Measurement System Evaluation
Overview
Distribution Statement A: Approved for Public Release. Distribution is Unlimited
Unclassified
Feels like we’re walking in different dimensions!
Current Challenges…
• Submission, review, and approval process
• MULTIPLE…
– Contract clauses (applicable to ammo & weapons)
– Outdated Data Item Descriptions (DIDs)
– Outdated AIE MIL-Specs in TDPs
– Industry standards embedded in Clause and TDPs at various levels
THEREFORE, requirements variability and visibility is a challenge…
Contract
AIE
JMC
AIE
JMC
AF/USN
DID
DID
DID
DID
DID
TDP
70625
48078
ASTM
ISO ANSI
ASME
AIE
ARDEC
CDRL
Balancing many requirements
Our Vision…
Creation of a “one-stop shop” with removal of ambiguity.
WHY?
LONG TERM RISKS
Boundary Conditions
• Long life cycle - Failures of inventory decades later
• Diverse DoD inventory and unique items.
– 5.56mm to Precision Guided munitions
• Diverse industrial base.
– Small, medium, large businesses
Current State Requirement Number of Vehicles Notes
Contract Clauses 3 ARDEC, JMC, JMC AF/Navy
Government AIE Mil Specs 3 MIL-A-70625A, MIL-A-48078, MIL-A-2550
Data Item Descriptions 5 Various DIDs being currently used. No standard.
Industry Specifications Several Measurement systems, calibration, NDT, etc.
How - Future State Requirement Number of Vehicles Notes
Contract Clauses 1 MSE Clause
Government AIE Mil-Specs 1 MIL-A-70625A AAIE, some quality requirements from others noted in the clause.
Data Item Descriptions 1 DID tailored to note exactly what is needed IAW clause.
Industry Specifications Several All referenced in the clause for clarity and applicability.
Review Guide and Training (NON contractual)
1 Explaining expectations associated with the requirements for government and contractor.
Contract
MSE Clause CDRL &
DID
70625
ASTM
ISO
ANSI
ASME
TDP
MSE Clause is a…
What is MSE
• MSE is not just Inspection Equipment
• MSE includes gages, instruments, tools, standards, operations, methods, fixtures, software, personnel, environment, assumptions used & any other piece of equipment used to quantify a unit of measure or fix assessment to a feature characteristic.
Navy Furnished Gages
• Navy Special Interface Gages (NSIG)
• Navy Gage Lab provides NSIG(s) for:
1. Several branches of the Military Services.
2. Final acceptance of identified TDP features/interfaces.
• Purpose of NSIGs is to ensure satisfactory interface rqrts.
• NSIGs are for Major & Critical Characteristics.
• Contractor must request NSIGs 45 days prior to FAT (if rqrd) or production.
NSWC, Corona processes the request.
This will ensure gages arrive before needed & will not need to be sent back early for re-calibration.
Navy Furnished Gages (Cont’d)
• Navy Special Interface Gages (NSIG)
• Para (o)(9) contains:
• NSIG info that includes specific dwg # (from Govt provided TDP), revision, & feature(s) the NSIG is designed to inspect.
• NSIG # (used for tracking), quantity included, dimensions, weight, & value.
• Contractor may elect to use their own gages in lieu of NSIGs but would need to send their designs to Navy Gage Lab for approval.
• Calibration or repair of NSIGs only to be performed as authorized by NSWC-Corona
• Navy Gage Lab typically has two sets of duplicate NSIGs, thus damaged or worn NSIGs need to be brought to the attn of NSWC-Corona so a replacement can be sent.
What: Three Concluding Points
• ONE MSE clause, DID, and review guide
• Requirements included are current state, with added clarity/amplification.
• Alignment with other requirements and best practices: CCC, Process Control, ISO 9001/AS 9100, NDT, AIAG etc.
Back up Slides
It’s Not Reality Unless It’s Shared”
“How do perfectly smart people make bad decisions? In an organizational context, it’s almost always the result of a lack of shared reality”
Peter Blaber, COL (Retired) US Army, The Mission, The Men, and Me: Lessons from a Former Delta Force Commander
Challenges
• Variability:
–Three current clauses
–Multiple requirements spread over various specifications, commercial and DoD
• Waste:
–Lack of requirements in one place leads to waste. Labor and energy needed to connect the dots.
–Affects first pass yield of submissions
–Can lead to Government and contractors miscommunication.
–Failures of inventory decades later requiring screening and maintenance
• Constraints:
–Diverse DoD inventory and unique items.
–Diverse industrial base (e.g., GOGO, GOCO, & COCO)
–Cost (e.g., REAs, Govt & Contractor labor)
–Long life cycle of ammunition
Path Forward
• Consolidate clauses
• Consolidate current requirements from various outdated government specifications into the clause
• Craft a tailored DID and recommended CDRL for the clause
• Create review guide that explains to users what’s expected for compliance.
Key Events So Far
• Kaizen Event
• SQI Management Review Team Chartering the MSE project.
• FedbizOps Notice soliciting feedback from Industry
• SQI Working Group meetings with Joint Service Representatives to craft requirements
• SQI Management Review Team meeting
• Industry Day
Benefits! ONE STOP SHOP
• No trying to find all specifications, contracts, drawings, etc to find the correct AIE/AAIE requirements. MSE clause is the consolidated gateway.
–Clause, CDRL, DID and Review guide a pathway to all necessary information.
• Clause is longer, but clearer.
• No “new” requirements. Language phrased to complement other requirements rather than conflict.
• It may appear to be “new” due to how spread out current requirements are.