B.08 Attachment 0002 - Pricing Matrix.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- RANGE 27 - ROAD RECONSTRUCTION AND WATER MITIGATION CHANNELS TO PREVENT RANGE EROSION ISO OPM-SANG, KSA
- Solicitation number
- W519TC-25-R-A004
About this file
The document is a Pricing Matrix for the Range 27 Project (Solicitation W519TC-25-R-A004) involving road reconstruction and water mitigation channels for the Ministry of National Guard (MNG) Khashm Al AAn Airfield in Saudi Arabia. The pricing breakdown includes five Contract Line Item Numbers (CLINs) covering mobilization/equipment, road remediation, transformer protection, deliverables, and 15% VAT, with detailed cost breakdown categories such as site grading, storm water mitigation, road washout remediation, drainage ditch repair, and transformer protection installation.
Key project details include an Industry Day scheduled for 16 March 2025, with controlled access requiring prior registration by 06 March 2025 at 3 PM KSA time. The project is managed by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal and involves military training infrastructure improvements, specifically preparing Range 27 for heavy vehicle and aviation firing exercises. The pricing matrix provides granular work elements including subgrade preparation, aggregate base course installation, soil stabilization, and various site-specific reconstruction and protection tasks, though the current document shows placeholder/zero values for proposed costs.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RANGE 27 PROJECT 24-KSA-23
| PRICE EVALUATION SHEET | Contractor Fill-In | |
| W519TC-25-R-A004 | ||
| Offeror Name: | ||
| CAGE: | ||
| Unique Entity ID: | ||
| Date: |
| CLIN | CLIN Type | Description | ||||
| Period Of Performance | USD Proposed Cost | SAR Total Price | ||||
| Equipment | $ - 0 | |||||
| Facilities and Mobilization | $ - 0 | |||||
| 0001 | FFP | Mobilization/ Equipment Cost | 1 Job | $ - 0 | $ - 0 | |
| Back Fill Eroded Areas/Compact/Soil Stabilization | $ - 0 | |||||
| Remediate Road | $ - 0 | |||||
| Remove Silt Buildup/ Regrade Existing Ditches | $ - 0 | |||||
| 0002 | FFP | Road Remediation | 1 Job | $ - 0 | $ - 0 | |
| Precast Transformer Protection/ Delivery to Site | $ - 0 | |||||
| Installation/ Footer Installation | $ - 0 | |||||
| 0003 | FFP | Transformer Protection | 1 Job | $ - 0 | $ - 0 | |
| 0004 | FFP | Deliverables | 1 Job | $ - 0 | ||
| 0005 | FFP | 15% VAT | 1 Lot | $ - 0 | $ - 0 |
| Total Price by Ordering Period | $ - 0 | $ - 0 |
| Total Evaluated Price |
$ - 0
Range 27 COST BREAKDOWN
| CLIN | Item Number | Category | Work Element | Unit | Estimated Cost |
| 0001 | 2.1.1 | Mobalization/ Equipment | Site Grading and Road Reconstruction Plan | ||
| 0001 | 2.1.2 | Mobalization/ Equipment | Storm Water Mitigation Plan | ||
| 0001 | 2.1.3 | Mobalization/ Equipment | Transformer Protection Plan | ||
| 0001 | 2.1.4 | Mobalization/ Equipment | Quality Control Plan (QCP) | ||
| 0001 | 2.1.5 | Mobalization/ Equipment | Communication Management Plan | ||
| 0001 | 2.1.6 | Mobalization/ Equipment | Submittal Plans | ||
| 0001 | 2.1.7 | Mobalization/ Equipment | Inspection Plans | ||
| 0001 | 2.1.8 | Mobalization/ Equipment | Mobilization | ||
| 0002 | 2.2.1 | Road reconstruction | Major Road Washout Remediation | m | |
| 0002 | 2.2.2 | Road reconstruction | Minor Road Washout Remediation | m | |
| 0002 | 2.2.3 | Road reconstruction | Drainage Ditch Cut (Road Crossing) | m | |
| 0002 | 2.2.4 | Road reconstruction | Drainage Ditch Repair | m | |
| 0002 | 2.2.5 | Road reconstruction | Subgrade Preparation and Compaction | m² | |
| 0002 | 2.2.5 | Road reconstruction | Minor Road Washout Remediation | m | |
| 0002 | 2.2.6 | Road reconstruction | Aggregate Base Course Installation | m³ | |
| 0002 | 2.2.6 | Road reconstruction | Drainage Ditch Cut in Road | m | |
| 0002 | 2.2.7 | Road reconstruction | Drainage Ditch Repair | m | |
| 0002 | 2.2.7 | Road reconstruction | Surface Course Finishing | m² | |
| 0003 | 2.3.1 | Transformer Protection | Subgrade Excavation and Shaping | m | |
| 0003 | 2.4.1 | Transformer Protection | Transformer Protection - Design | LS | |
| 0003 | 2.4.2 | Transformer Protection | Soil Mound Repair and Damp Proofing | Each | |
| 0003 | 2.4.2 | Transformer Protection | Transformer Protection - Precast Manufacturing | LS | |
| 0003 | 2.4.3 | Transformer Protection | Transformer Protection - Delivery | LS | |
| 0004 | 2.4.4 | Deliverables | Transformer Protection - Installation | LS | |
| 0004 | 2.6.1 | Deliverables | Miscellaneous Demobilization and Final Site Repair | LS | |
| 0004 | 2.6.2 | Deliverables | Access/Security Compliance | LS | |
| 0002 | 2.6.3 | Road Reconstruction | Vegetation and Debris Removal | LS | |
| 0002 | 2.7.1 | Road Reconstruction | Soil Stabilization and Compaction | m² | |
| 0004 | 3.1 | Deliverables | As-Built Drawings | LS | |
| 0004 | 3.2 | Deliverables | Warranties and Documentation | LS | |
| SCOPE OF WORK TOTAL BEFORE 15% VAT IN SAR | $0.0000 | ||||
| SCOPE OF WORK TOTAL BEFORE 15% VAT IN USD | $0.0000 |