W52P1J-22-R-5002 -- Solicitation Attachment 0005 -- Appendix D Submittal Register.pdf
PDF 113 KB Posted
- Solicitation number
- W52P1J-22-R-5002
About this file
This submittal register outlines 27 line items of required submittals for the construction of a splash pad in Memorial Park on Rock Island Arsenal in Illinois. Key submittals include certificates of insurance, safety plans, as-built drawings, warranties, shop drawings, product data and samples for site elements like benches, valves, and electrical components. The low-voltage electrical submittals encompass items like rigid steel conduit, underground conduit, weather heads, circuit breakers, conduit, wire, safety disconnects, enclosures, ground rods, and connectors. The solicitation was posted on February 14, 2022 by the United States Army Contracting Command-Rock Island to construct the splash pad with responses due by unspecified dates. The approving authority and contractor are listed but contractor information is redacted.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
1 01 33 00 Certificates of Insurance
2 01 33 00 Surety Bonds
3 01 33 00 List of Proposed Subcontractors
4 01 33 00 List of Proposed Products
5 01 33 00 Construction progess schedule
6 01 33 00 Submittal Register
7 01 33 00 Schedule of Prices or Earned Value
8 01 33 00 Report Health and Safety Plan
9 01 33 00 Work Plan
10 01 33 00 Quality Control (QC) Plan
11 01 33 00 Environmental Protection Plan
CONTRACTOR:
(d)
CONTRACTOR
ACTION
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
CONTRACTOR SCHEDULE
DATES APPROVING AUTHORITY
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
CONTRACT NO: 2022-102
Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
12 01 35 26 Accident Prevention Plan
13 01 35 26 Notifications and Reports
14 01 35 26 Accident Reports
15 01 35 26 Activity Hazard Analysis
16 01 35 26 Confined Space Entry Permit
17 01 35 26 Hot Work Permit
18 01 35 26 Certificate of Compliance
19 01 35 26 License Certificates
20 01 45 00 QC Plan
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
CONTRACTOR:
Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
21 01 50 00 Construction Site Plan
22 01 50 00 Traffic Control Plan
23 01 78 00 Warranty
24 01 78 00 Operation and Maintenance Manuals
25 01 78 00 As-Built Drawings
26 01 78 00 Final DD Form 1354
27 01 78 00 Checklist for DD Form 1354
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
28 11 68 17 Installation Drawings
29 11 68 17 Manufacturer's Catalog Data
30 11 68 17 Finish and Color Samples
31 11 68 17 Manufacturer's Product Warranty
32 11 68 17 Operation and Maintenance Manuals
33 12 93 00 Benches
34 12 93 00 Recycled Content for Aluminum Components
35 12 93 00 Powder Coatings Certificate
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
36 C-101 Valve Curb Box
37 C-101 Valve Box
38 C-101 Backflow Preventer
39 C-101 Water Piping
40 C-101 Storm Sewer Piping
41 C-101 Concrete
42 C-101 Concrete Reinforcing
43 C-101 Joint Sealants
44 C-101 Joint Filler
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
Activity
Transmittal
Specification
Section Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
45 E-101 Rigid Steel Conduit
46 E-101 Underground Conduit
47 E-101 Weather Head
48 E-101 Circuit Breakers
49 E-101 Conduit
50 E-101 Wire
51 E-101 Safety Disconnects and Fuses
52 E-101 Enclosures
53 E-101 Ground Rods
54 E-101 Transformer Termination Lugs
55 E-101 Nema 4X Connectors
56 E-101 Low Voltage Wire
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
PROJECT TITLE: BUILD SPLASH PAD IN MEMORIAL PARK
SUBMITTAL REGISTERLOCATION: Memorial Park, Rock Island Arsenal
| 21B0003x |
| 21B0003xSHT2 |
| 21B0003xSHT3 |
| 21B0003xSHT4 |
| 21B0003xSHT5 |
| 21B0003xSHT6 |