CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
General
D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Logistic Support Services W52P1J-15-R-0195
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
PM-24 Contractor’s Equipment Maintenance Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
PWS Para. 1.10.3 COR / PM / Maint Division
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO Annual Draft, 15 days after notice to proceed
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
Notice to Proceed date
See BlK 16 Reg Repro
16. REMARKS KO 1 1
Block 13 – Annually or as changes occur the Contractor shall submit revisions clearly identifying changes. The Government requires 15 days for review and comments for Contractor incorporation into the new submission. The Contractor shall resubmit NLT 15 days after receipt of Government comments.
Contractor format acceptable.
The Contractor’s plan shall describe the Contractor’s approach for the long-term use, systematic care, inspection, and maintenance record keeping concerning Government Furnished Equipment (GFE) and shall describe in detail how the Contractor will manage the following requirements:
a. Identify inspection frequency and intervals for GFE in order to detect wear, impending breakdown, maladjustment, the need for repairs and the replacement of worn or damaged parts.
b. Life-cycle tracking of GFE that requires replacement.
c. Proper preservation, protection, and safeguard of GFE that will not be used for periods of time in order to prevent deterioration, loss, damage, or destruction of GFE while not in use.
ALL DAYS INDICATED ARE CALENDAR DAYS UNLESS OTHERWISE
ANNOTATED.
COR 1
Maintenance Division
1 1
PM 1 1
15. TOTAL 3 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages