This is a Solicitation Questions & Answers document for a Tool & Fixture Vendor Managed Inventory (VMI) contract (W519TC26QA141) issued by the Army on 21 July 2026.

The document clarifies four key contractual issues. First, contractors shall invoice monthly through Defense Finance and Accounting Services (DFAS) via Wide Area Workflow (WAWF), with invoices covering costs incurred from multiple visits within each month. Second, all VMI equipment costs—including cabinets, software, installation, connectivity, maintenance, and onsite labor—must be allocated across the item unit prices in the price matrix, as no separate Contract Line Item Numbers (CLINs) exist for these services and supplies. Third, the extended price in the evaluation spreadsheet represents the maximum quantity for storage and projected usage, distinguishing it from guaranteed minimum quantities based on minimum-on-hand levels. Fourth, contractors interested in inspecting the 20-by-50-foot storage room and testing cellular reception for electronic cabinets may request a site visit by contacting the contracting officer at travis.l.thomas38.civ@army.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Questions & Answers

W519TC26QA141

Tool & Fixture Vendor Managed Inventory (VMI) 21 July 2026

1. Question: When may the contractor invoice? The PWS says the Government assumes ownership when an item is removed from the cabinet, but it also says the contractor may invoice after stocking.

Answer: The contractor shall invoice monthly, stated in section 6.3 in the PWS. “The Contractor shall submit invoices for approval and payment on a monthly basis. The contractor’s monthly invoice may include cost incurred from multiple visits within the month” which will be invoiced through Defense Finance and Accounting (DFAS) via Wide Area Workflow (WAWF). See DFARS 252.223-7003 & 252.223-7006 for additional guidance on invoicing.

2. Question: Where are the VMI equipment costs placed? There is no separate CLIN for cabinets, software, installation, connectivity, maintenance, or onsite labor.

Should those be allocated across the item unit prices?

Answer: Per 1.1, Scope of the PWS, the items shall be placed in the vendor supplied cabinets/bins/shelving and designated Government owned racks. The Contractor shall provide, install, stock, and maintain the cabinets/bins/shelves. Therefore, ALL COSTS of services and supplies shall be included on the corresponding price matrix items, quote must be complete and accurate.

3. Question: Minimum versus maximum quantities. The guaranteed minimum is based on the minimum-on-hand quantities, but the spreadsheet’s evaluated extended prices appear to use maximum quantities. Can you confirm the intended calculation and initial delivery order quantity?

Answer: The extended price is what our maximum quantity is for storage, and for projected usage.

4. Question: Site access before bidding. The contractor is instructed to verify cellular reception for the electronic cabinets. Will that be offered so the proposed VMI operator can inspect the 20-by-50-foot room and test connectivity?

Answer: A site visit can be approved for this solicitation, please reach out to travis.l.thomas38.civ@army.mil to coordinate a visit.