This is a DD Form 1694, Request for Variance (RFV), submitted on 14-FEB-2024 for RFV Number 24CK999-V001 by ABC Manufacturing, Inc. under Navy contract N00104-23-C-K999 CLIN 001. The variance is classified as Major and affects the JM60 Catapult system (model CKU-5C/A) used in F-16 and F-22 aircraft. The affected item is an Inflation Device, Water Activated FLU-11/A with part numbers 855AS110 and 1812-172-01.
The variance requests the addition of a battery voltage check procedure to be performed after NO-FIRE SENSITIVITY testing and before functional tests to ensure that electrical testing has not reduced battery voltage below required levels. The variance is pre-production and applies to Lots K999-12345 and K999-67890. No performance, functional, reliability, durability, or schedule impacts are anticipated. The requested change carries zero per-unit and total cost impact. Engineering Change Proposal ECPXX-XXX is in process to update the Technical Data Package. This is a recurring variance request, as a prior RFV XXXX-XXX addressed the same issue for Lot K099-12222. The contracting officer is Jane Doe (+1 (555) 555-5555, jane.doe@navy.mil), and the originating activity contact is John Smith at ABC Manufacturing, Inc.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVIOUS EDITION IS OBSOLETEDD FORM 1694, APR 2017 Page 1 of 2 AEM LiveCycle Designer
REQUEST FOR VARIANCE
(RFV)
1. DATE
PREPARED:
(DD-MMM-YYYY)
14-FEB-2024
2. RFV NUMBER:
24CK999-V001
3. PROCURING ACTIVITY NO. (PAN):
N00104
OMB No. 0704-0188 OMB approval expires October 31, 2019
The public reporting burden for this collection of information, 0704-0188, is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE ACQUIRER ISSUING CONTRACTING OFFICER
FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN BLOCK 22 OF THIS FORM.
DISTRIBUTION STATEMENT:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only; Controlled Technical Information (CTI); January 1, 2024. Other requests for this document shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division.
4. TITLE OF VARIANCE: JM60 Catapult battery voltage check
5. VARIANCE PRE OR POST-PRODUCTION: 6. BASELINE AFFECTED:
Pre-Production Post-Production Functional Allocated Product
7. SYSTEM
INFORMATION
7.a. MODEL/TYPE DESIGNATION:
CKU-5C/A (JM60)
7.b. SYSTEM/CONFIG. ITEM NOMENCLATURE:
F-16, F-22
7.c. END ITEM CAGE CODE:
14083
8. AFFECTED ITEM NOMENCLATURE:
Inflation Device,Water Activated FLU-11/A
9. PART NUMBER(S) OF AFFECTED ITEM(S):
855AS110, 1812-172-01
10.a. OTHER EXTERNAL SYSTEM AFFECTED?:
Yes No
10.b. IF YES, LIST OTHER SYSTEMS OR CONFIGURATION ITEMS AFFECTED:
Training System XXX
11. IDENTIFICATION
OF VARIANCE
11.a. VARIANCE CLASSIFICATION:
Critical Major Minor
11.b. DEFECT NO.
(if applicable):
N/A
11.c. DOCUMENT DEFINING DEFECT NO./CLASS (if applicable):
N/A
12. DESCRIPTION OF VARIANCE:
Add battery voltage check after NO-FIRE SENSITIVITY. See attachment.
13. NEED FOR VARIANCE:
Voltage needs to be checked after electrical test and before functional tests to ensure the No-Fire tests did not reduce the battery voltage below required volts.
14. CORRECTIVE ACTION TAKEN:
ECPXX-XXX is in the process of being approved to update the TDP.
15. EFFECT ON PERFORMANCE, FUNCTION, RELIABILITY, DURABILITY, INTEGRATED LOGISTICS SUPPORT, INTERFACE, OR SOFTWARE:
None.
16. RECURRENCE 16.a. RECURRING VARIANCE?:
Yes No
16.b. IF YES, PROVIDE RATIONALE:
Prior RFV XXXX-XXX was limited to Lot K099-12222. ECP was drafted at the same time, but not yet approved and implemented.
17. EFFECTIVITY: (Quantity Affected, Lot Numbers Affected, Serial Numbers, Dates)
Lots K999-12345 and K999-67890
18. PER UNIT COST IMPACT:
$0.00
19. TOTAL COST IMPACT:
$0.00
20. EFFECT ON SCHEDULE IF APPROVED/DISAPPROVED:
No impact to the schedule
21. CONTRACT
INFORMATION
21.a. SUPPLIER:
ABC Manufacturing, Inc.
21.b. CONTRACT NO. AND LINE ITEM:
N00104-23-C-K999 CLIN 001
22. CONTRACTING
OFFICER
22.a. NAME:
Jane Doe
22.b. TELEPHONE:
+1 (555) 555-5555
22.c. E-MAIL:
jane.doe@navy.mil
RFV Form DD1694 Example Only dated 06/05/2025
EXAMPLE
melina.andino-rivera Line melina.andino-rivera Line melina.andino-rivera Line melina.andino-rivera Line tammy.l.riemer Callout Verity distribution statement with the contract.
tammy.l.riemer Callout Brief description of intent/purpose to include identifying info such as DODIC/model/type tammy.l.riemer Callout Describe the corrective actions taken or will be taken to prevent a future recurrence of this variance.
tammy.l.riemer Text Box Block 16a is only marked if the same request has been approved in the past. Block 16b will include the approved RFV number of the previous request. Approved RFVs should rarely be submitted on a recurring basis.
melina.andino-rivera Line melina.andino-rivera Line tammy.l.riemer Text Box Per Section B of the contract ("See attached" if cont. page if needed). Nomenclature name should match affected item name.
tammy.l.riemer Text Box Add affected, quantity, Lot Numbers and serial numbers tammy.l.riemer Line tammy.l.riemer Callout Critical tammy.l.riemer Callout Verity date with the contract.
tammy.l.riemer Callout End item cage code tammy.l.riemer Callout If needed, Enter the supplier defect number, which corresponds with the variance listing of defect characteristic(s) from which an authorized variance can be released, when appropriate. Otherwise, disregard and enter N/A.
tammy.l.riemer
If needed, enter the appropriate title or reference number of the supplier document that details/lists the defect numbers, or identifies the variance classification based on the defect number definition(s), when appropriate. Otherwise, disregard and enter N/A.
tammy.l.riemer Callout Describe the nature of the proposed include marked drawings and/or other relevant documents.
tammy.l.riemer Callout Block 18 & 19 Enter the per unit cost/ impact of the variance, and if accepted post-production, a reduction in cost (enclosed in parentheses) should be presented. If needed tammy.l.riemer Callout Describe any changes to the schedule dependent on the final disposition for the variance.
If the per-unit cost in Box 18 and the total cost in Box 19 are both $0.00, then Box 20 should indicate that there will be no cost impact.
oluwafemi.richards Rectangle
PREVIOUS EDITION IS OBSOLETEDD FORM 1694, APR 2017 Page 2 of 2 AEM LiveCycle Designer
23. ORIGINATING
ACTIVITY
23.a. NAME: John Smith
23.c. TELEPHONE: +1 (123) 456-7890
23.d. CAGE CODE:XXXXX 23.e. E-MAIL: john_smith@abcmanufacturing.com
23.b. ADDRESS: (Street, City, State, Zip Code)
XXX Alphabet Street Somewhere, DC 22222
24.a. SUBMITTING AUTHORITY:
ABC Manufacturing
24.b. NAME AND TITLE:
John Smith, Manufacturing Manager
24.c. SIGNATURE:
BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY
25.a. RECOMMENDATION: Approval Approval with Modification Disapproval
25.b. MODIFICATION DESCRIPTION:
25.c. NAME AND TITLE: 25.d. SIGNATURE: 25.e. DATE: (DD-MMM-YYYY)
26.a. DISPOSITION: (Configuration Approval Authority) Approved Approved with Modification Disapproved
26.b. MODIFICATION DESCRIPTION:
26.c. NAME AND TITLE: 26.d. SIGNATURE: 26.e. DATE: (DD-MMM-YYYY)
27. LIST OF ATTACHMENTS
List Of Attachments (1)
Block 12 - Additional Information.pdf
EXAMPLE
tammy.l.riemer
Signature of the authorized individual that will be submitting the RFV.
| PreProduction: Off |
| PostProduction: Off |
| Functional: Off |
| Allocated: Off |
| Product: Off |
| 10a OTHER EXTERNAL SYSTEM AFFECTED: Off |
| Critical: Off |
| Major: Off |
| Minor: Off |
| 16a RECURRING VARIANCE: Off |
| Approval: Off |
| Approval with Modification: Off |
| Disapproval: Off |
| Approved: Off |
| Approved with Modification: Off |
| Disapproved: Off |