CDRL PM-32 LIS AWRDS Reporting.pdf

PDF 31 KB Posted

Attached to
EAGLE APS-2 EAS
Solicitation number
W52P1J-15-R-0195
Issued by

About this file

X

View the file

Other files

File Type Posted
W52P1J15R0195-0005.pdf PDF
Att0005_Cost-PriceMatrix19JAN16.xlsx XLSX spreadsheet
W52P1J15R0195-0004.pdf PDF
W52P1J15R0195-0003.pdf PDF
W52P1J15R0195-0002.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
Att0002_EAS_Staffing_Labor_Mix_v2.xlsx XLSX spreadsheet
W52P1J15R0195-0001.pdf PDF
CDRL PM-13 Project Management Plan.pdf PDF
CDRL SD-03 Retail Supply Management Plan.pdf PDF
Att0009PurchasingandInvoicingGuide.pdf PDF
CDRL PM-12 External Standing Operating Procedures —
CDRL MD-06 Production Control Warranty Claim Status Reporting.pdf PDF
CDRL PM-03 Training Program.pdf PDF
CDRL SD-08 AWRDS Security Matrix.pdf PDF
CDRL CD-04 DD Form 2734-3 Format 3 Integrated Progam Management Report.pdf PDF
CDRL PM-04 Personnel Qualification and Certification Report.pdf PDF
CDRL MD-09 Integrated Master Schedule.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
CDRL PM-15 Environmental Protection and Hazardous Material-Waste Management Plan.pdf PDF
CDRL PM-18 Accident Drug Screening Results Reporting.pdf PDF
Att0018ACC-RIContractingPOCs.xlsx XLSX spreadsheet
CDRL PM-25 Continuous Improvement Plan Qrtly Results.pdf PDF
CDRL SD-06 HAZMAT Management Plan.pdf PDF
CDRL MD-05 Investigation Status Reporting.pdf PDF
CDRL TD-01 Transportation Statistical Data Report.pdf PDF
CDRL PM-20 Work Area Hazard Inspection Reporting.pdf PDF
CDRL PM-29 System Access Request.pdf PDF
CDRL CD-07 Staffing by Cost Center.pdf PDF
CDRL PM-24 Contractor's Equipment Maintenance Plan.pdf PDF
CDRL PM-07 Transition Plan.pdf PDF
CDRL CD-01 Financial Briefing.pdf PDF
CDRL CD-02 Integrated Program Management Report —
CDRL SD-05 Master Storage Plan.pdf PDF
CDRL MD-08 Workload Execution Plan.pdf PDF
CDRL PM-10 OPSEC Plan.pdf PDF
CDRL TD-02 GSA Vehicle Dispatch Record.pdf PDF
CDRL MD-01 Maintenance Management Plan.pdf PDF
CDRL PM-22 Occupational Health Hazard Plan.pdf PDF
CDRL PM-05 Employee Installation Clearing Report.pdf PDF
CDRL PM-31 Key Lock Seal Program.pdf PDF
Att0005_Cost-PriceMatrix16DEC15.xlsx XLSX spreadsheet
CDRL SD-07 Excess Stock Level Report.pdf PDF
CDRL PM-17 Safety and Emergency Response Plan.pdf PDF
CDRL MD-04 Monthly and Quarterly Sensitive Items Inventory Reporting.pdf PDF
CDRL PM-06 Contingency Plan.pdf PDF
CDRL CD-03 DD Form 2734-1 IPMR Format 1 Work Break Down Structure.pdf PDF
CDRL MD-02 Inventory of Weapons Locks Keys.pdf PDF
CDRL PM-02 Key Position Resumes.pdf PDF
CDRL SD-04 Shelf Life Management Plan.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

General

D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Logistic Support Services W52P1J-15-R-0195

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

PM-32 LIS/AWRDS Reporting

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

PWS Para. 5.3.1 COR / PM

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

No As Needed See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

See block 16 See block 16 Reg Repro

16. REMARKS COR 1

Block 10 – As needed.

Block 11 – As needed.

Block 12 – As needed.

Block 13 – As needed.

Required format as exported from applicable LIS.

a. The Contractor shall produce reports within the timelines outlined in AR

750-1, AR 700-138, DA PAM 750-8, AR 710-2, DA PAM 710-2-1, DA

PAM 710-2-2, or as directed by the COR or Division Chief, Program Manager and Army Material Command (AMC) guidance to meet requirements.

b. The Contractor shall produce various logistics reports (standard LIS or custom as needed) in order to provide maintenance management information to the COR, PM or Division Chief as soon as practical not to exceed 4 hours of request or as indicated by COR.

c. The Contractor shall produce ADHOC queries (standard LIS or custom as needed) in order to provide maintenance management information to the COR as soon as practical not to exceed 24 hours (not including non-duty days) of request or as indicated by COR.

d. Reports required may include: COP Chart, SITREPs, Commander’s Brief, various ‘trackers’, FOI reports, excess reports, radiation test and tracking, historical reports, 026 print and briefing, daily draw/turn in schedule, RAM report, USR reporting, various data calls, NMC report, CCIR, work order detail, ORL report. Templates will be provided when applicable.

ALL DAYS INDICATED ARE CALENDAR DAYS UNLESS OTHERWISE

ANNOTATED.

Maintenance Division

Supply Division 1

Program Management

15. TOTAL 3 3

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

General

File details come from the government source that posted it. Updated .