Att_0009_-_Security_-_FINAL_2017-07-20.pdf

PDF 87 KB Posted

Attached to
Solicitation - Request for Proposal (RFP) Federal contract opportunity
Solicitation number
W52P1J15R0023
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This document outlines a performance work statement (PWS) for security services at the Scranton Army Ammunition Plant (SCAAP). The contractor shall provide security personnel, develop a physical security plan, and implement access controls in accordance with Army regulations. Responsibilities include training and qualifying security staff, providing uniforms and authorized weapons, conducting background checks, drug testing and medical evaluations. The contractor must also establish security patrols and emergency response procedures, and increase security based on force protection conditions. The PWS specifies requirements for antiterrorism, operations security, and compliance with the Criminal Justice Information Services Security Policy for accessing relevant law enforcement databases.

Att 0009 - Security PWS

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation - Request for Proposal (RFP), newest first.
File Type Posted
Att_0017_-_Surge_PWS_REV_A_2017-10-10.pdf PDF
Att_0031_-_W15QKN-17-R-0018_Amendment_0003_2017-10-11.pdf PDF
Att_0026_-_LIF_MIF_Encl_3_GFP_Prohibited_from_Layaway.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0029_-_W15QKN-17-R-0018_RFP_Amd_0001.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0004_-_Section_M_2017-07-28_FINAL.pdf PDF
Att_0025_-_LIF_MIF_Encl_2_Active_GFP.pdf PDF
Att_0007_-_Maintenance_and_Utilities_PWS_-_REV_A_2017-09-07.pdf PDF
Att_0010_-_Safety_-_FINAL_2017-06-06.pdf PDF
Att_0009_-_Security_REV_A_2017-08-31.pdf PDF
W52P1J-15-R-0023_Amd_0001_2017-09-07.pdf PDF
W52P1J-15-R-0023_FINAL_2017-07-28.pdf PDF
W15QKN-17-R-0018_Att_0008_-_PPQ_for_Large_Caliber_Metal_Parts_REV_A_28_Aug_2017.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0020_-_Procedures_for_Submitting_a_CDR_2017-06-16.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0017_-_Surge_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_2017-06-16.pdf PDF
Att_0018_-_GFP_List_2017-07-06.pdf PDF
Att_0004_-_Section_M_2017-07-28_FINAL.pdf PDF
Att_0015_-_LIF_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0024_-_LIF_MIF_Encl_1_GFP_Currently_in_Layaway.pdf PDF
W52P1J-15-R-0023_FINAL_2017-07-28.pdf PDF
Att_0005_-_Price_Matrix_2017-07-27.xlsx XLSX spreadsheet
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0001_-_W15QKN-17-R-0018_RFP_2017-07-27.pdf PDF
FINAL-Scranton_AAP_EBS-06-25-2015_v2.pdf PDF
Final_List_of_Attendees.pdf PDF
SCAAP_Ind_Day__2_QAs_Final_-_25_Jan_17.pdf PDF
W52P1J-15-R-0023_Draft_11-01-2016_FINAL.pdf PDF
Att_0004_-_SCAAP_PWS_1_-_Property_-_Draft_RFP.docx DOCX document
Att_0021_-_Small_Business_Participation_Plan_Property_Management.docx DOCX document
Att_0010_-_SCAAP_PWS_7_-_Utilities-Energy_-_Draft_RFP.docx DOCX document
Att_0007_-_SCAAP_PWS_4_-_Security_-_Draft_RFP.docx DOCX document
Att_0013_-_SCAAP_PWS_10_-_Facility_Plans_-_Draft_RFP.docx DOCX document
Att_0005_-_SCAAP_PWS_2_-_Maintenance_-_Draft_RFP.docx DOCX document
Att_0014_-_SCAAP_PWS_11_-_LIF_-_Draft_RFP.docx DOCX document
Att_0015_-_SCAAP_PWS_12_-_MIF_-_Draft_RFP.docx DOCX document
Att_0008_-_SCAAP_PWS_5_-_Safety_-_Draft_RFP.docx DOCX document
Att_0012_-_SCAAP_PWS_9_-_ARMS_-_Draft_RFP.docx DOCX document
Att_0011_-_SCAAP_PWS_8_-_Transition_Plan_-_Draft_RFP.docx DOCX document
Att_0017_-_Contract_Discrepancy_Report.xlsx XLSX spreadsheet
Show all 50

Solicitation - Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALLATION SECURITY/ANTITERRORISM

PERFORMANCE WORK STATEMENT (PWS)

(INDIRECT)

1. GENERAL:

1.1. This PWS prescribes standards, procedures, and general responsibilities pertaining to security, antiterrorism, and preservation of order at the Scranton Army Ammunition Plant (SCAAP).

1.2. The Contractor shall develop a Physical Security Plan (PSP) in accordance with Army Regulations (AR) 190-13 and submit it to the SCAAP Security Manager for review and approval within 45 days of contract award. SCAAP site specific provisions can be added to the PSP by the Government. The SCAAP PSP will be reviewed on an annual basis and updated if required. Contractor's PSP shall be based on the current version of the AR referenced in this PWS;

however, the Contractor shall comply with and shall be responsible for meeting all the requirements in the updates to the AR as they become effective. When requirements change, the Contractor shall revise the PSP as required. Chapter and page numbers have been included for convenience, however, this does not relieve the Contractor from complying with all other applicable parts of the referenced AR. In the event it is determined a new PSP is required, the contractor will have up to 90 days to complete any updates. Both the Government and Contractor will sign a memorandum authenticating the annual review/update was conducted and approved (CDRL A001).

1.3. The Contractor shall hold subcontractors responsible for adhering to security requirements as outlined in the PSP and this PWS.

1.4. The installation is under Proprietary Jurisdiction.

1.5. Access and general protection/security policy and procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.5.1. For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1.5.2. For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6. Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems: All contractor employees with access to a government info system must be registered in the ATCTS at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

1.7. For information assurance (IA)/information technology (IT) training: All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.

2. CONTRACTOR REQUIREMENTS: The Contractor shall perform the services enumerated below in accordance with this PWS and its approved PSP.

2.1. The Contractor shall furnish properly trained and qualified security personnel.

2.1.1. The Contractor shall train and qualify each individual who performs security tasks or duties, before assignment to such duties or tasks.

2.1.2. Training standards shall conform, as local requirements and AR 190-56 dictate, to performance-oriented tasks necessary to ensure adequate security and preservation of order at SCAAP. The Contractor will develop and submit a training program based on mission, local requirement, NCIC 190-14, and AR 190-56. If additional requirements are identified, the Security contract will be modified. The SCAAP Commander’s Representative, or designee, will review and approve the program.

2.1.3. The Contractor shall document the training and qualifications of each individual. This documentation will be readily available for review by the Government and maintained for as long as that individual remains in a security capacity.

2.2. The Contractor shall provide uniforms for all security personnel. Uniforms for administrative personnel will be at the discretion of the Contractor.

2.3. The Contractor’s security guard service subcontractor shall arm the security personnel. This subcontractor will provide side arms and other weapons considered necessary for the performance of the security mission at SCAAP.

Side arms will be of standard law enforcement type in 9MM, .40, or .45 caliber.

The carrying of concealed weapons, or weapons owned by the individual guards is not authorized. To be considered eligible to carry firearms, personnel must have satisfactorily completed the mandatory training and proficiency testing within the preceding 6 months of employment and possess any licenses and complete any training required by the Commonwealth of Pennsylvania.

The Contractor must provide documentation substantiating these actions for review by the Government upon request.

2.3.1. Prior to issuance of weapons, all security personnel shall receive training on use of force on an Army facility per AR 190-14 and in accordance with applicable State law; instructions on firearm's safety functions, capabilities, limitations, and maintenance procedures for the type of weapon issued; and individual responsibilities on the carrying of firearms. This training shall include the use and proficiency of options on the degree of force required for specific security situations as described in AR 190-14. The Contractor shall document this training and maintain the documents for as long as each employee remains employed in a security capacity. This documentation will be available to the Commander, Commander’s Representative, or designee upon request.

2.3.2. All security personnel shall successfully qualify with their assigned weapon (sidearm) using the ST 19-LEWTAQ (Law Enforcement Weapons Training and Qualification) course and Commonwealth of Pennsylvania requirements biannually and always before assignment to security duties. The Contractor shall maintain documentation of this qualification firing for as long as each employee remains employed in a security capacity. The Contractor shall make this documentation available to the Commander, Commander’s Representative, or designee upon request. In addition, firearms familiarization training is required and must be documented for all other weapons security personnel may carry. No privately owned weapons will be allowed on the installation or stored at the guard station.

2.4. The Security Contractor shall hire trustworthy and reliable security personnel.

AR 190-56 provides the required personnel qualifications and selection standards. In addition, Security Contractor shall establish an Individual Reliability Program as specified in AR 190-56 (CDRL A002). Meeting the standards of the Individual Reliability Program shall be a condition of continued employment in a security capacity. Each security officer shall undergo a background investigation which consists of a NACI conducted by the U.S.

Office of Personnel Management (OPM) to confirm his/her trustworthiness.

The Security Contractor will coordinate with the Scranton Security Manager for submission of the required investigation via the Personnel Security Investigation - Center of Excellence (PSI-CoE). The Contractor will be responsible for submission of fingerprints IAW the NACI investigation.

2.4.1. Security personnel shall undergo drug abuse testing as specified in AR 600-85, and AR 190-56. Results of this test will be maintained by the Contractor and be made readily available for review by the Commander’s Representative or designee upon request.

2.4.2. Security personnel shall be administered an initial and subsequent medical evaluation no later than 30 days after arriving at SCAAP by a qualified physician to determine the individual is fit for duty in accordance with AR 190-56. The Contractor will document these results, and make such documentation available to the Commander, Commander’s Representative, or designee upon request.

2.4.3. Reliability standards shall also include, but are not limited to, the following: criminal misconduct, financial stability, alcohol or drug abuse, sexual misconduct, loyalty to the United States Government, foreign interests, and job-related violations. The DA Form 5557 will be used to record the individual’s reliability. Once complete, the records will be forwarded to the Commander’s representative for review. Once approved, the Commander’s representative will sign Part III of this form, and the guard is cleared for employment. This form will be maintained in the individual’s personnel folder and will be available for review by the Commander, Commander’s representative, or designee.

2.4.4. The Contractor shall annually certify that all security personnel satisfactorily meet these individual reliability standards. Personnel that fail to meet these standards will be immediately relieved of security duties.

2.4.5. Guard force members shall be administered a physical ability test (PAT) prior to assignment of guard duties. Guard force members who are retained under a subsequent contract shall receive a PAT no later than 30 days after signature of the subsequent contract. This is to ensure that all members of the SCAAP guard force are given a PAT on a yearly basis. The standard is for all members of the SCAAP Guard Force to have one passing PAT on a yearly basis to determine the individual’s fitness for duty. The Contractor shall designate an appropriate location and coordinate and supervise the actual testing in order to assure compliance with applicable regulations. The Government staff shall be notified at least 30 minutes prior to all scheduled PAT. The PAT shall be conducted in accordance with the most current Army Regulation, currently AR 190-56 (to be supplied by the Government). This physical ability test is subject to monitoring by the Administrative Contracting Officer (ACO) staff. Failure to pass the PAT is reason for dismissal from guard force duties. Security guards have up to 90 days to comply with the fitness for duty requirements after failing the initial test.

2.5. The Contractor shall establish, maintain, and document an ingress/egress system for personnel, vehicles, and shipments at SCAAP. The Contractor will establish installation access controls for vehicle, personnel, and property following the guidelines of AR 190-13 to include NCIC-III vetting for all visitors.

The Contractor shall control access by 1) identifying vehicles, personnel, and material; 2) determining the eligibility of vehicles, personnel, and material to pass onto Army property; 3) inspecting vehicles, personnel, and material, as appropriate; 4) controlling and monitoring vehicles, personnel, and material; 5) preventing unauthorized exit of vehicles, personnel, and material and 6) establishing a visitor control program. The Contractor shall secure all access control points (ACP) when not staffed. The Contractor shall assure ACPs are sufficiently staffed to provide access control, vehicle inspections, and an over-watch position. A minimum of two security guards will be located at the main ACP when the gate remains in the open position. All documentation pursuant to these programs will be made available to the Commander’s Representative, or designee, upon request.

2.5.1. The Contractor shall use an identification badge or card system for individual access control. The identification badges will conform to the requirements of AR 190-13, and AR 600–8–14. The Contractor shall ensure the following:

2.5.1.1. Strict accountability, storage, and handling of these badges/cards through their life cycle will be accomplished.

2.5.1.2. The Contractor will store and handle all badging or card components in such a manner to preclude access by unauthorized individuals.

2.5.1.3. Prompt access invalidation for lost or stolen cards/badges and a means to quickly communicate these invalidated cards/badges to security personnel at points of ingress/egress.

2.5.1.4. Prompt denial of access for individuals who have lost access privileges.

2.5.1.5. Any automated card/badge reading system utilizing mechanical, electronic, or other technological means for access controls proposed for use by the Contractor, must receive approval prior to implementation per AR 190-13.

2.5.1.6. To control and secure outgoing shipments of Army and Department of Defense property by tractor-trailer and/or rail shipment, the Contractor shall establish a seal control program in accordance with the requirements outlined in AR 190-51.

2.6. The Installation is designated a restricted area and will be posted with signs as specified in AR 190-13.

2.7. The Contractor shall establish a system to receive, secure, and account for all security interest keys used at SCAAP. This system shall conform to the requirements of AR 190-51 and the PSP. When not in use, keys will be stored in such a manner to preclude access by unauthorized individuals.

2.8. The protection of arms, ammunition, and explosives (AA&E) shall be of the utmost concern. In the event of weapons storage at SCAAP, security for AA&E shall be in accordance with AR 190-11 and any current security exceptions or waivers. The level of physical security shall be commensurate with the category of the AA&E protected. When applicable, the contractor shall use Intrusion Detection Systems.

2.9. The Contractor is responsible for maintaining an adequate means of communication between plant security forces and local law enforcement agencies.

2.10. The Contractor shall establish security posts and patrols to meet local threats and mission requirements. The Contractor shall outline these posts and patrols in the PSP.

2.11. In case of fire or medical emergency, the Contractor shall ensure emergency personnel are notified and direct/escort emergency response personnel and equipment to the location of the fire or injury.

2.12. A number of events or situations, i.e., accidents, fires, explosions, or injuries, may require immediate (within ten (10) minutes) telephonic notification to specific parties. The Contractor shall be responsible for such notifications in accordance with a published notification roster. Within 30 days of contract award, which the Contractor shall, in coordination with the Commanders Representative, develop, maintain and update this roster. The Commander’s Representative may call upon the Contractor to provide follow-up oral and written reports for such incidents. (CDRL A003)

2.13. The Contractor will ensure all security force personnel are well-versed and knowledgeable in their authority as defined by state and/or federal laws and AR 190-56.

2.14. In the event of suspected criminal offense(s) at SCAAP, the security staff will assume control of, and protect, the scene under the authority of the Commander’s Representative, or designee, pending notification and arrival of appropriate law enforcement officials. If no law enforcement agency is available to investigate the suspected offense, security staff, in coordination with the Commander’s Representative, will request guidance and disposition from the Operation Protection Division.

2.15. The Contractor shall develop and maintain plans for Emergency Management in accordance with AR 525-27 that in the case of an emergency the Contractor can take appropriate actions. The Contractor shall submit a copy of these plans for review and acceptance by the Commander’s Representative or designee within 45 days of contract award and annually thereafter (CDRL A004).

2.16. The Contractor shall be prepared to increase security measures at the direction of the Commander Representative or authorized designee to meet the standards for each Force Protection Condition level. The Contractor shall be prepared to increase to FPCON levels, Alpha, Bravo, Charlie or Delta within 24 hours of notification, but must make the effort to reach these complete FPCON levels as soon as possible. Contract Modification of EPA clause to address FPCON increases for Charlie or Delta.

2.16.1. The Contractor will designate an individual to participate in the Commander’s Representative Antiterrorism (AT) Committee and/or Working Group that will focus on planning, coordinating and executing the installation’s AT Program.

2.16.2. The Contractor shall participate in an AT exercise annually.

2.16.3. The Contractor shall provide required information to assist the Commander’s Representative in the implementation of the Army’s critical tasks identified in AR 525-13.

2.17. The Contractor shall notify the government staff of any foreign visits to SCAAP.

Requests for visits or release of information by, or on behalf of, representatives of or civilians from foreign governments shall be coordinated in advance with the Commander’s Representative, or designee.

2.18. The Contractor shall prepare, implement, maintain, and manage an Operations Security (OPSEC) Program for their employees. Program shall meet all requirements mandated by AR 530-1, Operations Security (OPSEC) (CDRL A005). Program assessments will be conducted annually to ensure requirements remain in compliance with AR 530-1. The contractor shall conduct OPSEC reviews on all information intended for publication external to SCAAP and shall forward the results of the review to the Commander’s Representative before granting publication authorization.

2.18.1. The Contractor shall be responsible for establishing and maintaining an OPSEC program to adequately manage, protect, and control sensitive information that has been provided or generated under the contract. The Contractor shall appoint an OPSEC Officer to manage the OPSEC program and to prepare a written OPSEC Plan which identifies the critical information, threat information, and OPSEC measures used to mitigate known vulnerabilities and risks.

2.18.2. The contractor shall conduct security training, to include OPSEC requirements, for all new hires within 30 days of hire. Refresher training will be conducted no less than annually. Training shall be documented and such documentation shall be available for inspection by the Commander’s Representative, or designee.

2.18.3. At a minimum, the OPSEC program shall include a system to review information to be released to external sources to ensure the contractor is not releasing governmental non-classified sensitive information.

External sources include web pages, journals, technical papers, etc.

This does not include information the government may release, nor does it include contractor proprietary information.

2.18.4. Ensure contractor employees are aware of review requirement prior to release of information to external sources. This can be accomplished via web based briefings, flyers, reminders during other type briefings, etc. Enhance employee awareness by web based/e-mail notices, posting flyers, notices, etc. in offices and common areas.

2.18.5. Contractor employees who are U.S. citizens shall be provided access to sensitive information on a “need to know” basis required to fulfill the terms and conditions of the contract. Foreign National (FN) employees’ access to information will be limited to non-sensitive information. FN access to sensitive information will be approved in writing by the Contracting Officer on a case-by-case basis, and will be strictly limited to the information that the employee must know in order to fulfill the terms and conditions of the contract.

2.19. The contractor will respond to requests for information regarding, Antiterrorism, Physical Security, Law Enforcement, Intelligence or Counterintelligence by the ACO staff. A matrix for notification will be provided by the ACO staff.

2.20. The U.S. Army at SCAAP has entered into a User Agency Agreement with the Pennsylvania State Police that grants the installation access to Criminal Justice Information Services (CJIS), such as the Pennsylvania Justice Network (JNET) and the National Crime Information Center (NCIC). The CJIS Security Policy, implemented by the U.S. Department of Justice, allows the U.S. Army to delegate the authority to access the JNET and NCIC systems to a contractor, provided that the contractor is willing to adhere to all of the requirements outlined in CJIS Security Policy. As part of this delegation of access to JNET and NCIC, the Contractor shall ensure SCAAP Badge Officer and Security Force personnel are authorized access to JNET/NCIC to perform inquires of the Interstate Information Index (III) to access criminal history information, as all these checks are required by AR 190-13 for access control duties. All inquiries of the NCIC III shall be logged by the Contractor’s Security Force and these logs shall list the date, time, name, and reason for inquiry. These records shall be kept for a full calendar year and are subject to inspection by CJIS or U.S.

Army personnel at any time.

2.20.1. In the event that the Contractor contracts Security Force services to a subcontractor, the Operating Contractor is responsible for contractually delegating the authority to access the CJIS, such as JNET and NCIC.

The Contractor is also required to ensure any Security Force subcontractor adheres to all CJIS Security Policies.

2.20.2. The Contractor is responsible for paying any JNET/NCIC access service fees, equipment, training, and network connection costs if applicable to ensure continuous access. Specific guidance with regards to JNET/NCIC Access Control Policies will be developed by the Government and passed down to the Contractor.

3. PHYSICAL SECURITY/ANTITERRORISM/FORCE PROTECTION EQUIPMENT

PROJECTS AND PURCHASE: The contractor shall purchase required equipment and engage in improvement projects IAW all applicable Department of Defense, Army, Army Materiel Command, Joint Munitions Command and applicable federal, state, and local laws, regulations, and standards. At the conclusion, or termination, of this contract, all property and equipment purchased by the Contractor will revert to the ownership of the Government.

4. INSPECTION AND ACCEPTANCE: The Contractor shall facilitate Government inspection processes.

5. TECHNICAL REFERENCES: Please see Appendix A for the documents applicable to this PWS.

APPENDIX A

APPLICABLE DOCUMENTS

DOCUMENT

NUMBER

DOCUMENT TITLE DATE

AR 190-5 Motor Vehicle Traffic Supervision -http://www.apd.army.mil/pdffiles/r190_5.pdf

22 May 06

AR 190-11

Physical Security of Arms, Ammunition, and Explosives - This document is limited distribution. Contractors may receive a copy upon request from the installation COR.

5 Sep 13

AR 190-13

The Army Physical Security Program - This document is limited distribution. Contractors may receive a copy upon request from the installation COR.

25 Feb 11

AR 190-14

Carrying of Firearms and Use of Force for Law Enforcement and Security Duties - http://www.apd.army.mil/pdffiles/r190_14.pdf

12 Mar 93

AR 190-16 Physical Security - http://www.apd.army.mil/pdffiles/r190_16.pdf 31 May 91

AR 190-45 Law Enforcement Reporting -http://www.apd.army.mil/pdffiles/r190_45.pdf

27 Sep 16

AR 190-51

Security of Unclassified Army Property (Sensitive) and (Nonsensitive) - http://www.apd.army.mil/pdffiles/r190_51.pdf

30 Sep 93

AR 190-56 The Army Civilian Police and Security Guard Program -http://www.apd.army.mil/pdffiles/r190_56.pdf

15 Mar 13

AR 190-58 Personal Security - http://www.apd.army.mil/pdffiles/R190_58.pdf 22 Mar 89

AR 380-67

The Department of the Army Personnel Security Program -http://armypubs.army.mil/epubs/pdf/R380_67.PDF

24 Jan 14

AR 525-2 The Army Protection Program 08 Dec 14

AR 525-13

Antiterrorism - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

17 Feb 17

AR 525-27 Army Emergency Management Program -http://www.apd.army.mil/pdffiles/r525_27.pdf

13 Mar 09

AR 530-1

Operations Security -http://www.usapa.army.mil/pubnum_pubs.asp?search=ar+530- 1&submit1=Go

26 Sep 14

AR 600-8-14

Identification Cards for Members of the Uniformed Services, Their Family Members, and Other Eligible Personnel (Paragraph

19.11 - 19.16) - http://static.e-publishing.af.mil/production/1/af_a1/publication/afi36-3026v1_ip/afi_36- 3026_ip.pdf

17 Jun 09

AR 600-85 Alcohol and Drug Abuse Prevention and ControlProgram -http://www.apd.army.mil/pdffiles/r600_85.pdf

28 Dec 12

AR 710-2 Supply Policy Below the National Level (Paragraph 2-12, 2-42, 2- 44 and table 2-2) - http://www.apd.army.mil/pdffiles/r710_2.pdf

28 Mar 08

DA PAM 190-51 Risk Analysis for Army Property -http://www.apd.army.mil/pdffiles/p190_51.pdf

30 Sep 93

DA PAM 710-2-1

Using Unit Supply System (Manual Procedures) (Paragraphs 5- 6 & 9-10) - http://www.apd.army.mil/pdffiles/p710_2_1.pdf

31 Dec 97

DoD 5220.22-M National Industrial Security Program Operating Manual -http://www.dss.mil/documents/odaa/nispom2006-5220.pdf

28 Feb 06

DoDI 2000.12 DoD Antiterrorism (AT) Program - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

01 Mar 12

DOD O 2000.12 H

DoD Antiterrorism Handbook - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

02 Feb 04

DoDI 2000.16 DoD Antiterrorism (AT) Standards - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

02 Oct 06 w/Chg 2, 08 Dec 06

FM 19-10

Military Police Law and Order Operations -http://www.castpics.net/pdfs/m/AR/fm_19-10%20- %20Military%20Police.pdf

30 Sep 87

FM 3-19,15

Civil Disturbances -http://155.217.58.58/cgi-bin/atdl.dll/fm/19-15/toc.htm

18 Apr 05

FM 21-20

Physical Fitness Training -http://www1.udel.edu/armyrotc/current_cadets/cadet_resources/manuals_r egulations_files/FM%2021-20%20- %20Physical%20Fitness%20Training.pdf

01 Oct 98

Unified Facilities Criteria 4-010-01

DoD Minimum Antiterrorism Standards for Builidngs - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

09 Feb 12 w/ chg 1, 1 Oct 13

AMC-R 525-13

AMC Force Protection Program - This document is limited distribution. Contractors may receive a copy upon request from the installation COR

08 Nov 12

AR 525-27

Army Emergency Management Program -http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchForm.aspx?x=

AR

13 Mar 09

DA PAM 525-27

Army Emergency Management Program -http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchForm.aspx?x=

PAM

20 Sep 12

DODI 6055.17

DOD Installation Emergency Management (IEM) Program w/ Change 19 Nov 2010 - http://www.dtic.mil/whs/directives/corres/pdf/605517p.pdf

13 Jan 09

DODI 6055.06

DOD Fire and Emergency Services (F&ES) Program -http://www.dtic.mil/whs/directives/corres/pdf/605506p.pdf

21 Dec 06

DODI 3020.52

DOD Installation Chemical, Biological, Radiological, Nuclear, and High-Yield Explosive (CBRNE) Preparedness Standards -http://www.dtic.mil/whs/directives/corres/pdf/302052p.pdf

18 May 12

DODD 3020.26

Department of Defense Continuity Programs -http://www.dtic.mil/whs/directives/corres/pdf/302026p.pdf

9 Jan 09

AR 500‐3 U.S. Army Continuity of Operations Program Policy and Planning 18 Apr 08

AMC OPORD

16‐124

Emergency Management Program (EMP) Implementation 29 Oct 15

JMC OPORD

17‐39

Emergency Management (EM) Program Implementation 18 Nov 15

Unified Facilities Criteria 4‐021‐01

Design and O&M Mass Notification Systems, with Change 1, Jan 2010 9 Apr 08

Unified Facilities Criteria 3‐600‐01

Fire Protection Engineering For Facilities, with Change 1, 14 July

26 Sep 06

TM 3‐11.42

Multi-service Tactics, Techniques & Procedures for Installation Emergency Management DISTRIBUTION RESTRICTION: Distribution authorized to U.S. government agencies and their contractors only due to the sensitive nature of information contained in the manual.

23 Jun 14

File details come from the government source that posted it. Updated .