Att0006SF1408PreawardSurvey.pdf

PDF 35 KB Posted

Attached to
EAGLE APS-2 EAS
Solicitation number
W52P1J-15-R-0195
Issued by

About this file

X

View the file

Other files

File Type Posted
W52P1J15R0195-0005.pdf PDF
Att0005_Cost-PriceMatrix19JAN16.xlsx XLSX spreadsheet
W52P1J15R0195-0004.pdf PDF
W52P1J15R0195-0003.pdf PDF
W52P1J15R0195-0002.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
Att0002_EAS_Staffing_Labor_Mix_v2.xlsx XLSX spreadsheet
W52P1J15R0195-0001.pdf PDF
CDRL PM-13 Project Management Plan.pdf PDF
CDRL SD-03 Retail Supply Management Plan.pdf PDF
Att0009PurchasingandInvoicingGuide.pdf PDF
CDRL PM-12 External Standing Operating Procedures —
CDRL MD-06 Production Control Warranty Claim Status Reporting.pdf PDF
CDRL PM-03 Training Program.pdf PDF
CDRL SD-08 AWRDS Security Matrix.pdf PDF
CDRL CD-04 DD Form 2734-3 Format 3 Integrated Progam Management Report.pdf PDF
CDRL PM-04 Personnel Qualification and Certification Report.pdf PDF
CDRL MD-09 Integrated Master Schedule.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
CDRL PM-15 Environmental Protection and Hazardous Material-Waste Management Plan.pdf PDF
CDRL PM-18 Accident Drug Screening Results Reporting.pdf PDF
Att0018ACC-RIContractingPOCs.xlsx XLSX spreadsheet
CDRL PM-25 Continuous Improvement Plan Qrtly Results.pdf PDF
CDRL SD-06 HAZMAT Management Plan.pdf PDF
CDRL MD-05 Investigation Status Reporting.pdf PDF
CDRL TD-01 Transportation Statistical Data Report.pdf PDF
CDRL PM-20 Work Area Hazard Inspection Reporting.pdf PDF
CDRL PM-29 System Access Request.pdf PDF
CDRL CD-07 Staffing by Cost Center.pdf PDF
CDRL PM-24 Contractor's Equipment Maintenance Plan.pdf PDF
CDRL PM-07 Transition Plan.pdf PDF
CDRL CD-01 Financial Briefing.pdf PDF
CDRL CD-02 Integrated Program Management Report —
CDRL SD-05 Master Storage Plan.pdf PDF
CDRL MD-08 Workload Execution Plan.pdf PDF
CDRL PM-10 OPSEC Plan.pdf PDF
CDRL TD-02 GSA Vehicle Dispatch Record.pdf PDF
CDRL MD-01 Maintenance Management Plan.pdf PDF
CDRL PM-22 Occupational Health Hazard Plan.pdf PDF
CDRL PM-05 Employee Installation Clearing Report.pdf PDF
CDRL PM-32 LIS AWRDS Reporting.pdf PDF
CDRL PM-31 Key Lock Seal Program.pdf PDF
Att0005_Cost-PriceMatrix16DEC15.xlsx XLSX spreadsheet
CDRL SD-07 Excess Stock Level Report.pdf PDF
CDRL PM-17 Safety and Emergency Response Plan.pdf PDF
CDRL MD-04 Monthly and Quarterly Sensitive Items Inventory Reporting.pdf PDF
CDRL PM-06 Contingency Plan.pdf PDF
CDRL CD-03 DD Form 2734-1 IPMR Format 1 Work Break Down Structure.pdf PDF
CDRL MD-02 Inventory of Weapons Locks Keys.pdf PDF
CDRL PM-02 Key Position Resumes.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preaward Survey of Prospective Contractor Accounting System Checklist

[FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, a Preaward Survey of Prospective Contractor’s Accounting System (SF1408) can be requested from DCAA. Before requesting such an audit, it is a good idea to send this checklist to prospective contractor’s for completion to ensure they understand the requirements of the SF1408, and to ensure they are ready for DCAA to come in and perform an audit].

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary

Contractor Name:

Point of Contact (Name/Ph #/Email):

CAGE Code:

READY FOR AUDIT (YES) / (NO):

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost

(FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

>PLEASE ANSWER ALL QUESTIONS BELOW:

>ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO) ______

>ARE YOU READY FOR A DCAA AUDIT? (YES/NO) _____________

>HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) ____________

>HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's >WEBSITE (http://www.dcaa.mil/)? (YES/NO) _____________

>PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR

COMPANY - >(Found on DCAA's website (http://www.dcaa.mil/) _____________________ >PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ eMail)

If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report

>>[Insert name and title of individual responsible for design of the accounting system] Name: ______________________ Signature: ___________________________ Title: ______________________ Date: ______________________________ Contractor: ______________________________________________________________ http://www.dcaa.mil/ http://www.dcaa.mil/

File details come from the government source that posted it. Updated .