Att0001_PWS-EAS.pdf

PDF 1 MB Posted

Attached to
EAGLE APS-2 EAS
Solicitation number
W52P1J-15-R-0195
Issued by

About this file

X

View the file

Other files

File Type Posted
W52P1J15R0195-0005.pdf PDF
Att0005_Cost-PriceMatrix19JAN16.xlsx XLSX spreadsheet
W52P1J15R0195-0004.pdf PDF
W52P1J15R0195-0003.pdf PDF
W52P1J15R0195-0002.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
Att0002_EAS_Staffing_Labor_Mix_v2.xlsx XLSX spreadsheet
W52P1J15R0195-0001.pdf PDF
CDRL PM-13 Project Management Plan.pdf PDF
CDRL SD-03 Retail Supply Management Plan.pdf PDF
Att0009PurchasingandInvoicingGuide.pdf PDF
CDRL PM-12 External Standing Operating Procedures —
CDRL MD-06 Production Control Warranty Claim Status Reporting.pdf PDF
CDRL PM-03 Training Program.pdf PDF
CDRL SD-08 AWRDS Security Matrix.pdf PDF
CDRL CD-04 DD Form 2734-3 Format 3 Integrated Progam Management Report.pdf PDF
CDRL PM-04 Personnel Qualification and Certification Report.pdf PDF
CDRL MD-09 Integrated Master Schedule.pdf PDF
Att0015SECRETFacilityClearance.docx DOCX document
CDRL PM-15 Environmental Protection and Hazardous Material-Waste Management Plan.pdf PDF
CDRL PM-18 Accident Drug Screening Results Reporting.pdf PDF
Att0018ACC-RIContractingPOCs.xlsx XLSX spreadsheet
CDRL PM-25 Continuous Improvement Plan Qrtly Results.pdf PDF
CDRL SD-06 HAZMAT Management Plan.pdf PDF
CDRL MD-05 Investigation Status Reporting.pdf PDF
CDRL TD-01 Transportation Statistical Data Report.pdf PDF
CDRL PM-20 Work Area Hazard Inspection Reporting.pdf PDF
CDRL PM-29 System Access Request.pdf PDF
CDRL CD-07 Staffing by Cost Center.pdf PDF
CDRL PM-24 Contractor's Equipment Maintenance Plan.pdf PDF
CDRL PM-07 Transition Plan.pdf PDF
CDRL CD-01 Financial Briefing.pdf PDF
CDRL CD-02 Integrated Program Management Report —
CDRL SD-05 Master Storage Plan.pdf PDF
CDRL MD-08 Workload Execution Plan.pdf PDF
CDRL PM-10 OPSEC Plan.pdf PDF
CDRL TD-02 GSA Vehicle Dispatch Record.pdf PDF
CDRL MD-01 Maintenance Management Plan.pdf PDF
CDRL PM-22 Occupational Health Hazard Plan.pdf PDF
CDRL PM-05 Employee Installation Clearing Report.pdf PDF
CDRL PM-32 LIS AWRDS Reporting.pdf PDF
CDRL PM-31 Key Lock Seal Program.pdf PDF
Att0005_Cost-PriceMatrix16DEC15.xlsx XLSX spreadsheet
CDRL SD-07 Excess Stock Level Report.pdf PDF
CDRL PM-17 Safety and Emergency Response Plan.pdf PDF
CDRL MD-04 Monthly and Quarterly Sensitive Items Inventory Reporting.pdf PDF
CDRL PM-06 Contingency Plan.pdf PDF
CDRL CD-03 DD Form 2734-1 IPMR Format 1 Work Break Down Structure.pdf PDF
CDRL MD-02 Inventory of Weapons Locks Keys.pdf PDF
CDRL PM-02 Key Position Resumes.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W52P1J-15-R-0195

A P S - 2 E U R O P E A N A C T I V I T Y S E T L o g i s t i c s S u p p o r t S e r v i c e s

Performance Work Statement

Maintenance Supply

Transportation Services

16 December 2015

E U R O P E A N A C T I V I T Y S E T P e r f o r m a n c e W o r k S t a t e m e n t

December 2015 Page i

T H I S P A G E I N T E N T I O N A L L Y L E F T B L A N K

December 2015 Page ii

C O N T E N T S

SECTION TITLE

C–1 General Requirements

C–2 Definitions, Acronyms & Abbreviations

C–3 Government Furnished Property & Services

C–4 Contractor-Furnished Facilities & Services

C–5 Performance Work Statement & Performance Requirements Summary

C–6 Publications and Forms

December 2015 Page iii

December 2015 Section C – 1 Page i

S E C T I O N C - 1

G e n e r a l R e q u i r e m e n t s

1.1 Introduction C – 1 Page 1

1.2 Scope of Effort C – 1 Page 2

1.3 Contractor Personnel Requirements C – 1 Page 4

1.4 Contractor Planning, Resource Management C – 1 Page 10

1.5 Physical Security, Anti-terrorism & Operations Security C – 1 Page 13

1.6 Quality Program Requirements C – 1 Page 17

1.7 Environmental Requirements C – 1 Page 18

1.8 Safety Requirements C – 1 Page 19

1.9 Intellectual Property / Data Rights C – 1 Page 22

1.10 Administrative Requirements C – 1 Page 23

1.11 Automated Systems C – 1 Page 25

1.12 Other Direct Costs C – 1 Page 26

December 2015 Section C – 1 Page ii

December 2015 Section C – 1 Page 1

1.1 Introduction

1.1.1 The Army Prepositioned Stocks (APS)-2 European Activity Set (EAS) is comprised of combined-arms, battalion-sized groups of vehicles and equipment pre-positioned in Europe designed to equip Army regionally-aligned forces when they rotate into theater for training, disaster relief, theater security or contingency operations. This pre-positioning of vehicles and equipment in theater enables the Army to save time, money and resources by only rotating personnel into theater.

This successful strategy has enabled the Chief of Staff of the Army’s intent of having Continental United States (CONUS) forces train in a Multi-National environment. Additionally, the Defense Planning Guidance (DPG) directed the rotation of forces to Europe to reinvigorate the US participation in the NATO Response Force (NRF) and train US rotational forces in a multinational training environment at JMTC and Europe. The EAS program will be similar to existing APS operations and is approved to support exercises and theater engagement and equipment for Humanitarian Assistance/Disaster Relief (HA/DR).

1.1.2 The U.S. Army Sustainment Command (ASC) is responsible for maintaining EAS Stocks at Army Standard -10/-20 condition in accordance with Army Regulation (AR) 750-1, Chapter 3 and TM 38-470. EAS stocks are currently stored at Coleman Worksite (formerly Coleman Barracks), Mannheim and at the Grafenwoehr Training Area in southeastern Germany, home to the Army’s only permanently forward-based training command, the 7th Army Joint Multinational Training Command.

The main work effort will largely be performed on and in the vicinity of the two locations; however, as additional sites in Europe (to include Eastern Europe) become operational (non-expeditionary – not requiring additional services such as life support or facilities maintenance/improvement) those sites may be added to this effort. Conversely, sites may be removed from this effort as the mission changes. Travel may be required to support the effort and changes in the locations may occur as the Army’s strategy evolves. The 405th Army Field Support Brigade or the Army Field Support Battalion

– Germany (AFSBn-Germany) will identify any travel requirements under this effort. The COR must concur with the travel requirement and the KO must approve the request. These activities will directly and indirectly support training of forces, preparing forces for deployment, sustainment and redeployment in support of current conflicts, reset forces, and to rebuild readiness for future deployments and contingencies to meet the demands of a persistent conflict in the 21st Century. The goal of this performance work statement (PWS) is to obtain efficient, cost-effective services through continuous improvement programs and use industry best practices where applicable while ensuring compliance with all applicable laws, rules and regulations. Customers for this effort may include the Department of the Army, Coalition partners, foreign governments, and other Department of Defense agencies. Functional and programmatic services may be required by any Army organization, at any level, including Army Commands (ACOM), Army Service Component Commands (ASCC), and Direct Reporting Units (DRU) as well as other U.S. Agencies, Coalition partners, foreign governments with whom the Army has entered into an agreement.

1.1.3 The United States Government uses a performance based format to provide the descriptions, instructions, and references in this document. Each section of this document contains a table of contents where the primary task areas / actions/ requirements are identified (Section 5 in particular). This approach relies upon the experience of knowledgeable contractors to employ innovative techniques necessary to deliver successful work plans, staffing strategies and management approaches. As such, not all actions, responsibilities, requirements, constraints, or considerations associated with working in this flexible work environment are addressed.

Requirements in each performance area (general, maintenance, supply, and transportation) identify the required service or deliverable. The Government provides additional details or references when experience indicates a need exists to drive a specific effective and efficient outcome. The presence of

December 2015 Section C – 1 Page 2 these additional details or the absence of these details reflect the performance-based nature of this format and should not be construed to mean this performance based document lists all implied tasks necessary to achieve the successful level of performance. Referenced publications, regulations, and guidance in this PWS provide specific performance metrics; the contractor, subcontractors and its agents or representatives (herein the contractor) must adhere to those metrics unless specific relief has been given, in writing, by the contracting officer. Failure to meet the contract requirements (i.e.

metrics, such as work exceeding the times stated in the maintenance allocation chart or standards identified in this document), may result in a corrective action request (CAR), contract discrepancy report (CDR), cure notice, and loss of fee or termination.

1.1.4 All work under this effort is subject to periodic inspection and on-the-spot performance assessment. All performance assessments and periodic inspection results will be supplied in writing describing the positive, neutral or negative results or determination(s). In the event the contractor is found to have failed to comply with contract requirements, corrective action will be initiated. The corrective action process will be governed by the applicable rules and regulations and administered by the Contracting Officer’s Representative (COR). Minor issues will normally be handled onsite with a Corrective Action Request (CAR) being issued at the discretion of the COR. For more serious issues and unresolved minor issues (to include repetitive minor problems) the COR may issue the contractor a CDR through the KO (Contracting Officer). The KO will present the CDR to the contractor with instructions. The Government reserves the right to seek consideration in the event of un-resolved contract discrepancies and serious incidents impacting the effort.

1.2 Scope of Effort

1.2.1 The contractor shall provide the appropriate amounts of qualified labor and management necessary to perform all logistics support services (to include functions required to perform named tasks) ordered under this task order in a cost effective, safe and environmentally sound manner. In the event qualified personnel cannot be hired, the contractor is obligated to inform the COR and KO of its mitigation strategy to provide training and estimated time to fully train personnel. This training must be provided at no additional cost to the Government, including labor costs during this training, unless approved by the KO. This support will focus primarily on the following areas: Materiel Maintenance, Supply Services, Transportation, and the associated logistics analysis and management functions in support of the EAS mission. All current and future EAS requirements for Maintenance, Supply, and Transportation services at locations across Europe are contemplated under this task order as the locations become operational (non-expeditionary). Additionally, non-EAS requirements emerging within APS-2 determined suitable for contracting are contemplated under this task order.

1.2.2 Work performed under this task order is not limited by current customer lists, program names or acronyms, or funding sources. All work within the scope of the effort in support of EAS and some future APS-2 requirements is contemplated for inclusion in this task order. In the event non- EAS requirements emerge and can be supported by the same workforce as those supporting the EAS requirement, the contractor shall consider reallocation as its primary alternative to support. No additional personnel shall be hired to specifically support non-EAS missions unless specifically authorized by the KO. The preponderance of work under this task order will be conducted by the contractor at or in Government-owned and furnished facilities (GFF); support is to be provided throughout Coleman Worksite and the Grafenwoehr training area and its adjacent areas (with additional sites to be added, as the mission evolves). These areas will include: unit facilities;

range/field locations; other Government facilities; and by exception, at off-post / to-be-determined locations.

December 2015 Section C – 1 Page 3

1.2.3 The contractor will be the primary logistics provider for the EAS mission and shall be responsible for all aspects of performance. This Performance Work Statement provides a general depiction of the types and kinds of non-personal services that may be ordered. Contractor personnel are employees selected by the contractor and solely under its administrative control and supervision.

The specific efforts required of the contractor are those task areas detailed in this document. The contractor will perform non-personal services in these primary areas. The contractor will be required to ensure all supporting requirements (implied tasks) required to fulfill the primary task areas are accomplished to standard using industry best practices, while continuously working toward reducing costs without increasing risk or sacrificing quality. The contractor shall ensure compliance with all applicable local, state and federal laws, regulations and policies. In the event of a conflict between any law, ordinances, construction codes, or regulations, the more stringent rule shall apply. Additionally, the contractor will ensure all work meets critical reliability rates or tolerances specified either in the PWS, identified by industry best practice, applicable technical manual or other publication cited within this document.

1.2.4 The Army’s Materiel Enterprise and supporting programs continue to evolve and are directly linked to continued Army operations. Support requirements will continue to change over the life of this task order. Efforts may increase, decrease or cease as Contingency Operations and/or Army restructure and support plans are carried out. The contractor’s roles, responsibilities mission and functional areas will likely change, while still remaining within the general scope of this PWS.

Additionally, there may be instances at the installation or area of support that preclude specific maintenance, supply or transportation functions from being incorporated into this task order. The contactor must understand some exclusion(s) of the aforementioned functions may exist. The information set forth herein is not necessarily all-inclusive and will typically change throughout the life of this contract to keep pace with program decisions, service requirements and technology.

1.2.5 The estimated installation logistics workload is provided at Technical Exhibit (TE) 1 M-S-T Minimum Functional Labor Category 1 Hours. While this information is the best available at present, actual workload during the period of performance will vary from both the historical and projected figures. The EAS workload is comprised of planned and unplanned requirements causing the workload fluctuations. It is anticipated that the workload will also vary based on operational tempo and the natural cycle of the beginning and ending of logistics programs. In addition to these cyclic changes, manning levels may require change due to program funding levels and budgets constraints.

Therefore, the contractor must adjust manning levels in accordance with mission/resource analysis and to stay within funding levels. The Government will provide the contractor as much advance notice of workload changes as possible, however, workload variations may occur with little advanced notice. The contractor shall plan for and respond to changes in workload requirements and the resulting changes to manning levels.

1.2.5.1 The contractor, shall establish a core staff level capable of providing all critical mission capabilities involved with running the EAS program. This element provides the staffing and expertise necessary to plan and execute all critical EAS functions required during a period when there is limited activities being performed. Contractor shall support elements of the Army War Reserve Deployment System (AWRDS) and the Logistics Modernization Program (LMP) & Global Combat Service Support- Army (GCSS-Army). The possibility of shortened unit deployments and unit managed equipment could drive a surge or increase in contractor personnel.

1.2.5.2 Due to the cyclical nature of the workload, the contractor may be required to temporarily re-allocate workforce to other locations to support other APS-2 equipment. The contractor shall provide the Government a summary of an analysis of alternatives (including but not limited to

December 2015 Section C – 1 Page 4 staffing as temporary duty compared to establishing a permanent presence) prior to executing. The Government shall make the decision whether or not to order such reallocation. The Government may consider factors other than cost in evaluating a proposal and deciding whether or not to issue a notice to proceed.

1.2.6 RESERVED

1.2.7 Given the nature of logistics support, the near certainty of fluctuation, and the complexity of the program, robust accounting processes/procedures are paramount to the successful administration of this effort. Support is resourced by base funding, unit funding (sometimes referred to as reimbursable) and in certain instances other to-be-determined sources. Due to the nature of this complicated funding situation the need for accurate tracking of multiple, simultaneous funding streams is required. The contractor shall ensure accurate tracking, invoicing and reporting of all funding on a reoccurring basis, typically not to exceed once per week. In some instances the frequency of reporting may be inversely proportional to the level of incremental funding applied to the effort (e.g., less funding may require more frequent reporting). The contractor shall ensure its accounting processes are able to support multiple jobs, shops, customers. All contractor employees must have the ability to accurately apply time for services rendered to the applicable 'job' and ultimately to the appropriate funding allocation. Additionally, in order to accurately and fairly apply the overall project costs across the effort, the contractor shall ensure it follows the prescribed method for applying Project Management costs. In some instances this will require the contractor to apply the Project Management cost elements proportionally across all CLINs or specified CLINs. Failure to accurately report or to properly assign employee time to the correct line of funding will be grounds for adverse contract action up to and including termination.

1.3 Contractor Personnel Requirements

1.3.1 The services provided under this contract are strictly non-personal in nature. Under this contract, no employer-employee relationship will exist between the Government and the contractor and/or between the Government and the contractor’s employees. No contractor employee will be directly supervised by the Government. All individual employee assignments, and daily work direction, shall be given by the contractor. If the contractor believes any Government action, inaction or communication would create a personal services relationship, or appearance of, between the Government and any contractor employee, the contractor shall promptly notify the contracting officer. Additionally, the contractor shall ensure all contracted employees fully understand the Government–contractor relationship. All contractor employees must be fully aware that Government personnel do not have direct authority over contractor personnel. Additionally, all contractor employees must fully understand that only the KO has the authority to change the terms of the contract, only the KO has authority to direct work, and both the KO & COR can provide guidance.

1.3.2 The contractor shall provide the appropriate amount of personnel with required training, skills and experience in order to accomplish the work required under this PWS. Additionally, the contractor must exercise due diligence in its hiring practices to validate required skills and ensure employee probity. Moreover, the contractor shall provide its employees with detailed instruction on Government policies and regulations in the areas of safety, security, and environmental compliance as they pertain to the operations specified or implied in this PWS and subsequent modifications. The contractor shall not allow any employee that is not certified, trained or licensed for a particular task to perform such work.

December 2015 Section C – 1 Page 5

1.3.2.1 The Government has determined that certain positions, for the purpose of ensuring the contractor can satisfy minimum experience, education and/or credential requirements are deemed key and essential. A list of these positions is provided at TE 1G-005 Key and Specified Non-Key Positions. The contractor shall provide the definitive listing and associated resumes of all its key personnel to the contracting officer within ten (10) calendar days after notice to proceed date. Key positions must be filled within 24 hours of being vacated, as a temporary mitigation, and filled within 30 days with a permanent employee. The Contracting Officer’s Representative (COR) must be notified immediately upon temporary replacement of key personnel and the contracting officer must be notified within 72 hours. Key personnel will not be permanently replaced without prior notification of the contracting officer. Prior to employment, the contractor will provide a resume for personnel proposed to permanently fill key positions. The Government reserves the right to review contractor employee qualifications. Contractor personnel that are in, or expected to fill, a key position that requires a SECRET security clearance will have the clearance at the time of the notice to proceed unless otherwise noted. Named Key Positions are to be not less than one (1) FTE each and may not be ‘dual – hatted’ with other Key Positions except during transition-in or the transition of another named Key Position not to exceed 30 days.

CDRL PM-01: Contractor Employee Information CDRL PM-02: Key Position Resumes

1.3.2.1.1 The Government has also determined that certain positions vital to the effort may require specific attributes for success of the effort. Although these positions are not key, the Government has determined that these specified non-key personnel are likely to have skills or knowledge that is distinct to supporting this effort and are needed to enhance mission performance and allow flexibility within each task area. These specified non-key positions are listed at TE 1G-005 Key and Specified Non-Key Positions. The contractor need not provide resumes for non-key personnel but shall provide CDRL PM-01: Contractor Employee Information List identifying these positions.

CDRL PM-01: Contractor Employee Information List

1.3.2.1.2 Technical Expert Status Accreditation in Germany Contractor employees hired for positions in Germany as Technical Experts must be accredited by host nation authorities Technical Expert Status Accreditation (TESA) in accordance with procedures established in Article 73 of the Supplementary Agreement (SA) to the NATO Status of Forces Agreement, managed by the Department of Defense Contractor Personnel Office, Schwetzingen, Germany. The contractor is responsible for creating position descriptions for submittal to DOCPER, Germany, for all positions that require TESA accreditation.

1.3.2.1.3 The contractor shall provide first line supervisors required for completion of the PWS requirements. Typical supervisory duties include tasks such as, but not limited to: conducting employee orientation and training; assigning work; evaluating and rewarding performance;

counseling and taking corrective action; reviewing and approving time records; reviewing and approving time off / leave requests; resolving complaints; developing the staff; mentoring, and coaching / motivating to establish an effective team; resolving issues and recommending actions to improve delivery of services to the customers; participating in or conducting meetings; evaluating plans; and preparing reports, plans, and working instructions.

1.3.2.2 The contractor shall establish and maintain an appropriate employee occupational reliability program (ORP). The ORP, a formal security and safety reliability program, will serve to ensure that individuals working in positions afforded access to certain materials, facilities, and programs are contractor-certified to meet the highest standards of reliability and physical and mental suitability before such access is granted. The ORP must identify which positions are required to be certified in

December 2015 Section C – 1 Page 6 accordance with the appropriate local guidance, Federal laws, and Army regulations (e.g., AR 190-11 for arms, ammunition and explosives). The contractor shall ensure all required interviews, background checks, and forms are up to date and on file at all times. Requirements vary by activity;

therefore, the contractor shall be responsible for determining the training, documentation and suitability for its employees and shall comply appropriately. The contractor’s ORP is subject to Government review. Failure to establish and maintain a suitable ORP will be grounds for negative contract actions up to and including termination.

1.3.2.3 The contractor shall develop a training program addressing both Government training and contractor-provided training to ensure contractor personnel are trained and required skills are maintained to accomplish the requirements of this effort. Additionally, the contractor will be advised of mandatory Government sponsored training (e.g., anti-terrorism training) and shall request, in writing, authorization for additional training to be approved by the KO. The Government will, at its discretion, provide training to support new systems and upgrades to existing systems and equipment required to be fielded. All contractor personnel attending cost-reimbursable seminars, symposiums, or user group conferences must be justified by the contractor that attendance is mandatory for the performance of a task order requirement and must have COR concurrence and KO approval.

Approvals will be obtained in accordance with FAR 31.205. The contractor shall maintain records of all accomplished training.

CDRL PM-03: Training Program

1.3.2.4 The contractor shall provide a licensing / certification program that validates the abilities of contractor personnel to operate the vehicles and equipment necessary for use during this effort. In accordance with Department of Defense Directive (DODD) 4500.36-R, DOD contractor personnel shall comply with state licensing requirements and local motor vehicle laws. Contractor employees assigned to operate Government furnished equipment in the performance of this contract must be certified, by the contractor and at the contractor's expense, as being fully qualified to operate the vehicles or equipment to which they are assigned. Contractor personnel who operate Government furnished equipment shall possess a valid driver’s license or an appropriate Commercial Driver’s License (CDL) or host nation/European Union equivalent, if required. The Optional Form 346, U.S.

Government Motor Vehicle Operator’s Identification Card, will not be used as a substitute to the certification documentation requirement or electronic equivalent. A record of required licensing / certification(s) and status of each employee will be available to the Government upon request during normal business hours or at any time following damage, destruction to Government property or following any contractor or Government employee injury resulting in lost time from work or requiring medical attention.

CDRL PM-04: Personnel Qualification and Certification Report

1.3.2.5 The contractor shall ensure new or reassigned personnel are familiar with Government specific environmental, safety, and emergency rules, regulations, and procedures such as AR 600-63, Army Health Promotion, installation smoking policy; installation safety and fire prevention; Hazard Communication (HAZCOM) and Hazard Waste and Emergency Response (HAZWOPER) guidance;

Threat Awareness and Reporting Program (TARP); severe weather delay and base closure reporting responsibilities.

1.3.2.6 The contractor shall ensure all contractors with security clearances receive annual TARP training by a counter intelligence (CI) agent or other trainer as specified in AR 381-12.

1.3.3 The contractor shall ensure that all contractor personnel meet the physical requirements to perform the function(s) and task(s) to which they are assigned. This may include performing work

December 2015 Section C – 1 Page 7 in conditions of inclement weather, extreme heat and cold, high/low humidity, blowing sand and dust, and working in confined spaces and at heights.

1.3.4 Contractor employees or representatives will, at all times, be clearly identified as such and must be distinct from Government personnel. Contractor employees shall not act, advertise, or willfully appear to be Government employees, agents, or representatives. Contractor employees are required to appropriately identify themselves as contractor employees. Contractor employees will be introduced as contractor personnel and must wear contractor furnished identification badges that display the employees name, photograph and company name in a conspicuous place on exterior clothing, above the waist, except when safety or health reasons prohibit. Upon termination of this contract or the employment of any individual, the contractor shall destroy the affected individual’s badge(s). Additionally, contractors will, when appropriate, wear assigned hard hats of the appropriate/assigned color, as determined by the EAS representative based on functional area or status. For additional guidance reference Army Contracting Agency Contracting in the Workplace Guide at: www.atsc.army.mil/tcmlive/srp/downloads/ContractorsintheWorkplace.doc

1.3.5 Contractor personnel shall be appropriately dressed, including individual protective clothing and equipment, for the work to be performed. At no time will contractor employees, or representatives wear or display any clothing, garment or accessory that is offensive, racial, gang-related, otherwise derogatory, or contrary to the Army values. Government rules and policies, regulations, laws, directives and requirements which are in place or issued during the contract term relating to law, order, and security shall be applicable to all contractor employees. Contractor personnel who violate such rules, policies, regulations, laws, directives or requirements may be denied access to the installation, either temporarily or permanently. The contractor shall provide employees with appropriate dress code information for their required functional area.

1.3.5.1 Contractor employees, while in a duty status, will be professionally dressed at all times. Male contractor employees shall wear long pants (no ‘clam diggers’, shorts, or athletic pants), collared shirts (long or short sleeve with no large logos or commercial designs other than the contractor’s insignia/name) and closed-toed shoes unless otherwise required due to work being performed (i.e.

coveralls). Female contractor employees shall be clean in appearance, with appropriate pants / pant-skirts and closed toed shoes. Female contractor employees shall wear appropriate collared blouse, sweater or other appropriate garments (long or short sleeve with no large logos or commercial designs other than the contractor’s insignia/name) unless otherwise required due to work being performed (i.e. coveralls). However, leggings, yoga pants and other types of athletic or faddish clothing are not authorized. All employees’ clothing must be generally free of rips, tears, significant stains or other damage.

1.3.5.1.1 Contractor employees shall not wear Bluetooth headsets while on a duty status. Headgear such as baseball hats are not authorized except as issued by the contractor for wear while on duty (i.e. bump caps). Personally owned headgear for use in hot (direct sun), inclement or cold weather is authorized provided it is in good taste and not contrary to the effort. All headgear (hats) will be worn as intended, straight and square on the head. Backwards or off-center wear, addition of bandanas, or other decorations is not permitted (exception: military insignia (e.g. parachutist badge) or other military affiliation is authorized if in good taste and not contrary to the effort).

1.3.6 The contractor shall not hire any person whose employment would result in a conflict of interest or employment that is prohibited by the latest Department of Defense Directive (DoDD) 5500.7.R entitled “Joint Ethics Regulation”.

December 2015 Section C – 1 Page 8

1.3.7 The contractor shall not employ persons considered by the Government to be a potential threat to the health, safety, security, general well-being, or mission of the Installation and its population.

1.3.8 Employment of off-duty military personnel or Government civilian personnel is permissible provided such employment does not contravene the policies set forth in DoD Joint Ethics Regulation 5500.7-R as determined by local Staff Judge Advocate (SJA).

1.3.9 The contractor shall ensure all employees working under this effort possess basic proficiency in the English language (reading & writing) if required to interface at any time with Government employees, other contractors or members of the Military. Additionally the contractor shall ensure all employees possess basic arithmetic, typing/keyboarding, customer service skills required to accomplish assigned tasks.

1.3.10 Contractor employees shall not loiter in any working or patron area. Upon completion of their assigned duties, employees will depart the facility, if not their regular place of duty, and if no follow on actions are required within a reasonable amount of time. Only authorized personnel are to be present in contractor work areas.

1.3.11 The contractor shall establish and maintain a drug-free workplace. The contractor shall ensure all employees are drug-free, verified prior their start of work on this effort. The contractor will establish a random drug screening program with testing (≥10% of its employee population per month) that requires every employee to be tested at least once yearly or as allowed by host nation laws / European Union directives. The contractor will not allow any employee who is in possession of, or who is under the influence of, alcohol or illegal / hazardous drugs to perform work under this effort. Additionally, the contractor will follow testing guidelines of AR 600-85 & DoDI 1010.16 and the Department of Health and Human Services (HHS) mandatory guidelines for Federal Workplace Drug Testing Programs for all Testing Designated Positions (TDPs).

1.3.12 All contractor employees assigned or designated for key positions that require a Secret security clearance will obtain it prior to start of work. Other contractor personnel must possess the appropriate security clearances as prescribed in the DD 254 provided for this effort prior to start of work. Upon notification that an employee has been denied a Secret security clearance or is in any manner incapable of obtaining a Secret security clearance that employee will be removed from performance on this contract. Any deviation from this standard will be defined in subsequent modifications. Contractor employees with access to restricted areas or classified data will be subject to additional security requirements. Upon request, the contractor shall ensure employees complete questionnaires and other forms for applicable security levels. Failure to obtain required security clearances will not constitute a reason for non-performance. The Government will not sponsor interim clearances. Contractor personnel that are in or expected to fill a position requiring a security clearance, as identified in TE 1G-005, shall have the appropriate security clearance prior to starting work. The contractor is responsible to ensure anyone requiring access to information has the appropriate clearance.

1.3.13 All contractor personnel required to access a Government installation or computer network in performance of their duties under this effort must possess a Common Access Card (CAC) if otherwise eligible; non-CAC eligible contractor employees must possess the appropriate Government issued identification for entry to the installation (e.g. DA Form 1602), as required. The Government will issue a CAC to all qualified contractor employees performing work under this contract in accordance with Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and

December 2015 Section C – 1 Page 9

Budget (OMB) guidance M-05-24, Federal Information Processing Standards Publication (FIPS PUB) Number 201, and the Department of Defense, and Directive Type Memorandum (DTM) 08-003. Upon notice to proceed the contractor will provide the name, telephone number, and e-mail contact information for their Facility Security Officer (FSO) or Security PPOC through the KO to the servicing Government Security Office. The servicing Government Security Office will contact the FSO/POC and provide specific instructions on the electronic submission of background investigations (SF 85 and FD 258 Fingerprint Card) in accordance with HSPD-12 and OPM guidance. The servicing Government Security Office will provide verification of existing investigations for personnel transitioning from other contracts. The Government reserves the right, in its sole discretion, to refuse to issue a CAC to any employee or to revoke one for security or other reasons. The contractor must have a pre-hiring system in place to ensure probability and eligibility to receive a favorably adjudicated NAC-I. The contractor shall provide the COR with a System Access / Restricted Information request when requesting access to a shared drive, access to a computer system or when advised by the COR the form is required. The contractor shall notify the COR within 24 hours of an employee leaving the contract (termination, resignation, reassignment or other reason).

CDRL PM-29: System Access / Restricted Information Access Request

1.3.13.1 Contractors that require a CAC (before CAC issuance) must, at a minimum, have a favorably adjudicated National Agency Check with inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Physical access to a DoD facility and/or access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on recurring basis for a period of 6 months or more.

At the discretion of the sponsoring activity, an initial CAC may be issued based on favorable review of the FBI fingerprint check and successfully scheduled NACI at the Office of Personnel Management.

1.3.13.2 Contractors that do not require a CAC, but require access to a DoD facility or installation shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative), or at OCONUS locations, in accordance with status of forces agreements and other Theater regulations.

1.3.14 The contractor shall be responsible for out processing its personnel. In accordance with FAR 52.204-9, all out-processing documentation shall be provided to the COR.

CDRL PM-05: Employee Installation Clearing Report

1.3.15 The contractor shall comply with the International Traffic in Arms Regulation (ITAR). ITAR requirements are to include obtaining the appropriate licenses or waivers to allow requirements of this PWS to be executed without undue cost or delay; i.e., allowing FN personnel to provide labor support as appropriate and reasonable. The contractor will need to obtain a Technical Assistance Agreement (TAA) as required by the U.S. Department of State Directorate of Defense and Trade Controls and the ITAR. Reference CFR Title 22, Chapter 1, Subchapter M, Part 124.

http://www.pmddtc.state.gov/licensing/agreement.html.

http://www.pmddtc.state.gov/licensing/agreement.html

December 2015 Section C – 1 Page 10

1.4 Contractor Planning, Resource Management

1.4.1 The contractor’s normal duty hours will be commensurate with the work being performed or as needed in order to properly support the installation, customer, or unit. The hours of operation are Monday through Friday 0700 – 1630 with a standard 40-hour work week; however, during exercise support (issue, turn-in or during other times of increased workload) a work day in excess of 8-hours per day with 7-day a week support will likely be required. Overtime will be in accordance with paragraph 1.4.1.4. The contractor may request variations in hours for particular area of effort in order to provide better support or reduce cost. Additionally, requests to modify hours due to holidays or other events may be submitted. Any variations from the normal hours must be approved by the COR; and the KO if there are costs involved.

1.4.2 Estimated Exercise Period – During the performance period there will be exercises scheduled throughout the year. Each exercise will normally be approximately two (2) months or eight (8) weeks in length; however, this will change in accordance with the Army’s requirements. Exercises may be multiple months in length. Each exercise is unique; therefore, exercise periods may be shorter or longer in duration. In order to prepare the equipment/supplies for the exercises a 24-hour a day / 7-days per week operations may be required. The EAS mission cycle is comprised of four (4) operational phases: Draw, where EAS equipment is handed-off or issued to the Unit for use during training; Deployed, where the EAS equipment is in use by the supported Unit (normally 2 – 8 months); Redeploy, where the Unit returns the EAS equipment (requires inspection and joint inventory); Recovery, which requires the repair or ‘reset’ of the EAS equipment in order to prepare for the next draw. In order to the meet the follow on Draw date, a comprehensive master schedule is required to ensure all equipment required is to standard. Note: during redeploy Units may or may not return the equipment at the correct maintenance standard; therefore, the amount of man-hours required for recovery may vary greatly. The contractor shall use the aforementioned phases in its planning documents and plans.

1.4.2.1 If the Senior Mission Commander or Installation (Garrison) manager declares an installation ‘closed’ or road conditions ‘red’ or ‘black’ [or otherwise deemed unsafe for routine travel/use] due to inclement weather, the contractor will determine which, if any employees will be required for, or shall continue on, duty. Any employees not able to report will be absent in accordance with FAR 52.249-14, excusable delays. The labor costs of absent employees due to weather or other allowable causes are not reimbursable. At no time will the contractor invoice the Government for work not performed (absent or early departure as listed above). The remuneration of contractor employees for lost time due to weather or other allowable causes is at the sole discretion of the company and is not an allowable cost under this effort.

1.4.2.2 The Federal Government and the contractor shall observe only the following holidays, except for emergencies, 24/7 operations, or as otherwise noted in this PWS or subsequent modifications:

New Year’s Day First day of January (or as observed) Martin Luther King, Jr. Birthday Third Monday of January Presidents Day Third Monday of February Memorial Day Last Monday of May Independence Day Fourth day of July (or as observed) Labor Day First Monday of September Columbus Day Second Monday of October Veterans Day 11th day of November (or as observed) Thanksgiving Day Fourth Thursday of November

December 2015 Section C – 1 Page 11

Christmas Day 25th day of December (or as observed)

1.4.2.3 Installation Commanders historically grant military personnel (Enlisted and Officers) training holidays (for example, Christmas Exodus) in addition to the ten Federal holidays listed above. Training holidays are not considered a day of excused absence for the Government civilian work force or contractor employees. If a training holiday affects scheduled Contract work or access to facilities, the work in affected facilities may be rescheduled to compensate for the training holiday.

However, announced training holidays or Exodus of military personnel may provide the contractor with an opportunity for unrestricted access to facilities/areas or uninterrupted performance of work (i.e. training facility/area maintenance and supply inventories). The contractor shall take full advantage of such opportunities by planning maintenance or other activities that are better accomplished when Military personnel are not present or using required / supported facilities.

1.4.2.4 The contractor is expected to adjust normal workday personnel support requirements to reduce any requirements for overtime. Overtime hours are normally required to support active exercises, respond to emergencies, unusually heavy workloads, and unexpected situations that may occur due to unforeseen service requirements. If circumstances indicate the potential need for overtime in order to accomplish a task, the contractor shall request in writing the overtime hours to the COR for endorsement. The COR will then submit the endorsed Contractor’s overtime hours request to the KO and obtain written approval from the KO, in advance of the work. The KO’s written approval will be provided to the contractor and the COR. Overtime rates proposed by the contractor for Non-Exempt labor positions and accepted by the Government at the time of award will be used for reimbursement of overtime costs. Overtime will not be authorized to compensate for shortcomings in contractor performance. Approvals for using overtime shall ordinarily be prospective, but, if justified by emergency circumstances, approvals may be retroactive. In the event of an emergency and the KO is unavailable to provide written approval prior to the commencement of the work, the contractor will document the necessity for the overtime and submit in writing, along with COR concurrence, to the KO for approval. The KO will provide retroactive approval in writing per FAR 22.103-4 (i) for work performed which has been justified appropriately and meets the guidelines established in this paragraph.

1.4.3 The contractor shall address, in detail, its procedures, personnel, and the means to accomplish mission requirements without delay in the event of sudden or unusual events that could impact the contractor's performance and contract requirements such as, but not limited to mobilization, terrorism, natural disaster, utility outages, or labor disputes. The Government will not supplement the contractor’s work force. The contractor shall ensure personnel required to accomplish tasks designated as ‘mission essential personnel’ report to assigned work locations (or Government Continuity of Operations Plan (COOP) designated facilities) and perform required tasks, regardless of weather or security conditions. Government will identify tasks qualifying performers as essential personnel as applicable with the contractor providing a list of essential personnel required to perform those tasks to the COR. The COR will be responsible for providing Government security personnel with a list of contractor ‘mission essential personnel’ to enable access to Government facilities when ‘non-essential’ personnel are barred. Contractor will operate in accordance with DoDI 1100.22, ‘Continuation of Essential DoD Contractor Services during Crisis’.

The contractor shall include a strike contingency plan as part of its Plan in accordance with FAR Clause 52.222.1, Notice of Labor Disputes. The contingency plan will be submitted to the Government as specified in CDRL PM-06.

CDRL PM-06: Contingency Plan

December 2015 Section C – 1 Page 12

1.4.4 Due to the nature of military operations and the associated logistics support, a higher level of effort than forecasted may be required (limited in duration or sustained efforts). This includes support to such programs as: mobilization, demobilization of forces; deployments, redeployments of forces; equipment maintenance; or other efforts to be determined (TBD). Additionally, the contractor shall provide a management and supervisors list utilizing TE 1G-002 as outlined in CDRL PM-01. The list must provide emergency contact information for all key personnel when not present at the work site. The contractor shall be prepared and respond to emergency situations by providing an appropriate workforce for critical efforts within two hours of notice from the KO/COR.

CDRL PM-01: Contractor Employee Information

1.4.5 The Government may elect, at its discretion, to transition certain tasks or requirements to or from the contractor. The Government will provide (via the KO) notification to the contractor indicating the functional area(s) being performed by the contractor that will be assumed by the Government and the anticipated date of the assumption of the effort. The contractor shall prepare a transition-out plan and the appropriately adjusted proposal identifying the de-scoped portion of the effort. The contractor may be required, at the contracting officer’s discretion, to remain on site past the transition out in order to provide technical assistance to the Government.

1.4.6 The contractor shall provide and have on-site a General Manager (GM) for each location no later than the start of work and throughout the period of performance of this effort. Additionally, utilizing an existing staff member, the contractor will designate an alternate GM to be available in the event the general manager is absent or otherwise unavailable. The contractor’s General Manager and designated alternate shall be authorized to act on behalf of the contractor for all matters relating to this contract. The contractor shall provide the General Manager (and alternate) name and contact information in writing to the Contracting Officer. The GM or designated alternate shall be on duty at or near the supported location and available during normal operational hours and shall be available for contact with the Government during all other times. The GM or designated alternate is required to attend briefings, conferences, and other Government designated meetings as required in the execution of this effort or as requested by the COR. The General Manager or designated alternate may be required to attend operational and deployment meetings classified as Secret; therefore, these positions require a secret clearance. The contractor shall provide information in accordance with

CDRL PM-01.

CDRL PM-01: Contractor Employee Information

1.4.7 The contractor will ensure an effective and efficient transition-in at contract start and an effective, efficient transition-out at conclusion of the contract. The transition-in, being part of the base year of this effort, will commence at Notice to Proceed (NTP) date issued by the KO and will continue until full operational capability (FOC), not to exceed 60 days. The contractor will provide a transition-in plan in accordance with CDRL PM-07 Transition Plan.

CDRL PM-07: Transition Plan

1.4.7.1 The contractor will ensure an effective and efficient transition to incoming contractor at the end of the effort. The contractor will provide a transition-out plan in accordance with CDRL PM-07.

1.4.8 The contractor shall provide its staffing by cost center, or shop monthly along with the associated work order information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .