W52P1J13R0099-0002.pdf
PDF 16 KB Posted
- Attached to
- BDU-50D/B Cast Ductile Iron (CDI) Practice Bomb
- Solicitation number
- W52P1J-13-R-0099
About this file
Amendment 0002
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2015OCT20
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
LAURA K. SPENCER
EMAIL: LAURA.K.SPENCER2.CIV@MAIL.MIL
W52P1J-13-R-0099
2015SEP21
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 4
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LAURA K. SPENCER
Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-0295
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
THE PURPOSE OF AMENDMENT 0002 TO SOLICITATION W52P1J-13-R-0099 IS THE FOLLOWING:
1. TO REVISE SECTION C PHOSPHATE COATING REQUIREMENT (LIGHT), PARAGRAPH (d) TO REFLECT 240 HOURS MINIMUM FOR TGIC POLYESTER POWDER
COATING.
2. TO PROVIDE INDUSTRY QUESTIONS AND GOVERNMENT RESPONSES AS ATTACHMENT 0018. ATTACHMENT 0018 IS PROVIDED FOR INFORMATION AND
CLARIFICATION PURPOSES ONLY AND WILL NOT BE INCORPORATED INTO A RESULTANT CONTRACT FROM THIS SOLICITATION.
3. THE DUE DATE OF 5 NOVEMBER 2015, 1500 CENTRAL TIME (CT) HAS NOT BEEN EXTENDED.
*** END OF NARRATIVE A0003 ***
2 4
W52P1J-13-R-0099 0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Phosphate Coating Requirement (Light)_____________________________________
The following requirements regarding phosphate coating are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification TT-C-490.
(a) Paragraph 3.2.1 of TT-C-490 refers to "Procedure approval". The written procedure, along with the panel submission requirements of paragraph (b), below, shall be sent to the designated contracting officer. The procedure shall include product names and manufacturers of all chemicals/materials to be used. The procedure shall capture all processes, equipment, and controls, along with the testing and test frequencies used for phosphating including the application of supplemental finishes.
(b) Paragraph 3.2.2 of TT-C-490 refers to Preproduction validation panels. The contractor shall coat twelve (4 X 6 inch) panels (see 4.7.2) and six case sections (6 x 6 inch) by the proposed zinc phosphate coating procedure outlined for use in the contract. Case sections shall be made from cut sections of BDU-50D/B bomb cases of the same substrate and surface finish to be used in production. Standard test coupons may be used for the twelve (4 x 6 inch) panels. Six of the panels and six of the case sections shall be coated with the primer plus enamel or the TGIC polyester powder coating to be used in production. The dry film thickness (DFT) of the applied coating(s) shall be in the range specified on Drawing 923AS1100, and the nominal DFT shall be representative of the DFT to be used in production. Three of the non-coated panels shall be checked for phosphate coating weight, and the resultant coating weight test analysis report shall be provided to the procuring agency. Three of the coated panels and three of the coated case sections shall be performance tested by the contractor in neutral salt spray for accelerated corrosion resistance (see 3.5.7), with the results documented (including photographs of each tested panel and segment) and reported to the procuring agency. The remaining six panels (three phosphated only; three phosphate plus coating) and three remaining coated case sections shall be forwarded to the procuring activity for evaluation and testing.
(c) Paragraph 3.5.6.2 of TT-C-490 refers to Paint Adhesion of Non-CARC painted items. The adhesion testing requirements of
3.5.6.1 for CARC paint shall be required in lieu of section 3.5.6.2 for all testing performed on this contract and shall not be as specified in 3.5.6.2 for non-CARC painted items. All adhesion testing of the bomb case, 923AS1101, shall be performed on production items and not on panels or segments. Production items sampled for adhesion testing shall have their scribed areas subsequently touched-up with enamel conforming to MIL-DTL-11195 prior to submission for acceptance. Adhesion testing of sub-assemblies/smaller parts (not to include the bomb case 923AS1101) shall be in accordance with TT-C-490F, para. 4.7.6.3 for non-
CARC items.
(d) Paragraph 4.7.7 of TT-C-490 refers to Accelerated corrosion resistance. All panels and case sections subjected to accelerated corrosion resistance testing (see 4.7.7) shall be scribed with two intersecting lines not less than 2 inches long in the shape of an X using the scribe tool as described in ASTM D1654. Duration of accelerated corrosion resistance test shall be 240 hours minimum for MIL-DTL-11195 and 240 hours minimum for TGIC polyester power coating and shall be examined for compliance as specified in 3.5.7.
*** END OF NARRATIVE C0001 ***
3 4
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0018 INDUSTRY QUESTIONS AND GOVERNMENT RESPONSES 20-OCT-2015 001
4 4
| SECTION A |
| SECTION C |
| SECTION J |
File details come from the government source that posted it. Updated .