This document is a Quality Assurance Surveillance Plan (QASP) for Epoxy Floor Repairs at Tobyhanna Army Depot (TYAD), Version 1.0, dated 18 Jan 24. The QASP provides a structured approach for monitoring and evaluating contractor performance, with a primary focus on ensuring quality installation of epoxy flooring repairs. Key surveillance components include daily site visits by the Contracting Officer's Representative (COR), weekly Performance Assessment Reports, and mechanisms for tracking and addressing potential deficiencies through Corrective Action Reports and Customer Complaint Records.
The plan establishes a performance rating system ranging from Unsatisfactory to Excellent/Outstanding, with specific criteria for each level. The COR, Matthew Balut from TYAD, is responsible for continuous technical oversight and documentation of the contractor's performance. The QASP is designed to be a flexible, living document that allows for adjustments in surveillance level based on contractor performance, with the ultimate goal of minimizing mission performance impacts and maintaining high-quality floor repair standards at the depot.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W51AA1-25-R-0022 Exhibit 5 - Questions and Answers Rev. 2.pdf | ||
| W51AA1-25-R-0022 Amendment 0003.pdf | ||
| W51AA1-25-R-0022 Site Visit Sign In Sheet.pdf | ||
| W51AA1-25-R-0022 Exhibit 5 - Questions and Answers Rev. 1.pdf | ||
| Site Visit Pic Floor.jpg | JPG image | |
| W51AA1-25-R-0022 Amendment 0002.pdf | ||
| Site Visit Pic Transition by Door.jpg | JPG image | |
| W51AA1-25-R-0022 Exhibit 4 - Wage Determination Rev. 1.pdf | ||
| W51AA1-25-R-0022 Amendment 0001.pdf | ||
| W51AA1-25-R-0022 Exhibit 5 - Questions and Answers.pdf | ||
| W51AA1-25-R-0022 Exhibit 1 - Appendix 1 - Bldg 16 Layout.pdf | ||
| W51AA1-25-R-0022 Exhibit 1 - PWS.pdf | ||
| W51AA1-25-R-0022 Solicitation.pdf | ||
| W51AA1-25-R-0022 Exhibit 4 - Wage Determination.pdf | ||
| W51AA1-25-R-0022 Exhibit 2 - Proposed Pricing Worksheet.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
EPOXY FLOORING IDIQ
Version 1.0
18 Jan 24 Epoxy Floor Repairs TYAD QASP
Table of Contents:
1 Vision
2 Mission
3 Purpose
4 Authority
5 Roles and Responsibilities
5.1 Contracting Officer (KO)
5.2 Contracting Officer's Representative (COR)
6 Performance Requirements and Method of Surveillance
6.1 Contract Surveillance
6.2 Inspection Performance Rating
6.3 Reporting Measures:
Appendix 2 - Corrective Action Report (CAR)
Appendix 3 - Customer Complaint Record
Appendix 4 - Performance Assessment Report (PAR)
Quality Assurance Surveillance Plan (QASP)
1 Vision
The vision of this QASP is to provide the procedures necessary to monitor the operation & maintenance of nitrogen plant within Tobyhanna Army Depot (TYAD). Additionally, this
QASP shall offer the details and means to identify, record, and report deficiencies observed throughout the construction process.
2 Mission
Tobyhanna is a recognized leader in providing world-class logistics support for Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance
(C5ISR) Systems across the Department of Defense. Tobyhanna's Corporate Philosophy, dedicated workforce and electronics expertise ensure the depot is the Joint C5ISR provider of choice for all branches of the Armed Forces and our industry partners. Tobyhanna's unparalleled capabilities include full-spectrum support for sustainment, overhaul and repair, fabrication and manufacturing, engineering design and development, systems integration, technology insertion, modification, and global field support to our Warfighters. To support these capabilities and its
Warfighters, Tobyhanna requires this contract carry out the necessary upkeep and servicing of the sanitary sewer lines and grease traps found within the TYAD premises. The primary goal is to eliminate any potential risks that could lead to accidents or injuries within the workspace. By proactively addressing safety concerns and maintaining a safe environment, the mission can operate smoothly and efficiently without any disruptions caused by preventable incidents.
3 Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
- What will be monitored
- How monitoring will take place
- Who will be conduct the monitoring
- How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4 Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition
Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5 Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
5.1 Contracting Officer (KO)
The Contracting Officer (KO) shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the
United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned KO: TBD
Organization or Agency: Tobyhanna Army Depot (TYAD)
Telephone: TBD
Email: TBD
5.2 Contracting Officer's Representative (COR)
The Contracting Officer's Representative (COR) is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The
QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the
Government's behalf.
Assigned COR: Matthew Balut
Organization or Agency: Tobyhanna Army Depot (TYAD)
Telephone: (570)-615-9644
Email: matthew.j.balut.civ@army.mil
6 Performance Requirements and Method of Surveillance
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the
KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2 Inspection Performance Rating
The goal of the inspection performance rating is to provide quality assurance to ensure the material is installed per the scope of work and specifications. Inspections will be on a pass/fail basis and will reference the manufacturer’s installation and/or specification requirements for backup. Performance objectives define the desired outcomes.
Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating
Criteria
Excellent /
Outstanding
Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
6.3 Reporting Measures:
The COR shall utilize a Corrective Action Report (CAR) (Appendix 2) when a discrepancy is observed during the repair/maintenance/operation process. The COR submit the CAR to the contractor, KO, and customer.
If a customer has a complaint during the construction process, they shall fill out the Customer Complaint Record and submit it to the project’s COR who will then forward it onto the contractor and KO.
Additionally, the COR shall conduct daily site visits to the construction area and conduct a weekly Performance Assessment Report to provide feedback to the contractor, customer, and KO on the project’s development.
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR 2. CONTRACT NUMBER 3. TYPE OF SERVICES
4. FUNCTIONAL AREA 5. SUSPENSE
DATE
6. CONTROL
NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT
RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF
COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION BUILDING
NUMBER
INDIVIDUAL PHONE
NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK
ORDER NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR)
SIGNATURE AND DATE
5. COR
PHONE
6. SUSPENSE
DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL
BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH
ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF
DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE
CONCUR NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED
COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF
RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS