Attachment 0005_CDRL00003_InventoryRoadMap SIGNED.pdf
PDF 194 KB Posted
- Solicitation number
- W519TC26QA141
About this file
This is a DD Form 1423-1, Contract Data Requirements List, issued by Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) on May 13, 2026. The form specifies one data item requirement for a Hardware & Tooling Vendor-Managed Inventory (VMI) contract. The contractor must provide an inventory Road Map of Stocked Items (Data Item 0003) that displays the location of supplied items within shelves and cabinets. The road map must be submitted in Microsoft Excel or Adobe PDF format and delivered electronically to the Contracting Officer's Representative (COR), Abbey Ewan, at abbey.l.ewan.civ@army.mil. Initial submission timing is indicated as "Draft" with subsequent submissions required annually, unless inventory items are relocated, in which case a new road map must be submitted within 10 days of the move.
The form references the contract's Performance Work Statement (PWS), paragraph 4.4.3, as the authority for this data requirement. Contract and contractor information blocks (E and F) are marked as "TBD" (To Be Determined), indicating this is a pre-award document. No DD Form 250 inspection/acceptance or distribution statement marking is required. No pricing or total cost estimate is provided on this form, as pricing for data items would be established separately during contract negotiation. The document was prepared by Abbey Ewan and approved by Donald L. Gordon Jr. on May 13, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY:
TDP TM OTHER Reports
D. SYSTEM/ITEM
Hardware & Tooling VMI
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Road Map of Stocked Items
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS, paragraph 4.4.3
6. REQUIRING OFFICE
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
Yearly
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
The Contractor shall provide a inventory Road Map.
The contractors road map shall show the location of where supplied items are located in the supplied shelves and in the cabinets.
The road map shall be in Microsoft Excel or Adobe.pdf format and sent electronically to the Contracting Officers Representative (COR).
Road maps shall be submitted yearly unless items move, then a new road map wil be required within 10-days of the move.
Road maps shall be sent to the following POC (COR):
Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) Attn: Abbey Ewan Email: abbey.l.ewan.civ@army.mil
15. TOTAL 0 0 0
G. PREPARED BY H. DATE
05/1 /2026
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
EWAN.ABBEY.LAWR
ENCE.1516175164
Digitally signed by
EWAN.ABBEY.LAWRENCE.1516175164
Date: 2026.05.13 08:50:06 -05'00'
GORDON.DONALD.L
.JR.1285023455
Digitally signed by
GORDON.DONALD.L.JR.1285023455
Date: 2026.05.13 09:59:50 -05'00' 5/13/2026
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
File details come from the government source that posted it. Updated .