This solicitation package includes drawings and specifications for the construction of a splash pad at Memorial Park in Rock Island, Illinois. The United States Army Contracting Command - Rock Island is requesting proposals to install thirteen water features including fountains, jets, and interactive pads. Drawings show the layout of the splash pad and anchoring details for each feature. Specifications cover site preparation, concrete, reinforcing steel, piping, electrical, and other construction requirements. Proposals are due by 14 February 2022. The selected contractor will be responsible for excavation, formwork, installation of all water and electrical systems, placement of concrete, and ensuring the splash pad meets all applicable codes.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S L O
P E
S L O
P E
A
B
B
C
C
D
E
E
F
F
G
I
FT-001
FT-001
FT-001
TYP FOR F
IA
1664 155m²
924 86m²
64.5
PRODUCT LEGEND
SPLASHPAD DIMENSION
REF PRODUCT
QTY
A
Bobble N°1
VOR 7232
B
Directional Jet N°2
VOR 0321
C
Fountain Spray N°2
VOR 7676
D
Helio N°6
VOR 7241
E
Jet Stream N°1
VOR 7512
F
Loop N°2
VOR 7553
G
Luna N°3
VOR 7234
IA
Smartpoint N°1 Foot Activator
VOR-1910
I
Twinsplash
VOR 7242
TOTAL
QTY
TOTAL FLOW :
SPRAY AREA :
TOTAL AREA :
ft² ft²
GPM
SPECIFICATIONS FOR CONSTRUCTION
1 GENERAL NOTES
1.1 MANUFACTURER ACCEPTS NO RESPONSIBILITY FOR DAMAGES, IF ANY, SUFFERED BY
ANY THIRD PARTY AS A RESULT OF DECISIONS MADE OR ACTIONS BASED ON THESE
DESIGN DOCUMENTS WITHOUT THE PREVIOUS CONSULTATION TO MANUFACTURER.
1.2 ALL WORK, MATERIALS AND THEIR ASSEMBLIES SHALL CONFORM TO THE
STANDARDS, REGULATIONS AND CODES CURRENTLY IN FORCE FOR ALL TRADES, AISC,
ACNOR, EN, OR IBC.
1.3 THESE DESIGN DOCUMENTS DO NOT INDICATE THE METHOD OR MEANS OF
CONSTRUCTION. WHEN APPLICABLE, THE CONTRACTORS SHALL SUPERVISE AND DIRECT
ALL THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,
METHODS, PROCEDURES AND SEQUENCES AS PER STANDARD BEST PRACTICES.
1.4 DO NOT SCALE DRAWINGS.
1.5 USE ONLY THOSE MARKED "ISSUED FOR CONSTRUCTION".
1.6 THE CONTRACTOR SHALL REVIEW THESE DESIGN DOCUMENTS AND REPORT ANY
CONFLICTS OR OMISSIONS TO THE MANUFACTURER IMMEDIATELY.
1.7 TEMPORARY SUPPORTS, WHICH WILL BE REQUIRED DURING CONSTRUCTION, SUCH
AS FORMWORK, BRACING, SHORING, ETC. ARE NOT SHOWN ON THESE DRAWINGS AND
ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE TO
ENSURE THAT ALL SAFE CONSTRUCTION PROCEDURES ARE FOLLOWED.
1.8 THE FOLLOWING SPECIFICATIONS ARE MANUFACTURER'S MINIMUM
RECOMMENDATIONS TO OBTAIN A QUALITY PRODUCT. THE CONTRACTOR SHALL FOLLOW
THE LOCAL CODES IF MORE RESTRICTIVE.
1.9 ALL SEEFLOW COMPONENTS TO BE SNUG-TIGHT ONLY. USING POWER TOOLS OR
TIGHTEN HARDWARE FULLY-TENSIONED CAN PRODUCE CRACKING ON THE PLASTIC.
2 EXCAVATION
2.1 ANY SHORING OR TEMPORARY SHORING NOT SHOWN ON DRAWINGS WILL BE
EXECUTED, IN A SAFE MANNER, BY THE GENERAL CONTRACTOR.
2.2 IT IS THE RESPONSIBILITY OF OTHERS TO VERIFY THE EXISTENCE OF ANY
UNDERGROUND SERVICES ETC.
2.3 IF AVAILABLE, REFER TO SOIL REPORT FOR BACKFILL REQUIREMENTS. ALL BACKFILL
(FOR SLAB ON GRADE, ETC.) MUST BE DONE IN ACCORDANCE WITH THE
RECOMMENDATIONS OF A QUALIFIED PROFESSIONAL. USE ONLY FREE DRAINING,
GRANULAR, MINERAL, INERT AND NON- REACTIVE FILL.
3 FOUNDATIONS
3.1 REFER TO SOIL REPORT FOR RECOMMENDATIONS.
3.2 ALL FOOTINGS SHALL REST ON A HOMOGENEOUS LAYER OF UNDISTURBED SOIL OR
ENGINEERED BACKFILL WITH A MINIMUM ALLOWABLE BEARING CAPACITY OF 100KPA
(2000 PSF) AND MAXIMUM DIFFERENTIAL SETTLEMENT OF 19 MM (0.75"). ALL ORGANIC
MATERIAL SHALL BE REMOVED.
3.3 IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE SOIL AT ALL
FOOTING LOCATIONS BE VERIFIED BY A QUALIFIED SOILS EXPERT BEFORE POURING
FOOTINGS TO ENSURE FOOTINGS REST ON APPROPRIATE STRATA.
3.4 WHEN APPLICABLE, FOLLOW GEOTECHNICAL EXPERT RECOMMENDATIONS FOR ALL
EXTERIOR FOOTINGS TO ENSURE FROST PROTECTION.
4 CONCRETE
4.1 ALL CONCRETE MATERIALS, PROCEDURES, TOLERANCES & WORKMANSHIP SHALL
CONFORM TO THE LATEST ISSUES OF ACI-318 AND ACI 317 OR ACNOR CAN3-A23.1 &
A23.2, DEPENDING ON PROJECT LOCATION.
4.2 CONCRETE THAT HAS BEEN IN THE TRUCKS LONGER THAN 2 HOURS SHALL BE
REJECTED. DO NOT ADD WATER TO THE CONCRETE IN THE TRUCKS OR ON THE SITE
UNDER ANY CIRCUMSTANCES.
4.3 USE MAXIMUM 76mm (3") SLUMP, 19mm (3/4") AGGREGATE, UNLESS
OTHERWISE-NOTED. USE 5-7% AIR ENTRAINMENT FOR CONCRETE EXPOSED TO WEATHER
ONLY.
4.4 ALL GROUT SHALL BE NON-SHRINK TYPE WITH A MINIMUM 28 DAYS STRENGTH OF
35.0 MPa (5000 PSI). USE 25mm (1") GROUT UNDER ALL STEEL COLUMN BASE PLATES.
4.5 CONCRETE STRENGTH @ 28 DAYS TO BE:
4.5.1 FOUNDATIONS (FOOTINGS): 25.0 MPa (3500 PSI), UNLESS OTHERWISE
NOTED.
4.5.2 INTERIOR SLAB ON GRADE: 25.0 MPa (3500 PSI), UNLESS OTHERWISE NOTED.
4.5.3 EXTERIOR SLAB ON GRADE: 32.0 MPa (4500 PSI), UNLESS OTHERWISE NOTED.
4.6 MINIMAL RE-BAR COVER:
4.6.1 CONCRETE POURED ON-GRADE = 76mm (3") COVER
4.6.2 CONCRETE POURED INTO FORMWORK BUT EXPOSED TO SOIL AND WEATHER
FOR REBAR 15M (#4) AND UNDER = 50mm (2") COVER
5 REINFORCING STEEL
5.1 DEPENDING ON PROJECT LOCATION, ALL REINFORCING STEEL SHALL CONFORM TO
ASTM A615 (BARS 15m (#4) TO BE GRADE 60 WITH SUPPLEMENTARY REQUIREMENTS ON
S1.
BARS SMALLER THAN 15m (#4), TO BE GRADE 40); OR TO ACNOR GRADE G30.12 [FY =
400MPA (60,000 PSI), UNLESS OTHERWISE NOTED].
5.2 USE CONCRETE, PLASTIC OR STEEL SUPPORT BARS, AS PER ACI (MANUAL OF
STANDARD PRACTICE FOR DETAILING CONCRETE STRUCTURES). THE RE-BAR PLACER
MUST REMAIN ON-SITE DURING POURS TO VERIFY CORRECT POSITIONING OF RE-BARS.
SLANT UPPER REINFORCING STEEL IN LINE WITH THE SLOPE OF THE SLAB, IF
APPLICABLE.
5.3 BARS SHALL BE SECURELY WIRED PER LATEST EDITION OF CRSI (RECOMMENDED
PRACTICE FOR PLACING REINFORCING BARS).
5.4 ALL REINFORCING STEEL IS TO BE KEPT CLEAN AND FREE OF MUD, SNOW, ICE, AND
ANY CONTAMINANTS.
5.5 VERTICAL AND CONTINUOUS REBAR SHALL BE LAPPED TO DEVELOP FULL TENSILE
CAPACITY OF THE BAR. FOR 15m (#4) BARS MINIMUM LAP OF 610mm (24”).
6 EXTERIOR / INTERIOR SLAB ON GRADE
6.1 FOLLOW THE GEOTECHNICAL EXPERT RECOMMENDATIONS FOR PREPARATION OF
SOIL BEFORE POURING THE CONCRETE. ALL GRANULAR MATERIAL SHALL BE MOISTENED
IMMEDIATELY BEFORE POURING THE CONCRETE. WATER AS NEEDED. DO NOT USE A
VAPOR BARRIER.
6.2 NO TRUCKS ARE PERMITTED ON THE CONSTRUCTION SITE (OF THE SLAB) AFTER
THE FINAL COMPACTION, EITHER BEFORE OR DURING, THE POUR.
6.3 SLAB TO BE MINIMUM 6 INCHES THICK, REINFORCED WITH 10M (#3) @ 300 MM
(12”) C/C REBAR PLACED IN BOTH DIRECTIONS AT MID-HEIGHT OF THE SLAB, UNLESS
OTHERWISE NOTED ON PLANS.
6.4 REFER TO CONCRETE SECTION FOR MINIMUM COMPRESSIVE STRENGTH AND
AIR-ENTRAINMENT REQUIREMENTS.
6.5 FINISHING WILL BE MEDIUM BROOM.
6.6 CONTROL JOINTS (SAW-CUTS) TO BE LOCATED IN EACH DIRECTION, AT REGULAR
INTERVALS, WITH A MAXIMUM DISTANCE OF 3 METERS (10 FEET). SHALL BE MINIMUM 3
MM (1/8") WIDE AND SHALL PENETRATE THE SLAB TO A MINIMUM DEPTH OF 1/3 OF
THE THICKNESS OF THE SLAB. CONTROL JOINTS SHOULD BE DONE AS SOON AS
POSSIBLE WITHOUT DAMAGING THE CONCRETE, BUT NO LATER THAN 18 HOURS AFTER
POURING.
6.7 WHEN POSSIBLE AND TO AVOID SHRINKAGE CRACKING, HUMIDITY SHALL BE
MAINTAINED FOR 7 DAYS DURING THE CURING PERIOD OF THE SLAB. WATER AND USE
POLYETHYLENE CLOTH OR BAG. THE CONCRETE MUST DRY UNIFORMLY.
7 CONCRETE WORK IN COLD OR HOT WEATHER (MINIMUM REQUIREMENTS)
7.1 COLD WEATHER REQUIREMENTS APPLY WHEN THE MEAN AIR IS LESS THAN 5
DEGREES CELSIUS (40 DEGREES FAHRENHEIT).
7.2 GENERAL REQUIREMENTS FOR COLD WEATHER CONCRETE WORK SHALL BE AS
PER ACI 306R-88; OR AS PER THE NBC'S LATEST REQUIREMENTS INCLUDING THE
LATEST ISSUE OF CSA STANDARD CAN3-A23.1.
7.3 ALL SNOW AND ICE SHALL BE REMOVED FROM FORMS AND REBAR WITH STEAM
AND COMPRESSED AIR BEFORE POURING. DO NOT USE DE-ICING SALT (CALCIUM
CHLORIDE) OR ANY OTHER SALTS UNDER ANY CIRCUMSTANCES.
7.4 CONCRETE SHALL HAVE A MINIMUM TEMPERATURE OF 20 DEGREES CELSIUS AND
A MAXIMUM TEMPERATURE OF 25 DEGREES CELSIUS WHILE POURING. IT IS THE
CONTRACTOR'S RESPONSIBILITY
TO ENSURE THAT THESE REQUIREMENTS ARE SATISFIED. ANY CONCRETE THAT DOES
NOT CONFORM MUST BE REJECTED.
7.5 THE SURFACE OF POURED CONCRETE SHALL BE PROTECTED BY MEANS OF
SUITABLE COVERINGS AND INSULATION (TO BE DETERMINED BY TEMPERATURE)
DURING THE CURING PROCESS.
7.6 GENERAL REQUIREMENTS FOR HOT WEATHER CONCRETE WORK SHALL BE AS PER
ACI 305R-99; OR AS PER LOCAL CODE REQUIREMENTS.
8 PIPING
8.1 WDS CONFIGURATION ARE SCHEMATIC AND MAY BE MOVED OR ADJUSTED ON
SITE BY MANUFACTURER CERTIFIED INSTALLER TO ADJUST FOR SITE CONDITIONS
8.2 ANY REQUIRED BACKFLOW PREVENTER AND WATER METER ON THE CITY WATER
MAIN SHALL BE PROVIDED BY INSTALLER. PRESSURE REGULATOR SHALL BE INSTALLED
INSIDE THE SMARTPOINT.
8.3 ALL PIPE LINES TO FEATURES TO HAVE A 1% MINIMUM RECOMMENDED SLOPE
FOR PROPER WINTERIZATION.
8.4 ALL LINE SIZING (FEATURE CONNECTION TABLE) ASSUMES A MAXIMUM DISTANCE
OF 30 FEET BETWEEN THE WATER DISTRIBUTION MANIFOLD AND THE FURTHEST PLAY
PRODUCT. DISTANCES ABOVE 30 FEET MAY REQUIRE AN INCREASE IN LINE SIZING.
PLEASE CONTACT MANUFACTURER.
8.5 THE LINE DIAMETER FROM SMARTPOINT SHALL BE 6" BASED ON THE MAXIMUM
APPROXIMATE FLOW AT 1% SLOPE. FINAL LOCATION OF DRAIN AND LINE ROUTING ARE
TO BE DETERMINED BY OTHERS.
8.6 PRESSURE LINES ARE RECOMMENDED TO BE SCHEDULE 80 PVC OR PEX, AND
NON-PRESSURE LINES TO BE SCHEDULE 40, UNLESS OTHERWISE REQUESTED BY LOCAL
CODE.
8.7 DRAINAGE LINES ARE RECOMMENDED TO BE SDR 35, UNLESS OTHERWISE
REQUESTED BY LOCAL CODE.
8.8 PIPING SHOULD BE INSPECTED AFTER TRANSPORTATION FOR CUTS, SCRATCHES,
GOUGES OR SPLITS; DAMAGED SECTIONS MUST BE DISCARDED OR CUT OUT.
8.9 PIPE SHALL BE INSTALLED BELOW THE FROST LEVEL NOT LESS THAN 12" (ASTM
F-645) UNLESS OTHERWISE REQUESTED BY LOCAL CODE.
8.10 PIPE INSTALLATION MINIMUM COVER SHOULD BE EVALUATED ACCORDING TO
ASTM D-2774, UNLESS OTHERWISE REQUESTED BY LOCAL CODE.
8.11 SPECIAL CONSIDERATIONS SHOULD BE TAKEN FOR THERMAL CONDITIONS,
EXPANSION AND CONTRACTIONS DUE TO TEMPERATURE SHOULD BE EVALUATED
BEFORE THE INSTALLATION BY THE CONTRACTOR.
8.12 MINIMUM 50 PSI REQUIRED AT THE INLET OF THE BACKFLOW PREVENTER AND
PRESSURE REGULATING DEVICE.
8.13MAXIMUM FLOW CAPACITY OF SMARTPOINT IS 72 GPM.
8.14 TOTAL FLOW OF FEATURE IS 64.5 GPM.
8.15 FACTORY MAXIMUM SEQUENCING FLOW IS 52 GPM ACTUAL FLOW MAY VARY DUE
TO SITE CONDITIONS.
9 ELECTRICAL
9.1 WIRING FROM THE TIMER POWER PACK TO SMARTPOINT SHALL BE #14 AWG. A
TOTAL OF TWO (2) CONDUCTORS PER SMARTPOINT.
9.2 ALL CONNECTIONS TO THE TIMER POWER PACK AND OTHER MANUFACTURER
ELECTRICAL PANEL SHALL BE PERFORMED USING AN APPROVED NEMA 4X CONNECTOR.
9.3 WIRE FROM MAIN POWER TO MANUFACTURER PANEL TO BE DETERMINED BY
OTHERS RESPECTING THE LOCAL CODE.
9.4 MAINTAIN A MINIMUM CLEARANCE ZONE OF 36" IN FRONT OF ELECTRICAL PANEL,
UNLESS OTHERWISE REQUESTED BY LOCAL CODE.
9.5 USE #8 BARE COPPER BONDING WIRE BETWEEN FEATURES TO A GROUNDING
ROD IN THE SOIL, TIED INTO REBAR GRID, OR AS PER LOCAL CODE.
9.6 AS PER ELECTRICAL CONSTRUCTION AND SAFETY CODES: CONTROLLER AND/OR
ANY OTHER ELECTRICAL EQUIPMENT MUST BE HARD-WIRED TO A GROUND FAULT
CIRCUIT INTERRUPTER (GFCI) FROM THE INPUT POWER SOURCE.
9.7 ALL ELECTRICAL WORK SHOULD BE PERFORMED BY A LICENCE ELECTRICIAN IN
ACCORDANCE TO LOCAL ELECTRICAL CONSTRUCTION AND SAFETY CODES.
9.8 TIMER POWER PACK TO BE INSTALLED IN EXISTING ENCLOSURE OR WALL
MOUNTED ON A VERTICAL STRUCTURE WITHIN 100' FROM THE SMARTPOINT.
A-001
SCALE: 1/4"=1'-0"
1. 5'[1.5M] SPRAY FREE AREA ALL AROUND THE SPLASHPAD
2. RECOMMENDED SLOPE: 2% TOWARDS DRAINAGE.
FOR WATER JOURNEY SLOPE, COORDINATE WITH
WATER JOURNEY SECTION
3. COORDINATE THESE DRAWINGS WITH
ARCHITECTURAL , CIVIL, PLUMBING & ELECTRICAL SECTIONS.
SPRAY ZONE & FEATURE PLAN1
Abbreviations
A Architectural
C Civil Work
PE
Plumbing & Electrical
Layout
E
Electrical Layout
ED Electrical Details
FT
Feature Drawings
Drawing # Drawing Name
A-001
Spray Zone Layout
A-002 Anchor Plan
C-001 Embed Details
C-002 Embed Details
PE-001
Plumbing & Electrical
Layout
E-001
Bonding Layout
ED-001 Electrical Details
FT-001
Feature Drawings
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
C T
N
O
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
R O
K
I
L A
D
A
S
E N
A L
D I R
E C
T O
R A
E
F
P
U B
L
W
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
B
Y
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
G
FOR ADVERTISEMENT
M E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
A-001
NOTE TO BIDDERS:
BASIS OF DESIGN IS THE PRODUCTS MANUFACTURED BY VORTEX AQUATIC
STRUCTURES INTERNATIONAL LIMITED.
OTHER MANUFACTURER PRODUCTS CAN BE USED IF SIMILAR PRODUCTS CAN BE
PROVIDED. ALL PRODUCTS MUST BE SUBMITTED FOR REVIEW AND GOVERNMENT
APPROVED PRIOR TO INCLUSION INTO THE PROJECT.
6 FT. ALUMINUM BENCH WITH BACKS AND ARMRESTS.
SEE SPECIFICATIONS SECTION 12 93 00 SITE FURNISHINGS.
SLOPE
1 -2%
SLOPE
1 -2%
SAFESWAP No2
A
B
B
C
C
INSTALLATION KIT 55000.0433
D
E
E
SAFESWAP No2
F
SAFESWAP No2
F
SAFESWAP No1
G
I
SAFESWAP NO1
C-002
C-001
C-002
C-001
TYP FOR A & F
C-001
3 TYP FOR B, C & E
C-001
1,4
C-001
IA
6'-1"
10'-2"
6'-1"
7'-10"
21'-0"
10'-2"
18'-7"
18'-6"
19'-3"
2'-7"
8'-3"
2'-7"
2'-8"
REF PRODUCT
QTY
A
Bobble N°1
VOR 7232
B
Directional Jet N°2
VOR 0321
C
Fountain Spray N°2
VOR 7676
D
Helio N°6
VOR 7241
E
Jet Stream N°1
VOR 7512
F
Loop N°2
VOR 7553
G
Luna N°3
VOR 7234
IA
Smartpoint N°1 Foot Activator
VOR-1910
I
Twinsplash
VOR 7242
TOTAL
QTY
A-002
SCALE: 3/8"=1'-0"
1. REFER TO SPECIFICATIONS ON A-001
2. COORDINATE THESE DRAWINGS WITH
ARCHITECTURAL, CIVIL, PLUMBING & ELECTRICAL SECTIONS.
ANCHOR PLAN1
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A-002
3" [8cm]
9" [23cm]
TOP OF
ANCHOR STUD
3' [91cm]
SLOPE
4 X
" (20mm) S.S. HEIGHT & LEVELING CONTROL ANCHOR
STUDS WITH HARDWARE.
DRILL & EPOXY GROUT STUDS (DONE BY INSTALLER)
COMPACTED GRANULAR
(SUPPLIED BY INSTALLER)
3" x 24" x 24" (0.075x0.61m x0.61m) CONCRETE LEVELING
BASE. (SUPPLIED BY INSTALLER).
CONCRETE SURFACE. VERIFY LOCAL CODES FOR
TYPE, THICKNESS & REINFORCEMENT
REQUIREMENTS
SAFESWAP™ ANCHORING SYSTEM
TO BE INSTALLED LEVEL, PLUMB & FLUSH
TO FINISHED GRADE DIA.10
" (259mm)
(IF IT'S INSTALLED ON A SLOPE , SEE DETAIL 1 & 2)
" (10mm) EARTH GROUNDING STUD
1'-3" [38cm] MIN
SLOPE
WATER LINE INLET 2" (51mm) NPT. (FEMALE) MIN. 2º SLOPE
BACK TO WATER SUPPLY. REFER TO CONSTRUCTION
DOCUMENTS FOR LINE SIZE DETAILS. (LINE CONNECTION
SUPPLIED BY INSTALLER)
#4 (15M) REBAR
12'' (30cm) C/C BOTH DIRECTIONS
3'(91cm) LENGTH (SUPPLIED BY INSTALLER)
1'-3" [38cm] MIN
WATER LINE
AND CONNECTION
SAFESWAP ANCHORING DETAIL
TOP OF SAFESWAP TO BE INSTALLED
LEVEL (NOT ON A SLOPE)
NON-SHRINK GROUT
SAFESWAP ANCHORING DETAIL
TOEGUARD
NON-SHRINK
GROUT
C-001
VOR-55000.0430
Safeswap No. 1 Anchor TYP.1
3 X
" (10mm) S.S HEIGHT & LEVELING CONTROL
ANCHOR STUDS WITH HARDWARE. DRILL & EPOXY
GPOXY GROUT STUDS. (DONE BY INSTALLER).
CONCRETE SURFACE, VERIFY LOCAL CODES
FOR TYPE, THICKNESS & REINFORCEMENT
REQUIREMENTS.
COMPACTED GRANULAR (SUPPLIED BY
INSTALLER).
3" X 12" X 12" (0.076m X 0.3m X 0.3m) . CONCRETE
LEVELING BASE. (SUPPLIED BY INSTALLER).
WATER LINE INLET
" (20mm) FNPT 2º SLOPE BACK.
TO WATER SUPPLY. REFER TO CONSTRUCTION
DOCUMENTS FOR LINE SIZE DETAILS.(LINE
CONNECTION SUPPLIED BY INSTALLER)
" (10mm) BONDING STUD
1'-2" [36cm]
7" [18cm]
TOP OF ANCHOR STUD
SLOPE
CONCRETE SLAB
FRONT ELEVATION VIEW
WATER LINE AND CONNECTION.
NOTE:
“BY INSTALLER/BY CONTRACTOR “MAY REFER TO
SERVICE PROVIDERS OTHER THAN THE EQUIPMENT
MANUFACTURER. PLEASE REFER TO PROJECT
SPECIFICATION FOR DETAILS OF RESPONSIBILITY.
C-001
Ground Feature Anchor (3/4" Inlet)3
3" [8cm]
9" [23cm]
TOP OF
ANCHOR STUD
3' [91cm]
CONCRETE SLAB
SLOPE
4 X
" (20mm) S.S. HEIGHT & LEVELING CONTROL
ANCHOR STUDS WITH HARDWARE.
DRILL & EPOXY GROUT STUDS (DONE BY INSTALLER)
COMPACTED GRANULAR
(SUPPLIED BY INSTALLER)
3" x 24" x 24" (0.075x0.61m x0.61m) CONCRETE LEVELING
BASE. (SUPPLIED BY INSTALLER).
" (10mm) BONDING STUD
1'-3" [38cm] MIN
SLOPE
WATER LINE INLET 2" (51mm) NPT. (FEMALE)
MIN. 2º SLOPE BACK TO WATER SUPPLY.
REFER TO CONSTRUCTION DOCUMENTS FOR
LINE SIZE DETAILS.
(LINE CONNECTION SUPPLIED BY INSTALLER)
#4 (15M) REBAR
12'' (30cm) C/C BOTH DIRECTIONS
3'(91cm) LENGTH (SUPPLIED BY INSTALLER)
1'-3" [38cm] MIN
WATER LINE AND
CONNECTION
SAFESWAP™ ANCHORING SYSTEM TO BE
INSTALLED LEVEL, PLUMB & FLUSH TO FINISHED
GRADE DIA.7
" (191mm)
(IF IT'S INSTALLED ON A SLOPE , SEE DETAIL 1 & 2)
SAFESWAP ANCHORING DETAIL
TOP OF SAFESWAP TO BE INSTALLED
LEVEL (NOT ON A SLOPE)
NON-SHRINK GROUT
SAFESWAP ANCHORING DETAIL
TOEGUARD
NON-SHRINK
GROUT
CONCRETE SURFACE. VERIFY LOCAL CODES FOR
TYPE, THICKNESS & REINFORCEMENT
REQUIREMENTS
FRONT ELEVATION VIEW
C-001
VOR-55000.0570
Safeswap No. 2 Anchor TYP.2
SIDE ELEVATION VIEW
1'-11" [60cm]
4'-10" [148cm]
PLAN VIEW
FRONT ELEVATION VIEW
TOEGUARD™
TYPICAL ANCHORING SAFESWAP No.1
EARTH GROUND
5'-9" [176cm]
EARTH GROUND
TOEGUARD™
1'-11" [59cm]
ANCHORING DETAIL
" (10mm) EARTH GROUNDING
STUD
" (16mm) MECHANICAL ANCHORS
CONCRETE SLAB
CONCRETE SURFACE. VERIFY LOCAL
CODES FOR TYPE, THICKNESS &
REINFORCEMENT REQUIREMENTS
ANCHORING DETAIL
GASKET
C-001
VOR-7234.2XXX
Luna No. 3
3" [8cm]
9" [23cm]
TOP OF
ANCHOR STUD
3' [91cm]
SLOPE
4 X
" (20mm) S.S. HEIGHT & LEVELING CONTROL ANCHOR
STUDS WITH HARDWARE.
DRILL & EPOXY GROUT STUDS (DONE BY INSTALLER)
COMPACTED GRANULAR
(SUPPLIED BY INSTALLER)
3" x 24" x 24" (0.075x0.61m x0.61m) CONCRETE LEVELING
BASE. (SUPPLIED BY INSTALLER).
CONCRETE SURFACE. VERIFY LOCAL CODES FOR
TYPE, THICKNESS & REINFORCEMENT
REQUIREMENTS
SAFESWAP™ ANCHORING SYSTEM
TO BE INSTALLED LEVEL, PLUMB & FLUSH
TO FINISHED GRADE DIA.10
" (259mm)
(IF IT'S INSTALLED ON A SLOPE , SEE DETAIL 1 & 2)
" (10mm) EARTH GROUNDING STUD
1'-3" [38cm] MIN
SLOPE
WATER LINE INLET 2" (51mm) NPT. (FEMALE) MIN. 2º SLOPE
BACK TO WATER SUPPLY. REFER TO CONSTRUCTION
DOCUMENTS FOR LINE SIZE DETAILS. (LINE CONNECTION
SUPPLIED BY INSTALLER)
#5 (15M) REBAR
12'' (30cm) C/C BOTH DIRECTIONS
3'(91cm) LENGTH (SUPPLIED BY INSTALLER)
1'-3" [38cm] MIN
WATER LINE
AND CONNECTION
SAFESWAP ANCHORING DETAIL
TOP OF SAFESWAP TO BE INSTALLED
LEVEL (NOT ON A SLOPE)
NON-SHRINK GROUT
SAFESWAP ANCHORING DETAIL
TOEGUARD
NON-SHRINK
GROUT
C-001
VOR-55000.0433
Installation Kit Safeswap No. 1 Heavy Duty5
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
C-001
C-002
VOR-1910.0B00R01
Smartpoint No12
PLAN VIEW
FRONT ELEVATION VIEW
SIDE ELEVATION VIEW
3'-9" [114cm]
TOEGUARD™
ANCHORING DETAIL
4'-9" [144cm]4'-9" [144cm]
9'-11" [303cm]
15'-2" [463cm]
TYPICAL ANCHORING SAFESWAP Nº1
3' [91cm]
ANCHORING LOCATION
Ø10
" [Ø26cm]
GASKET 1/8" THK.
" [13cm]
Ø7
" [Ø19cm]
CONCRETE SLAB
(X4) MECHANICAL ANCHOR
" (16mm) x 6" (152mm)
DRILL & EPOXY GROUT STUDS
(DONE BY INSTALLER)
CONCRETE SURFACE. VERIFY LOCAL CODES FOR
TYPE, THICKNESS & REINFORCEMENT
REQUIREMENTS
ANCHORING DETAIL
C-002
VOR-7242.2XXX
Twinsplash1
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
C-002
NOTE:
1. BY INSTALLER/BY CONTRACTOR MAY REFER TO SERVICE PROVIDERS OTHER THAN THE EQUIPMENT
MANUFACTURER.PLEASE REFER TO PROJECT SPECIFICATION FOR DETAILS OF RESPONSIBILITY.
2. CAUTION : RESPECT THE ELECTRICAL POLAROTY WHEN WIRING INPUT POWER-WIRING MUST PERFORMED
ACCORDING TO THE WIRES LABELS. GREAT CARE SHOULD BE TAKEN BEFORE UNDERTAKING EXTENSION, ALTERATION OR REPAIR THAT ALL ELECTRICAL CONDUCTORS ARE HAVING THE MANUFACTURE LABELS.
WARRANTY IS VOIDED IF THE ELECTRICAL WIRING INSTRUCTIONS ARE NOT FOLLOWED.
24 VAC - 14AWG
(BY INSTALLER)
(REFER TO NOTE 2)
3/4" (20mm) ELECTRICAL CONDUIT
SLIP CONNECTION
(LINE CONNECTION SUPPLIED BY
INSTALLER)
6" (150mm)FLEXIBLE COUPLING (BY VORTEX)
2'-2" [66cm]
OUTLET 1" (25mm)
(BY VORTEX)
3 X 3/8" (10mm) S.S. HEIGHT & LEVELING
CONTROL ANCHOR STUDS WITH HARDWARE.
DRILL & EPOXY GROUT STUDS (DONE BY INSTALLER)
6" (150mm) P.V.C DRAIN LINE
CONNECTED TO DRAINAGE SYSTEM.
ENSURE P-TRAP IS BELOW
FROST LINE TO PREVENT FREEZING
(BY INSTALLER)
3" x 8" Ø (76mm x 203mm) CONCRETE LEVELING BASE (x3)
(BY INSTALLER)
COMPACTED GRANULAR(BY INSTALLER).
CONCRETE SURFACE, VERIFY LOCAL CODE FOR TYPE,
THICKNESS & REINFORCEMENT REQUIREMENTS.
1'-9" [54cm]
ACTIVATOR
1-2% SLOPE
1-2% SLOPE
6'-5
" [197cm]
Ø 2'-6" [76cm]
" (10mm) EARTH
GROUNDING STUD
PIPING AND CONNECTION
(BY INSTALLER)
NOTE:
USE EXPANSION FOAM TO FILL GAP BETWEEN PIPES
AND HOUSING TO PROTECT CONCRETE FROM
SEEPING INSIDE HUB COMMAND CENTER.
PIPING AND CONNECTIONS BY INSTALLER
SEE PIPING AND ELECTRICAL SCHEMATIC FOR
SIZES & QUANTITIES
VALVE # 1
VALVE # 2
VALVE # 3
VALVE # 4
VALVE # 5
VALVE # 6
VALVE # 7
VALVE # 8
VALVE # 9
VALVE # 10
2'-10
" [87cm]
TYP.
VALVE # 5
1'-10
" [57cm]
3' [91cm]
RECOMMENDED WATER LINE INLET SIZE: 2"(50mm) PIPING &
CONNECTION (BY INSTALLER)
PIPING ARE RECOMMENDED TO HAVE A 1-2% SLOPE FOR
WINTERIZING DRAINAGE
120VAC 10AMPS
(BY INSTALLER)
15.5"X13.5"X6.6" TIMER
POWER PACK (BY VORTEX)
(REMOTE INSTALLATION BY
INSTALLER)
FT-001
VOR-7232.2XXX
Bobble No. 1
FT-001
VOR-7241.2XXX
Helio No. 6
FT-001
VOR-7553.2XXX
Loop No. 23
SIDE ELEVATION VIEW
1'-9" [54cm]
PLAN VIEW
FRONT ELEVATION VIEW
TOEGUARD™
TYPICAL ANCHORING SAFESWAP No.2
EARTH GROUND
2'-8" [81cm]
SIDE ELEVATION VIEW
3'-9" [116cm]
2'-7" [79cm]
PLAN VIEW
FRONT ELEVATION VIEW
TOEGUARD™
EARTH GROUND
12'-4" [375cm]
INSTALLATION KIT 55000.0433
SIDE ELEVATION VIEW
11" [27cm]
1'-9" [54cm]
4'-2" [128cm]
PLAN VIEW
FRONT ELEVATION VIEW
TOEGUARD™
TYPICAL ANCHORING SAFESWAP Nº2
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
FT-001
S
S
S
S
S
S
S
S
S
S05 A
S01 B
S06
B
S09 C
S09 C
S03
D
E S04
E S04
S10 F
S07F
S02
G
S08 I
PE-001
ID
IA
Product Legend
Product
Ref.
Product
Qty
IA
Smartpoint N°1 Post
VOR 1910.0B01R02
IB
Timer Power Pack
VOR 33903.1982
IC
2" City Water Line @ 50PSI
(by Installer)
ID
6" Drain Line to
Municipal Drain
(by Installer)
IE
Self Draining
Curb Box Valve
(by Installer)
2" Pressure Regulator, Located Inside Smartpoint
(by Vortex)
2" Backflow Preventer
(by Installer)
Electrical Line Connections Power
Product
Code
From To # Conductors
Gauge/Type
Note
PA
Main Power Line
(by Owner)
IB-120VAC 3
TBD
(by Other)
120V, 1 Phase, Neutral, 60Hz, 10 Amps Breaker
Recommended
± 5% Voltage Drop is Acceptable
Electrical Line Connections Controller Outputs
Product
Code
From To # Conductors
Gauge/ Type
Note
EOA IB
IA-PCB
POWER
2 14
Signal form Timer Power
Pack to Smartpoint No1
24VAC
(by Installer)
Feature Connection Table
Manifold
Output
Ref.
Solenoid
Valve
Feature
Ref.
Feature
Qty
Line Size
Gpm Output
S01 1" Std B
Directional Jet N°2
VOR 0321
1 1" 3 IA-PCB-01
S02 1" Std G
Luna N°3
VOR 7234
1 1" 6.5 IA-PCB-02
S03 1" Std D
Helio N°6
VOR 7241
1 1" 13 IA-PCB-03
S04 1" Std E
Jet Stream N°1
VOR 7512
2 1" 5 IA-PCB-04
S05 1" Std A
Bobble N°1
VOR 7232
1 1" 6 IA-PCB-05
S06 1" Std B
Directional Jet N°2
VOR 0321
1 1" 3 IA-PCB-06
S07 1" Std F
Loop N°2
VOR 7553
1 1" 5 IA-PCB-07
S08 1" Std I
Twinsplash
VOR 7242
1 1" 12 IA-PCB-08
S09 1" Std C
Fountain Spray N°2
VOR 7676
2 1" 6 IA-PCB-09
S10 1" Std F
Loop N°2
VOR 7553
1 1" 5 IA-PCB-10
IE
IC
PA
IB
EOA
ED-001
WATER LINE
DRAIN LINE
ELECTRICAL LINE
PE-001
SCALE: 3/8"=1'-0"
PLUMBING & ELECTRICAL LAYOUT1
PE-001
SCALE: 3/4"=1'-0"
PLUMBING & ELECTRICAL LAYOUT2
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
PE-001
B
C
C
D
E
E
F
F
G
I
CONNECT TO MAIN ELECTRICAL PANEL
(BY INSTALLER)
SEE SPECS 9.5
IA
REF PRODUCT
QTY
A
Bobble N°1
VOR 7232
B
Directional Jet N°2
VOR 0321
C
Fountain Spray N°2
VOR 7676
D
Helio N°6
VOR 7241
E
Jet Stream N°1
VOR 7512
F
Loop N°2
VOR 7553
G
Luna N°3
VOR 7234
IA
Smartpoint N°1 Foot Activator
VOR-1910
I
Twinsplash
VOR 7242
TOTAL
QTY
E-001
SCALE: 3/8"=1'-0"
1. REFER TO SPECS ON A-001
2. COORDINATE THIS DRAWING WITH
ARCHITECTURAL, CIVIL, PLUMBING & ELECTRICAL.
BONDING LAYOUT1
Bonding wire
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
E-001
TIMER POWER PACK 1
(120V, 100VA) FOR 1 SMARTPOINT
MAIN POWER
120VAC 60 HZ
SINGLE PHASE 10 AMPS
( NOTE 1 - BY INSTALLER )
(NOTE 3 - BY OWNER )
1 OUTPUT 24VAC - 3AMP MAX
CONNECTED TO SMARTPOINT
14 AWG MAX 100' (30.5m)
RECOMMENDED ( BY INSTALLER)
(NOTE 1)
MAIN
LINE
OUTPUT
P N
PLC
P N GN
NEMA 4X 14'' X 12 ''
FIBERGLASS ENCLOSURE
NOTE :
1 - WATERTIGHT CONNECTIONS WITH ENCLOSURE DONE BY INSTALLER.
2 - ENSURE ENOUGH CLEARANCE FOR THE DOOR OPENING.
3.AS PER ELECTRICAL CONSTRUCTION AND SAFETY CODES: TIMER POWER PACK AND/OR ANY
OTHER ELECTRICAL EQUIPMENT MUST BE HARD-WIRED TO A GROUND FAULT CIRCUIT
INTERRUPTER(GFCI)FROM THE INPUT POWER SOURCE.ALL ELECTRICAL WORK SHOULD BE
PERFORMED BY A LICENCE ELECTRICIAN IN ACCORDANCE TO LOCAL ELECTRICAL
CONSTRUCTION AND SAFETY CODES.
ESC
AC/DC 24V
OK
INPUT 8xAC/DC
OUTPUT 4x RELAY/10A
SIEMENS
LOGO! 24RC
P1 P2 I1 I2 I3 I4 I5 I6 I7 I8
1 2
Q1
1 2
Q2
1 2
Q3
1 2
Q4
N E
U T
R A
L
2A
A
M P
S
ED-001
VOR-33903.1982
TIME POWER PACK FOR SMARTPOINT NO. 1
OUTPUT
D A
T E
A P
P R
M
A R
K D
E S
C R
I P
T I O
N
S U
B M
I T
T E
D
B
Y
I S
S U
E
D
A T
E
P R
O J E
D R
A W
I N
G
N
O
U S
A
R M
Y
G
A R
R I S
O
L A
S
E N
A L
D I R
E C
T O
R A
P
U B
L
R
K S
R O
L A
N D
R G
D E
S I G
N E
D
B
Y
J O
L
D R
A W
N
B
Y
J O
L
C H
E C
K E
D
B
Y
C S
B
A P
P R
O V
G
K
O S
K I
D
I R
E C
T O
R
O
F
P
U B
L
R
K S
C S
B
A C
H
C
H I E
F
O
F
E
N G
I N
E E
R I
E
M O
R I A
L
P
A R
K
B U
I L
D
S
P L
A S
H
P
A D
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
ED-001
| VORTEX A-001 |
| Sheets and Views |
| A-001 |
| VORTEX A-002 |
| Sheets and Views |
| A-002 |
| VORTEX C-001 |
| Sheets and Views |
| C-001 |
| VORTEX C-002 |
| Sheets and Views |
| C-002 |
| VORTEX FT-001 |
| Sheets and Views |
| FT-001 |
| VORTEX PE-001 |
| Sheets and Views |
| PE-001 |
| VORTEX E-001 |
| Sheets and Views |
| E-001 |
| VORTEX ED-001 |
| Sheets and Views |
| ED-001 |