, Cartridge, M13
A165 Cartridge, 7.62mm, Ball, M80 and Tracer, M62, Linked (4:1)
A168 Cartridge, 7.62mm, Ball, M80 and Tracer, M62, Linked (9:1)
A255 Cartridge, 7.62mm, 4 Ball, M80, Tracer, M276
A257 Cartridge, 7.62mm Ball, M80: M276 LINK, M13
AA11 Cartridge, 7.62mm, SPECIALBALL, LONG RANGE, M118
AB80 Cartridge, 7.62mm, Ball, M80A1: Packed 5-CTG/5 ROUND CLIP
AB81 Cartridge, 7.62mm, Ball, M80A1: Packed 750-CTG/BELT, LINK, Ctg, M13
AB85 Ctg. 7.62mm Trace M62A1 Linked
AB88 Cartridge, 7.62mm, Ball, M80A1 and Tracer, M62A1, Linked (4:1)
AB89 Cartridge, 7.62mm, Ball, M80A1 and Tracer, M62A1, Linked (9:1)
7.62mm Requirement CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature N/A Cal .50, M33, Reference
N/A Cal .50, Reference (lead free)
A531 Cal .50, API, M8 BULK Pack 120
A541 Cal .50, M20, AP Incendiary Tracer (APIT); Packed 120 Ctgs/Box, M2A1; 2 Box/Wbd
A552 Cal .50, BALL, M33, BULK, 120CRTG
A552 Cal .50, BALL, M33, BULK, 120CRTG/CTN (lead free)
A575 Cal .50 HPT M1:BULK PACK 120-CRTG
A585 Cal .50, APIT, M20, LINKED M9
A606 Cal .50 API MK211-0 Single Round
A607 Cal .50, Linked 4 API MK211 MOD 1 to 1 APIT M20
AA06 Cal .50 MK211/MK263/M20
AA41 Cal .50 MK211/MOD1 SINGLE ROUND
AA42 Cal .50 API-DT MK257 Mod 0 Single Round
AA50 Cal .50 2 API MK211 Mod 1/2AP MK263 Mod 0/1 API-DT MK257
AA58 Cal .50 AP MK263 SINGLE ROUND
AB30 Cal .50 4 API M8/1 API-DT MK257
Cal .50 Requirement CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature
A201 Cartridge, CAL .30 ARMOR PIERCING M2
A222 Cartridge, CAL .30.BLANK, M1909, CTN, BOX, Ammo
AB68 Cartridge, CAL .30 ARMOR TEST PARTS KITS M2A1
CNTNR
A091 Cartridge, Cal .22 Long Rifle Match
Cal .30 and Cal .22 Requirement CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature A059 Cartridge, 5.56mm, Ball, M855; Packed 10-Ctgs/10 Round Clip; Bandoleer, M8
A062 Cartridge, 5.56mm, Ball, M855, Linked; Packed 200-Ctgs/Belt, Link, Ctg, M27
A080 Cartridge, 5.56mm, Blank, M200; Packed 20-Ctgs/Carton
AB56 Cartridge, 5.56mm, Ball, M855A1, Linked; Packed 200-Ctgs/Belt, Link
AB57 Cartridge, 5.56mm, Ball, M855A1; Packed 10-Ctgs/Clip
AB58 Cartridge, 5.56mm, M855A1, Ball (10-Round Clips); Packed 10-Ctg/ Clip
AB77 Cartridge, 5.56mm, M855A1 Clipped Bulk
5.56mm IDIQ CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature
A131 Cartridge, 7.62mm NATO M80 Ball & M62 Tracer, 4:1, packed 100 cartridges/belt
A143 Cartridge, 7.62mm NATO M80 Ball, packed 100 cartridges/belt
AB72 Cartridge, 7.62mm, Blank, M82A1, "Ceremonial" (Bottlenose)
AB79 Cartridge, 7.62mm, Ball, M80A1: Packed 100 CTG/ BELT, LINK Ctg, M13
AB82 Cartridge, 7.62mm, Ball, M80A1: Packed 20-CTG/CARTON
AB84 Cartridge 7.62mm Trace M62A1 : Packed 20-CTG/CARTON
AB86 Cartridge 7.62mm M80A1 Linked 4:1 with M62A1
A159 Cartridge 7.62mm Dummy
7.62mm IDIQ CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
DODIC Nomenclature A555 Cal .50 M33 Ball, packed 100 cartridges/belt
A555 Cal .50 M33 Ball, packed 100 cartridges/belt (lead free)
A557 Cal .50 M33 Ball and M17 Tracer, 4:1, packed 100 cartridges/belt
A557 Cal .50 M33 Ball and M17 Tracer, 4:1, packed 100 cartridges /belt (lead free)
A576 Cal .50, M8 API, M20 APIT AND M9
A598 Cal .50, M1A1 PACK 100-CRTGS
Cal .50 IDIQ CLINS
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Anticipated Contract Terms & Conditions
• FFP contract with Economic Price Adjustment (EPA)
- Government currently considering EPA for copper and zinc as well as currency fluctuation for Mk211 (Projectile)
• Required delivery after Government places an order on contract:
- All DO1 quantity - NTE date is SEP 2021 (regardless of what months awards are made in
FY20)
- All DO2 quantity - NTE is SEP 2022 (regardless of what months awards are made in FY21)
- Everything subsequent SEP would be the NTE date for next delivery order
• Ammunition must be built to U.S. Military Technical Data Packages (TDPs)
• Progress Payments are planned predicated on an adequate accounting system
• Government is considering allowing LCAAP to be used for commercial use
- Use of LCAAP may be allowed for commercial use with PCO approval and consideration
- Government is considering including an evaluation factor for offeror’s compensation to the
Government for use of facility
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Anticipated Contract Terms & Conditions
•Ownership and Data Rights:
-Ownership and rights for all Capital & Intellectual Property vests in the Government for:
All Government furnished property, modifications to Government furnished property, contractor acquired property, and intellectual property
•Pricing:
-Volume level unit prices will be proposed for all DODICs broken out by cartridge and pack out configuration
-Ordering periods correspond to Government fiscal years (e.g., DO 01 = 01 OCT 2019 to 30 SEP 2020)
-Unit prices utilized will reflect cumulative family quantities per ordering period at time of award
-Government will adjust unit prices for DODICS previously issued under that DO for that family, if the change in cumulative family quantity results in reduced price
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Anticipated Contract Terms & Conditions
• Pricing Example (all quantity ranges/prices are for illustration purposes):
• 30 OCT 19, Government issues DO for 45M cartridges of A059 at $0.50 each
• 02 JAN 20, Government issues modification to same DO for 40M cartridges of AA33
• As both DODICs are within 5.56mm family, both of their quantities count towards the cumulative family total, resulting in total family quantity for that DO of 85M cartridges
• 40M cartridges of AA33 are awarded at unit price of $0.34 each and price for the initial 45M cartridges of A059 awarded is adjusted from $0.50 each to $0.48 each
DODIC A059 DODIC AA33
Range
(Millions) Unit Price Range (Millions) Unit Price
1-50 $0.50 each 1-50 $0.39 each 51-99 $0.48 each 51-99 $0.34 each
100-200 $0.46 each 100-200 $0.29 each
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Indemnification
•Clause indemnifies contractor against claims by third persons for death, personal injury, or loss of, damage to, or loss of use of property -Applicable only to claims or losses resulting from “unusually hazardous” risk when the claim or loss is not covered by insurance
-Generally covers two types of risk – explosive and environmental -Excludes loss or damage caused by willful misconduct or lack of good faith on the part of the contractor’s principal officials
•Requests for Indemnification will be considered for this acquisition -Offerors will be required to prepare and submit a cost justification package
•Secretary of Army approval is required to include indemnification clause, FAR 52.250-1, and should not be assumed to be guaranteed
•Operating contractor must still maintain both usual and customary commercial insurance coverage for itself, its operations, and its employees
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Quality Assurance
•Standard Compliance Requirements, such as -Quality Management System (QMS) per ISO or Equivalent -Configuration Management -Critical Characteristics Control -Acceptance Inspection Equipment (AIE) -First Article Acceptance Testing (FAAT) -Lot Acceptance Requirement/Lot Acceptance Test Report
(LATR)
-Ammunition Data Card
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
GFE/GFM vs Contractor Furnished
•Items Under Consideration:
-Ammo Cans M2A2 M548
-Weapons & Spare Parts
-Reference Ammunition
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Current Modernization Projects To Date
•Major manufacturing equipment investments -Upgrades to 5.56mm rotary case, bullet, priming, loading -New 5.56mm penetrator fabrication -New 7.62mm case -New cal .50 case, bullet draws, loading and priming -Link manufacture upgrades – All calibers -Packaging improvements – All calibers -New 5.56mm primer assembly including Safe Pack
•Major infrastructure improvements -HVAC buildings 1 & 3 -New Fire and Emergency Service Facility -Building 1 Compressed air system -Steam main replacement
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Planned Modernization Projects
•Major projects under consideration to support current production:
-New Water Treatment Facility -Automation of primer manufacturing -Tracer charging (all calibers) -Facilitization for Lead-Free Primer -Facilitization for Classified Manufacturing -Explosive Manufacturing Upgrades -Plant wide roofing replacements -HVAC energetic manufacturing wings
Planned Projects are Subject to Actual Budgets & Resources
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Potential Future Technologies
• RDT&E Overview
• Approved CDDs for 5.56mm, 7.62mm, and .50 Caliber driving new products to address gaps to:
- Enhance Warfighter Survivability
- Increase Lethality
- Lighten Warfighter Load
- Improve Warfighter Training
• Initial focus is 7.62mm followed by 5.56mm and .50 Caliber
- In addition, Next Generation (NG) systems are being developed in parallel
• Goal will be to transition manufacturing of these products to LCAAP in parallel to a LRIP at the prime Engineering Manufacturing and Development (EMD) contractor location
- Plan to have at least Government Purpose Rights (GPR) – TBD
- Plan to have a detailed Technical Data Package (TDP) – TBD
- Plan to, at a minimum, Load, Assemble and Pack (LAP) at LCAAP - TBD
- Make Buy decision on unique components will be done on a case by case basis
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
2017 2018 2019 2020 2021 2022 2023 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
.50 CAL RRA
.50 CAL APTC
2016 2017 2018 2019 2020 2021 2022 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
5.56mm ADVAP 5.56mm OWL
Potential Future Technologies
2016 2017 2018 2019 2020 2021 2022 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
7.62mm RRA 7.62mm OWL 7.62mm LSCA 7.62mm ADVAP
MDD
PDR
MS-B
CDR
MS-C
Fielding Decision
Lightweight Small Caliber Ammunition (LSCA) [Estimated LCAAP Contract Award FY23] Reduce Warfighter burden
One Way Luminescence (OWL) [Estimated LCAAP Contract Award FY23] Significantly reduced signature preventing threat from tracing round back to shooter while providing Enhanced Performance Round (EPR) effects in the tracer
Enhance Warfighter Survivability & Enhance Lethality
Lighten Warfighter Load
Reduced Range Ammo (RRA) [Estimated LCAAP Contract Award FY24] Reduce maximum range while maintaining tactically relevant training range Improve Warfighter Training
Advanced Armor Piercing (ADVAP) [Estimated LCAAP Contract Award FY20] Provide overmatch capability vs. broad spectrum of hard targets
Increase Lethality
All Purpose Tactical Cartridge (APTC) [Estimated LCAAP Contract Award FY25] Improve .50 caliber capability to include overmatch capability against a broad spectrum of targets;
implement LSCA and OWL
Increase Lethality / Lighten Warfighter Load / Enhance Warfighter Survivability
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Questions
•Based on today’s presentation, industry is invited to provide comments/questions on the upcoming acquisition
•Comments/questions should be submitted via Q&A form on FBO website (www.fbo.gov) by 3 NOV 17 and directed to:
-Contracting Officer at jennifer.n.paul.civ@mail.mil -Contract Specialist at benjamin.j.gillen.civ@mail.mil
•Industry should provide rationale for any comments or concerns mailto:jennifer.n.paul.civ@mail.mil mailto:benjamin.j.gillen.civ@mail.mil
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Conclusion
•All information provided today is TENTATIVE and subject to change
•All information regarding LCAAP acquisition, to include future industry day announcements, draft solicitation, Q&A will be posted on FBO website (www.fbo.gov)
•Search FBO site for “LCAAP” or Solicitation Number "W52P1J-17-R-0141"
•It is the responsibility of the contractors to check this website frequently for the latest information regarding this acquisition
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Acronyms
ACC-RI Army Contracting Command – Rock Island ADVAP Advanced Armor Piercing AIE Acceptance Inspection Equipment AP Armor Piercing API Armor Piercing Incendiary APIT Armor Piercing Incendiary Trace API-DT Armor Piercing Incendiary – Dim Trace APTC All Purpose Tactical Cartridge ARMS Armament Retooling Manufacturing Support Cal Caliber CDD Capability Development Document CDR Critical Design Review CLINS Contract Line Item Numbers CTG(S) Cartridge(s) CTN Carton DO Delivery Order DOD Department of Defense DODICS Department of Defense Identification Codes EMD Engineering & Manufacturing Development EPA Economic Price Adjustment
EPR Enhanced Performance Round F&C Function & Casualty FAAT First Article Acceptance Test FAR Federal Acquisition Regulation FBO Federal Business Opportunities FCL Facility Clearance FFP Firm Fixed Price FOUO For Official Use Only FY Fiscal Year GFE Government Furnished Equipment GFM Government Furnished Material GOCO Government Owned Contractor Operated GPR Government Purpose Rights GWOT Global War on Terror HPT High Pressure Test HVAC Heating Ventilation & Air Conditioning IAW In Accordance With IDIQ Indefinite Delivery Indefinite Quantity IP Intellectual Property ISO International Organization for Standardization
UNCLASSIFIED
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is unlimited
Acronyms
JCP Joint Certification Program JMC Joint Munitions Command LAP Load, Assemble, & Pack LATR Lot Acceptance Test Report LCAAP Lake City Army Ammunition Plant LSCA Lightweight Small Caliber Ammunition LRIP Low Rate Initial Production MDD Materiel Development Decision MFG Manufacturing MOD Modernization MS-B Milestone B MS-C Milestone C NG Next Generation NLT No Later Than NTE Not To Exceed OH Overhead OWL One Way Luminescence PCO Procuring Contracting Officer PDR Preliminary Design Review
PM MAS Project Manager Maneuver Ammunition Systems PoP Period of Performance PPE Personal Protective Equipment PWS Performance Work Statement Q&A Questions & Answers QMS Quality Management System Qty Quantity RDT&E Research Development Test & Engineering RFP Request For Proposal RRTA Reduced Range Training Ammunition SAM System for Award Management SCAMP Small Caliber Ammunition Modernization Program TBD To Be Determined US United States USG United States Government V&P Velocity & Pressure WBD Wire bound WW Waste Water WWII World War II
| Industry Day #1 |
| LCAAP Industry Day Agenda |
| Industry Day Objectives |
| Disclaimer |
| Rules of Engagement |
| LCAAP History |
| LCAAP Production History |
| LCAAP Annual Production |
| General Information |
| General Information |
| General Information |
| General Information |
| Tentative Acquisition Milestones |
| Tentative Acquisition Strategy |
| Tentative Acquisition Strategy |
| Tentative Performance Work Statements |
| ARMS Tenants |
| Projected Pricing Ranges |
| Requirement CLINS |
| 5.56mm Requirement CLINS |
| 7.62mm Requirement CLINS |
| Cal .50 Requirement CLINS |
| Cal .30 and Cal .22 Requirement CLINS |
| 5.56mm IDIQ CLINS |
| 7.62mm IDIQ CLINS |
| Cal .50 IDIQ CLINS |
| Anticipated Contract Terms & Conditions |
| Anticipated Contract Terms & Conditions |
| Anticipated Contract Terms & Conditions |
| Indemnification |
| Quality Assurance |
| GFE/GFM vs Contractor Furnished |
| Current Modernization Projects To Date |
| Planned Modernization Projects |
| Potential Future Technologies |
| Potential Future Technologies |
| Questions |
| Conclusion |
| Acronyms |
| Acronyms |
File details come from the government source that posted it. Updated .