This document is an Exhibit 5 Questions and Answers (Rev. 2) for Solicitation W51AA1-25-R-0022, a 5-year Task Order Contract for Epoxy Floor Repair IDIQ at Tobyhanna Army Depot. The document provides clarifications on various aspects of the solicitation, including current contract details, repair specifications, and submission requirements. Key details include a current contract with Spectrum of Floors, LLC/Spectrum Construction Services, an average of ~3,000 SF of repairs performed yearly, and task orders ranging from 500-4000 SF per order.

The Q&A addresses critical operational details such as work hours (historically 75% of repairs after 1630 Monday-Friday and weekends), material specifications (including primer, Stonclad GS mortar, and Stonseal PA7 sealer), and proposal submission guidelines. Offerors must submit proposals electronically to the Contracting Officer, potentially provide proof of bonding capacity up to $150,000, and adhere to the Davis-Bacon Act Wage Determination PA20250098. The government reserves the right to issue task orders across multiple locations and buildings, with the first task order focusing on repairs at Building 16.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal W51AA1-25-R-0022 Project Title: Epoxy Floor Repair IDIQ

Exhibit 5 - Questions and Answers Rev. 2

Date: 3 April 2025

Note: Verbiage may have changed from the initial Requests for Information (RFI)/Questions submitted, however, the context of the questions did not. Similar questions may have been combined and one answer provided. If you feel as though a(n) RFI/Question you submitted was not addressed, or was done so without providing a clear and concise answer, please notify the Contracting Officer, Mark Buonomo.

This Question and Answer document shall be incorporated into the solicitation and any resultant contract and considered binding.

Question #1: Is there any incumbent contractor/existing contract for this requirement?

Answer #1: These services are currently being performed under contract W25G1V-22- P-0072 by Spectrum of Floors, LLC/Spectrum Construction Services.

Question #2: Reference Solicitation Exhibit 1 - PWS section 5 Requirements: 5.1.

Deliverables: on the maximum and minimum deliverables of 4000SF and 500SF, is this per task or for the duration of the contract.

Answer #2: This represents the minimum and maximum repair requirements PER

TASK ORDER.

Question #3: Is there any historical data or trends to show how much or how many flooring repairs have been made (either by SF per month, or per task order)?

Answer #3: Based on historical data, an average of ~3,000 SF of repairs have been performed on a yearly basis.

Question #4: What’s the total SF of buildings that require maintenance? Are drawings available?

Answer #4: Repairs may be required at any of the buildings throughout TYAD. The total SF for maintenance is not known at this time. Task orders shall be issued by the Government on an as needed basis.

Question #5: Will there be any on site storage available for material and equipment?

Answer #5: On site storage will NOT be available.

Exhibit 5 – Questions and Answers Rev. 2 Solicitation W51AA1-25-R-0022

Question #6: Is the scope of work only for the shaded area of Exhibit 1- Appendix 1 – Bldg 16 or for the entire building?

Answer #6: The shaded area.

Question #7: How would you like the proposal submitted? (i.e. technical capability, past performance and pricing in one document or on separate documents for each?

Word or Adobe PDF?)

Answer #7: Offerors may submit the required proposal submission documents in any manner most convenient to them, provided each section is easily identifiable. However, it’s requested that a separate Adobe PDF be provided for each submission.

Question #8: Are the materials to be submitted via mail or electronically (a picture of the materials) with the proposal?

Answer #8: Proposal submission instructions required by the Solicitation (reference ADDENDUM to FAR 52.212-1, Paragraph 3, Proposal Submission Instructions) shall be submitted to the Contracting Officer (mark.buonomo2.civ@army.mil) via e-mail only.

Question #9: Is a bid bond or Payment/performance bond required?

Answer #9: In accordance with FAR 28.102, Payment and Performance Bonds OR other types of Alternative Payment Protections may be required at the task order level, based on the orders total value.

As a result of Solicitation Amendment 0001, FAR Clauses 52.218-13. 52.218-14, and 52.218-15 have been incorporated into this solicitation and any resultant award.

Reference the Solicitation, ADDENDUM to FAR 52.212-1, Paragraph 3, Proposal Submission Instructions, which has been revised to add:

“(d) Proof of Bonding Capacity: In accordance with FAR Subpart 28.102, Alternative Payment Protections (FAR 52.228-13) and Payment and Performance Bonds (FAR 52.228-15) may be required for task orders dependent upon the overall value of the task order.

Offerors are required to submit proof of their ability to obtain surety for performance and payment bonds for orders issued under the awarded contract in the form of commercial surety bonds, irrevocable letters of credit, or other acceptable surety under FAR 52.228- 15, which is included in this solicitation. The evidence shall prove that the offeror is able to provide bonds for a total of $150,000.00.”

Question #9: Please advise on the correct wage determination.

Answer #9: In accordance with Solicitation Amendment 0002 and Exhibit 4 – Wage Determination Rev. 1, the applicable Davis Bacon Act Wage Determination shall be:

PA20250098, Modification 5, Dated 3/21/2025.

mailto:mark.buonomo2.civ@army.mil

Exhibit 5 – Questions and Answers Rev. 2 Solicitation W51AA1-25-R-0022

Question #10: Will all task orders be similar to the “seed” project, in that the repairs will all be in one location? Or can the > 500 SF consist of many repairs/locations.

Answer #10: While the seed project represents a common repair type, the Government reserves the right to issue a single Task Order across numerous locations and buildings which total > 500 SF. However, in accordance with the minimum and maximum constraints, no Task Order will be issued with a quantity of less than 500 SF.

Question #11: Will all task orders be similar to the “seed” project, in that the repairs will all be in one location? Or can the > 500 SF consist of many repairs/locations.

Answer #11: While the seed project represents a common repair type, the Government reserves the right to issue a single Task Order across numerous locations and buildings which total > 500 SF. However, in accordance with the minimum and maximum constraints, no Task Order will be issued with a quantity of less than 500 SF.

Question #12: Please confirm the acceptability of this system:

-Standard primer – 1st layer – discussed in epoxy specs.

-Stonclad GS mortar (1/4” thickness – discussed in specs) – troweled mortar.

-Stonseal PA7 – pigmented Urethane sealer – discussed in specs.

Answer #12: This flooring system adheres to the specifications set forth by the Government and aligns with anticipated requirements.

Question #13: A typical 250-mil system would consist of a primer, troweled mortar, and topcoat. The mortar is a mixture of a epoxy binder resin and aggregates (filler) that is trowel applied. The pricing sheet has line items for “filler with binder” and also “SEALER/RESIN (Based on 1/4” / 250MIL thick requirement)” These items both seem to apply to the mortar portion of the system. Can you explain what the difference in these are.

Answer #13: In accordance with the bid sheet, we have categorized the measurements into various units. In general, there are instances where we encounter voids within the flooring that extend approximately 3 to 5 inches into the concrete, which require repair. To address this issue, we will utilize a filler composed of a harder material mixed with sand or use concrete. Following the repair, we will proceed to install a 1/4-inch resin flooring layer.

Question #14: What work hours are permitted for the seed project/Building 16?

Answer #14: Offerors are referred to the PWS, section 1.4.6.1, which states “Historically, 75% of all epoxy repairs have been performed after 1630 Monday through Friday and during the weekends.” However, the seed project/Building 16 is an exception to this 75%, as work can be done outside these hours (i.e. can be performed during the day, during the week).