Ex_A_-_U15A06DAHI_U16A06NAHI_cdrl_revc_11Aug2015.pdf

PDF 1004 KB Posted

Attached to
BDU-50D/B Cast Ductile Iron (CDI) Practice Bomb
Solicitation number
W52P1J-13-R-0099
Issued by

About this file

EXHIBIT A CONTRACT DATA REQUIREMENTS LIST (CDRL)

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 QUALITY PROGRAM PLAN

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81722 SECTION E (SEE BLK 16) AMSJM-QAP

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

D ONE/R ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: AMSJM-QAP 0 1 0

NAWCWD (685200D) 0 1 0

BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE NAWCWD (QA) 0 1 0

CONTRACTOR’S IMPLEMENTATION OF A QUALITY SYSTEM IN AFLCMC/EBHCB 0 1 0

ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP). DCMA-MCWB (QAR) 0 1 0

CCRC-AR/PCO 0 LT 0

BLKS 10, 12: THE QPP SHALL BE SUBMITTED 60 DAYS PRIOR TO FIRST

ARTICLE TEST (FAT), IF FAT IS REQUIRED, OR 60 DAYS PRIOR TO

INITIATION OF PRODUCTION. THE GOVERNMENT REQUIRES 30 DAYS FOR

REVIEW. DISPOSITION OF THE QPP WILL BE PROVIDED THROUGH THE

PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS ARE

NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE

REVISIONS AND THE GOVERNMENT WILL REVIEW AND PROVIDE

DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE QPP SHALL BE

APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION

OF PRODUCTION.

BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL PRIOR

TO IMPLEMENTATION.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Kristy Mosher 2015-02-20

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 15 Pages

Jan Murphy 2015-04-01

NO

A

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 INSPECTION AND TEST PLAN

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81110 SECTION E AMSJM-QAP

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

D ONE/R ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: AMSJM-QAP 0 1 0

NAWCWD (685200D) 0 1 0

BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN ACCORDANCE NAWCWD (QA) 0 1 0

WITH THE QUALITY ASSURANCE PROVISION (QAP). AFLCMC/EBHCB 0 1 0

DCMA-MCWB (QAR) 0 1 0

CCRC-AR/PCO 0 LT 0 BLKS 10, 12: THE ITP SHALL BE SUBMITTED 60 DAYS PRIOR TO FIRST

ARTICLE TEST (FAT), IF FAT IS REQUIRED, OR 60 DAYS PRIOR TO

INITIATION OF PRODUCTION. THE GOVERNMENT REQUIRES 30 DAYS

FOR REVIEW. DISPOSITION OF THE ITP WILL BE PROVIDED THROUGH

THE PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS

ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE

REVISIONS AND THE GOVERNMENT WILL REVIEW AND PROVIDE

DISPOSITION WITHIN 15 DAYS. THE ITP SHALL BE APPROVED PRIOR

TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.

BLK 13: SUBMIT UPDATES FOR REVIEW AND APPROVAL PRIOR TO

IMPLEMENTATION.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 15 Pages

Kristy Mosher 2015-04-01

N0

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 REQUEST FOR DEVIATION (RFD)

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80640C SECTION C NAWCWD (685200D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (685200D) 0 1 0

AFLCMC/EBHCB 0 1 0

BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE RDAR-EIS-PD 0 1 0

PARA 2, SUBMIT REQUEST FOR DEVIATION (RFD) ON DD FORM 1694, CCRC-AR 0 1 0

AND INCLUDE IN THE CONTENT OF THE RFD ADEQUATE

DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST FOR DEVIATION.

BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A

RFD FOR EACH DEVIATION ON DD FORM 1694. DD FORM IS LOCATED AT:

HTTPS://WWW.PICA.ARMY.MIL/PROD_TECHDATA/CMDOCS-LINKS.HTM.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 15 Pages

Kristy Mosher 2015-04-01

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 ENGINEERING CHANGE PROPOSAL (ECP)

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80639C SECTION C NAWCWD (685200D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (685200D) 0 1 0

AFLCMC/EBHCB 0 1 0

BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE RDAR-EIS-PD 0 1 0

PARA 2 AND SUBMIT ENGINEERING CHANGE PROPOSAL (ECP) ON DD CCRC-AR 0 1 0

FORM 1692. SUBMIT TEXT FILES IN GOVERNMENT COMPATIBLE

MICROSOFT WORD AND VIEW FILES IN GOVERNMENT COMPATIBLE

ADOBE ACROBAT. FOR DRAWINGS SUBMIT PDF VIEW FILES IN

GOVERNMENT COMPATIBLE ADOBE ACROBAT.

BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT AN

ECP ON DD FORM 1692. DD FORM IS LOCATED AT:

HTTPS://WWW.PICA.ARMY.MIL/PROD_TECHDATA/CMDOCS-LINKS.HTM.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 15 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 NOTICE OF REVISION (NOR)

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80642C SECTION C NAWCWD (685200D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (685200D) 0 1 0

AFLCMC/EBHCB 0 1 0

BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE PARA RDAR-EIS-PD 0 1 0

2 AND SUBMIT NOTICE OF REVISION (NOR) ON DD FORM 1695. CCRC-AR 0 1 0

BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A

NOR ON DD FORM 1695 FOR EACH DRAWING, ASSOCIATED LIST, OR

OTHER REFERENCED DOCUMENT WHICH REQUIRES REVISION AND

SUBMIT NOR WITH THE ECP. DD FORM IS LOCATED AT:

HTTPS://WWW.PICA.ARMY.MIL/PROD_TECHDATA/CMDOCS-LINKS.HTM.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 5 of 15 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006 TEST/INSPECTION REPORT FIRST ARTICLE ACCEPTANCE TEST REPORT

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B SECTION E NAWCWD (685200D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (685200D) 0 1 0

AMSJM-QAP 0 1 0

0 1 0 0 1 0 0 1 0

BLKS 10, 12, 13: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE NAWCWD (QA)

SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. THE GOVERNMENT AFLCMC/EBHCB

REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE FAT REPORT WILL DCMA-MCWB

BE PROVIDED THROUGH THE PCO. CCRC-AR/PCO 0 LT 0

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 6 of 15 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 TEST/INSPECTION REPORT LOT ACCEPTANCE TEST REPORT

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B SECTION E DCMA-MCWB (QAR)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

NO D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: DCMA-MCWB (QAR)* 0 1 0

WARP** 0 1 0

*FULL LOT ACCEPTANCE TEST REPORTS SHALL BE SUBMITTED TO THE

QAR FOR LOT ACCEPTANCE. REPORTS SHALL BE SUBMITTED UPON

COMPLETION OF EACH LOT. **LOT ACCEPTANCE TEST REPORTS SHALL

BE SUBMITTED BY ACCESSING THE WORLDWIDE AMMUNITION DATA

CARD REPOSITORY PROGRAM (WARP) WHICH IS LOCATED ON THE

MUNITIONS HISTORY PROGRAM (MHP) WEBSITE AT HTTPS://

MHP.REDSTONE.ARMY.MIL/. TEST REPORTS SHALL INCLUDE

INSPECTION AND TEST DATA IN ACCORDANCE WITH THE APPROVED

INSPECTION AND TEST PLAN (CDRL A002).

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 7 of 15 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 3. SUBTITLE

A008 AMMUNITION DATA CARD

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80043B SECTION C, MIL-STD-1168 AMSJM-QAP

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

NO D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

N/A N/A ASREQ

16. REMARKS: DCMA-MCWB (QAR) 0 1 0

WARP 0 1 0

LOT SHIPMENT* 0 2

0 2 0 MAIL TO DEST **

BLKS 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE PREPARED

IAW MIL-STD-1168, SECTION C, AND BY ACCESSING THE WORLDWIDE

AMMUNITION DATA REPOSITORY PROGRAM (WARP), WHICH IS LOCATED

AT HTTPS://MHP.REDSTONE.ARMY.MIL.

*HARD COPY ADC PROVIDED WITH LOT SHIPMENTS SHALL BE

GENERATED FROM THE WARP PROGRAM AND SIGNED AND DATED BY

THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE (GARA).

**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY GENERATED

FROM THE WARP PROGRAM SIGNED AND DATED BY THE GARA SHALL BE

SENT TO THE PROVING GROUND WITH SAMPLE SHIPMENT, PLUS AN

ADDITIONAL SIGNED, HARD COPY PROVIDED TO THE PROVING GROUND

BY MAIL.

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 8 of 15 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI and

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

FAILURE ANALYSIS AND CORRECTIVE ACTION

A009 REPORT (FACAR)

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81315B QAP, PARA V.A.4 NAWCWD (685200D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT D ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (685200D) 0 1 0

AMSJM-QAP 0 1 0

0 1 0 0 1 0 0 1 0 0 1 0

BLKS 10, 12, 13: CONTRACTOR SHALL NOTIFY IAW DISTRIBUTION LIST VIA

EMAIL WITHIN 24 HOURS AFTER THE OCCURRENCE OF A FAILURE DURING

ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY FAILURES

DURING FAT/LAT AND ANY DESTRUCTIVE/NONDESTRUCTIVE TEST

FAILURES. FORMAL SUBMITTAL SHALL BE NO LATER THAN 10 DAYS AFTER

REPORTED FAILURE. FINAL REPORT SHALL BE SUBMITTED NO LATER

THAN 30 DAYS AFTER DETERMINING/CONDUCTING ROOT CAUSE FAILURE

ANALYSIS. GOVERNMENT COMMENTS SHALL BE RESOLVED PRIOR TO

PRESENTING PRODUCT FOR ACCEPTANCE.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jan Murphy 2015-02-20 DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 9 of 15 Pages

Kristy Mosher 2015-04-01

A

NAWCWD (QA)

AFLCMC/EBHCB

DCMA-MCWB (QAR)

CCRC-AR/PCO

DD FORM 1423-1, FEB 2001

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

2015-04-01

U15A06DAHI and

U16A06NAHI

10 15

NO

A

BOMB ASSEMBLY, BDU-50D/B PRACTICE BOMB

laura.k.spencer2.civ@mail.mil

F. CONTRACTOR

SECTION H

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 15

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No. B. Exhibit C. Category

D. System/Item. E. Contract/PR NO. F. Contractor

1. Data Item No A011

2. Title of Data Item:

Measurement System Evaluation (MSE)

3. Subtitle:

4. Authority (Data Acquisition Document No.)

DI-QCIC-81960

5. Contract Reference Contract Section E MSE Clause

6. Requiring Office

NSWC (PE-21)

7. DD 250 Req N/A

9. Dist Statement Required

D

10. Frequency

ASREQ

12. Date of First Submission

120DAC

14. Distribution

8. APP Code

A

11. As of Date N/A

13. Date of Subsequent Submission

ASREQ

a. Addressee b. Copies

Draft Final

Reg Repro

16. REMARKS

BLK 12: The Contractor shall submit a completed AIE package no later than (120) calendar days after contract award and no later than (60) calendar days prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The Government will furnish disposition within (45) calendar days of final AIE package receipt.

BLK 13: If further revisions are necessary, the Contractor shall have (30) calendar days to generate them and the Government shall have (30) calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract.

If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within (30) calendar days.

The Contractor shall notify the responsible Government technical agency minimum of (30) calendar days prior to acceptance (prove out) testing.

An MSE Review Guide is available to assist Contractors on the ARDEC Public Website in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.

0 1 0

AMSJM-QAP 0 1 0

NAWCWD

(QA)

0 1 0

AFLCMC/EBH

CB

0 1 0

NAWCWD

(685200D)

0 1 0

CCRC-AR 0 LT 0

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

K. Mosher 1 June 2015

U15A06DAHI and

U16A06NAHI

NSWC (PE-21)

BOMB ASSEMBLY, BDU-50D/B PRACTICE BOMB

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No. B. Exhibit C. Category

D. System/Item. E. Contract/PR NO. F. Contractor

1. Data Item No. 2. Title of Data Item:

Management Plan

3. Subtitle:

Process Control Plan (PCP)

4. Authority (Data Acquisition Document No.)

DI-MGMT-80004 (Tailored)

5. Contract Reference Contract Section E Clause

6. Requiring Office

AMSJM-QAP

7. DD 250 Req N/A

9. Dist Statement Required

D

10. Frequency

ASREQ

12. Date of First Submission

60DAC

14. Distribution

8. APP Code

A

11. As of Date

N/A

13. Date of Subsequent Submission

ASREQ

a. Addressee b. Copies

Draft Final

Reg Repro

16. REMARKS

Blk 12: The Contractor shall submit initial PCP no later than sixty (60) days after contract award.

The Government will respond within thirty (30) days of initial submission. If further revisions are necessary, the Contractor shall have fifteen (15) days to generate them and the Government shall have fifteen (15) days to review and respond to them. The final PCP shall be available sixty (60) days prior to the First Article or start of production if a First Article is not required.

Blk 13: The Contractor shall submit the final PCP sixty (60) days prior to the First Article.

If a First Article is not required, the Contractor shall submit the final PCP sixty (60) days prior to the start of production.

If Contractor revises a previously Government accepted PCP, the revised PCP must be submitted to the Government for acceptance before it is released for use. The Government will respond within 10 working days.

A PCCI Review Guide is available to assist Contractors on the ARDEC Public Website in the application of the PCCI Clause. The PCCI Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the PCCI Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the PCCI clause itself nor into the terms and conditions of any underlying contract which contains the PCCI clause.

DCMA-

MCWB (QAR)

0 1 0

AMSJM-QAP 0 1 0

NAWCWD

(QA)

0 1 0

AFLCMC/EBH

CB

0 1 0

NAWCWD

(685200D)

0 1 0

CCRC-AR 0 1 0

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

A012

K. Mosher 1 June 2015

U15A06DAHI and

U16A06NAHI

BOMB ASSEMBLY, BDU-50D/B PRACTICE BOMB

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ______________ TM ___________ OTHER __X_____________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

BOMB ASSEMBLY, BDU-50D/B

PRACTICE BOMB

U15A06DAHI

U16A06NAHI

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 TEST PROCEDURE PHOSPHATE COATING PRE-PRODUCTION PROCEDURE

4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80603A SECTION C (SEE BLK 16) NAWCWD (434100D)

7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

D ONE/R 60DAC b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro

A N/A ASREQ

16. REMARKS: NAWCWD (434100D) 0 1 0

NAWCWD (685200D) 0 1 0

BLK 5: SAMPLES SHALL BE SUBMITTED 60 DAYS PRIOR TO FAT TO

NAWCWD (434100D). SUBMITTED SAMPLES SHALL INCLUDE THREE

PANELS WITH PHOSPHATE ONLY, THREE PANELS WITH PHOSPHATE AND

NAWCWD (QA) 0 1 0

COATING, AND THREE CASE SEGMENTS WITH PHOSPHATE AND COATING. AFLCMC/EBHCB 0 1 0

DCMA-MCWB (QAR) 0 1 0

CCRC-AR 0 LT 0

AMSJM-QAP 0 1 0 BLKS 10, 12: THE TEST PLAN/PHOSPHATE COATING PRE-PRODUCTION

PROCEDURE SHALL BE SUBMITTED 60 DAYS AFTER CONTRACT AWARD.

IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL

HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT WILL

REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF RECEIPT.

THE TEST PLAN/PHOSPHATE COATING PRE-PRODUCTION PROCEDURE

SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO

INITIATION OF PRODUCTION.

BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL PRIOR

TO PRODUCTION.

BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/12/2015

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 13 of 15 Pages

NO

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Pages

A

MGMT

D. SYSTEM/ITEM

A014 GOVERNMENT FURNISHED MATERIEL (GFM)

CONSUMPTION REPORT

DI-MGMT-80438B Section C AMSJM-SOE

NO

N/A N/A

MTHLY

N/A

DFDEL*

ASREQ**

0 1 0

CCRC-AR/PCO 0 1 0

0 2 0

*30 DAYS AFTER PRODUCTION COMMENCES. **3 WORKING DAYS

FOLLOWING REPORTING MONTH. DELETE PARAGRAPHS 2.1-2.3, 2.8, 2.9, 2.11, 2.16.

***CONTRACTOR FORMAT ACCEPTABLE. SHALL BE SUBMITTED IN ELECTRONIC

FORMAT IN EITHER RICH TEXT FORMAT (RTF) OR ASCII AND INCLUDE DESCRIPTION/

NSN; TOTAL OF GFM ON CONTRACT VS. TOTAL DELIVERED AS OF THE CURRENT

MONTH; RECEIPTS, CUMULATIVE VS. CURRENT MONTH; CONSUMED, CUMULATIVE VS.

CURRENT MONTH; REJECTED/DAMAGED MATERIEL, LOT NUMBERS AND SERIAL

NUMBERS OF GFM; AND LAP CLINS, CONTRACT QUANTITY VS. DELIVERED QUANTITY.

SUBMIT ELECTRONICALLY TO EUGENE.F.FILDES.CIV@MAIL.MIL AND

LAURA.K.SPENCER2.CIV@MAIL.MIL.

DD FORM 1423-1, FEB 2001

AMSJM-SOE

BOMB ASSEMBLY, BDU-50D/B PRACTICE BOMB U12A06DAHI U16A06NAHI

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

U15A06DAHI_U16A06NAHI_cdrl_revB_combined
U15A06DAHI_cdrl_revA
U15A06DAHI_CDRL
OPSEC_1423
mse_hotle
CONTRACT DATA REQUIREMENTS LIST
u15a06dahi_u16a06nahi_pcp_hotle
CONTRACT DATA REQUIREMENTS LIST

A020-GFM_Consumption_Report_Signed

A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
1_DATA_ITEM_NO: A010
2_TITLE_OF_DATA_ITEM: Operations Security (OPSEC) Plan
3_SUBTITLE: OPSEC Program
4_AUTHORITY_Data_Acquisit: DI-MGMT-80934C
5_CONTRACT_REFERENCE: PADDS Clause HS7001
6_REQUIRING_OFFICE: AMSJM-FP/G2
7_DID_250_REQ:
8_APP_CODE: A
DIST_STATEMENT: D
10_FREQUENCY: ONE/R
11_AS_OF_DATE: ASREQ
12_DATE_OF_FIRST_SUBMISSI: ASREQ*
13_DATE_OF_SUBSEQUENT_SUB: ASREQ**
addressee1: AMSJM-FP/G2
draft1: 0
reg1: 1
repro1: 0
addressee2: PCO
draft2: 0
reg2: 1
repro2: 0
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN CRITICAL INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10 CALENDAR DAYS AFTER GOVERNMENT REVIEW. SUBMIT ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil and
17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Kristy Mosher
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
of_pages:
Reset:
reg38t: 2

File details come from the government source that posted it. Updated .