Attachment 0005 - Price Matrix_11Sept2024.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- W519TC-24-Q-MESS
About this file
This document contains a price matrix for the Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments contract (Contract Number: W52P1J-24-Q-MESS).
The price matrix provides a breakdown of the firm fixed price (FFP) and time and materials (T&M) contract line items (CLINs) for quarterly, semi-annual, and annual preventative maintenance, as well as emergency repairs. It also includes CLINs for Contract Data Requirements List (CDRLs) and Contractor Acquired Property List (CAP), which are not separately priced. The total evaluated price is listed at the end of the matrix. The document includes a related federal contract opportunity (Solicitation Number: W519TC-24-Q-MESS) for the same requirement, which is a combined synopsis/solicitation issued under FAR Part 12, Acquisition of Commercial Items. The opportunity is set aside for small businesses, with a NAICS code of 561210 Facilities Support Services and a $47 million size standard. Award will be made on a best value basis, with technical and price as the evaluation factors. Proposal submissions are due by June 12, 2024.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Crane Army Ammunition Activity |
| Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments |
| Contract Number: W52P1J-24-Q-MESS |
| Contractor Name: | Contractor Name | Denotes Contractor Fill In | |
| Proposal Version: | Date | FFP | Firm Fixed Price |
| Proposal Date: | Version | T&M | Time and Materials |
| NSP | Not Separetly Priced |
| CLIN # | Type | CLIN Description | Base Year | Note that quarterly maintenance is expected to be performed four times per year, therefore the Total Quarterly Maintenance is multiplied by 4 when coming from the Base Year sheet to the Summary. Additionally, the Semi-Annual Maintenance is expected to be performed twice per year and the Total Semi-Annual Maintenance is multiplied by 2 when coming from the Base Year sheet to the Summary. |
| 0001 | FFP | Quarterly Preventative Maintenance | $ - 0 | |
| 0002 | FFP | Semi-Annual Preventative Maintenance | $ - 0 | |
| 0003 | FFP | Annual Preventative Maintenance | $ - 0 | |
| 0004 | T&M | Emergency Repair | ||
| 0005 | NSP | Contract Data Requirements List (CDRLs) | NSP | |
| 0006 | NSP | Contractor Acquired Property List (CAP) | NSP |
Total Evaluated Price: $ - 0
**For all T&M CLINS, please provide a breakdown of all labor categories that could be required to repair all equipment on Emergency Repairs Tab of the Equipment List.**
Base year
| Crane Army Ammunition Activity | Emergency Repairs | |||||||
| Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments | **Provide Labor Categories and Cost Per Hour associatd with Emergency Repairs tab in Equipment List. Add more rows, as needed. | |||||||
| W519TC-24-Q-MESS | Labor Category | Cost Per Hour | ||||||
| BASE YEAR | ||||||||
| Total | ||||||||
| Quantity | Total | |||||||
| Hours | Labor | |||||||
| Rate | Total | |||||||
| PM - Quarterly (for ONE quarter) | ||||||||
| Lathe | 1 | $ - 0 | ||||||
| Robot | 1 | $ - 0 | ||||||
| Tail & Nose Arc Cut Saw | 1 | $ - 0 | ||||||
| Linear Cut Sawing Machine | 1 | $ - 0 | ||||||
| Powder Elevator | 1 | $ - 0 | ||||||
| Materials Quarterly Preventative Maintenance | - | - | - | |||||
| Total Quarterly Maintenace | $ - 0 | |||||||
| PM - Semi-Annual (for ONE semi-annual period) | ||||||||
| Robomill | 4 | $ - 0 | ||||||
| Lathe | 1 | $ - 0 | ||||||
| Robot | 1 | $ - 0 | ||||||
| Tail & Nose Arc Cut Saw | 1 | $ - 0 | ||||||
| Powder Elevator | 1 | $ - 0 | ||||||
| CNC Lathe | 8 | $ - 0 | ||||||
| Strippit Punch Press | 1 | $ - 0 | ||||||
| CNC Mill | 7 | $ - 0 | ||||||
| Waterjet | 2 | $ - 0 | ||||||
| CNC Fiber Laser | 1 | $ - 0 | ||||||
| Shear | 1 | $ - 0 | ||||||
| Finishing Machine | 1 | $ - 0 | ||||||
| Horizontal Saw | 1 | $ - 0 | ||||||
| Vertical Bandsaw | 2 | $ - 0 | ||||||
| Vertical Saw | 2 | $ - 0 | ||||||
| Circular Saw | 1 | $ - 0 | ||||||
| Laser Cutting Machine | 1 | $ - 0 | ||||||
| Burr Master Tube Deburring Machine | 1 | $ - 0 | ||||||
| Heat Treat Oven | 1 | $ - 0 | ||||||
| Electric Furnace | 1 | $ - 0 | ||||||
| Robotic Welder | 1 | $ - 0 | ||||||
| Conventional Lathe | 2 | $ - 0 | ||||||
| Surface Grinder | 3 | $ - 0 | ||||||
| Power Press | 3 | $ - 0 | ||||||
| Wire EDM | 1 | $ - 0 | ||||||
| Materials Semi-Annual Preventative Maintenance | - | - | - | |||||
| Total Semi-Annual Maintenance | $ - 0 | |||||||
| PM - Annual | ||||||||
| Magneformer | 2 | $ - 0 | ||||||
| Lathe | 1 | $ - 0 | ||||||
| Robot | 1 | $ - 0 | ||||||
| Tail & Nose Arc Cut Saw | 1 | $ - 0 | ||||||
| Linear Cut Sawing Machine | 1 | $ - 0 | ||||||
| Waterjet Robot | 1 | $ - 0 | ||||||
| CNC Lathe | 8 | $ - 0 | ||||||
| Strippit Punch Press | 1 | $ - 0 | ||||||
| CNC Mills | 7 | $ - 0 | ||||||
| Waterjet | 2 | $ - 0 | ||||||
| Waterjet Intensifier | 1 | $ - 0 | ||||||
| CNC Fiber Laser | 1 | $ - 0 | ||||||
| Shear | 1 | $ - 0 | ||||||
| Press Brake | 1 | $ - 0 | ||||||
| Finishing Machine | 1 | $ - 0 | ||||||
| Hydraulic Press | 2 | $ - 0 | ||||||
| Vertical Bandsaw | 3 | $ - 0 | ||||||
| Circular Saw | 3 | $ - 0 | ||||||
| Vertical Saw | 1 | $ - 0 | ||||||
| Burr Master Tube Deburring Machine | 1 | $ - 0 | ||||||
| Heat Treat Oven | 1 | $ - 0 | ||||||
| Electric Furnace | 1 | $ - 0 | ||||||
| Furnace Box | 1 | $ - 0 | ||||||
| Robotic Welder | 1 | $ - 0 | ||||||
| Conventional Lathe | 2 | $ - 0 | ||||||
| Surface Grinder | 3 | $ - 0 | ||||||
| Power Press | 1 | $ - 0 | ||||||
| Wire EDM | 1 | $ - 0 | ||||||
| Drill Press | 2 | $ - 0 | ||||||
| Hydraulic Draw Press | 1 | $ - 0 | ||||||
| Materials Annual Preventative Maintenance | - | - | - | |||||
| Total Annual Maintenance | $ - 0 |
Base Year Preventative Maintenance Total $ - 0
File details come from the government source that posted it. Updated .