W52P1J-22-R-5002 -- Solicitation Attachment 0006 -- Appendix E Non-Hazardous Construct Demo Debris Submit Form.pdf
PDF 14 KB Posted
- Solicitation number
- W52P1J-22-R-5002
About this file
This document is a template for submitting non-hazardous construction and demolition debris data from a project. It includes tables to report estimated weights and percentages of materials to be landfilled, recycled, or diverted from landfills. Contractors must provide data on civil, architectural, electrical, mechanical, and hazardous materials generated from a project. They must also submit the project title and number, contractor name, and contracting officer's representative. This template collects required data for contractors to submit on non-hazardous construction waste generated from a project and how it was disposed of through landfilling, recycling, or diversion in order to comply with federal requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data